    Flare Gas Recovery Project

    at TAKREER Ruwais Refinery

    The 31st International symposium

    January 31, 2013

    COSMO OIL CO., LTD.

  • 8/10/2019 s2 5 Cosmo Mrkawashimaefbc8dpresentation Data

    2/14

    Abu Dhabi National Oil Company(ADNOC) has been actively

    engaging in environmental countermeasures. Gas Conservation Task Force(1996)

    Instruct the group companies to eliminate or minimizegas flaring.

    Launch a health, safety and environmental managementprogram(1997~)

    Reducing the flue gas and wasted materials.

    Abu Dhabi Oil Refining Company(TAKREER) Tackle the environmental issues

    Making effort to reduce the flare gas

    1. Background and Objectives of the Project 1

    We conducted joint implementation of

    gas recovery project with JCCP

    Reduce SO and CO2

  • 8/10/2019 s2 5 Cosmo Mrkawashimaefbc8dpresentation Data

    3/14

    TAKREER

    Cosmo Oil Co., Ltd.

    Cosmo Engineering Co.,

    Ltd.

    Toyo Engineering

    Corporation

    Project management

    Basic Design

    EPC Project

    It em 2005FY 2006FY 2007FY 2008FY

    BasicDesign

    Contract of EPC

    EPC

    Performance test

    Technical support

    evaluation

    2. Project Schedule 2

  • 8/10/2019 s2 5 Cosmo Mrkawashimaefbc8dpresentation Data

    4/14

    3. Ruwais Refinery 3

    Crude Distillation Unit 120,000BPD

    Condensate Splitters 140,000BPD 2 units

    Naphtha, Kerosene, Gas oil Hydrodesulphurization Units

    Vacuum Distillation Unit 46,000BPD

    Hydrocracker 27,000BPD

    Hydrogen Plant 60,000m3N/hr

    Sulfur Recovery units 44/49 tons/day

    Other

    Our target is in theHydrocracker group

  • 8/10/2019 s2 5 Cosmo Mrkawashimaefbc8dpresentation Data

    5/14

    Existing Units

    NEW Flare gasrecovery unit

    Gas treatingunit

    BoilerFurnace

    Reduce the

    Fuel gas

    Flare Stack

    Fuel gasRecovery

    the flare gas

    The some units emitted a part of the gas to the flare gas header. And they

    burn the flare gas in the flare stack.In this project, we executed the introduction of the flare gas recovery unitin the hydrocracker group.And we can recovery the flare gas and reduce the fuel gas.

    Remove the H2S

    CNG

    4. Project Overview 4

  • 8/10/2019 s2 5 Cosmo Mrkawashimaefbc8dpresentation Data

    6/14

    We have the following facilities for the flare gas recovery.

    This system requires a large land by a Gas holder.

    We have a lot of equipment for this system , so the operation is complex.

    5. Conventional gas recovery system - 1 5

    FlareStack

    FlareGas

    RecoveredFlare Gas

    ReciprocatingGas Compressor

    Conventional Flare gas recovery unit

    M

    Gas Holder

  • 8/10/2019 s2 5 Cosmo Mrkawashimaefbc8dpresentation Data

    7/14

    5. Conventional gas recovery system - 2 6

  • 8/10/2019 s2 5 Cosmo Mrkawashimaefbc8dpresentation Data

    8/14

    M

    FlareStack

    FlareGas

    Recovered

    Flare Gas

    Gas Compressor

    Spill Back control valve

    New Flare gas recovery unit

    Introduce the Liquid-Ring compressor and Spill Back Control.a) Stable against fluctuations of flare header.

    b) The unit configuration is simple and easy to operation

    C) Operating range is wide.( 0 1,000m3N/h)

    6. Introduced gas recovery system - 1 7

  • 8/10/2019 s2 5 Cosmo Mrkawashimaefbc8dpresentation Data

    9/14

    6. Introduced gas recovery system - 2 8

  • 8/10/2019 s2 5 Cosmo Mrkawashimaefbc8dpresentation Data

    10/14

    Conventional system

    50m 30m

    7. FGR Plant Area 9

    New system area25m 10m

    New flare gas recovery unit is a very compact compared to the

    conventional unit.

    Image Figure

  • 8/10/2019 s2 5 Cosmo Mrkawashimaefbc8dpresentation Data

    11/14

    Recovered Flare gas(m3N/h)

    SOx reduction(ton/y)

    CO2reduction(ton/y) About7,000

    Operation

    About400

    About40

    This project is the one greatly contributing to the environmental

    improvement. Especially, it is the one to achieve the result to the

    CO2 reduction greatly.

    0

    200

    400

    600

    Feb-09 Mar-09 Apr-09 Jun-09 Jul-09 Aug-09

    Operating result (m3N/h)

    8. Project Result - 1 10

  • 8/10/2019 s2 5 Cosmo Mrkawashimaefbc8dpresentation Data

    12/14

    This project is covered ADNOC News and TAKREER News.

    8. Project Result - 2 11

  • 8/10/2019 s2 5 Cosmo Mrkawashimaefbc8dpresentation Data

    13/14

    8. Project Result - 3 12

    This project wins The Japan Petroleum Institute s Award for

    International cooperation.

    This news is also covered the Japanese newspapers.

  • 8/10/2019 s2 5 Cosmo Mrkawashimaefbc8dpresentation Data

    14/14

    We not only achieved through this environmental

    project, we were able to build a good relationship.

    We will continue the good relationship as partners

    in the future.

    9. Finally 13