s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy...

125
WELL COMPLETION REPORT DAANDINE-27T PL 230 AUTHORS: MEGAN NIGHTINGALE GEOLOGIST

Transcript of s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy...

Page 1: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

WELL COMPLETION REPORT

DAANDINE-27TPL 230

AUTHORS: MEGAN NIGHTINGALEGEOLOGIST

Page 2: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

Daandine-27T – Well Completion Report Arrow Energy Ltd

1

1. WELL DATA CARD

Daandine-27T

GENERAL DATA

Location Latitude 27°05’28.61”SLongitude 150°55’18.61”EEasting 293 954.78ENorthing 7 001 752.30NZone 56Datum GDA-94

Elevation GL 350.10mKB NA

TD 500mFinal Completion Interval NAWell Type ProductionStatus ProducingSpud Date 25/04/2009TD Date 18/05/2009Rig Release Date 24/05/2009Drilling Contractor Lucas MitchellRig Type and Number Lucas Mitchell 91

LITHOSTRATIGRAPHIC UNITS

Formation Tops

Depth From (m)

Thickness (m)

Elevation (m SS) Net Coal

Alluvium 0 20 350.10 0Springbok 20 68 330.10 0

Kogan 88 55 262.10 3.4Macalister 143 50 207.10 6.4

Wambo 193 46 157.10 5.9Iona 239 29 111.10 0.4

Argyle 268 55 82.10 4.1Taroom 323 146 27.10 11.5

Eurombah 469 31 -118.90 0TD 500 - -149.90 -

Page 3: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

Daandine-27T – Well Completion Report Arrow Energy Ltd

2

HOLE SIZE

Interval (from/to) (m)

Hole Size Bit Type Casing Type

0.00-6.00 431.8mm Auger Conductor6.00-64.00 311.15mm PDC Surface

64.00-329.00 250.83mm PDC Intermediate329.00-500.00 200.3mm PDC Production

CASING

Interval (from/to)

(m)

ID(mm)

OD(mm)

APIGrade CPL Weight

(kg/m) Casing Type

0.00-6.00 342.9 355.6 - N/A 55.11 Conductor0.00-61.43 260.35 273.1 5LB Welded 42.09 Surface

0.00-326.25 206.4 219.1 Welded 33.57 Intermediate

300.26-500.00 155.6 168.3 5LB Threaded 25.55 Production

CASING ANNULUS

Interval (from/to)

(m)

Type Quantity of

cement (kg)

Grout Volume

(L)

SG H2O(L/kg bag)

Chase Water Volume

(L)0.00-6.00 Steel - - - 25L/40kg -0.00-61.43 Steel 3320 3211 1.75 25L/40kg 2735

0.00-326.25 Steel 7680 7463 1.72 25L/40kg 10564

300.26-500.00 Steel N/A N/A N/A 25L/40kg N/A

WIRELINE LOGS

LOG INTERVAL (from/to) mGamma, Density, Caliper 0.00-478.90

Neutron,Resistivity, Deviation

318.00-479.70

Page 4: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

Daandine-27T – Well Completion Report Arrow Energy Ltd

3

TABLE OF CONTENTS

1. WELL DATA CARD...................................................................................12. SUMMARY.................................................................................................43. WELL HISTORY........................................................................................5

3. a. BASIC WELL INFORMATION............................................................53. b. PARTICIPANTS AND CONTRACTORS............................................83. c. DRILLING DETAILS............................................................................9

4. GEOLOGY...............................................................................................114. a. GEOLOGICAL SETTING..................................................................114. b. STRATIGRAPHY..............................................................................14

5. REFERENCES.........................................................................................15

LIST OF FIGURES

Figure 1: Location map of Daandine-27T PL230...........................................6Figure 2: Tectonic Setting of the Surat Basin.................................................7Figure 3: Daandine-27T Time Depth Chart..................................................10Figure 4: Clarence-Moreton Basin Stratigraphic Section.............................13

LIST OF APPENDICES

APPENDIX 1: Chip LogAPPENDIX 2: Wellsite Daily ReportsAPPENDIX 3: Well Location SurveyAPPENDIX 4: Wireline Logs (IMAGES)APPENDIX 5: Wireline Logs (LAS FILES)

Page 5: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

Daandine-27T – Well Completion Report Arrow Energy Ltd

4

2. SUMMARY

Daandine-27T was drilled by Arrow Energy Ltd through April and May 2009 to a total depth of 500m in PL230 as a Production Hole.

It spuded on 25/04/2009 where upon conductor was set to 6m. Then a 311.15mm section was drilled to 64.00m where surface casing was set with cement and chase water. A 250.83mm section was then drilled from 64.00m to 329.00m. Intermediate casing was set from 0.00m to 326.25m with cement and chase water. After a successful BOP/casing test was conducted, the Production Zone was drilled from 329.00m to 500m where casing was placed from 300.26m to TD (500.00m).

A total coal thickness of 31.7m was recorded while a net production coal thickness of 11.5m was recorded. The entirety of the net total was obtained within the Walloon Coal Measures.

Page 6: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

Daandine-27T – Well Completion Report Arrow Energy Ltd

5

3. WELL HISTORY

3. a. BASIC WELL INFORMATION

Well Name and Number Daandine-27TPetroleum Tenure PL 230Location Latitude 27°05’28.61”S

Longitude 150°55’18.61”EEasting 293 954.78ENorthing 7 001 752.30NZone 56Datum GDA-94

Nearest Town DalbyNearest Wells Daandine-22

Daandine-26Mapsheet 1:100,000 DalbyElevation GL 350.10m

KB NATD 500.00Final Completion Interval Not ApplicableWell Type ProductionStatus ProducingSpud Date 25/04/2009TD Date 18/05/2009Rig Release Date 24/05/2009Drilling Contractor Lucas MitchellRig Type and Number Lucas Mitchell 91Operator Arrow Energy LtdTenure Holder Arrow (Daandine) Pty Ltd

Page 7: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

Figure 1: Location map of Daandine-27T in PL230.

Daandine-27T – Well Completion Report Arrow Energy Ltd

6

Page 8: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

Daandine-27T – Well Completion Report Arrow Energy Ltd

7

Figure 2: Tectonic Setting of the Surat Basin (after Nguyen and Dewhirst, 2002)

Page 9: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

Daandine-27T – Well Completion Report Arrow Energy Ltd

8

3. b. PARTICIPANTS AND CONTRACTORS

Tenure Holder:Arrow (Daandine) Pty Ltd Level 19, AM6042 - 60 Albert StreetBrisbane QLD 4000

JV Participants:Arrow (Daandine) Pty Ltd (70%) Level 19, AM6042-60 Albert StreetBrisbane QLD 4000

Shell CSG (Australia) Pty Ltd (30%) 8 Redfern RoadHawthorn East, VIC 3123

Operator:Arrow Energy Ltd Level 19, AM6042 - 60 Albert StreetBrisbane QLD 4000

Landholder:Wambo Cattle Company Ltd.

Drilling Contractor:Lucas Mitchell 23 Limestone StDarra, QLD 4076

Wireline Loggers:Coal Seam Wireline Unit 2/7 Pitino CrtOsbourne Park, WA 6017

Surveyors:Cottrell Cameron and Steen Pty Ltd 107 Miles Platting RoadEight Mile Plians, QLD 4113

Page 10: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

Daandine-27T – Well Completion Report Arrow Energy Ltd

9

3. c. DRILLING DETAILS

HOLE SIZE

Interval (from/to) (m) Hole Size Bit Type Casing Type

0.00-6.00 431.8mm Auger Conductor6.00-64.00 311.15mm PDC Surface

64.00-329.00 250.83mm PDC Intermediate329.00-500.00 200.3mm PDC Production

CASING

Interval (from/to)

(m)

ID(mm)

OD(mm)

APIGrade CPL Weight

(kg/m) Casing Type

0.00-6.00 342.9 355.6 - N/A 55.11 Conductor

0.00-61.43 260.35 273.1 5LB Welded 42.09 Surface

0.00-326.25 206.4 219.1 Welded 33.57 Intermediate

300.26-500.00 155.6 168.3 5LB Threaded 25.55 Production

CASING ANNULUS

Interval (from/to)

(m)

Type Quantity of

cement(kg)

Grout Volume

(L)

SG H2O(L/kg bag)

Chase Water Volume

(L)0.00-6.00 Steel - - - 25L/40kg -0.00-61.43 Steel 3320 3211 1.75 25L/40kg 2735

0.00-326.25 Steel 7680 7463 1.72 25L/40kg 10564

300.26-500.00 Steel N/A N/A N/A 25L/40kg N/A

Page 11: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

Drill to 64m with 12 ¼” PDC bit.Mechanical StandbyDaandine-27T Time Depth Curve

Days from Start of Operation0Drill to 329m with 9 7/8”100PDC bit

RIH and Cement 10 ¾” Surface casingDrill to TD 500m with 7 7/8” PDC bit

200 Rig Incident- Rig Standby

300

400

Mechanical Standby/Wet Weather Standby

500RIH & Cement 8 5/8” Intermediate casing.

Well completions

600

Figure 3: Daandine 27-T Time Depth Chart

Daandine-27T – Well Completion Report Arrow Energy Ltd

10

28262201816186420

Dep

th (m

)

Page 12: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

Daandine-27T – Well Completion Report Arrow Energy Ltd

1

4. GEOLOGY

4. a. GEOLOGICAL SETTING

The Surat Basin is a large intracratonic basin of Mesozoic age covering approximately 300,000km2 of southeastern Queensland and northern New South Wales. The basin forms part of the larger Great Australian Basin (Green at al, 1997), interfingering westward across the Nebine Ridge with the Eromanga Basin, and eastward across the Kumbarilla Ridge with the Clarence-Moreton Basin (Exon, 1976). Basin Blocks consisting of the Central West Fold Belt and the New England Fold Belt limit the basin to the south, while in the north the basin unconformably overlies Triassic and Permian sediments of the Bowen Basin.

The Surat Basin contains up to 2,500m of sedimentary rocks deposited during the later Triassic to Early Cretaceous periods (Figure 3). The succession in the basin consists of five fining-upwards sedimentary cycles dominated by fluvio-lacustrine deposits (Exon, 1976; Exon and Burger, 1981; Day et al, 1983). The lower part of each cycle typically comprises coarse-grained mature sandstone, grading up into more labile sandstone and siltstone, with mostly siltstone, mudstone and coal in the upper part. In the Cretaceous, inundation of the land through an increase in sea level led to deposition of predominantly coastal plain and shallow sediments in two cycles.

Structurally, the Surat Basin is relatively simple (Figure 2), with the area of maximum deposition in the Mimosa Syncline, which overlies the thickest Permian-Triassic rocks in the Taroom Trough of the underlying Bowen Basin (Day et al., 1983). Major faulting within the basin predominantly mirrors basinal boundary faults of the underlying Bowen Basin. There is substantial folding across the basin, which is due to compaction and draping, as well as some rejuvenation of older pre-Jurassic structures and faults. Formations outcrop along the northern erosional boundary and dip gently to the south and southwest at less than 5°.

A simplified stratigraphic section of the Surat Basin is shown in Figure 3. Basin fill started with the Precipice Sandstone, which was overlain by the more silty Evergreen Formation. A renewal of sedimentation laid down the Hutton Sandstone. Above these the Walloon Coal Measures were conformably deposited. Overlying the Walloon Coal Measures with a slight unconformity is the Springbok Sandstone (or Kumbarilla Beds further east). The springbok sandstone is overlain by the Westbourne Formation and Gubbermunda Sandstone. In the study area, the Surat Basin sequence is overlain by tertiary sediments and alluvial deposits.

The Walloon Coal Measures are usually shales, siltstones, and claystones, with fine to medium calcareous sandstones and greywackes. There is also a reasonable amount of coal present (Gould, 1968). Individual lithologies

Page 13: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

Daandine-27T – Well Completion Report Arrow Energy Ltd

1

usually form lenses that are only of limited lateral extent (Yago et al., 1994),

Page 14: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

Daandine-27T – Well Completion Report Arrow Energy Ltd

1

although sand bodies may be quite extensive and thick (up to 30m; Fielding, 1993). Coal bodies are generally sheet-like when viewed locally, but lenticular over wider areas (Yago & Fielding, 1996).

Where unweathered, the Walloon Coal Measures are usually light grey sandstones, siltstones and mudstones. Sandstones are generally fine to medium-grained, poorly-sorted and angular to subrounded. Finer-grained layers usually have a silky to soapy texture, and are poorly laminated. The mudrock units frequently contain nodular masses of siderite (Fielding, 1993).

The base of the Walloon Coal Measures is defined by the first significant coarse quartz sand of the Hutton Sandstone. This is usually indicated on wireline logs by a sharp SP break, and a lesser gamma break.

Page 15: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

Daandine-27T – Well Completion Report Arrow Energy Ltd

1

Figure 3: Clarence-Moreton Basin Stratigraphic Section

Page 16: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

Daandine-27T – Well Completion Report Arrow Energy Ltd

1

4. b. STRATIGRAPHY

Formation Tops

Depth From (m)

Thickness (m)

Elevation (m SS) Net Coal

Alluvium 0 20 350.10 0Springbok 20 68 330.10 0

Kogan 88 55 262.10 3.4Macalister 143 50 207.10 6.4

Wambo 193 46 157.10 5.9Iona 239 29 111.10 0.4

Argyle 268 55 82.10 4.1Taroom 323 146 27.10 11.5

Eurombah 469 31 -118.90 0TD 500 - -149.90 -

WIRELINE LOGS

LOG INTERVAL (from/to) mGamma, Density,

Caliper 0.00-478.90

Neutron,Resistivity, Deviation

318.00-479.70

Page 17: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

Daandine-27T – Well Completion Report Arrow Energy Ltd

1

5. REFERENCES

DAY, R.W., WHITAKER, W.G., MURRAY, C.G., WILSON, I.H., & GRIMES,K.G., 1983. Queensland Geology. Geological Survey of Queensland Publication, 383

EXON, N.F., 1976. Geology of the Surat Basin, Queensland. Bureau of Mineral Resources, Geology and Geophysics, 166.

EXON, N.F. AND BURGER, D., 1981. Sedimentary cycles in the Surat Basin and global changes of sea level. BMR Journal of Australian Geology and Geophysics, Vol 6, pp. 153-159.

FIELDING, C. R., 1993. The Middle Jurassic Walloon Coal Measures in the type area, the Rosewood-Walloon coal field, southeast Queensland. Australian Coal Geology, 9: 4-16.

GOULD, R. E., 1968. The Walloon Coal Measures: a compilation.Queensland Government Mining Journal, 69: 509-515.

GREEN, P.M., HOFFMANN, K.L., BRAIN, T.J., & GRAY, A.R.G., 1997.Project aims and activities, exploration history and geological investigations in the Bowen and overlying Surat Basins, Queensland. In, GREEN, P.M. (ed.), The Surat and Bowen Basins, south-east Queensland. Queensland Minerals and Energy Review Series, Queensland Department of Mines and Energy, pp1-11.

McKELLAR, J.L., 1999. Late Early to Late Jurassic palynology, biostratigraphy and palaeogeography of the Roma Shelf area, northwestern Surat Basin, Queensland, Australia. Department of Geology and Mineralogy, University of Queensland, PhD thesis, (1-3).

NGUYEN, D.L., & DEWHIRST, N.H., 2002. ATP 471P, MNL Barker -1 , WellCompletion Report.

YAGO, J. V. R., FIELDING, C. R. and KASSAN, J., 1994. Depositional styles of channel & overbank deposits in the middle Jurassic Walloon Coal measures, Clarence-Moreton basin, NSW., Advances in the study of the Sydney Basin. Proceedings of the twenty eighth symposium.University of Newcastle, Newcastle.

YAGO, J. V. R. and FIELDING, C. R., 1996. Sedimentology of the middle Jurassic Walloon Coal Measures in the Great Artesian Basin, Eastern Australia, Mesozoic geology of the Eastern Australia Plate conference. Geological Society of Australia, Brisbane, Queensland,

Page 18: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

Daandine-27T – Well Completion Report Arrow Energy Ltd

1

pp. 574-575.

Page 19: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

APPENDIX 1 CHIP LOG

Page 20: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

Depth Lithology Description0 - 8.09m CLAY Clay/MDST - White, Red, Orange in colour8.09 - 13.942m CLAY CLAY/Weathered SST13.942 - 19.794m CLAY CLAY/Weathered SST19.794 - 24.5m SST Sand with Clay24.5 - 29.2m SST Sand with Clay29.2 - 34m MDST Mudstone34 - 38.7m MDST Mudstone with Sandstone38.7 - 43.4m SST Sandstone with minor Mudstone and Clay(Tuff?)43.4 - 48.1m SST Sandstone48.1 - 52.7m SST Sandstone with very minor coal, light pink + orange clay52.7 - 57.3m SST Sandstone with minor Coal57.3 - 62m SST Sandstone62 - 64m SST Coarse Sandstone with dark brown Mudstone64 - 66.6m SST Coarse Sandstone with dark brown Mudstone66.6 - 71.2m SST Coarse Sandstone71.2 - 75.8m SST Coarse Sandstone75.8 - 80.5m SST Coarse Sandstone80.5 - 85.2m SST Coarse Sandstone85.2 - 89.9m SST Coarse Sandstone with dark brown Mudstone89.9 - 94.6m SST Coarse Sandstone with dark brown Mudstone94.6 - 99.3m MDST Dark brown Mudstone with Coarse Sandstone99.3 - 104m MDST Dark brown Mudstone with Coarse Sandstone and Coal104 - 108.64m MDST Dark grey sandy mudstone with minor coal fragments and cream coloured laminated mustone with coal108.64 - 113.3m SST medium/fine grained sandstone with mudstone113.3 - 118.57m SST medium/fine grained sandstone with mudstone and coal118.57 - 123.8m COAL Coal with a dark grey sandy mudstone123.83 - 128.65m COAL Coal128.65 - 133.5m SST medium/fine grained light grey sandstone with minor coal fragments133.46 - 138.09m MDST Dark grey mudstone with light grey medium fine graianed sandstone138.09 - 142.72m MDST Dark grey mudstone with light grey medium fine graianed sandstone and minor coal fragments

Page 21: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

142.72 - 147.49m COAL Coal with minor silt and sandstone.147.49 - 152.26m COAL Coal with light grey/brown claystone152.26 - 157.08m MDST Dark grey mudstone/claystone with coal157.08 - 161.89m COAL Coal with light grey/brown claystone and minor sandstone161.89 - 166.76m MDST Mudstone with coal and minor claystone166.76 - 171.63m MDST Dark grey mudstone171.63 - 176.39m MDST Dark grey mudstone with silt and sandstone (traces of claystone)176.39 - 181.15m MDST Dark grey mudstone with light brown/cream coloured claystone181.15 - 185.95m SST Light grey medium granied sandstone with coal185.95 - 190.75m MDST Medium grained light grey sandstone, mudstone with minor coal fragments190.75 - 195.57m SST Llight grey medium sanstone with mudstone195.57 - 200.39m COAL Coal with light grey sandstone and traces of silt and claystone200.39 - 205.29m SST Dark grey muddy sandstone with minor coal fragments205.29 - 210.18m MDST Dark grey sandy mudstone210.18 - 215.04m MDST Dark grey sandy mudstone215.04 - 219.9m SST Medium grained light grey sandstone219.9 - 224.63m COAL Coal224.63 - 229.36m COAL Coal with minor traces of sandstone and mudstone229.36 - 234.2m MDST Grey/brown mudstone with coal234.2 - 239.05m MDST Grey/brown sandy mudstone with coal239.05 - 243.82m MDST Grey/brown sandy mudstone243.82 - 248.58m MDST Grey/brown sandy mudstone248.58 - 253.39m SST Light grey medium granied muddy sandstone with traces of siltstone253.39 - 258.2m MDST Grey/brown sandy mudstone with coal258.2 - 263.07m MDST Dark grey/light brown mudstone with coaland minor traces of siltstone263.07 - 267.93m MDST Dark grey/light brown mudstone with coal and minor traces of siltstone267.93 - 272.81m MDST Grey/brown sandy mudstone with coal272.81 - 277.68m COAL Coal with minor mudstone277.68 - 282.42m MDST Grey/brown mudstone with coal282.42 - 287.15m COAL Coal with minor mudstone287.15 - 292m SST Light grey medium grained sandstone with minor coal fragments

Page 22: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

292 - 296.85m COAL Coal with minor sandstone296.85 - 301.66m MDST Grey/brown mudstone, sandstone in part with minor coal fragments301.66 - 306.47m MDST Grey/brown mudstone, sandstone in part with minor coal fragments306.47 - 311.29m MDST Grey/brown mudstone, sandstone in part311.29 - 316.1m MDST Grey/brown mudstone, sandstone in part316.1 - 320.86m MDST Grey sandy mudstone320.86 - 325.61m SST Light grey sandstone, with mudstone and minor coal fragments325.61 - 330.5m SST Light grey sandstone, with mudstone and minor coal fragments330.5 - 335.4m SST Fine grey SST335.4 - 340.25m MDST Mix of MDST / SLTST340.25 - 345.11m MDST Mix of MDST / SLTST with coal345.11 - 349.99m MDST MDST / Claystone, some cardonated349.99 - 354.87m MDST MDST / Claystone, minor coal fragments354.87 - 359.7m MDST MDST359.7 - 364.53m CLAY Sandy white clay364.53 - 369.33m CLAY Sandy white clay369.33 - 374.14m MDST Dark MDST & coal374.14 - 378.97m MDST Mix of MDST / Claystone378.97 - 383.81m MDST Mix of MSDT / Claystone383.81 - 388.63m MDST Grey MDST388.63 - 393.45m CLAY Sandy white clay393.45 - 398.32m CLAY Sandy white clay / traces of coal398.32 - 403.2m CLAY Sandy white clay / minor coal fragments403.2 - 408.08m CLAY Sandy white clay408.08 - 412.97m CLAY Sandy white clay412.97 - 417.74m SST Light grey SST mixed with white clay417.74 - 422.51m SST Light grey SST mixed with white clay / minor coal fragments422.51 - 427.28m SST Fine light grey SST / minor coal fragments / MDST427.28 - 432.06m SST Fine light grey SST / coal432.06 - 436.96m SST Fine light grey SST / white clay / MDST436.96 - 441.85m SST Fine light grey SST / white clay / coal

Page 23: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

441.85 - 446.72m MDST Dark grey MDST / some carbonated446.72 - 451.59m MDST Dark grey MDST / some carbonated451.59 - 456.46m COAL Coal456.46 - 461.34m MDST Dark grey MDST mixed with fine grey SST461.34 - 466.17m SST Fine light grey SST mixed with white clay & grey MDST466.17 - 471m SST Fine light grey SST speckled with coal / white clay471 - 475.77m CLAY White clay with grey MDST475.77 - 480.55m SST Fine light grey SST480.55 - 485.36m SLTST siltstone d/g,et.sandstone,mudstone485.36 - 490.17m SLTST siltstone d/g,et.sandstone,mudstone490.17 - 495.02m SST sandstone l/g,with minor siltstone,carb-mudstone495.02 - 500m SLTST siltstone d/g,et.sandstone,mudstone

Page 24: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

APPENDIX 2 WELLSITE DAILY REPORTS

Page 25: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

Page 1

Daandine 27TSaturday, 25 April 2009

Weather

Fine

Well Rig

Latitude Longitude Elevation:

Current Depth Drilled From:

Daily Ops

Daandine 27T Current Formation: Daily Meterage:

Spud: Surf.

Csg:TD:

Logging: Rig Release:

Spirngbok Net Coal From Chip SamplesLucas 091 58.00 Daily Coal

27° 5' 27.87" S Cumulative150° 55' 19.98" E Operations HRS CUM

349.7 Drilling 3 364.00 PTD: 480 Underream 0 0

6.00 To: 64.00 Casing 0 0

Spud, Drill Surface zoneCementing 0 0Gravel pack 0 0Jetting 0 0

Last Safety Meeting: 25/04/2009 Days Since LTI: Conditioning 0.5 0.5Comments on

SafetyWOC 0 0Setup BOP 0 0

Bit Data Tripping rods

0.5 0.5

Bit # Size Type From To Hours Fluid Additives Surveys 0 01 8.5" Hammer 0hrs Air Standby 0 02 17" Auger 0.00 6.00 0hrs Air Water Production Tests3 12 1/4" PDC 6.00 64.00 3hrs Water Date Depth Rate4 9 7/8" PDC 0hrs Water KCL5 7 7/8" PDC 0hrs Water KCL6 13" Eccentric bit 0hrs Water7

U-Reamer 16" Mills 0hrs Water Deviation Surveys While DrillingCasing Depth Deviation Azimuth

From To Make ID OD Weight Grade LengthConductor: 0.00 6.00 Steel 13 1/2" 14 " 55.11kg/m Steel 6.00

Surface: Steel 10 1/4" 10 3/4" 42.09 kg/m API 5LB 0.00Intermediate Steel 8 1/8" 8 5/8" 33.57 kg/m API 5LB 0.00

Liner Steel 6 1/8" 6 5/8" 25.55 kg/m API 5LB 0.00Casing Cement / Gravel Pack Details

From To Type Volume SG Bags H2O p/bag Chase waterConductor: 0.00 6.00 Cement

Surface Csg. 0.00 CementIntermediate 0.00

Liner:Daily Activity Summary

From To Description6:00 14:00 Site set up-mechanical faults

14:00 17:00 Spud, Drill Surface zone17:00 17:30 Clean and Circulate well17:30 18:00 POOH18:000:000:00 Actual Underreamed Zones0:00 Interval # From To0:00 1: (0m)0:00 2: (0m)0:00 3: (0m)0:00 4: (0m)0:00 5: (0m)0:00 6: (0m)0:00 7: (0m)0:00 8: (0m)0:00 9: (0m)0:00 10: (0m)0:00 11: (0m)0:00 12: (0m)0:00 13: (0m)0:00 14: (0m)0:00 15: (0m)0:00 16: (0m)0:00 17: (0m)0:00 18: (0m)0:00 19: (0m)

BHA20: (0m)21: (0m)

General Comments

22: (0m)Total Underreamed (m): 0m

Cement Plugs

From To SGOperations for next 24hrs

Run casing, WOC, Drill out Cement plug, Drill Intermediate zone

PersonnelDrill Supervisor J.Allwood (0427 116 090) Les Friske (0417 636 929) Bent Ostegaard (0429 053 441)Geologist/TA G.Hokin / A.May , T/A's A.Rowbotham

Drill Crew Drillers: Offsiders:

Page 26: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

Page 1

Daandine 27TSunday, 26 April 2009

Weather

Fine

Well Rig

Latitude Longitude Elevation:

Current Depth Drilled From:

Daily Ops

Daandine 27T Current Formation: Daily Meterage:

Spud: Surf.

Csg:TD:

Logging: Rig Release:

Springbok Net Coal From Chip SamplesLucas 091 58.00 Daily Coal

27° 5' 27.87" S 25/04/2009 Cumulative150° 55' 19.98" E 26/04/2009 Operations HRS CUM

349.7 Drilling 0 364.00 PTD: 480 Underream 0 0

6.00 To: 64.00 Casing 1.75 1.75

Wiper Trip, Run 10 1/4" casing, cementCementing 0 0.25Gravel pack 0 0Jetting 0 0

Last Safety Meeting: 26/04/2009 Days Since LTI: Conditioning 1.25 1.75Comments on

SafetyWOC 0 4.25Setup BOP 0 0

Bit Data Tripping rods

2.25 2.75

Bit # Size Type From To Hours Fluid Additives Surveys 0 0.51 8.5" Hammer 0hrs Air Standby 0 02 17" Auger 0.00 6.00 0hrs Air Water Production Tests3 12 1/4" PDC 6.00 64.00 3hrs Water Date Depth Rate4 9 7/8" PDC 0hrs Water KCL5 7 7/8" PDC 0hrs Water KCL6 13" Eccentric bit 0hrs Water7

U-Reamer 16" Mills 0hrs Water Deviation Surveys While DrillingCasing Depth Deviation Azimuth

From To Make ID OD Weight Grade Length 64.00 89.8Conductor: 0.00 6.00 Steel 13 1/2" 14 " 55.11kg/m Steel 6.00

Surface: 0.00 61.43 Steel 10 1/4" 10 3/4" 42.09 kg/m API 5LB 61.43Intermediate Steel 8 1/8" 8 5/8" 33.57 kg/m API 5LB 0.00

Liner Steel 6 1/8" 6 5/8" 25.55 kg/m API 5LB 0.00Casing Cement / Gravel Pack Details

From To Type Volume SG Bags H2O p/bag Chase waterConductor: 0.00 6.00 Cement

Surface Csg. 0.00 61.43 Cement 3211 1.75 83 39.7 2735Intermediate 0.00

Liner:Daily Activity Summary

From To Description6:00 06:30 Toolbox meeting

06:30 07:00 Prestart checks07:00 07:30 Clean and Circulate well07:30 08:00 RIH for wiper Trip08:00 08:45 Clean and Circulate well-Waiting on toolpusher to get logging tool from another Rig08:45 09:15 Deviation Survey09:15 11:00 POOH to Run 10 3/4" Surface Casing Actual Underreamed Zones11:00 11:45 Set up to run Surface Casing, (JSEA) - Standby waiting to get in contact with wagners Interval # From To11:45 13:00 Run 10 3/4" Surface Casing 1: (0m)13:00 13:30 Lower Casing - Get Circulation 2: (0m)13:30 15:00 WOC to arrive 3: (0m)15:00 15:15 Poured Cement 4: (0m)15:15 18:00 WOC to dry 5: (0m)18:00 6: (0m)0:00 7: (0m)0:00 8: (0m)0:00 9: (0m)0:00 10: (0m)0:00 11: (0m)0:00 12: (0m)0:00 13: (0m)0:00 14: (0m)0:00 15: (0m)0:00 16: (0m)0:00 17: (0m)0:00 18: (0m)0:00 19: (0m)

BHA20: (0m)21: (0m)

General Comments

22: (0m)Total Underreamed (m): 0m

Cement Plugs

From To SGOperations for next 24hrs

Drill out Cement plug, Drill Intermediate zone

PersonnelDrill Supervisor J.Allwood (0427 116 090) Les Friske (0417 636 929) Bent Ostegaard (0429 053 441)Geologist/TA G.Hokin / A.May , T/A's A.Rowbotham

Drill Crew Drillers: David, Toolpusher: Lewis, Offsiders:Jimmy

Page 27: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

Page 1

Daandine 27TMonday, 27 April 2009

Weather

Fine

Well Rig

Latitude Longitude Elevation:

Current Depth Drilled From:

Daily Ops

Daandine 27T Current Formation: Daily Meterage:

Spud: Surf.

Csg:TD:

Logging: Rig Release:

Springbok Net Coal From Chip SamplesLucas 091 58.00 Daily Coal

27° 5' 27.87" S 25/04/2009 Cumulative150° 55' 19.98" E 26/04/2009 Operations HRS CUM

349.7 Drilling 0 364.00 PTD: 480 Underream 0 0

6.00 To: 64.00 Casing 0 1.75

Mechanical standbye, Set-up BOP, BOP Test, Mechanical standbyeCementing 0 0.25Gravel pack 0 0Jetting 0 0

Last Safety Meeting: 27/04/2009 Days Since LTI: Conditioning 0 1.75Comments on

SafetyWOC 0 4.25Setup BOP 2.25 2.25

Bit Data Tripping rods

1 3.75

Bit # Size Type From To Hours Fluid Additives Surveys 0 0.51 8.5" Hammer 0hrs Air Standby 0 02 17" Auger 0.00 6.00 0hrs Air Water Production Tests3 12 1/4" PDC 6.00 64.00 3hrs Water Date Depth Rate4 9 7/8" PDC 0hrs Water KCL5 7 7/8" PDC 0hrs Water KCL6 13" Eccentric bit 0hrs Water7

U-Reamer 16" Mills 0hrs Water Deviation Surveys While DrillingCasing Depth Deviation Azimuth

From To Make ID OD Weight Grade Length 64.00 0.2Conductor: 0.00 6.00 Steel 13 1/2" 14 " 55.11kg/m Steel 6.00

Surface: 0.00 61.43 Steel 10 1/4" 10 3/4" 42.09 kg/m API 5LB 61.43Intermediate Steel 8 1/8" 8 5/8" 33.57 kg/m API 5LB 0.00

Liner Steel 6 1/8" 6 5/8" 25.55 kg/m API 5LB 0.00Casing Cement / Gravel Pack Details

From To Type Volume SG Bags H2O p/bag Chase waterConductor: 0.00 6.00 Cement

Surface Csg. 0.00 61.43 Cement 3211 1.75 83 39.7 2735Intermediate 0.00

Liner:Daily Activity Summary

From To Description6:00 06:30 Toolbox - Prestart Checks

06:30 07:30 Mechanical - Rig07:30 09:30 Set up BOP09:30 15:00 Mechanical Standby - Rig would not start15:00 15:15 BOP test15:15 16:30 Mechanical Standby - Hydrolic lines on BOP?16:30 17:30 RIH to drill out cement plug Actual Underreamed Zones17:30 18:00 Complete JSEA for BOP set up Interval # From To18:00 1: (0m)0:00 2: (0m)0:00 3: (0m)0:00 4: (0m)0:00 5: (0m)0:00 6: (0m)0:00 7: (0m)0:00 8: (0m)0:00 9: (0m)0:00 10: (0m)0:00 11: (0m)0:00 12: (0m)0:00 13: (0m)0:00 14: (0m)0:00 15: (0m)0:00 16: (0m)0:00 17: (0m)0:00 18: (0m)0:00 19: (0m)

BHA20: (0m)21: (0m)

General Comments

22: (0m)Total Underreamed (m): 0m

Cement Plugs

From To SGOperations for next 24hrs

Drill intermediate zone, Run wiper trip, Run 8 5/8" Casing

PersonnelDrill Supervisor J.Allwood (0427 116 090) Les Friske (0417 636 929) Bent Ostegaard (0429 053 441)Geologist/TA G.Hokin / A.May , T/A's A.Rowbotham

Drill Crew Drillers: Dave Nolan, Toolpusher: Lewis Pepper, Offsiders:Jimmy, Troy, Marshal,

Page 28: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

Page 1

Daandine 27TTuesday, 28 April 2009

Weather

Fine

Well Rig

Latitude Longitude Elevation:

Current Depth Drilled From:

Daily Ops

Daandine 27T Current Formation: Daily Meterage:

Spud: Surf.

Csg:TD:

Logging: Rig Release:

Springbok Net Coal From Chip SamplesLucas 091 21.00 Daily Coal

27° 5' 27.87" S 25/04/2009 Cumulative150° 55' 19.98" E 26/04/2009 Operations HRS CUM

349.7 Drilling 3 685.00 PTD: 480 Underream 0 064.00 To: 85.00 Casing 0 1.75

Drill out Cement plug, Drill intermediate zone, DME on site, standby (review procedures)Cementing 0 0.25Gravel pack 0 0Jetting 0 0

Last Safety Meeting: 28/04/2009 Days Since LTI: Conditioning 0 1.75Comments on

SafetyWOC 0 4.25Setup BOP 0 2.25

Bit Data Tripping rods

0.75 4.5

Bit # Size Type From To Hours Fluid Additives Surveys 0 0.51 8.5" Hammer 0hrs Air Standby 1.25 1.252 17" Auger 0.00 6.00 0hrs Air Water Production Tests3 12 1/4" PDC 6.00 64.00 3hrs Water Date Depth Rate4 9 7/8" PDC 64.00 3hrs Water KCL5 7 7/8" PDC 0hrs Water KCL6 13" Eccentric bit 0hrs Water7

U-Reamer 16" Mills 0hrs Water Deviation Surveys While DrillingCasing Depth Deviation Azimuth

From To Make ID OD Weight Grade Length 64.00 89.8Conductor: 0.00 6.00 Steel 13 1/2" 14 " 55.11kg/m Steel 6.00

Surface: 0.00 61.43 Steel 10 1/4" 10 3/4" 42.09 kg/m API 5LB 61.43Intermediate Steel 8 1/8" 8 5/8" 33.57 kg/m API 5LB 0.00

Liner Steel 6 1/8" 6 5/8" 25.55 kg/m API 5LB 0.00Casing Cement / Gravel Pack Details

From To Type Volume SG Bags H2O p/bag Chase waterConductor: 0.00 6.00 Cement

Surface Csg. 0.00 61.43 Cement 3211 1.75 83 39.7 2735Intermediate 0.00

Liner:Daily Activity Summary

From To Description6:00 07:00 Toolbox meeting-Pre start checks

07:00 07:15 Tested safety relief valve on mudpump (passed)07:15 07:30 RIH to tag cement plug. Tagged @ 51m07:30 08:00 Drill out cement plug (51-64m)08:00 10:30 Drill Intermediate zone10:30 11:30 DME on site11:30 12:00 POOH to shoe Actual Underreamed Zones12:00 18:00 Mechanical Standby - Re-write Procedures Interval # From To18:00 1: (0m)0:00 2: (0m)0:00 3: (0m)0:00 4: (0m)0:00 5: (0m)0:00 6: (0m)0:00 7: (0m)0:00 8: (0m)0:00 9: (0m)0:00 10: (0m)0:00 11: (0m)0:00 12: (0m)0:00 13: (0m)0:00 14: (0m)0:00 15: (0m)0:00 16: (0m)0:00 17: (0m)0:00 18: (0m)0:00 19: (0m)

BHA20: (0m)21: (0m)

General Comments

Rig has been moved slightly, so the Surface zone Table height is 3.076m and the Intermediate zone Table height is 3.070m.

22: (0m)Total Underreamed (m): 0m

Cement Plugs

From To SGOperations for next 24hrs

Drill intermediate zone, Run wiper trip, Run 8 5/8" Casing

PersonnelDrill Supervisor J.Allwood (0427 116 090) Les Friske (0417 636 929) Bent Ostegaard (0429 053 441)Geologist/TA G.Hokin / A.May , T/A's A.Rowbotham, J.McKern

Drill Crew Drillers: Dave Nolan, Toolpusher: Lewis Pepper, Offsiders:Jimmy, Troy, Marshal,

Page 29: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

Page 1

Daandine 27TWednesday, 29 April 2009

Weather

Fine

Well Rig

Latitude Longitude Elevation:

Current Depth Drilled From:

Daily Ops

Daandine 27T Current Formation: Daily Meterage:

Spud: Surf.

Csg:TD:

Logging: Rig Release:

Springbok Net Coal From Chip SamplesLucas 091 40.00 Daily Coal

27° 5' 27.87" S 25/04/2009 Cumulative150° 55' 19.98" E 26/04/2009 Operations HRS CUM

349.7 Drilling 0 6104.00 PTD: 480 Underream 0 0

64.00 To: 104.00 Casing 0 1.75

Standby - review JSAsCementing 0 0.25Gravel pack 0 0Jetting 0 0

Last Safety Meeting: 29/04/2009 Days Since LTI: Conditioning 0 1.75Comments on

SafetyWOC 0 4.25Setup BOP 0 2.25

Bit Data Tripping rods 0 4.5Bit # Size Type From To Hours Fluid Additives Surveys 0 0.5

1 8.5" Hammer 0hrs Air Standby 0 02 17" Auger 0.00 6.00 0hrs Air Water Production Tests3 12 1/4" PDC 6.00 64.00 3hrs Water Date Depth Rate4 9 7/8" PDC 64.00 3hrs Water KCL5 7 7/8" PDC 0hrs Water KCL6 13" Eccentric bit 0hrs Water7

U-Reamer 16" Mills 0hrs Water Deviation Surveys While DrillingCasing Depth Deviation Azimuth

From To Make ID OD Weight Grade Length 64.00 89.8Conductor: 0.00 6.00 Steel 13 1/2" 14 " 55.11kg/m Steel 6.00

Surface: 0.00 61.43 Steel 10 1/4" 10 3/4" 42.09 kg/m API 5LB 61.43Intermediate Steel 8 1/8" 8 5/8" 33.57 kg/m API 5LB 0.00

Liner Steel 6 1/8" 6 5/8" 25.55 kg/m API 5LB 0.00Casing Cement / Gravel Pack Details

From To Type Volume SG Bags H2O p/bag Chase waterConductor: 0.00 6.00 Cement

Surface Csg. 0.00 61.43 Cement 3211 1.75 83 39.7 2735Intermediate 0.00

Liner:Daily Activity Summary

From To Description6:00 18:00 Standby, review procedures

18:000:000:000:000:000:00 Actual Underreamed Zones0:00 Interval # From To0:00 1: (0m)0:00 2: (0m)0:00 3: (0m)0:00 4: (0m)0:00 5: (0m)0:00 6: (0m)0:00 7: (0m)0:00 8: (0m)0:00 9: (0m)0:00 10: (0m)0:00 11: (0m)0:00 12: (0m)0:00 13: (0m)0:00 14: (0m)0:00 15: (0m)0:00 16: (0m)0:00 17: (0m)0:00 18: (0m)0:00 19: (0m)

BHA20: (0m)21: (0m)

General Comments

22: (0m)Total Underreamed (m): 0m

Cement Plugs

From To SGOperations for next 24hrs 51.0 64 1.75

Drill intermediate zone, Run wiper trip, Run 8 5/8" Casing

PersonnelDrill Supervisor J.Allwood (0427 116 090) Les Friske (0417 636 929) Bent Ostegaard (0429 053 441)Geologist/TA A.May , T/A's A.Rowbotham

Drill Crew Drillers: Dave Nolan, Toolpusher: Lewis Pepper, Offsiders:Jimmy, Troy, Marshal,

Page 30: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

Page 1

Daandine 27TThursday, 30 April 2009

Weather

Fine

Well Rig

Latitude Longitude Elevation:

Current Depth Drilled From:

Daily Ops

Daandine 27T Current Formation: Daily Meterage:

Spud: Surf.

Csg:TD:

Logging: Rig Release:

Springbok Net Coal From Chip SamplesLucas 091 40.00 Daily Coal

27° 5' 27.87" S 25/04/2009 Cumulative150° 55' 19.98" E 26/04/2009 Operations HRS CUM

349.7 Drilling 0 6104.00 PTD: 480 Underream 0 0

64.00 To: 104.00 Casing 0 1.75

Standby - review JSAsCementing 0 0.25Gravel pack 0 0Jetting 0 0

Last Safety Meeting: 30/04/2009 Days Since LTI: Conditioning 0 1.75Comments on

SafetyWOC 0 4.25Setup BOP 0 2.25

Bit Data Tripping rods 0 4.5Bit # Size Type From To Hours Fluid Additives Surveys 0 0.5

1 8.5" Hammer 0hrs Air Standby 0 02 17" Auger 0.00 6.00 0hrs Air Water Production Tests3 12 1/4" PDC 6.00 64.00 3hrs Water Date Depth Rate4 9 7/8" PDC 64.00 3hrs Water KCL5 7 7/8" PDC 0hrs Water KCL6 13" Eccentric bit 0hrs Water7

U-Reamer 16" Mills 0hrs Water Deviation Surveys While DrillingCasing Depth Deviation Azimuth

From To Make ID OD Weight Grade Length 64.00 89.8Conductor: 0.00 6.00 Steel 13 1/2" 14 " 55.11kg/m Steel 6.00

Surface: 0.00 61.43 Steel 10 1/4" 10 3/4" 42.09 kg/m API 5LB 61.43Intermediate Steel 8 1/8" 8 5/8" 33.57 kg/m API 5LB 0.00

Liner Steel 6 1/8" 6 5/8" 25.55 kg/m API 5LB 0.00Casing Cement / Gravel Pack Details

From To Type Volume SG Bags H2O p/bag Chase waterConductor: 0.00 6.00 Cement

Surface Csg. 0.00 61.43 Cement 3211 1.75 83 39.7 2735Intermediate 0.00

Liner:Daily Activity Summary

From To Description6:00 18:00 Standby, review procedures

18:000:000:000:000:000:00 Actual Underreamed Zones0:00 Interval # From To0:00 1: (0m)0:00 2: (0m)0:00 3: (0m)0:00 4: (0m)0:00 5: (0m)0:00 6: (0m)0:00 7: (0m)0:00 8: (0m)0:00 9: (0m)0:00 10: (0m)0:00 11: (0m)0:00 12: (0m)0:00 13: (0m)0:00 14: (0m)0:00 15: (0m)0:00 16: (0m)0:00 17: (0m)0:00 18: (0m)0:00 19: (0m)

BHA20: (0m)21: (0m)

General Comments

22: (0m)Total Underreamed (m): 0m

Cement Plugs

From To SGOperations for next 24hrs 51.0 64 1.75

Drill intermediate zone, Run wiper trip, Run 8 5/8" Casing

PersonnelDrill Supervisor J.Allwood (0427 116 090) Les Friske (0417 636 929) Bent Ostegaard (0429 053 441)Geologist/TA A.May , T/A's A.Rowbotham

Drill Crew Drillers: Dave Nolan, Toolpusher: Lewis Pepper, Offsiders:Jimmy, Troy, Marshal,

Page 31: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

Page 1

Daandine 27TFriday, 1 May 2009

Weather

Fine

Well Rig

Latitude Longitude Elevation:

Current Depth Drilled From:

Daily Ops

Daandine 27T Current Formation: Daily Meterage:

Spud: Surf.

Csg:TD:

Logging: Rig Release:

Kogan Net Coal From Chip SamplesLucas 091 40.00 Daily Coal

27° 5' 27.87" S 25/04/2009 Cumulative150° 55' 19.98" E 26/04/2009 Operations HRS CUM

349.7 Drilling 0 6104.00 PTD: 480 Underream 0 0

64.00 To: 104.00 Casing 0 1.75

Complete JSEAsCementing 0 0.25Gravel pack 0 0Jetting 0 0

Last Safety Meeting: 1/05/2009 Days Since LTI: Conditioning 0 1.75Comments on

SafetyWOC 0 4.25Setup BOP 0 2.25

Bit Data Tripping rods 0 4.5Bit # Size Type From To Hours Fluid Additives Surveys 0 0.5

1 8.5" Hammer 0hrs Air Standby 0 02 17" Auger 0.00 6.00 0hrs Air Water Production Tests3 12 1/4" PDC 6.00 64.00 3hrs Water Date Depth Rate4 9 7/8" PDC 64.00 3hrs Water KCL5 7 7/8" PDC 0hrs Water KCL6 13" Eccentric bit 0hrs Water7

U-Reamer 16" Mills 0hrs Water Deviation Surveys While DrillingCasing Depth Deviation Azimuth

From To Make ID OD Weight Grade Length 64.00 89.8Conductor: 0.00 6.00 Steel 13 1/2" 14 " 55.11kg/m Steel 6.00

Surface: 0.00 61.43 Steel 10 1/4" 10 3/4" 42.09 kg/m API 5LB 61.43Intermediate Steel 8 1/8" 8 5/8" 33.57 kg/m API 5LB 0.00

Liner Steel 6 1/8" 6 5/8" 25.55 kg/m API 5LB 0.00Casing Cement / Gravel Pack Details

From To Type Volume SG Bags H2O p/bag Chase waterConductor: 0.00 6.00 Cement

Surface Csg. 0.00 61.43 Cement 3211 1.75 83 39.7 2735Intermediate 0.00

Liner:Daily Activity Summary

From To Description6:00 18:00 Re-Write Procedures - JSEA's

18:000:000:000:000:000:00 Actual Underreamed Zones0:00 Interval # From To0:00 1: (0m)0:00 2: (0m)0:00 3: (0m)0:00 4: (0m)0:00 5: (0m)0:00 6: (0m)0:00 7: (0m)0:00 8: (0m)0:00 9: (0m)0:00 10: (0m)0:00 11: (0m)0:00 12: (0m)0:00 13: (0m)0:00 14: (0m)0:00 15: (0m)0:00 16: (0m)0:00 17: (0m)0:00 18: (0m)0:00 19: (0m)

BHA20: (0m)21: (0m)

General Comments

22: (0m)Total Underreamed (m): 0m

Cement Plugs

From To SGOperations for next 24hrs 51.0 64 1.75

Drill intermediate zone, Run wiper trip, Run 8 5/8" Casing

PersonnelDrill Supervisor J.Allwood (0427 116 090) Les Friske (0417 636 929) Bent Ostegaard (0429 053 441)Geologist/TA G.Hokin / A.May , T/A's A.Rowbotham, J.McKern

Drill Crew Drillers: Dave Nolan, Toolpusher: Lewis Pepper, Offsiders:Jimmy, Troy, Marshal,

Page 32: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

Page 1

Daandine 27TSaturday, 2 May 2009

Weather

Fine/Cloudy

Well Rig

Latitude Longitude Elevation:

Current Depth Drilled From:

Daily Ops

Daandine 27T Current Formation: Daily Meterage:

Spud: Surf.

Csg:TD:

Logging: Rig Release:

Kogan Net Coal From Chip SamplesLucas 091 154.20 Daily Coal

27° 5' 27.87" S 25/04/2009 Cumulative150° 55' 19.98" E 26/04/2009 Operations HRS CUM

349.7 Drilling 6.75 12.75258.20 PTD: 480 Underream 0 0104.00 To: 258.20 Casing 0 1.75

Drill intermediate zone, mech. standby, drill intermed. Zone to 258.2mCementing 0 0.25Gravel pack 0 0Jetting 0 0

Last Safety Meeting: 2/05/2009 Days Since LTI: 10 Conditioning 0 1.75Comments on

SafetyWOC 0 4.25Setup BOP 0 2.25

Bit Data Tripping rods 1.5 6Bit # Size Type From To Hours Fluid Additives Surveys 0 1.5

1 8.5" Hammer 0hrs Air Standby 0 02 17" Auger 0.00 6.00 0hrs Air Water Production Tests3 12 1/4" PDC 6.00 64.00 3hrs Water Date Depth Rate4 9 7/8" PDC 64.00 9.75hrs Water KCL5 7 7/8" PDC 0hrs Water KCL6 13" Eccentric bit 0hrs Water7

U-Reamer 16" Mills 0hrs Water Deviation Surveys While DrillingCasing Depth Deviation Azimuth

From To Make ID OD Weight Grade Length 64.00 0.2Conductor: 0.00 6.00 Steel 13 1/2" 14 " 55.11kg/m Steel 6.00 133.46 0.3

Surface: 0.00 61.43 Steel 10 1/4" 10 3/4" 42.09 kg/m API 5LB 61.43 210.18 0.2Intermediate Steel 8 1/8" 8 5/8" 33.57 kg/m API 5LB 0.00

Liner Steel 6 1/8" 6 5/8" 25.55 kg/m API 5LB 0.00Casing Cement / Gravel Pack Details

From To Type Volume SG Bags H2O p/bag Chase waterConductor: 0.00 6.00 Cement

Surface Csg. 0.00 61.43 Cement 3211 1.75 83 39.7 2735Intermediate 0.00

Liner:Daily Activity Summary

From To Description6:00 06:30 BOP safety drill, evacuation drill

06:30 07:30 Pre-start checK, prepare to RIH to continue drilling inermediate zone, safety meeting07:30 08:00 RIH to 103.98m08:00 08:15 Drill intermediate zone to 134m for second deviation survey08:15 09:00 Mechanical standby - mudpump09:00 10:15 Continue to drill intermediate zone10:15 10:45 Deviation survey @ 133.46 - 89.7° Actual Underreamed Zones10:45 14:00 Continue to drill intermediate zone to 210.18m Interval # From To14:00 14:30 Deviation survey @ 210.18m - 89.8° 1: (0m)14:30 16:30 Continue to drill intermediate zone to 258.20m 2: (0m)16:30 17:30 Pull out of hole to approximately 85m for end of shift 3: (0m)17:30 18:00 final shut down 4: (0m)18:00 5: (0m)0:00 6: (0m)0:00 7: (0m)0:00 8: (0m)0:00 9: (0m)0:00 10: (0m)0:00 11: (0m)0:00 12: (0m)0:00 13: (0m)0:00 14: (0m)0:00 15: (0m)0:00 16: (0m)0:00 17: (0m)0:00 18: (0m)0:00 19: (0m)

BHA20: (0m)21: (0m)

General Comments

22: (0m)Total Underreamed (m): 0m

Cement Plugs

From To SGOperations for next 24hrs 51.0 64 1.75

Drill intermediate zone, Run wiper trip, Run 8 5/8" Casing

PersonnelDrill Supervisor Les Friske (0417 636 929)Geologist/TA A.May , T/A's T.King

Drill Crew Drillers: Dave Nolan, Toolpusher: Lewis Pepper, Offsiders:Jimmy, Troy, Marshal

Page 33: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

Page 1

Daandine 27TSunday, 3 May 2009

Weather

Fine/Cloudy

Well Rig

Latitude Longitude Elevation:

Current Depth Drilled From:

Daily Ops

Daandine 27T Current Formation: Daily Meterage:

Spud: Surf.

Csg:TD:

Logging: Rig Release:

Argyle Net Coal From Chip SamplesLucas 091 70.80 Daily Coal

27° 5' 27.87" S 25/04/2009 Cumulative150° 55' 19.98" E 26/04/2009 Operations HRS CUM

349.7 Drilling 2.75 15.5329.00 PTD: 480 Underream 0 0258.20 To: 329.00 Casing 0 1.75

Drill intermediate zone to 329.00m, circulate, survey, POOHCementing 0 0.25Gravel pack 0 0Jetting 0 0

Last Safety Meeting: 3/05/2009 Days Since LTI: 11 Conditioning 0.5 2.25Comments on

SafetyWOC 0 4.25Setup BOP 0 2.25

Bit Data Tripping rods 2.75 8.75Bit # Size Type From To Hours Fluid Additives Surveys 0 3.25

1 8.5" Hammer 0hrs Air Standby 0 02 17" Auger 0.00 6.00 0hrs Air Water Production Tests3 12 1/4" PDC 6.00 64.00 3hrs Water Date Depth Rate4 9 7/8" PDC 64.00 329.00 12.5hrs Water KCL5 7 7/8" PDC 0hrs Water KCL6 13" Eccentric bit 0hrs Water7

U-Reamer 16" Mills 0hrs Water Deviation Surveys While DrillingCasing Depth Deviation Azimuth

From To Make ID OD Weight Grade Length 64.00 0.2Conductor: 0.00 6.00 Steel 13 1/2" 14 " 55.11kg/m Steel 6.00 133.46 0.3

Surface: 0.00 61.43 Steel 10 1/4" 10 3/4" 42.09 kg/m API 5LB 61.43 210.18 0.2Intermediate Steel 8 1/8" 8 5/8" 33.57 kg/m API 5LB 0.00 267.93 0.1

Liner Steel 6 1/8" 6 5/8" 25.55 kg/m API 5LB 0.00 329.00 0.9Casing Cement / Gravel Pack Details

From To Type Volume SG Bags H2O p/bag Chase waterConductor: 0.00 6.00 Cement

Surface Csg. 0.00 61.43 Cement 3211 1.75 83 39.7 2735Intermediate 0.00

Liner:Daily Activity Summary

From To Description5:30 06:15 Toolbox meeting. Safety Meeting regarding running intermediate casing

06:15 09:30 Pre start check, mechanical standby- 'knock' in mud pump09:30 10:30 RIH to 253.39m to continue drilling intermediate zone first sample pipe 1610:30 11:15 Mechanical standby - attatching spiral tape to hoses on head11:15 11:30 Drill intermediate zone to 280m forsurvey11:30 12:15 Deviation survey @ 267.93 - testing different tool for confirmation12:15 14:45 Drill intermediate zone to 329m Actual Underreamed Zones14:45 15:15 Circulate Interval # From To15:15 16:15 Deviation survey @ 329.00m 1: (0m)16:15 18:00 Pull out of hole to surface casing 2: (0m)18:00 3: (0m)0:00 4: (0m)0:00 5: (0m)0:00 6: (0m)0:00 7: (0m)0:00 8: (0m)0:00 9: (0m)0:00 10: (0m)0:00 11: (0m)0:00 12: (0m)0:00 13: (0m)0:00 14: (0m)0:00 15: (0m)0:00 16: (0m)0:00 17: (0m)0:00 18: (0m)0:00 19: (0m)

BHA20: (0m)21: (0m)

General Comments

22: (0m)Total Underreamed (m): 0m

Cement Plugs

From To SGOperations for next 24hrs 51.0 64 1.75

Run wiper trip, Run 8 5/8" Casing,Cement

PersonnelDrill Supervisor Les Friske (0417 636 929)Geologist/TA G.Hokin / A.May , T/A's T.King

Drill Crew Drillers: Dave Nolan, Toolpusher: Lewis Pepper, Offsiders:Jimmy, Troy, Marshal

Page 34: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

Page 1

Daandine 27TMonday, 4 May 2009

Weather

Fine

Well Rig

Latitude Longitude Elevation:

Current Depth Drilled From:

Daily Ops

Daandine 27T Current Formation: Daily Meterage:

Spud: Surf.

Csg:TD:

Logging: Rig Release:

Taroom Net Coal From Chip SamplesLucas 091 0.00 Daily Coal

27° 5' 27.87" S 25/04/2009 Cumulative150° 55' 19.98" E 26/04/2009 Operations HRS CUM

349.7 Drilling 0 15.5329.00 PTD: 480 Underream 0 0329.00 To: 329.00 Casing 6.75 8.5

RIH for wiper trip, case, cementCementing 0 0.25Gravel pack 0 0Jetting 0 0

Last Safety Meeting: 4/05/2009 Days Since LTI: Conditioning 0.75 3Comments on

SafetyWOC 8.25 5.5Setup BOP 0.5 2.75

Bit Data Tripping rods 5 13.75Bit # Size Type From To Hours Fluid Additives Surveys 0 3.25

1 8.5" Hammer 0hrs Air Standby 0 02 17" Auger 0.00 6.00 0hrs Air Water Production Tests3 12 1/4" PDC 6.00 64.00 3hrs Water Date Depth Rate4 9 7/8" PDC 64.00 329.00 12.5hrs Water KCL5 7 7/8" PDC 0hrs Water KCL6 13" Eccentric bit 0hrs Water7

U-Reamer 16" Mills 0hrs Water Deviation Surveys While DrillingCasing Depth Deviation Azimuth

From To Make ID OD Weight Grade Length 64.00 89.8Conductor: 0.00 6.00 Steel 13 1/2" 14 " 55.11kg/m Steel 6.00 133.46 89.7

Surface: 0.00 61.43 Steel 10 1/4" 10 3/4" 42.09 kg/m API 5LB 61.43 210.18 89.8Intermediate 0.00 326.25 Steel 8 1/8" 8 5/8" 33.57 kg/m API 5LB 326.25 267.93 89.9

Liner Steel 6 1/8" 6 5/8" 25.55 kg/m API 5LB 0.00 329.00 89.1Casing Cement / Gravel Pack Details

From To Type Volume SG Bags H2O p/bag Chase waterConductor: 0.00 6.00 Cement

Surface Csg. 0.00 61.43 Cement 3211 1.75 83 39.7 2735Intermediate 0.00 326.25 Cement 7463 1.72 192 92.3 10564

Liner:Daily Activity Summary

From To Description5:30 06:15 Safety meeting, Pre-start check

06:15 07:45 RIH for wiper trip07:45 08:30 Clean and Circulate08:30 12:00 Pull out of hole to complete wiper trip12:00 12:15 Safety Meeting relating to running intermediate casing12:15 12:45 Remove BOP, flow line and riser12:45 17:30 Run intermediate casing to 326.25m Actual Underreamed Zones17:30 18:45 Wait on cement, Clean and circulate Interval # From To18:45 19:00 Pour cement - achieve returns @ 19:00 - 300 strokes 1: (0m)19:00 00:00 Wait on cement to dry - 06:00 5/5/09 2: (0m)00:00 3: (0m)0:00 4: (0m)0:00 5: (0m)0:00 6: (0m)0:00 7: (0m)0:00 8: (0m)0:00 9: (0m)0:00 10: (0m)0:00 11: (0m)0:00 12: (0m)0:00 13: (0m)0:00 14: (0m)0:00 15: (0m)0:00 16: (0m)0:00 17: (0m)0:00 18: (0m)0:00 19: (0m)

BHA20: (0m)21: (0m)

General Comments

While running in do complete the wiper trip, the loud knocking in the mud pump returned. Crew were still able to run in while attending to the mud pump. Boilermaker on site from 9:30 - 17:45

22: (0m)Total Underreamed (m): 0m

Cement Plugs

From To SGOperations for next 24hrs 51.0 64 1.75

Attatch BOP, flow line etc, RIH, CCIT test, Drill cement track, Drill production zone to 480m

PersonnelDrill Supervisor J.Allwood (0427 116 090) Les Friske (0417 636 929) Bent Ostegaard (0429 053 441)Geologist/TA G.Hokin / A.May , T/A's A.Rowbotham, J.McKern, T.King

Drill Crew Drillers: Dave Nolan, Toolpusher: Eric, Offsiders:Jimmy, Troy, Marshal,

Page 35: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

Page 1

Daandine 27TTuesday, 5 May 2009

Weather

Fine

Well Rig

Latitude Longitude Elevation:

Current Depth Drilled From:

Daily Ops

Daandine 27T Current Formation: Daily Meterage:

Spud: Surf.

Csg:TD:

Logging: Rig Release:

Tarooms Net Coal From Chip SamplesLucas 091 -329.00 Daily Coal

27° 5' 27.87" S 25/04/2009 Cumulative150° 55' 19.98" E 26/04/2009 Operations HRS CUM

349.7 Drilling 1 16.5329.00 PTD: 480 Underream 0 0329.00 To: Casing 0 8.5

Make up BHA, Run in hole,CCIT test, tag cement, drill cement track leaving 3m plug,Mechanical standbye

Cementing 0 0.25Gravel pack 0 0Jetting 0 0

Last Safety Meeting: 5/05/2009 Days Since LTI: Conditioning 0 3Comments on

SafetyWOC 0 5.5Setup BOP 2.25 5

Bit Data Tripping rods 4.5 18.25Bit # Size Type From To Hours Fluid Additives Surveys 0 3.25

1 8.5" Hammer 0hrs Air Standby 0 02 17" Auger 0.00 6.00 0hrs Air Water Production Tests3 12 1/4" PDC 6.00 64.00 3hrs Water Date Depth Rate4 9 7/8" PDC 64.00 329.00 12.5hrs Water KCL5 7 7/8" PDC 1hrs Water KCL6 13" Eccentric bit 0hrs Water7

U-Reamer 16" Mills 0hrs Water Deviation Surveys While DrillingCasing Depth Deviation Azimuth

From To Make ID OD Weight Grade Length 64.00 89.8Conductor: 0.00 6.00 Steel 13 1/2" 14 " 55.11kg/m Steel 6.00 133.46 89.7

Surface: 0.00 61.43 Steel 10 1/4" 10 3/4" 42.09 kg/m API 5LB 61.43 210.18 89.8Intermediate 0.00 326.25 Steel 8 1/8" 8 5/8" 33.57 kg/m API 5LB 326.25 267.93 89.9

Liner Steel 6 1/8" 6 5/8" 25.55 kg/m API 5LB 0.00 329.00 89.1Casing Cement / Gravel Pack Details

From To Type Volume SG Bags H2O p/bag Chase waterConductor: 0.00 6.00 Cement

Surface Csg. 0.00 61.43 Cement 3211 1.75 83 39.7 2735Intermediate 0.00 326.25 Cement 7463 1.72 192 92.3 10564

Liner:Daily Activity Summary

From To Description5:30 06:00 Safety meeting.

06:00 06:15 Pre-start checks.06:15 08:30 Set up BOP, flow line and riser.08:30 09:00 Lay out collars and prepare to prepare to make up BHA09:00 10:30 Make up BHA, run in hole to tag cement10:30 11:00 CCIT test - passed @ 750psi / 15 minutes11:00 13:30 Continue to run in hole Actual Underreamed Zones13:30 14:30 Drill out first 20m of cement (5m plug remaining) Interval # From To14:30 18:00 Mechanical Standbye:blown EX-Pump on accumulator:rigging up external pump to accumulator 1: (0m)18:00 2: (0m)0:00 3: (0m)0:00 4: (0m)0:00 5: (0m)0:00 6: (0m)0:00 7: (0m)0:00 8: (0m)0:00 9: (0m)0:00 10: (0m)0:00 11: (0m)0:00 12: (0m)0:00 13: (0m)0:00 14: (0m)0:00 15: (0m)0:00 16: (0m)0:00 17: (0m)0:00 18: (0m)0:00 19: (0m)

BHA20: (0m)21: (0m)

General Comments

Duration of the morning the accumulator broken down, which wont allow rig to do CCIT test, crew is attempting to fix it during run in etc. Lucas electricians on site from 13:00-14:30 : diagnose blown EX pump - rig up external air compressor to accumulator.

22: (0m)Total Underreamed (m): 0m

Cement Plugs

From To SGOperations for next 24hrs 51.0 64 1.75

Drill production zone to 480m, wiper trip, survey, under ream301.3

326.3 1.72

PersonnelDrill Supervisor J.Allwood (0427 116 090) Les Friske (0417 636 929) Bent Ostegaard (0429 053 441)Geologist/TA G.Hokin / A.May , T/A's A.Rowbotham, J.McKern, T.King

Drill Crew Drillers: Dave Nolan, Toolpusher: Eric, Offsiders:Jimmy, Troy, Marshal,

Page 36: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

Page 1

Daandine 27TSaturday, 9 May 2009

Weather

Fine with a slight westerly breeze.

Well Rig

Latitude Longitude Elevation:

Current Depth Drilled From:

Daily Ops

Daandine 27T Current Formation: Daily Meterage:

Spud: Surf.

Csg:TD:

Logging: Rig Release:

Tarooms Net Coal From Chip SamplesLucas 091 -329.00 Daily Coal

27° 5' 27.87" S 25/04/2009 Cumulative150° 55' 19.98" E 26/04/2009 Operations HRS CUM

349.7 Drilling 0 16.5329.00 PTD: 480 Underream 0 0329.00 To: Casing 0 8.5

Cementing 0 0.25Gravel pack 0 0Jetting 0 0

Last Safety Meeting: 9/05/2009 Days Since LTI: Conditioning 0 3Comments on

SafetySafety meeting bought up issues of dangers rigging down and general lack of knowledge on a new rig.

A staff member on a different lucas rig has his fingers crushed, emphasis on crush zones.WOC 0 5.5Setup BOP 0 5

Bit Data Tripping rods

0 21

Bit # Size Type From To Hours Fluid Additives Surveys 0 3.251 8.5" Hammer 0hrs Air Standby 12 122 17" Auger 0.00 6.00 0hrs Air Water Production Tests3 12 1/4" PDC 6.00 64.00 3hrs Water Date Depth Rate4 9 7/8" PDC 64.00 329.00 12.5hrs Water KCL5 7 7/8" PDC 1hrs Water KCL6 13" Eccentric bit 0hrs Water7

U-Reamer 16" Mills 0hrs Water Deviation Surveys While DrillingCasing Depth Deviation Azimuth

From To Make ID OD Weight Grade Length 64.00m 89.8°Conductor: 0.00 6.00 Steel 13 1/2" 14 " 55.11kg/m Steel 6.00 133.46m 89.7°

Surface: 0.00 61.43 Steel 10 1/4" 10 3/4" 42.09 kg/m API 5LB 61.43 210.18m 89.8°Intermediate 0.00 326.25 Steel 8 1/8" 8 5/8" 33.57 kg/m API 5LB 326.25 267.93m 89.9°

Liner Steel 6 1/8" 6 5/8" 25.55 kg/m API 5LB 0.00 329.00m 89.1°Casing Cement / Gravel Pack Details

From To Type Volume SG Bags H2O p/bag Chase waterConductor: 0.00 6.00 Cement

Surface Csg. 0.00 61.43 Cement 3211 1.75 83 39.7 2735Intermediate 0.00 326.25 Cement 7463 1.72 192 92.3 10564

Liner:Daily Activity Summary

From To Description6:00 18:00 Arrow open field day

18:000:000:000:000:000:00 Actual Underreamed Zones0:00 Interval # From To0:00 1: (0m)0:00 2: (0m)0:00 3: (0m)0:00 4: (0m)0:00 5: (0m)0:00 6: (0m)0:00 7: (0m)0:00 8: (0m)0:00 9: (0m)0:00 10: (0m)0:00 11: (0m)0:00 12: (0m)0:00 13: (0m)0:00 14: (0m)0:00 15: (0m)0:00 16: (0m)0:00 17: (0m)0:00 18: (0m)0:00 19: (0m)

BHA20: (0m)21: (0m)

General Comments

22: (0m)Total Underreamed (m): 0m

Cement Plugs

From To SGOperations for next 24hrs 51.0m 64.0m 1.75

301.25m 326.25m 1.72

PersonnelDrill Supervisor J.Allwood (0427 116 090) Les Friske (0417 636 929) Bent Ostegaard (0429 053 441)Geologist/TA G.Hokin / A.May , T/A Laird Selkirk

Drill Crew Drillers: Dave Nolan, Toolpusher: Eric Kennedy, Offsiders:Jimmy,Troy, Marshal, Matt, Bayden, Dave, Glen,Dave, Shane, Jason. Field Admin: Graeme McIntyre

Page 37: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

Page 1

Daandine 27TSunday, 10 May 2009

Weather

Fine with a slight westerly breeze.

Well Rig

Latitude Longitude Elevation:

Current Depth Drilled From:

Daily Ops

Daandine 27T Current Formation: Daily Meterage:

Spud: Surf.

Csg:TD:

Logging: Rig Release:

Tarooms Net Coal From Chip SamplesLucas 091 -329.00 Daily Coal

27° 5' 27.87" S 25/04/2009 Cumulative150° 55' 19.98" E 26/04/2009 Operations HRS CUM

349.7 Drilling 0 16.5329.00 PTD: 480 Underream 0 0329.00 To: Casing 0 8.5

Cementing 0 0.25Gravel pack 0 0Jetting 0 0

Last Safety Meeting: 10/05/2009 Days Since LTI: Conditioning 0 3Comments on

SafetySafety meeting bought up issues of dangers rigging down and general lack of knowledge on a new rig.

A staff member on a different lucas rig has his fingers crushed, emphasis on crush zones.WOC 0 5.5Setup BOP 0 5

Bit Data Tripping rods

0 21

Bit # Size Type From To Hours Fluid Additives Surveys 0 3.251 8.5" Hammer 0hrs Air Standby 12 122 17" Auger 0.00 6.00 0hrs Air Water Production Tests3 12 1/4" PDC 6.00 64.00 3hrs Water Date Depth Rate4 9 7/8" PDC 64.00 329.00 12.5hrs Water KCL5 7 7/8" PDC 1hrs Water KCL6 13" Eccentric bit 0hrs Water7

U-Reamer 16" Mills 0hrs Water Deviation Surveys While DrillingCasing Depth Deviation Azimuth

From To Make ID OD Weight Grade Length 64.00m 89.8°Conductor: 0.00 6.00 Steel 13 1/2" 14 " 55.11kg/m Steel 6.00 133.46m 89.7°

Surface: 0.00 61.43 Steel 10 1/4" 10 3/4" 42.09 kg/m API 5LB 61.43 210.18m 89.8°Intermediate 0.00 326.25 Steel 8 1/8" 8 5/8" 33.57 kg/m API 5LB 326.25 267.93m 89.9°

Liner Steel 6 1/8" 6 5/8" 25.55 kg/m API 5LB 0.00 329.00m 89.1°Casing Cement / Gravel Pack Details

From To Type Volume SG Bags H2O p/bag Chase waterConductor: 0.00 6.00 Cement

Surface Csg. 0.00 61.43 Cement 3211 1.75 83 39.7 2735Intermediate 0.00 326.25 Cement 7463 1.72 192 92.3 10564

Liner:Daily Activity Summary

From To Description6:00 Mobilize from Dalby to DD27T & tower up0:000:000:000:000:000:00 Actual Underreamed Zones0:00 Interval # From To0:00 1: (0m)0:00 2: (0m)0:00 3: (0m)0:00 4: (0m)0:00 5: (0m)0:00 6: (0m)0:00 7: (0m)0:00 8: (0m)0:00 9: (0m)0:00 10: (0m)0:00 11: (0m)0:00 12: (0m)0:00 13: (0m)0:00 14: (0m)0:00 15: (0m)0:00 16: (0m)0:00 17: (0m)0:00 18: (0m)0:00 19: (0m)

BHA20: (0m)21: (0m)

General Comments

22: (0m)Total Underreamed (m): 0m

Cement Plugs

From To SGOperations for next 24hrs 51.0m 64.0m 1.75

301.25m 326.25m 1.72

PersonnelDrill Supervisor J.Allwood (0427 116 090) Les Friske (0417 636 929) Bent Ostegaard (0429 053 441)Geologist/TA G.Hokin / A.May , T/A Laird Selkirk

Drill Crew Drillers: Dave Nolan, Toolpusher: Eric Kennedy, Offsiders:Jimmy,Troy, Marshal, Matt, Bayden, Dave, Glen,Dave, Shane, Jason. Field Admin: Graeme McIntyre

Page 38: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

Page 1

Daandine 27TTuesday, 12 May 2009

Weather

Fine

Well Rig

Latitude Longitude Elevation:

Current Depth Drilled From:

Daily Ops

Daandine 27T Current Formation: Daily Meterage:

Spud: Surf.

Csg:TD:

Logging: Rig Release:

Tarooms Net Coal From Chip SamplesLucas 091 -329.00 Daily Coal

27° 5' 27.87" S 25/04/2009 Cumulative150° 55' 19.98" E 26/04/2009 Operations HRS CUM

349.7 Drilling 0 16.5329.00 PTD: 480 Underream 0 0329.00 To: Casing 0 8.5

Fix up rig, make up 7 7/8" BHA / RIH, pressure testCementing 0 0.25Gravel pack 0 0Jetting 0 0

Last Safety Meeting: 12/05/2009 Days Since LTI: Conditioning 0 3Comments on

SafetySafety meeting bought up issues of dangers rigging down and general lack of knowledge on a new rig.

A staff member on a different lucas rig has his fingers crushed, emphasis on crush zones.WOC 0 5.5Setup BOP 0 5

Bit Data Tripping rods

0 25

Bit # Size Type From To Hours Fluid Additives Surveys 0 3.251 8.5" Hammer Air Standby 12 482 17" Auger 0.00 6.00 0.00 Air Water Production Tests3 12 1/4" PDC 6.00 64.00 0.00 Water Date Depth Rate4 9 7/8" PDC 64.00 329.00 0.00 Water KCL5 7 7/8" PDC 0.00 Water KCL6 13" Eccentric bit 0.00 Water7

U-Reamer 16" Mills 0.00 Water Deviation Surveys While DrillingCasing Depth Deviation Azimuth

From To Make ID OD Weight Grade Length 64.00m 89.8°Conductor: 0.00 6.00 Steel 13 1/2" 14 " 55.11kg/m Steel 6.00 133.46m 89.7°

Surface: 0.00 61.43 Steel 10 1/4" 10 3/4" 42.09 kg/m API 5LB 61.43 210.18m 89.8°Intermediate 0.00 326.25 Steel 8 1/8" 8 5/8" 33.57 kg/m API 5LB 326.25 267.93m 89.9°

Liner Steel 6 1/8" 6 5/8" 25.55 kg/m API 5LB 0.00 329.00m 89.1°Casing Cement / Gravel Pack Details

From To Type Volume SG Bags H2O p/bag Chase waterConductor: 0.00 6.00 Cement

Surface Csg. 0.00 61.43 Cement 3211 1.75 83 39.7 2735Intermediate 0.00 326.25 Cement 7463 1.72 192 92.3 10564

Liner:Daily Activity Summary

From To Description6:00 13:00 Mechanical Standby:- electronic problem with throttle / adjust the head in the derrick

13:00 17:00 Make up 7 7/8" BHA / RIH, tag cmt @ 321m17:00 17:15 Pressure test (7 days since last test) :- Failed first run / leaking around flange17:15 18:00 Pressure test :- 300psi - 5 mins / 800psi - 10 mins18:000:000:00 Actual Underreamed Zones0:00 Interval # From To0:00 1: (0m)0:00 2: (0m)0:00 3: (0m)0:00 4: (0m)0:00 5: (0m)0:00 6: (0m)0:00 7: (0m)0:00 8: (0m)0:00 9: (0m)0:00 10: (0m)0:00 11: (0m)0:00 12: (0m)0:00 13: (0m)0:00 14: (0m)0:00 15: (0m)0:00 16: (0m)0:00 17: (0m)0:00 18: (0m)0:00 19: (0m)

BHA Bit, Stab, DC1, Stab, DC2, DC3, DC4, DC5, DC6, DC7, DC8, DC9, X/O20: (0m)21: (0m)

General Comments

22: (0m)Total Underreamed (m): 0m

Cement Plugs

From To SGOperations for next 24hrs 51.0m 64.0m 1.75

Drill production zone, POOH, wiper if needed, log hole301.25m 326.25m 1.72

PersonnelDrill Supervisor J.Allwood (0427 116 090) Les Friske (0417 636 929) Bent Ostegaard (0429 053 441)Geologist/TA G.Hokin / A.May , T/A Laird Selkirk

Drill Crew Toolpusher: Eric Kennedy. Drillers: D Phillips & C Hall. Offsiders: N Drew, M Mcdonald, D Pasco, C McAlpine,S Hall, Z Agnew. Mechanic: J Dewes. Field Admin: Graeme McIntyre

Page 39: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

Page 1

Daandine 27TWednesday, 13 May 2009

Weather

Fine

Well Rig

Latitude Longitude Elevation:

Current Depth Drilled From:

Daily Ops

Daandine 27T Current Formation: Daily Meterage:

Spud: Surf/Int

Csg:TD:

Logging: Rig Release:

Tarooms Net Coal From Chip SamplesLucas 091 113.10 Daily Coal

27° 5' 27.87" S 25/04/2009 Cumulative150° 55' 19.98" E 26/04/09 4/05/2009 Operations HRS CUM

349.7 Drilling 0 21.75329.00 PTD: 480 Underream 0 0329.00 To: 442.10 Casing 0 8.5

Replace starter motor, drill cmt track, drill formationCementing 0 0.25Gravel pack 0 0Jetting 0 0

Last Safety Meeting: 13/05/2009 Days Since LTI: Conditioning 0 3.75Comments on

SafetyPipe handling system needs to be made safer & more efficient. If a complete function test was carried out on

the accumulator it would not meet requirments in regards to rebuilding pressure within 3 minutes.WOC 0 5.5Setup BOP 0 5.5

Bit Data Tripping rods

0 25

Bit # Size Type From To Hours Fluid Additives Surveys 0 41 8.5" Hammer Air Standby 12 482 17" Auger 0.00 6.00 0.00 Air Water Production Tests3 12 1/4" PDC 6.00 64.00 0.00 Water Date Depth Rate4 9 7/8" PDC 64.00 329.00 0.00 Water KCL5 7 7/8" PDC 329.00 442.10 0.00 Water KCL6 13" Eccentric bit 0.00 Water7

U-Reamer 16" Mills 0.00 Water Deviation Surveys While DrillingCasing Depth Deviation Azimuth

From To Make ID OD Weight Grade Length 64 89.8°Conductor: 0.00 6.00 Steel 13 1/2" 14 " 55.11kg/m Steel 6.00 133 89.7°

Surface: 0.00 61.43 Steel 10 1/4" 10 3/4" 42.09 kg/m API 5LB 61.43 210 89.8°Intermediate 0.00 326.25 Steel 8 1/8" 8 5/8" 33.57 kg/m API 5LB 326.25 267 89.9°

Liner Steel 6 1/8" 6 5/8" 25.55 kg/m API 5LB 0.00 329 89.1°Casing Cement / Gravel Pack Details 403 ?

From To Type Volume SG Bags H2O p/bag Chase waterConductor: 0.00 6.00 Cement

Surface Csg. 0.00 61.43 Cement 3211 1.75 83 39.7 2735Intermediate 0.00 326.25 Cement 7463 1.72 192 92.3 10564

Liner:Daily Activity Summary

From To Description6:00 6:30 Toolbox & prestarts6:30 7:00 Do up riser & blowie line on BOP7:00 11:15 Rig won't start - electric problems with starter motor

11:15 11:45 Drill cmt track11:45 14:45 Drill 7 7/8" hole from 329m to 403.16m14:45 15:00 Circ / cond15:00 15:45 Survey @ 403m - ? ( survey tool won't turn back on ) Actual Under reamed Zones15:45 17:30 Drill 7 7/8" hole from 403.16m to 442.10m Interval # From To17:30 18:00 Circ / cond - pull back 4 joints 1: (0m)18:00 2: (0m)0:00 3: (0m)0:00 4: (0m)0:00 5: (0m)0:00 6: (0m)0:00 7: (0m)0:00 8: (0m)0:00 9: (0m)0:00 10: (0m)0:00 11: (0m)0:00 12: (0m)0:00 13: (0m)0:00 14: (0m)0:00 15: (0m)0:00 16: (0m)0:00 17: (0m)0:00 18: (0m)0:00 19: (0m)

BHA Bit, Stab, DC1, Stab, DC2, DC3, DC4, DC5, DC6, DC7, DC8, DC9, X/O20: (0m)21: (0m)

General Comments

22: (0m)Total Under reamed (m): 0m

Cement Plugs

From To SGOperations for next 24hrs 51.0m 64.0m 1.75

Con't drilling, circ, pooh, wiper if neccesary, log hole301.25m 326.25m 1.72

PersonnelDrill Supervisor J.Allwood (0427 116 090) Les Friske (0417 636 929) Bent Ostegaard (0429 053 441)Geologist/TA Geologist: A.Mountford T/A Laird Selkirk

Drill Crew Toolpusher: Eric Kennedy. Drillers: D Phillips & C Hall. Offsiders: N Drew, M McDonald, D Pasco, C McAlpine,S Hall, Z Agnew. Mechanic: J Dewes. Field Admin: Graeme McIntyre

Page 40: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

Page 1

Daandine 27TThursday, 14 May 2009

Weather

Fine

Well Rig

Latitude Longitude Elevation:

Current Depth Drilled From:

Daily Ops

Daandine 27T Current Formation: Daily Meterage:

Spud: Surf/Int

Csg:TD:

Logging: Rig Release:

Eurombah Net Coal From Chip SamplesLucas 091 38.64 Daily Coal

27° 5' 27.87" S 25/04/2009 Cumulative150° 55' 19.98" E 26/04/09 4/05/2009 Operations HRS CUM

349.7 Drilling 0 23.75329.00 PTD: 480 14/05/2009 Underream 0 0442.10 To: 480.74 Casing 0 8.5

Con't to drill, POOH, log holeCementing 0 0.25Gravel pack 0 0Jetting 0 0

Last Safety Meeting: 14/05/2009 Days Since LTI: Conditioning 0 4.75Comments on

SafetyPipe handling system needs to be made safer & more efficient. If a complete function test was carried out on

the accumulator it would not meet requirments in regards to rebuilding pressure within 3 minutes.WOC 0 5.5Setup BOP 0 5.5

Bit Data Tripping rods

0 31

Bit # Size Type From To Hours Fluid Additives Surveys 0 41 8.5" Hammer Air Standby 12 482 17" Auger 0.00 6.00 0.00 Air Water Production Tests3 12 1/4" PDC 6.00 64.00 0.00 Water Date Depth Rate4 9 7/8" PDC 64.00 329.00 0.00 Water KCL5 7 7/8" PDC 329.00 480.74 0.00 Water KCL6 13" Eccentric bit 0.00 Water7

U-Reamer 16" Mills 0.00 Water Deviation Surveys While DrillingCasing Depth Deviation Azimuth

From To Make ID OD Weight Grade Length 64 89.8°Conductor: 0.00 6.00 Steel 13 1/2" 14 " 55.11kg/m Steel 6.00 133 89.7°

Surface: 0.00 61.43 Steel 10 1/4" 10 3/4" 42.09 kg/m API 5LB 61.43 210 89.8°Intermediate 0.00 326.25 Steel 8 1/8" 8 5/8" 33.57 kg/m API 5LB 326.25 267 89.9°

Liner Steel 6 1/8" 6 5/8" 25.55 kg/m API 5LB 0.00 329 89.1°Casing Cement / Gravel Pack Details 403 89o

From To Type Volume SG Bags H2O p/bag Chase waterConductor: 0.00 6.00 Cement

Surface Csg. 0.00 61.43 Cement 3211 1.75 83 39.7 2735Intermediate 0.00 326.25 Cement 7463 1.72 192 92.3 10564

Liner:Daily Activity Summary

From To Description6:00 6:15 Toolbox6:15 7:30 Mechanical standby :- rig & plant servicing / prestarts7:30 9:30 RIH, 4 joints / Drill 7 7/8" hole from 422.10m to 480.74m9:30 10:30 Circ / Cond

10:30 16:30 POOH to surface16:30 24:00 Run wireline logs / GR-SSD-LSD-Caliper / GR-Resitivity-Neutron-Deviation / Sonic

Actual Under reamed ZonesInterval # From To1: (0m)2: (0m)3: (0m)4: (0m)5: (0m)6: (0m)7: (0m)8: (0m)9: (0m)

10: (0m)11: (0m)12: (0m)13: (0m)14: (0m)15: (0m)16: (0m)17: (0m)18: (0m)19: (0m)

BHA Bit, Stab, DC1, Stab, DC2, DC3, DC4, DC5, DC6, DC7, DC8, DC9, X/O20: (0m)21: (0m)

General Comments

After viewing logs of the hole it has been decided that the hole should be deepened by 20m to allow a 40m sump. The drilling supervisor has been consulted and will advise the toolpusher to deepen the hole when they

conduct the wiper trip after under reaming.

22: (0m)Total Under reamed (m): 0m

Cement Plugs

From To SGOperations for next 24hrs 51.0m 64.0m 1.75

Under-ream301.25m 326.25m 1.72

PersonnelDrill Supervisor J.Allwood (0427 116 090) Bent Ostegaard (0429 053 441)Geologist/TA A.Mountford , T/A Laird Selkirk

Drill Crew Toolpusher: Eric Kennedy. Drillers: D Phillips & C Hall. Offsiders: N Drew, M McDonald, D Pasco, C McAlpine,S Hall, Z Agnew. Mechanic: J Dewes. Field Admin: Graeme McIntyre

Page 41: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

Page 1

Daandine 27TFriday, 15 May 2009

Weather

Fine

Well Rig

Latitude Longitude Elevation:

Current Depth Drilled From:

Daily Ops

Daandine 27T Current Formation: Daily Meterage:

Spud: Surf/Int

Csg:TD:

Logging: Rig Release:

Eurombah Net Coal From Chip SamplesLucas 091 0.00 Daily Coal

27° 5' 27.87" S 25/04/2009 Cumulative150° 55' 19.98" E 26/04/09 4/05/2009 Operations HRS CUM

349.7 Drilling 0 23.75329.00 PTD: 500 14/05/2009 Underream 0 4.25480.74 To: 480.74 Casing 0 8.5

underreamCementing 0 0.25Gravel pack 0 0Jetting 0 0

Last Safety Meeting: 15/05/2009 Days Since LTI: 23 Conditioning 0 4.75Comments on

Safety Running casingWOC 0 5.5Setup BOP 0 5.5

Bit Data Tripping rods

0 38.25

Bit # Size Type From To Hours Fluid Additives Surveys 0 41 8.5" Hammer Air Standby 12 482 17" Auger 0.00 6.00 0.00 Air Water Production Tests3 12 1/4" PDC 6.00 64.00 0.00 Water Date Depth Rate4 9 7/8" PDC 64.00 329.00 0.00 Water KCL5 7 7/8" PDC 329.00 480.74 0.00 Water KCL6 13" Eccentric bit 0.00 Water7

U-Reamer 16" Mills 0.00 Water Deviation Surveys While DrillingCasing Depth Deviation Azimuth

From To Make ID OD Weight Grade Length 64 0.2°Conductor: 0.00 6.00 Steel 13 1/2" 14 " 55.11kg/m Steel 6.00 133 0.3°

Surface: 0.00 61.43 Steel 10 1/4" 10 3/4" 42.09 kg/m API 5LB 61.43 210 0.2°Intermediate 0.00 326.25 Steel 8 1/8" 8 5/8" 33.57 kg/m API 5LB 326.25 267 0.1°

Liner Steel 6 1/8" 6 5/8" 25.55 kg/m API 5LB 0.00 329 0.9°Casing Cement / Gravel Pack Details 403 1.0°

From To Type Volume SG Bags H2O p/bag Chase waterConductor: 0.00 6.00 Cement

Surface Csg. 0.00 61.43 Cement 3211 1.75 83 39.7 2735Intermediate 0.00 326.25 Cement 7463 1.72 192 92.3 10564

Liner:Daily Activity Summary

From To Description6:00 6:15 Toolbox Meeting6:15 9:00 Set up for underreaming ( pre-start checks )9:00 13:15 RIH to fist underreaming zone

13:15 13:30 emergency evacuation drill13:30 13:45 RIH to fist underreaming zone13:45 18:00 underream18:00 Actual Under reamed Zones0:00 Interval # From To0:00 1: (0m)0:00 2: (0m)0:00 3: (0m)0:00 4: (0m)0:00 5: (0m)0:00 6: (0m)0:00 7: (0m)0:00 8: (0m)0:00 9: (0m)0:00 10: (0m)0:00 11: (0m)

12: (0m)13: (0m)14: (0m)15: (0m)16: (0m)17: (0m)18: (0m)19: (0m)

BHA Bit, Stab, DC1, Stab, DC2, DC3, DC4, DC5, DC6, DC7, DC8, DC9, X/O20: (0m)21: (0m)

General Comments

After viewing logs of the hole it has been decided that the hole should be deepened by 20m to allow a 40m sump. The drilling supervisor has been consulted and will advise the toolpusher to deepen the hole when they

conduct the wiper trip after under reaming.

22: (0m)Total Under reamed (m): 0m

Cement Plugs

From To SGOperations for next 24hrs 51.0m 64.0m 1.75

underream, Log hole 3arm Caliper301.25m 326.25m 1.72

PersonnelDrill Supervisor J.Allwood (0427 116 090) Bent Ostergaard (0429 053 441)Geologist/TA A.Mountford, A.May. T/A: Rick Lucas

Drill Crew Toolpusher:Lewis Pepper. Drillers: Dale Phillips & Craig Hall. Offsiders: N Drew, D Pasco, S. McAlpine, S. Hall,Z. Agnew,T.Jeffrey, Mechanic: John Dewes. Field Admin: Graeme McIntyre

Page 42: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

Page 1

Daandine 27TSaturday, 16 May 2009

Weather

Fine

Well Rig

Latitude Longitude Elevation:

Current Depth Drilled From:

Daily Ops

Daandine 27T Current Formation: Daily Meterage:

Spud: Surf/Int

Csg:TD:

Logging: Rig Release:

Eurombah Net Coal From Chip SamplesLucas 091 0.00 Daily Coal

27° 5' 27.87" S 25/04/2009 Cumulative150° 55' 19.98" E 26/04/09 4/05/2009 Operations HRS CUM

349.7 Drilling 0 23.75480.74 PTD: 500 14/05/2009 Underream 0 14480.74 To: 480.74 Casing 0 8.5

underreamCementing 0 0.25Gravel pack 0 0Jetting 0 0

Last Safety Meeting: 16/05/2009 Days Since LTI: Conditioning 0 4.75Comments on

Safety Rod HandleingWOC 0 5.5Setup BOP 0 5.5

Bit Data Tripping rods

0 39.75

Bit # Size Type From To Hours Fluid Additives Surveys 0 41 8.5" Hammer 0hrs Air Standby 12 482 17" Auger 0.00 6.00 0hrs Air Water Production Tests3 12 1/4" PDC 6.00 64.00 3hrs Water Date Depth Rate4 9 7/8" PDC 64.00 329.00 12.5hrs Water KCL5 7 7/8" PDC 329.00 480.74 8.25hrs Water KCL6 13" Eccentric bit 0hrs Water7

U-Reamer 16" Mills 345.00 466.00 14hrs Water Deviation Surveys While DrillingCasing Depth Deviation Azimuth

From To Make ID OD Weight Grade Length 64 0.2Conductor: 0.00 6.00 Steel 13 1/2" 14 " 55.11kg/m Steel 6.00 133 0.3

Surface: 0.00 61.43 Steel 10 1/4" 10 3/4" 42.09 kg/m API 5LB 61.43 210 0.2Intermediate 0.00 326.25 Steel 8 1/8" 8 5/8" 33.57 kg/m API 5LB 326.25 267 0.1

Liner Steel 6 1/8" 6 5/8" 25.55 kg/m API 5LB 0.00 329 0.9Casing Cement / Gravel Pack Details 403 1

From To Type Volume SG Bags H2O p/bag Chase water 480 1.6Conductor: 0.00 6.00 Cement

Surface Csg. 0.00 61.43 Cement 3211 1.75 83 39.7 2735Intermediate 0.00 326.25 Cement 7463 1.72 192 92.3 10564

Liner:Daily Activity Summary

From To Description6:00 6:15 Toolbox Meeting6:15 6:45 Pre-start checks ( rig service )6:45 7:45 RIH ( run back in hole to continue underreaming )7:45 17:30 underream

17:30 18:00 POOH to joint # 2318:000:00 Actual Under reamed Zones0:00 Interval # From To0:00 1: (0m)0:00 2: (0m)0:00 3: (0m)0:00 4: (0m)0:00 5: (0m)0:00 6: (0m)0:00 7: (0m)0:00 8: (0m)0:00 9: (0m)0:00 10: (0m)0:00 11: (0m)

12: (0m)13: (0m)14: (0m)15: (0m)16: (0m)17: (0m)18: (0m)19: (0m)

BHA Bit, Stab, DC1, Stab, DC2, DC3, DC4, DC5, DC6, DC7, DC8, DC9, X/O20: (0m)21: (0m)

General Comments

After viewing logs of the hole it has been decided that the hole should be deepened by 20m to allow a 40m sump. The drilling supervisor has been consulted and will advise the toolpusher to deepen the hole when they

conduct the wiper trip after under reaming.

22: (0m)Total Under reamed (m): 0m

Cement Plugs

From To SGOperations for next 24hrs 51.0m 64.0m 1.75

underream, Log hole 3arm Caliper301.25m 326.25m 1.72

PersonnelDrill Supervisor J.Allwood (0427 116 090) Bent Ostergaard (0429 053 441)Geologist/TA A.Mountford, A.May. T/A: Rick Lucas

Drill Crew Toolpusher:Lewis Pepper. Drillers: Dale Phillips & Craig Hall. Offsiders: N Drew, D Pasco, S. McAlpine, S. Hall,Z. Agnew,T.Jeffrey, Mechanic: John Dewes. Field Admin: Graeme McIntyre

Page 43: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

Page 1

Daandine 27TSunday, 17 May 2009

Weather

Fine

Well Rig

Latitude Longitude Elevation:

Current Depth Drilled From:

Daily Ops

Daandine 27T Current Formation: Daily Meterage:

Spud: Surf/Int

Csg:TD:

Logging: Rig Release:

Eurombah Net Coal From Chip SamplesLucas 091 0.00 Daily Coal

27° 5' 27.87" S 25/04/2009 Cumulative150° 55' 19.98" E 26/04/09 4/05/2009 Operations HRS CUM

349.7 Drilling 0 23.75480.74 PTD: 500 14/05/2009 17/05/09 Underream 0 16.75480.74 To: 480.74 Casing 0 8.5

underream, Log hole 3arm Caliper, Make up BHA to drill extra 20mCementing 0 0.25Gravel pack 0 0Jetting 0 0

Last Safety Meeting: 17/05/2009 Days Since LTI: Conditioning 0 4.75Comments on

Safety Rod HandelingWOC 0 5.5Setup BOP 0 5.5

Bit Data Tripping rods

0 46

Bit # Size Type From To Hours Fluid Additives Surveys 0 41 8.5" Hammer 0hrs Air Standby 12 482 17" Auger 0.00 6.00 0hrs Air Water Production Tests3 12 1/4" PDC 6.00 64.00 3hrs Water Date Depth Rate4 9 7/8" PDC 64.00 329.00 12.5hrs Water KCL5 7 7/8" PDC 329.00 480.74 8.25hrs Water KCL6 13" Eccentric bit 0hrs Water7

U-Reamer 16" Mills 337.20 467.00 16.75hrs Water Deviation Surveys While DrillingCasing Depth Deviation Azimuth

From To Make ID OD Weight Grade Length 64 0.2Conductor: 0.00 6.00 Steel 13 1/2" 14 " 55.11kg/m Steel 6.00 133 0.3

Surface: 0.00 61.43 Steel 10 1/4" 10 3/4" 42.09 kg/m API 5LB 61.43 210 0.2Intermediate 0.00 326.25 Steel 8 1/8" 8 5/8" 33.57 kg/m API 5LB 326.25 267 0.1

Liner Steel 6 1/8" 6 5/8" 25.55 kg/m API 5LB 0.00 329 0.9Casing Cement / Gravel Pack Details 403 1

From To Type Volume SG Bags H2O p/bag Chase water 480 1.6Conductor: 0.00 6.00 Cement

Surface Csg. 0.00 61.43 Cement 3211 1.75 83 39.7 2735Intermediate 0.00 326.25 Cement 7463 1.72 192 92.3 10564

Liner:Daily Activity Summary

From To Description6:00 6:15 Toolbox Meeting6:15 6:45 Pre-start checks6:45 7:15 RIH ( run back in hole to continue underreaming )7:15 10:00 underream

10:00 14:15 POOH14:15 16:30 Log hole ( 3 ARM Caliper )16:30 18:00 Make up BHA to drill extra 20mts Actual Under reamed Zones18:00 Interval # From To0:00 1: (1.4m) 337.2 338.60:00 2: (2.7m) 339.9 342.60:00 3: (1m) 343.8 344.80:00 4: (1.2m) 344.9 346.10:00 5: (1.4m) 350.1 351.50:00 6: (1.8m) 369.1 370.90:00 7: (1.3m) 386.0 387.30:00 8: (4.5m) 437.7 442.20:00 9: (1.2m) 452.7 453.90:00 10: (2.1m) 454.9 457.00:00 11: (1.3m) 465.7 467.0

12: (0m)13: (0m)14: (0m)15: (0m)16: (0m)17: (0m)18: (0m)19: (0m)

BHA Bit, Stab, DC1, Stab, DC2, DC3, DC4, DC5, DC6, DC7, DC8, DC9, X/O20: (0m)21: (0m)

General Comments

22: (0m)Total Under reamed (m): 19.9m

Cement Plugs

From To SGOperations for next 24hrs 51.0m 64.0m 1.75

RIH,Drill extra 20m,Clean out hole,Run production Liner301.25m 326.25m 1.72

PersonnelDrill Supervisor J.Allwood (0427 116 090) Bent Ostergaard (0429 053 441)Geologist/TA A.Mountford, A.May. T/A: Rick Lucas

Drill Crew Toolpusher:Lewis Pepper. Drillers: Dale Phillips & Craig Hall. Offsiders: N Drew, D Pasco, S. McAlpine, S. Hall,Z. Agnew,T.Jeffrey, Mechanic: John Dewes. Field Admin: Graeme McIntyre

Page 44: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

Page 1

Daandine 27TMonday, 18 May 2009

Weather

overcast with the odd shower

Well Rig

Latitude Longitude Elevation:

Current Depth Drilled From:

Daily Ops

Daandine 27T Current Formation: Daily Meterage:

Spud: Surf/Int

Csg:TD:

Logging: Rig Release:

Eurombah Net Coal From Chip SamplesLucas 091 19.26 Daily Coal

27° 5' 27.87" S 25/04/2009 Cumulative150° 55' 19.98" E 26/04/09 4/05/2009 Operations HRS CUM

349.7 18/05/2009 Drilling 0 24.75500.00 PTD: 500 14/05/2009 17/05/09 Underream 0 16.75480.74 To: 500.00 Casing 0 10

RIH,Drill extra 20m,Clean out hole, POOH to casing shoe,Prepare casingCementing 0 0.25Gravel pack 0 0Jetting 0 0

Last Safety Meeting: 18/05/2009 Days Since LTI: 26 Conditioning 0 5.5Comments on

Safety Gas Kick ProcedureWOC 0 5.5Setup BOP 0 5.5

Bit Data Tripping rods

0 52

Bit # Size Type From To Hours Fluid Additives Surveys 0 41 8.5" Hammer 0hrs Air Standby 12 502 17" Auger 0.00 6.00 0hrs Air Water Production Tests3 12 1/4" PDC 6.00 64.00 3hrs Water Date Depth Rate4 9 7/8" PDC 64.00 329.00 12.5hrs Water KCL5 7 7/8" PDC 329.00 500.00 9.25hrs Water KCL6 13" Eccentric bit 0hrs Water7

U-Reamer 16" Mills 337.20 467.00 16.75hrs Water Deviation Surveys While DrillingCasing Depth Deviation Azimuth

From To Make ID OD Weight Grade Length 64 0.2Conductor: 0.00 6.00 Steel 13 1/2" 14 " 55.11kg/m Steel 6.00 133 0.3

Surface: 0.00 61.43 Steel 10 1/4" 10 3/4" 42.09 kg/m API 5LB 61.43 210 0.2Intermediate 0.00 326.25 Steel 8 1/8" 8 5/8" 33.57 kg/m API 5LB 326.25 267 0.1

Liner Steel 6 1/8" 6 5/8" 25.55 kg/m API 5LB 0.00 329 0.9Casing Cement / Gravel Pack Details 403 1.0

From To Type Volume SG Bags H2O p/bag Chase water 480 1.6Conductor: 0.00 6.00 Cement

Surface Csg. 0.00 61.43 Cement 3211 1.75 83 39.7 2735Intermediate 0.00 326.25 Cement 7463 1.72 192 92.3 10564

Liner:Daily Activity Summary

From To Description6:00 6:45 Tool-box Meeting ( Pre-Start checks )6:45 10:15 RIH ( to drill extra 20mts .to 500mts )

10:15 11:15 Drill extra 20mts11:15 12:00 Circulate ( clean out hole )12:00 14:30 POOH ( up to casing shoe ) not enough time to run casing (day shift only )14:30 16:00 Screwing casing pups together and test slips for running casing16:00 18:00 Stand-by ( doing maintenance ) Actual Under reamed Zones18:00 Interval # From To0:00 1: (1.4m) 337.2 338.60:00 2: (2.7m) 339.9 342.60:00 3: (1m) 343.8 344.80:00 4: (1m) 345.2 346.20:00 5: (1.4m) 350.1 351.50:00 6: (1.8m) 369.1 370.90:00 7: (1.3m) 386.00 387.300:00 8: (4.5m) 437.70 442.200:00 9: (1.2m) 452.70 453.900:00 10: (2.1m) 454.90 457.000:00 11: (1.3m) 465.70 467.00

12: (0m)13: (0m)14: (0m)15: (0m)16: (0m)17: (0m)18: (0m)19: (0m)

BHA Bit, Stab, DC1, Stab, DC2, DC3, DC4, DC5, DC6, DC7, DC8, DC9, X/O20: (0m)21: (0m)

General Comments Being resricted to day shift only they didn't have enough time to finish running casing so they didn't start.

22: (0m)Total Under reamed (m): 19.7m

Cement Plugs

From To SGOperations for next 24hrs 51.0m 64.0m 1.75

RIH,Clean out hole,POOH,Run production Liner301.25m 326.25m 1.72

PersonnelDrill Supervisor J.Allwood (0427 116 090) Bent Ostergaard (0429 053 441)Geologist/TA A.Mountford, A.May, G.Hokin T/A: Rick Lucas

Drill Crew Toolpusher:Lewis Pepper. Drillers: Dale Phillips & Craig Hall. Offsiders: N Drew, D Pasco, S. McAlpine, S. Hall,Z. Agnew,T.Jeffrey, Mechanic: John Dewes. Field Admin: Graeme McIntyre

Page 45: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

Page 1

Daandine 27TTuesday, 19 May 2009

Weather

overcast / Raining

Well Rig

Latitude Longitude Elevation:

Current Depth Drilled From:

Daily Ops

Daandine 27T Current Formation:

Daily Meterage:Spud

: Surf/Int Csg:TD:

Logging: Rig Release:

Eurombah Net Coal From Chip SamplesLucas 091 0.00 Daily Coal

27° 5' 27.87" S 25/04/2009 Cumulative150° 55' 19.98" E 26/04/09 4/05/2009 Operations HRS CUM

349.7 18/05/2009 Drilling 0 24.75500.00 PTD: 500 14/05/2009 17/05/09 Underream 0 16.75500.00 To: 500.00 Casing 0 10

RIH,Clean out hole,POOH up to casing shoe,wet weather stand-byCementing 0 0.25Gravel pack 0 0Jetting 0 0

Last Safety Meeting: 19/05/2009 Days Since LTI: 27 Conditioning 0 6.5Comments on

Safety Handleing CasingWOC 0 5.5Setup BOP 0 5.5

Bit Data Tripping rods

0 55.25

Bit # Size Type From To Hours Fluid Additives Surveys 0 41 8.5" Hammer 0hrs Air Standby 12 572 17" Auger 0.00 6.00 0hrs Air Water Production Tests3 12 1/4" PDC 6.00 64.00 3hrs Water Date Depth Rate4 9 7/8" PDC 64.00 329.00 12.5hrs Water KCL5 7 7/8" PDC 329.00 500.00 9.25hrs Water KCL6 13" Eccentric bit 0hrs Water7

U-Reamer 16" Mills 337.20 467.00 16.75hrs Water Deviation Surveys While DrillingCasing Depth Deviation Azimuth

From To Make ID OD Weight Grade Length 64 0.2Conductor: 0.00 6.00 Steel 13 1/2" 14 " 55.11kg/m Steel 6.00 133 0.3

Surface: 0.00 61.43 Steel 10 1/4" 10 3/4" 42.09 kg/m API 5LB 61.43 210 0.2Intermediate 0.00 326.25 Steel 8 1/8" 8 5/8" 33.57 kg/m API 5LB 326.25 267 0.1

Liner Steel 6 1/8" 6 5/8" 25.55 kg/m API 5LB #VALUE! 329 0.9Casing Cement / Gravel Pack Details 403 1.0

From To Type Volume SG Bags H2O p/bag Chase water 480 1.6Conductor: 0.00 6.00 Cement

Surface Csg. 0.00 61.43 Cement 3211 1.75 83 39.7 2735Intermediate 0.00 326.25 Cement 7463 1.72 192 92.3 10564

Liner:Daily Activity Summary

From To Description5:45 6:30 Tool-box Meeting ( Pre-Start checks )6:30 7:45 RIH7:45 8:45 Circulate & Clean8:45 9:15 POOH ( to joint 40 ) ( Circulating )9:15 10:00 Wet weather stand-by ( Raining )

10:00 11:30 POOH ( to casing shoe, still raining )11:30 18:00 Wet weather stand-by ( Raining ) Revising SOP's,JSEA"s Actual Under reamed Zones18:00 Interval # From To0:00 1: (1.4m) 337.2 338.60:00 2: (2.7m) 339.9 342.60:00 3: (1m) 343.8 344.80:00 4: (1m) 345.2 346.20:00 5: (1.4m) 350.1 351.50:00 6: (1.8m) 369.1 370.90:00 7: (1.3m) 386.00 387.300:00 8: (4.5m) 437.70 442.200:00 9: (1.2m) 452.70 453.900:00 10: (2.1m) 454.90 457.000:00 11: (1.3m) 465.70 467.00

12: (0m)13: (0m)14: (0m)15: (0m)16: (0m)17: (0m)18: (0m)19: (0m)

BHA Bit, Stab, DC1, Stab, DC2, DC3, DC4, DC5, DC6, DC7, DC8, DC9, X/O20: (0m)21: (0m)

General Comments Raining and crew are revising SOP's, JSEA's,

22: (0m)Total Under reamed (m): 19.7m

Cement PlugsFrom To SG

Operations for next 24hrs 51.0m 64.0m 1.75

Hope to run Production Liner,weather permitting301.25m 326.25m 1.72

PersonnelDrill Supervisor J.Allwood (0427 116 090) Bent Ostergaard (0429 053 441)Geologist/TA A.Mountford, A.May, G.Hokin T/A: Rick Lucas

Drill Crew Toolpusher:Lewis Pepper. Drillers: Dale Phillips & Craig Hall. Offsiders: N Drew, D Pasco, S. McAlpine, S.Hall, Z. Agnew,T.Jeffrey, Mechanic: John Dewes. Field Admin: Graeme McIntyre

Page 46: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

Page 1

Daandine 27TWednesday, 20 May 2009

Weather

Rain

Well Rig

Latitude Longitude Elevation:

Current Depth Drilled From:

Daily Ops

Daandine 27T Current Formation:

Daily Meterage:Spud

: Surf/Int Csg:TD:

Logging: Rig Release:

Eurombah Net Coal From Chip SamplesLucas 091 0.00 Daily Coal

27° 5' 27.87" S 25/04/2009 Cumulative150° 55' 19.98" E 26/04/09 4/05/2009 Operations HRS CUM

349.7 18/05/2009 Drilling 0 24.75500.00 PTD: 500 14/05/2009 17/05/09 Underream 0 16.75500.00 To: 500.00 Casing 0 10

wet weather standbyCementing 0 0.25Gravel pack 0 0Jetting 0 0

Last Safety Meeting: 20/05/2009 Days Since LTI: 28 Conditioning 0 6.5Comments on

SafetyWOC 0 5.5Setup BOP 0 5.5

Bit Data Tripping rods

0 55.25

Bit # Size Type From To Hours Fluid Additives Surveys 0 41 8.5" Hammer 0hrs Air Standby 12 692 17" Auger 0.00 6.00 0hrs Air Water Production Tests3 12 1/4" PDC 6.00 64.00 3hrs Water Date Depth Rate4 9 7/8" PDC 64.00 329.00 12.5hrs Water KCL5 7 7/8" PDC 329.00 500.00 9.25hrs Water KCL6 13" Eccentric bit 0hrs Water7

U-Reamer 16" Mills 337.20 467.00 16.75hrs Water Deviation Surveys While DrillingCasing Depth Deviation Azimuth

From To Make ID OD Weight Grade Length 64 0.2Conductor: 0.00 6.00 Steel 13 1/2" 14 " 55.11kg/m Steel 6.00 133 0.3

Surface: 0.00 61.43 Steel 10 1/4" 10 3/4" 42.09 kg/m API 5LB 61.43 210 0.2Intermediate 0.00 326.25 Steel 8 1/8" 8 5/8" 33.57 kg/m API 5LB 326.25 267 0.1

Liner Steel 6 1/8" 6 5/8" 25.55 kg/m API 5LB #VALUE! 329 0.9Casing Cement / Gravel Pack Details 403 1.0

From To Type Volume SG Bags H2O p/bag Chase water 480 1.6Conductor: 0.00 6.00 Cement

Surface Csg. 0.00 61.43 Cement 3211 1.75 83 39.7 2735Intermediate 0.00 326.25 Cement 7463 1.72 192 92.3 10564

Liner:Daily Activity Summary

From To Description6:00 18:00 Wet weather standby

18:000:000:000:000:000:00 Actual Under reamed Zones0:00 Interval # From To0:00 1: (1.4m) 337.2 338.60:00 2: (2.7m) 339.9 342.60:00 3: (1m) 343.8 344.80:00 4: (1m) 345.2 346.20:00 5: (1.4m) 350.1 351.50:00 6: (1.8m) 369.1 370.90:00 7: (1.3m) 386.00 387.300:00 8: (4.5m) 437.70 442.200:00 9: (1.2m) 452.70 453.900:00 10: (2.1m) 454.90 457.000:00 11: (1.3m) 465.70 467.00

12: (0m)13: (0m)14: (0m)15: (0m)16: (0m)17: (0m)18: (0m)19: (0m)

BHA Bit, Stab, DC1, Stab, DC2, DC3, DC4, DC5, DC6, DC7, DC8, DC9, X/O20: (0m)21: (0m)

General Comments

22: (0m)Total Under reamed (m): 19.7m

Cement PlugsFrom To SG

Operations for next 24hrs 51.0m 64.0m 1.75

Hope to run Production Liner,weather permitting301.25m 326.25m 1.72

PersonnelDrill Supervisor J.Allwood (0427 116 090) Bent Ostergaard (0429 053 441)Geologist/TA G.Hokin, A.May T/A: Rick Lucas

Drill Crew Toolpusher:Lewis Pepper. Drillers: Dale Phillips & Craig Hall. Offsiders: N Drew, D Pasco, S. McAlpine, S.Hall, Z. Agnew,T.Jeffrey, Mechanic: John Dewes. Field Admin: Graeme McIntyre

Page 47: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

Page 1

Daandine 27TThursday, 21 May 2009

Weather

Rain

Well Rig

Latitude Longitude Elevation:

Current Depth Drilled From:

Daily Ops

Daandine 27T Current Formation:

Daily Meterage:Spud

: Surf/Int Csg:TD:

Logging: Rig Release:

Eurombah Net Coal From Chip SamplesLucas 091 0.00 Daily Coal

27° 5' 27.87" S 25/04/2009 Cumulative150° 55' 19.98" E 26/04/09 4/05/2009 Operations HRS CUM

349.7 18/05/2009 Drilling 0 24.75500.00 PTD: 500 14/05/2009 17/05/09 Underream 0 16.75500.00 To: 500.00 Casing 0 10

wet weather standbyCementing 0 0.25Gravel pack 0 0Jetting 0 0

Last Safety Meeting: 21/05/2009 Days Since LTI: 28 Conditioning 0 6.5Comments on

SafetyWOC 0 5.5Setup BOP 0 5.5

Bit Data Tripping rods

0 55.25

Bit # Size Type From To Hours Fluid Additives Surveys 0 41 8.5" Hammer 0hrs Air Standby 12 812 17" Auger 0.00 6.00 0hrs Air Water Production Tests3 12 1/4" PDC 6.00 64.00 3hrs Water Date Depth Rate4 9 7/8" PDC 64.00 329.00 12.5hrs Water KCL5 7 7/8" PDC 329.00 500.00 9.25hrs Water KCL6 13" Eccentric bit 0hrs Water7

U-Reamer 16" Mills 337.20 467.00 16.75hrs Water Deviation Surveys While DrillingCasing Depth Deviation Azimuth

From To Make ID OD Weight Grade Length 64 0.2Conductor: 0.00 6.00 Steel 13 1/2" 14 " 55.11kg/m Steel 6.00 133 0.3

Surface: 0.00 61.43 Steel 10 1/4" 10 3/4" 42.09 kg/m API 5LB 61.43 210 0.2Intermediate 0.00 326.25 Steel 8 1/8" 8 5/8" 33.57 kg/m API 5LB 326.25 267 0.1

Liner Steel 6 1/8" 6 5/8" 25.55 kg/m API 5LB #VALUE! 329 0.9Casing Cement / Gravel Pack Details 403 1.0

From To Type Volume SG Bags H2O p/bag Chase water 480 1.6Conductor: 0.00 6.00 Cement

Surface Csg. 0.00 61.43 Cement 3211 1.75 83 39.7 2735Intermediate 0.00 326.25 Cement 7463 1.72 192 92.3 10564

Liner:Daily Activity Summary

From To Description6:00 18:00 Wet weather standby

18:000:000:000:000:000:00 Actual Under reamed Zones0:00 Interval # From To0:00 1: (1.4m) 337.2 338.60:00 2: (2.7m) 339.9 342.60:00 3: (1m) 343.8 344.80:00 4: (1m) 345.2 346.20:00 5: (1.4m) 350.1 351.50:00 6: (1.8m) 369.1 370.90:00 7: (1.3m) 386.00 387.300:00 8: (4.5m) 437.70 442.200:00 9: (1.2m) 452.70 453.900:00 10: (2.1m) 454.90 457.000:00 11: (1.3m) 465.70 467.00

12: (0m)13: (0m)14: (0m)15: (0m)16: (0m)17: (0m)18: (0m)19: (0m)

BHA Bit, Stab, DC1, Stab, DC2, DC3, DC4, DC5, DC6, DC7, DC8, DC9, X/O20: (0m)21: (0m)

General Comments

22: (0m)Total Under reamed (m): 19.7m

Cement PlugsFrom To SG

Operations for next 24hrs 51.0m 64.0m 1.75

Hope to run Production Liner,weather permitting301.25m 326.25m 1.72

PersonnelDrill Supervisor J.Allwood (0427 116 090) Bent Ostergaard (0429 053 441)Geologist/TA G.Hokin, A.May T/A: Rick Lucas

Drill Crew Toolpusher:Lewis Pepper. Drillers: Dale Phillips & Craig Hall. Offsiders: N Drew, D Pasco, S. McAlpine, S.Hall, Z. Agnew,T.Jeffrey, Mechanic: John Dewes. Field Admin: Graeme McIntyre

Page 48: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

Page 1

Daandine 27TFriday, 22 May 2009

Weather

Fine

Well Rig

Latitude Longitude Elevation:

Current Depth Drilled From:

Daily Ops

Daandine 27T Current Formation:

Daily Meterage:Spud

: Surf/Int Csg:TD:

Logging: Rig Release:

Eurombah Net Coal From Chip SamplesLucas 091 0.00 Daily Coal

27° 5' 27.87" S 25/04/2009 Cumulative150° 55' 19.98" E 26/04/09 4/05/2009 Operations HRS CUM

349.7 18/05/2009 Drilling 0 24.75500.00 PTD: 500 14/05/2009 17/05/09 Underream 0 16.75500.00 To: 500.00 Casing 0 10

Lucas Internal Meeting, Stand-byCementing 0 0.25Gravel pack 0 0Jetting 0 0

Last Safety Meeting: 22/05/2009 Days Since LTI: 29 Conditioning 0 6.5Comments on

SafetyWOC 0 5.5Setup BOP 0 5.5

Bit Data Tripping rods

0 55.25

Bit # Size Type From To Hours Fluid Additives Surveys 0 41 8.5" Hammer 0hrs Air Standby 12 932 17" Auger 0.00 6.00 0hrs Air Water Production Tests3 12 1/4" PDC 6.00 64.00 3hrs Water Date Depth Rate4 9 7/8" PDC 64.00 329.00 12.5hrs Water KCL5 7 7/8" PDC 329.00 500.00 9.25hrs Water KCL6 13" Eccentric bit 0hrs Water7

U-Reamer 16" Mills 337.20 467.00 16.75hrs Water Deviation Surveys While DrillingCasing Depth Deviation Azimuth

From To Make ID OD Weight Grade Length 64 0.2Conductor: 0.00 6.00 Steel 13 1/2" 14 " 55.11kg/m Steel 6.00 133 0.3

Surface: 0.00 61.43 Steel 10 1/4" 10 3/4" 42.09 kg/m API 5LB 61.43 210 0.2Intermediate 0.00 326.25 Steel 8 1/8" 8 5/8" 33.57 kg/m API 5LB 326.25 267 0.1

Liner Steel 6 1/8" 6 5/8" 25.55 kg/m API 5LB #VALUE! 329 0.9Casing Cement / Gravel Pack Details 403 1.0

From To Type Volume SG Bags H2O p/bag Chase water 480 1.6Conductor: 0.00 6.00 Cement

Surface Csg. 0.00 61.43 Cement 3211 1.75 83 39.7 2735Intermediate 0.00 326.25 Cement 7463 1.72 192 92.3 10564

Liner:Daily Activity Summary

From To Description6:00 13:00 Internal Meeting

13:00 18:00 Stand-by18:000:000:000:000:00 Actual Under reamed Zones0:00 Interval # From To0:00 1: (1.4m) 337.2 338.60:00 2: (2.7m) 339.9 342.60:00 3: (1m) 343.8 344.80:00 4: (1m) 345.2 346.20:00 5: (1.4m) 350.1 351.50:00 6: (1.8m) 369.1 370.90:00 7: (1.3m) 386.00 387.300:00 8: (4.5m) 437.70 442.200:00 9: (1.2m) 452.70 453.900:00 10: (2.1m) 454.90 457.000:00 11: (1.3m) 465.70 467.00

12: (0m)13: (0m)14: (0m)15: (0m)16: (0m)17: (0m)18: (0m)19: (0m)

BHA20: (0m)21: (0m)

General Comments

22: (0m)Total Under reamed (m): 19.7m

Cement PlugsFrom To SG

Operations for next 24hrs 51.0m 64.0m 1.75

RIH,Wiper Trip,POOH,Run Production Liner,Land casing,POOH,Fit Well Head.301.25m 326.25m 1.72

PersonnelDrill Supervisor J.Allwood (0427 116 090) Bent Ostergaard (0429 053 441)Geologist/TA G.Hokin, A.May T/A: Rick Lucas

Drill Crew Toolpusher:Lewis Pepper. Drillers:D.Nolin,M.Kruger.Offsiders:G.Pollock,D.Atkins,S.McPaul,J.Wilson,M.McDonald,T.Jeffrey,B.Bland,D.Jenkins.

Page 49: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

Page 1

Daandine 27TSaturday, 23 May 2009

Weather

Fine

Well Rig

Latitude Longitude Elevation:

Current Depth Drilled From:

Daily Ops

Daandine 27T Current Formation:

Daily Meterage:Spud

: Surf/Int Csg:TD:

Logging: Rig Release:

Eurombah Net Coal From Chip SamplesLucas 091 0.00 Daily Coal

27° 5' 27.87" S 25/04/2009 Cumulative150° 55' 19.98" E 26/04/09 4/05/2009 Operations HRS CUM

349.7 18/05/2009 Drilling 0 24.75500.00 PTD: 500 14/05/2009 17/05/09 Underream 0 16.75500.00 To: 500.00 Casing 0 16.75

RIH,Wiper Trip,POOH,Run Production Liner,Land casing, back off.Cementing 0 0.25Gravel pack 0 0Jetting 0 0

Last Safety Meeting: 23/05/2009 Days Since LTI: 30 Conditioning 0 7Comments on

SafetyWOC 0 5.5Setup BOP 0 5.5

Bit Data Tripping rods

0 60.25

Bit # Size Type From To Hours Fluid Additives Surveys 0 41 8.5" Hammer 0hrs Air Standby 12 932 17" Auger 0.00 6.00 0hrs Air Water Production Tests3 12 1/4" PDC 6.00 64.00 3hrs Water Date Depth Rate4 9 7/8" PDC 64.00 329.00 12.5hrs Water KCL5 7 7/8" PDC 329.00 500.00 9.25hrs Water KCL6 13" Eccentric bit 0hrs Water7

U-Reamer 16" Mills 337.20 467.00 16.75hrs Water Deviation Surveys While DrillingCasing Depth Deviation Azimuth

From To Make ID OD Weight Grade Length 64 0.20Conductor: 0.00 6.00 Steel 13 1/2" 14 " 55.11kg/m Steel 6.00 133 0.30

Surface: 0.00 61.43 Steel 10 1/4" 10 3/4" 42.09 kg/m API 5LB 61.43 210 0.20Intermediate 0.00 326.25 Steel 8 1/8" 8 5/8" 33.57 kg/m API 5LB 326.25 267 0.10

Liner 300.26 500.00 Steel 6 1/8" 6 5/8" 25.55 kg/m API 5LB 199.74 329 0.90Casing Cement / Gravel Pack Details 403 1.00

From To Type Volume SG Bags H2O p/bag Chase water 480 1.60Conductor: 0.00 6.00 Cement

Surface Csg. 0.00 61.43 Cement 3211 1.75 83 39.7 2735Intermediate 0.00 326.25 Cement 7463 1.72 192 92.3 10564

Liner:Daily Activity Summary

From To Description5:45 6:15 Tool-Box Meeting & Pre-start checks6:15 7:30 RIH7:30 8:00 Circulate & Clean8:00 11:45 POOH

11:45 12:15 Set up to run Production Liner12:15 16:30 Run Production Liner16:30 18:30 Lower Liner, land casing (5.493m stick-up), back off, pull one rod back Actual Under reamed Zones18:30 Interval # From To0:00 1: (1.4m) 337.2 338.60:00 2: (2.7m) 339.9 342.60:00 3: (1m) 343.8 344.80:00 4: (1m) 345.2 346.20:00 5: (1.4m) 350.1 351.50:00 6: (1.8m) 369.1 370.90:00 7: (1.3m) 386.00 387.300:00 8: (4.5m) 437.70 442.200:00 9: (1.2m) 452.70 453.900:00 10: (2.1m) 454.90 457.000:00 11: (1.3m) 465.70 467.00

12: (0m)13: (0m)14: (0m)15: (0m)16: (0m)17: (0m)18: (0m)19: (0m)

BHA20: (0m)21: (0m)

General Comments Casing landed at TD (stick-up 5.493m)

22: (0m)Total Under reamed (m): 19.7m

Cement PlugsFrom To SG

Operations for next 24hrs 51.0m 64.0m 1.75

POOH, fit well head,rig release, move to next site.301.25m 326.25m 1.72

PersonnelDrill Supervisor J.Allwood (0427 116 090) Bent Ostergaard (0429 053 441)Geologist/TA G.Hokin, A.May T/A: Rick Lucas

Drill Crew Toolpusher:Lewis Pepper. Drillers:D.Nolin,M.Kruger.Offsiders:G.Pollock,D.Atkins,S.McPaul,J.Wilson,M.McDonald,T.Jeffrey,B.Bland,D.Jenkins.

Page 50: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

Page 1

Daandine 27TSunday, 24 May 2009

Weather

Fine

Well Rig

Latitude Longitude Elevation:

Current Depth Drilled From:

Daily Ops

Daandine 27T Current Formation:

Daily Meterage:Spud

: Surf/Int Csg:TD:

Logging: Rig Release:

Eurombah Net Coal From Chip SamplesLucas 091 0.00 Daily Coal

27° 5' 27.87" S 25/04/2009 Cumulative150° 55' 19.98" E 26/04/09 4/05/2009 Operations HRS CUM

349.7 18/05/2009 Drilling 0 24.75500.00 PTD: 500 14/05/2009 17/05/09 Underream 0 16.75500.00 To: 500.00 Casing 0 16.75

POOH,Set well head ,Tower down,Mobilize to DD 46Cementing 0 0.25Gravel pack 0 0Jetting 0 0

Last Safety Meeting: 24/05/2009 Days Since LTI: 30 Conditioning 0 7Comments on

SafetyWOC 0 5.5Setup BOP 0 12

Bit Data Tripping rods

0 60.25

Bit # Size Type From To Hours Fluid Additives Surveys 0 41 8.5" Hammer 0hrs Air Standby 12 932 17" Auger 0.00 6.00 0hrs Air Water Production Tests3 12 1/4" PDC 6.00 64.00 3hrs Water Date Depth Rate4 9 7/8" PDC 64.00 329.00 12.5hrs Water KCL5 7 7/8" PDC 329.00 500.00 9.25hrs Water KCL6 13" Eccentric bit 0hrs Water7

U-Reamer 16" Mills 337.20 467.00 16.75hrs Water Deviation Surveys While DrillingCasing Depth Deviation Azimuth

From To Make ID OD Weight Grade Length 64 0.20Conductor: 0.00 6.00 Steel 13 1/2" 14 " 55.11kg/m Steel 6.00 133 0.30

Surface: 0.00 61.43 Steel 10 1/4" 10 3/4" 42.09 kg/m API 5LB 61.43 210 0.20Intermediate 0.00 326.25 Steel 8 1/8" 8 5/8" 33.57 kg/m API 5LB 326.25 267 0.10

Liner 300.26 500.00 Steel 6 1/8" 6 5/8" 25.55 kg/m API 5LB 199.74 329 0.90Casing Cement / Gravel Pack Details 403 1.00

From To Type Volume SG Bags H2O p/bag Chase water 480 1.60Conductor: 0.00 6.00 Cement

Surface Csg. 0.00 61.43 Cement 3211 1.75 83 39.7 2735Intermediate 0.00 326.25 Cement 7463 1.72 192 92.3 10564

Liner:Daily Activity Summary

From To Description5:45 6:15 Too-Box Meeting & Pre-start checks6:15 8:15 POOH to surface8:15 8:30 Tower down8:30 15:00 Remove BOP and Set well head

15:000:000:00 Actual Under reamed Zones0:00 Interval # From To0:00 1: (1.4m) 337.2 338.60:00 2: (2.7m) 339.9 342.60:00 3: (1m) 343.8 344.80:00 4: (1m) 345.2 346.20:00 5: (1.4m) 350.1 351.50:00 6: (1.8m) 369.1 370.90:00 7: (1.3m) 386.00 387.300:00 8: (4.5m) 437.70 442.200:00 9: (1.2m) 452.70 453.900:00 10: (2.1m) 454.90 457.000:00 11: (1.3m) 465.70 467.00

12: (0m)13: (0m)14: (0m)15: (0m)16: (0m)17: (0m)18: (0m)19: (0m)

BHA20: (0m)21: (0m)

General Comments

22: (0m)Total Under reamed (m): 19.7m

Cement PlugsFrom To SG

Operations for next 24hrs 51.0m 64.0m 1.75301.25m 326.25m 1.72

PersonnelDrill Supervisor J.Allwood (0427 116 090) Bent Ostergaard (0429 053 441)Geologist/TA G.Hokin, A.May T/A: T.Bourquin

Drill Crew Toolpusher:Lewis Pepper. Drillers:D.Nolin,M.Kruger.Offsiders:G.Pollock,D.Atkins,S.McPaul,J.Wilson,M.McDonald,T.Jeffrey,B.Bland,D.Jenkins.

Page 51: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

APPENDIX 3 WELL LOCATION SURVEY

Page 52: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –
Page 53: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

APPENDIX 4 WIRELINE LOGS (IMAGES)

Page 54: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

ALL

SERVICES

PROVIDED

SUBJECT

DA

AN

DIN

E27

CO

MP

A

NY

WE

LL

FIELD

CO

UN

TY

STA

TE

LOC

ATI

ON

SE

CTIO

N

TOW

NS

HIP

::::::::::::

AR

RO

W

EN

ER

GY

DA

AN

DIN

E27T

DA

AN

DIN

E

NO

NE

QLD

NO

NE

NO

NE

NO

NE

NO

NE

NO

NE

NO

NE

NO

NE

NO

NE

NO

NE

05/14/

09480.74

20.0025

317.80

479.60

0326.25

NO

NE

000

OTH

ER

ELE

VA

TION

KB

:

NO

NE

ELE

VA

TION

DF

: NO

NE

LOG

ME

AS

UR

ED

FR

OM

:

DA

TE

DE

PTH

DR

ILLER

BIT S

IZE

LOG

TOP

LOG

BO

TTOM

CA

SIN

G

OD

CA

SIN

G B

OT

TOM

CA

SIN

G TY

PE

BO

RE

HO

LE

FLUID

RM

TEM

PE

RA

TUR

E

MU

D R

ES

MU

D

WE

IGH

T

::::::::::::::::

TAB

LE H

EIG

HT 3.05 A

BO

VE

G/L

LU 0501 9057S

N2320 A

MB

E241 S

OU

RC

E S

/N

ALL S

ER

VIC

ES

PR

OV

IDE

D S

UB

JEC

T TO

STA

ND

AR

D TE

RM

S A

ND

Page 55: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

POR(NEU)

50 PERCENT

NEUTRON

0 API-N

GAMMA

0

2000

METERS

0

0

0

RES

OHM

LATERAL

OHM-M

RES(16N)

OHM-M

RES(64N)

204000

200

200

SP

MV

TEMP

DEG C

SANG

DEG

SANGB

6000

60

2

0 API-GR

320

330

OHM-M 200 DEG 360

340

350

360

370

20

Page 56: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

380

390

400

410

420

430

440

Page 57: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

450

460

470

0 API-GR

GAMMA

0 API-N

NEUTRON

50 PERCENT

POR(NEU)

200480 0

2000 0

0 0

0

METERS

OHM-M

RES(64N)

OHM-M

RES(16N)

OHM-M

LATERAL

OHM

RES

200

200

200

204000

DEG

SANGB

DEG

SANG

DEG C

TEMP

MV

SP

360

2

60

6000

Page 58: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

SCALE: 1 M/CMTRUE DEPTH: 479.57 M AZIMUTH: 355.3DISTANCE: 3.1 M+ = 50 M INCR= BOTTOM OF HOLE

N4.0M

3.0M

2.0M

1.0M

PLAN VIEW COMPU-LOG DEVIATION

CLIENT: ARROW ENERGY LOCATION: DAANDINE HOLE ID: DAANDINE27T DATE OF LOG: 05/14/09PROBE: 9057A 2320 MAG DECL: 0.0

W E

S

Page 59: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

* * * * * * * COMPU-LOG - VERTICAL DEVIATION * * * * * * *

CLIENT : ARROW ENERGY HOLE ID. : DAANDINE27T FIELD OFFICE : DATE OF LOG : 05/14/09DATA FROM : NONE PROBE : 9057A , 2320MAG. DECL. : 0.000 DEPTH UNITS : METERS LOG: DAANDINE27T_DEVI.log

CABLE DEPTH TRUE DEPTH NORTH DEV. EAST DEV. DISTANCE AZIMUTH SANG SANGB319.60 319.60 0.00 0.00 0.0 9.1 0.1 9.1327.80 327.80 0.08 -0.01 0.1 352.3 0.8 3.0337.80 337.80 0.24 -0.00 0.2 358.9 0.9 3.5347.80 347.80 0.40 0.00 0.4 0.1 1.2 4.2357.80 357.79 0.59 0.00 0.6 0.0 1.1 359.9367.80 367.79 0.79 -0.01 0.8 359.6 1.1 355.8377.80 377.79 1.00 -0.02 1.0 359.1 1.2 355.3387.80 387.79 1.20 -0.03 1.2 358.6 1.2 358.0397.80 397.79 1.40 -0.04 1.4 358.2 1.2 354.9407.80 407.78 1.59 -0.06 1.6 357.9 1.1 355.9417.80 417.78 1.77 -0.07 1.8 357.6 1.1 354.6427.80 427.78 1.96 -0.10 2.0 357.2 1.0 350.8437.80 437.78 2.13 -0.12 2.1 356.7 1.0 354.6447.80 447.78 2.33 -0.15 2.3 356.3 1.3 351.1457.80 457.77 2.56 -0.19 2.6 355.8 1.4 352.9467.80 467.77 2.80 -0.22 2.8 355.6 1.4 353.0477.80 477.77 3.04 -0.24 3.1 355.4 1.5 353.5479.60 479.37 3.08 -0.25 3.1 355.3 1.6 347.4

Page 60: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

ALL

SERVICES

PROVIDED

SUBJECT

DA

AN

DIN

E27

CO

MP

A

NY

WE

LL

FIELD

CO

UN

TY

STA

TE

LOC

ATI

ON

SE

CTIO

N

TOW

NS

HIP

::::::::::::

AR

RO

W

EN

ER

GY

DA

AN

DIN

E27T

DA

AN

DIN

E

NO

NE

QLD

NO

NE

NO

NE

NO

NE

NO

NE

NO

NE

NO

NE

NO

NE

NO

NE

NO

NE

05/14/

09480.74

20.0025

-2.60

478.70

0326.25

NO

NE

000

OTH

ER

ELE

VA

TION

KB

:

NO

NE

ELE

VA

TION

DF

: NO

NE

LOG

ME

AS

UR

ED

FR

OM

:

DA

TE

DE

PTH

DR

ILLER

BIT S

IZE

LOG

TOP

LOG

BO

TTOM

CA

SIN

G

OD

CA

SIN

G B

OT

TOM

CA

SIN

G TY

PE

BO

RE

HO

LE

FLUID

RM

TEM

PE

RA

TUR

E

MU

D R

ES

MU

D

WE

IGH

T

::::::::::::::::

TAB

LE H

EIG

HT 3.05 A

BO

VE

G/L

LU 0501 9238S

N4352 C

S137 S

OU

RC

E S

/N

ALL S

ER

VIC

ES

PR

OV

IDE

D S

UB

JEC

T TO

STA

ND

AR

D TE

RM

S A

ND

Page 61: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

0

10

20

30

40

50

METERS RES(SG)

0.01 OHM-M 50

CALIPERL DEN(SS)

10 CM 30 1 G/CC 3

GAMMA DEN(LS)

0 API-GR 200 1 G/CC 3

Page 62: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

660

70

80

90

100

110

120

Page 63: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

13130

140

150

160

170

180

190

Page 64: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

20200

210

220

230

240

250

260

Page 65: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

270

280

290

300

310

320

330

Page 66: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

340

350

360

370

380

390

400

Page 67: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

410

420

430

440

450

460

470

Page 68: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

0 API-GR 200 1 G/CC 3

GAMMA DEN(LS)

10 CM 30 1 G/CC 3

CALIPERL DEN(SS)

0.01 OHM-M 50

METERS RES(SG)

Page 69: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

ALL

SERVICES

PROVIDED

SUBJECT

DA

AN

DIN

E27

CO

MP

A

NY

WE

LL

FIELD

CO

UN

TY

STA

TE

LOC

ATI

ON

SE

CTIO

N

TOW

NS

HIP

::::::::::::

AR

RO

W

EN

ER

GY

DA

AN

DIN

E27T

DA

AN

DIN

E

NO

NE

QLD

NO

NE

NO

NE

NO

NE

NO

NE

NO

NE

NO

NE

NO

NE

NO

NE

NO

NE

05/14/

09480.74

20.0025

-2.60

478.70

0326.25

NO

NE

000

OTH

ER

ELE

VA

TION

KB

:

NO

NE

ELE

VA

TION

DF

: NO

NE

LOG

ME

AS

UR

ED

FR

OM

:

DA

TE

DE

PTH

DR

ILLER

BIT S

IZE

LOG

TOP

LOG

BO

TTOM

CA

SIN

G

OD

CA

SIN

G B

OT

TOM

CA

SIN

G TY

PE

BO

RE

HO

LE

FLUID

RM

TEM

PE

RA

TUR

E

MU

D R

ES

MU

D

WE

IGH

T

::::::::::::::::

TAB

LE H

EIG

HT 3.05 A

BO

VE

G/L

LU 0501 9238S

N4352 C

S137 S

OU

RC

E S

/N

ALL S

ER

VIC

ES

PR

OV

IDE

D S

UB

JEC

T TO

STA

ND

AR

D TE

RM

S A

ND

Page 70: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

320

322

324

326

328

330

332

334

336

338

340

342

344

CALIPERL METERS DEN(SS)

10 CM 30 1 G/CC 3

GAMMA DEN(LS)

0 API-GR 200 1 G/CC 3

Page 71: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

346

348

350

352

354

356

358

360

362

364

366

368

370

372

Page 72: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

374

376

378

380

382

384

386

388

390

392

394

396

398

400

Page 73: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

402

404

406

408

410

412

414

416

418

420

422

424

426

428

Page 74: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

430

432

434

436

438

440

442

444

446

448

450

452

454

456

Page 75: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

458

460

462

464

466

468

470

472

474

476

4780 API-GR

GAMMA

10 CM

CALIPERL

200

30

1

1

METERS

G/CC 3

DEN(LS)

G/CC 3

DEN(SS)

Page 76: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

ALL

SERVICES

PROVIDED

SUBJECT

DA

AN

DIN

E27T_R

EP

EA

CO

MP

A

NY

WE

LL

FIELD

CO

UN

TY

STA

TE

LOC

ATI

ON

SE

CTIO

N

TOW

NS

HIP

::::::::::::

AR

RO

W E

NE

RG

Y

DA

AN

DIN

E27T_R

EP

E

AT D

AA

ND

INE

NO

NE

QLD

NO

NE

NO

NE

NO

NE

NO

NE

NO

NE

NO

NE

NO

NE

NO

NE

NO

NE

05/14/

09480.74

20.0025

313.90

345.50

0326.25

NO

NE

0000

OTH

ER

ELE

VA

TION

KB

:

NO

NE

ELE

VA

TION

DF

: NO

NE

LOG

ME

AS

UR

ED

FR

OM

:

DA

TE

DE

PTH

DR

ILLER

BIT S

IZE

LOG

TOP

LOG

BO

TTOM

CA

SIN

G

OD

CA

SIN

G B

OT

TOM

CA

SIN

G TY

PE

BO

RE

HO

LE

FLUID

RM

TEM

PE

RA

TUR

E

MU

D R

ES

MU

D

WE

IGH

T

::::::::::::::::

TAB

LE H

EIG

HT 3.05 A

BO

VE

G/L

LU 0501 9238S

N4352 C

S137 S

OU

RC

E S

/N

ALL S

ER

VIC

ES

PR

OV

IDE

D S

UB

JEC

T TO

STA

ND

AR

D TE

RM

S A

ND

Page 77: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

5 CM 35

CALIPERL

1 G/CC 4

DEN(L

0 API-GR200

1 G/CC 4

DEN(L

1 G/CC 4

DEN(S

1 G/CC 4

DEN(S

0 API-GR200

5 CM 35

CALIPERL METE

GAMMA

0 API-GR

GAMMA

2005

CALIPERL

CM

CALIPERL

METERS

35 1

DEN(SS)

G/CC 41

DEN(SS)

DEN(LS)

G/CC 4

DEN(LS)0 API-GR 2005 CM

320

330

340

G/CC 41 G/CC 4

0 API-GR

GAMMA

0 API-GR

GAMMA

2005

2005

CM

CALIPERL

CM

CALIPERL

35 1

35 1

METERS

G/CC 41

DEN(SS)

G/CC 41

DEN(SS)

G/CC 4

DEN(LS)

G/CC 4

DEN(LS)

31

Page 78: s3-ap-southeast-2.amazonaws.com · Web viewDaandine-27T – Well Completion Report Arrow Energy Ltd1. Daandine-27T – Well Completion Report Arrow Energy Ltd. 1. Daandine-27T –

APPENDIX 5 WIRELINE LOGS (LAS FILES)