Tuf-Bar | Fiberglass Rebar (GFRP) VS Traditional Steel Rebar
S1 mechanical plans for under slab plumbing placement prior to pouring slab. ... bend and place...
Transcript of S1 mechanical plans for under slab plumbing placement prior to pouring slab. ... bend and place...
2
PROJECT NO:
SHEET NO:
CONTENTS:
DATE:
3
REVISIONS:
1
PR
OJE
CT
:
P.O. Box 159
Huxley, IA 50124
Phone: (515) 597-5457
Fax: (515) 597-5461
www.jcorp.biz
I H
ER
EB
Y C
ER
TIF
Y T
HA
T T
HIS
E
NG
IN
EE
RIN
G D
OC
UM
EN
T W
AS
PR
EP
AR
ED
B
Y M
E O
R U
ND
ER
M
Y D
IR
EC
T P
ER
SO
NA
L
SU
PE
RV
IS
IO
N A
ND
T
HA
T I A
M A
D
UL
Y L
IC
EN
SE
D P
RO
FE
SS
IO
NA
L
EN
GIN
EE
R U
ND
ER
T
HE
L
AW
S O
F T
HE
S
TA
TE
O
F IO
WA
.
DU
AN
E E
. JE
NS
EN
RE
GIS
TR
AT
IO
N
No
. 1
35
67
ARCHITECTURAL STRUCTURAL
CONSTRUCTION ENGINEERING
Corpc o n s u l t i n g e n g i n e e r s
J , inc.
CE
RT
IF
IC
AT
IO
N:
Expires: 12-31-09
Iro
n W
oo
d
36 U
nit C
on
do
s - L
ot 7
Alto
on
a, IA
6 / 7 / 16
13-053
Foundation Plan
Foundation Sections
S1
SCALE:
7
Foundation Plan
3/32"=1'-0"
SCALE:
1
Foundation Section
1/2"=1'-0" SCALE:
2
Foundation Section
1/2"=1'-0" SCALE:
3
Foundation Section
1/2"=1'-0" SCALE:
5
Foundation Section
1/2"=1'-0"
SCALE:
6
Foundation Section
1/2"=1'-0"
SCALE:
4
Foundation Section
1/2"=1'-0"
2
PROJECT NO:
SHEET NO:
CONTENTS:
DATE:
3
REVISIONS:
1
PR
OJE
CT
:
P.O. Box 159
Huxley, IA 50124
Phone: (515) 597-5457
Fax: (515) 597-5461
www.jcorp.biz
I H
ER
EB
Y C
ER
TIF
Y T
HA
T T
HIS
E
NG
IN
EE
RIN
G D
OC
UM
EN
T W
AS
PR
EP
AR
ED
B
Y M
E O
R U
ND
ER
M
Y D
IR
EC
T P
ER
SO
NA
L
SU
PE
RV
IS
IO
N A
ND
T
HA
T I A
M A
D
UL
Y L
IC
EN
SE
D P
RO
FE
SS
IO
NA
L
EN
GIN
EE
R U
ND
ER
T
HE
L
AW
S O
F T
HE
S
TA
TE
O
F IO
WA
.
DU
AN
E E
. JE
NS
EN
RE
GIS
TR
AT
IO
N
No
. 1
35
67
ARCHITECTURAL STRUCTURAL
CONSTRUCTION ENGINEERING
Corpc o n s u l t i n g e n g i n e e r s
J , inc.
CE
RT
IF
IC
AT
IO
N:
Expires: 12-31-09
Iro
n W
oo
d
36 U
nit C
on
do
s - L
ot 7
Alto
on
a, IA
6 / 7 / 16
13-053
Framing Plans
S2
SCALE:
2
Third Floor Framing Plan
3/32"=1'-0"
SCALE:
1
Second Floor Framing Plan
3/32"=1'-0"
SCALE:
3
Deck Framing Plan
3/16"=1'-0"
SCALE:
4
Garage Portal Frame
3/4"=1'-0"
SCALE:
5
Garage Header Section
3/4"=1'-0"
SCALE:
6
Garage Header Support / Shear Wall Plan
1-1/2"=1'-0"
2
PROJECT NO:
SHEET NO:
CONTENTS:
DATE:
3
REVISIONS:
1
PR
OJE
CT
:
P.O. Box 159
Huxley, IA 50124
Phone: (515) 597-5457
Fax: (515) 597-5461
www.jcorp.biz
I H
ER
EB
Y C
ER
TIF
Y T
HA
T T
HIS
E
NG
IN
EE
RIN
G D
OC
UM
EN
T W
AS
PR
EP
AR
ED
B
Y M
E O
R U
ND
ER
M
Y D
IR
EC
T P
ER
SO
NA
L
SU
PE
RV
IS
IO
N A
ND
T
HA
T I A
M A
D
UL
Y L
IC
EN
SE
D P
RO
FE
SS
IO
NA
L
EN
GIN
EE
R U
ND
ER
T
HE
L
AW
S O
F T
HE
S
TA
TE
O
F IO
WA
.
DU
AN
E E
. JE
NS
EN
RE
GIS
TR
AT
IO
N
No
. 1
35
67
ARCHITECTURAL STRUCTURAL
CONSTRUCTION ENGINEERING
Corpc o n s u l t i n g e n g i n e e r s
J , inc.
CE
RT
IF
IC
AT
IO
N:
Expires: 12-31-09
Iro
n W
oo
d
36 U
nit C
on
do
s - L
ot 7
Alto
on
a, IA
6 / 7 / 16
13-053
Roof Framing Plan
S3
UP TO 4' SPAN (2) 2x8's -
(SINGLE CRIPPLE SUPPORT)
UP TO 6' SPAN (2) 9
1
2
" MICROLAMS -
(DOUBLE CRIPPLE SUPPORT)
= 40 PSF
= 15 PSF TOP CHORD (INCLUDES 3/4" GYPCRETE)
= 10 PSF BOTTOM CHORD
= 65 PSF (NO LIVE LOAD REDUCTION USED)
LIVE LOAD
DEAD LOAD
TOTAL
= 40 PSF
= 15 PSF TOP CHORD (INCLUDES 3/4" GYPCRETE)
= 10 PSF BOTTOM CHORD
= 65 PSF (NO LIVE LOAD REDUCTION USED)
FLOOR DESIGN LOADING
LIVE LOAD
DEAD LOAD
TOTAL
= 30 PSF (ADD DRIFTING WHERE REQUIRED)
= 10 PSF
= 10 PSF
= 50 PSF
ROOF DESIGN LOADING
LIVE LOAD (GROUND SNOW)
TOP CHORD DEAD LOAD
BOTTOM CHORD DEAD LOAD
TOTAL
LATERAL DESIGN LOADING
OVERTURNING FACTOR OF SAFETY 1.5
IMPORTANCE FACTOR 1.0
BASIC WIND SPEED 90 MPH
WIND EXPOSURE B
SEISMIC SITE CLASIFICATION D
SEISMIC DESIGN CATEGORY A
NOTE : BUILD AS
INSULATED BOX
HEADERS IN ALL
EXTERIOR WALLS
HEADER SCHEDULE
1. ALL DESIGN AND CONSTRUCTION SHALL CONFORM TO THE 2012 INTERNATIONAL
BUILDING CODE AS AMENDED AND ADOPTED BY YHE CITY OF ALTOONA, IOWA.
2. CONTRACTOR TO VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTION AND
REPORT ALL DISCREPANCIES TO JCORP, INC. CONSULTING ENGINEERS.
3. SILL ANCHORS TO BE 1/2" DIAMETER BOLTS MIN. 4'-0" O.C. EMBEDDED A MINIMUM OF 7"
INTO THE CONCRETE, @ 4'-0" O.C. MAX. AND 1'-0" MAX. FROM THE END OF ANY SILL PLATE.
AT INTERIOR SHEAR WALL LOCATIONS, AS AN ALTERNATE TO ANCHOR BOLTS,
SECURE PLATES WITH 1/2" DIA x 7" MIN. EMBEDMENT (10" LONG) EXPANSION ANCHORS.
4. THE FOOTING DESIGN IS BASED ON A MIN. BEARING CAPACITY OF 2000 PSF FOR
CONTINUOUS FOOTINGS AND 2500 PSF FOR ISOLATED SPREAD FOOTINGS. OWNER TO
OBTAIN THE SERVICES OF A GEOTECH TO VERIFY BEARING MATERIAL CAPACITY PRIOR
TO PLACING CONCRETE.
5. FORMED WALLS SHOWN TO BE FORMED & POURED 7 1/2" WIDE & 11 1/2" WIDE MAY BE
SUBSTITUTED WITH 8" WIDE & 12" WIDE RESPECTIVELY
6. SEE MECHANICAL PLANS FOR UNDER SLAB PLUMBING PLACEMENT
PRIOR TO POURING SLAB.
7. ALL CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF
4000 PSI IN 28 DAYS AND BE PLACED PER ACI 301 "SPECIFICATIONS FOR
STRUCTURAL CONCRETE OF BUILDINGS".
8. ALL REINFORCING STEEL SHALL BE GRADE 60 DEFORMED BARS. LAP CONTINUOUS
REINFORCING 1'-6" MIN. PROVIDE CORNER BARS IN FOOTINGS AND WALLS
LAPPED 2'-0" MIN. WITH LONGITUDINAL STEEL. BEND AND PLACE REBAR PER
ACI 315 "DETAILS AND DETAILING OF CONCRETE REINFORCEMENT".
9. ALL STRUCTURAL FRAMING LUMBER SHALL BE CLEARLY MARKED AND OF A QUALITY
TO MEET THE FOLLOWING MINIMUM GRADE REQUIREMENTS OR BETTER:
DOUGLAS FIR-LARCH (DFL) STUD GRADE
LOAD BEARING STUDS AT EXTERIOR WALLS: SINGLE 2x6- FIRST & SECOND LEVEL
SINGLE 2x4- THIRD LEVEL
LOAD BEARING STUDS AT INTERIOR CORRIDORS: SINGLE 2x6- ALL LEVELS
LOAD BEARING STUDS AT OTHER LOCATIONS: SINGLE 2x4- ALL LEVELS
JOISTS & HEADERS: DOUGLAS FIR-LARCH (DFL) NO.2 OR MICROLAMS PER NOTE 17
PLATES, NAILERS & BRACING: DOUGLAS FIR-LARCH (DFL) NO.3 OR
SPRUCE-PINE-FIR (SPF) NO.2
10. ALL WOOD IN CONTACT WITH CONCRETE OR EXPOSED TO WEATHER SHALL BE
PRESSURE TREATED PRESERVATIVE LUMBER.
11. ALL NAILING SHALL CONFORM TO IBC TABLE 2304.9.1.
12. ALL STUDS SHALL BE SPACED AT 16" O.C. MAXIMUM. STUDS SHALL ALIGN
VERTICALLY TO MATCH FLOOR TRUSS OR JOIST SPACING. EVERY THIRD
STUD SHALL ALIGN WITH ROOF TRUSSES SPACED AT 24" O.C. ABOVE.
13. FLOOR SHEATHING SHALL BE 3/4" THICK TONGUE AND GROOVE APA RATED 48/24
PLYWOOD. FASTEN TO SUPPORTS WITH GLUE AND 8d COMMON NAILS AT 4" O.C.
PANEL PERIMETER AND 8" O.C. AT INTERMEDIATE SUPPORTS. STAGGER JOINTS ONE
HALF SHEET.
14. ROOF SHEATHING SHALL BE 7/16" THICK O.S.B. WITH CLIPS AT MID-SPAN BETWEEN
TRUSSES. FASTEN TO SUPPORTS SAME AS FLOORS. STAGGER JOINTS ONE HALF SHEET.
15. EXTERIOR WALL SHEATHING SHALL BE 7/16" O.S.B. SHEATHING INSTALLED VERTICALLY.
CUT TO FIT FROM BOTTOM TO TOP PLATE. ADD HORIZONTAL BLOCKING WHERE REQ'D
AT PANEL SPLICES. FASTEN TO VERTICAL STUDS AND HORIZONTAL PLATES WITH 8d
COMMON GALVANIZED NAILS @ 4" O.C. AT PANEL EDGES (3/8" IN FROM EDGE) AND
12" O.C. AT INTERMEDIATE INTERIOR SUPPORTS.
16. INTERIOR UNIT SEPARATION AND STAIR TOWER WALLS SHEATHING AT SHEAR
WALL LOCATIONS NOTED SHALL BE 7/16 O.S.B. APPLY ONE LAYER TO ONE SIDE OF
STUD WALL (SAME SIDE ALL LEVELS) FULL HEIGHT. FASTEN O.S.B. w/ 8d x 2 1/2" LONG
COOLER NAILS @ 4"o.c. AT PANEL EDGES AND 12" o.c. AT INTERMEDIATE INTERIOR
SUPPORTS TO CONFORM TO IBC TABLE 2306.3.
17. INTERIOR CORRIDOR WALL SHEATHING SHALL BE 5/8" EXTERIOR GRADE GYPSUM
SHEATHING APPLIED BY FRAMER TO CORRIDOR SIDE OF WALL. FASTEN GYPSUM
BOARD w/ 8d GALVANIZED NAILS @ 4" o.c. AT PANEL EDGES AND 7" o.c. AT INTERMEDIATE
INTERIOR SUPPORTS TO CONFORM TO TABLE 2306.7. ALL EDGES TO BE BLOCKED.
18. LAMINATED VENEER LUMBER (LVL) BEAMS AND HEADERS SHALL BE "1.9E MICROLAM
LVL" AS MANUFACTURED BY TRUSS JOISTS MACMILLAN OR APPROVED EQUIVALENT.
19. WOOD FLOOR AND ROOF TRUSSES ARE TO BE METAL PLATE CONNECTED, WOOD
CHORDS AND WOOD WEBS. PARALLEL CHORD FLOOR TRUSS MEMBERS SHALL BE
PLACED FLATWISE.
20. WOOD FLOOR AND ROOF TRUSSES SHALL BE DESIGNED AND MANUFACTURED TO
SUPPORT THE DESIGN LOADS INDICATED BELOW.
21. THE MAXIMUM ALLOWABLE FLOOR TRUSS LIVE LOAD DEFLECTION SHALL
BE LIMITED TO SPAN/480 AND THE TOTAL LOAD DEFLECTION TO SPAN / 360. THE
MAXIMUM ALLOWABLE ROOF TRUSS LIVE LOAD DEFLECTION SHALL BE LIMITED
TO SPAN / 360 AND THE TOTAL LOAD DEFLECTION TO SPAN / 240.
22. THE TRUSS LAYOUTS SHOWN ARE SCHEMATIC ONLY.
23. THE TRUSS MANUFACTURER SHALL DESIGN AND FURNISH ALL CONNECTIONS AND
ACCESSORIES REQUIRED FOR COMPLETE INSTALLATION OF TRUSS FRAMING
SYSTEM.
24. GIRDER TRUSSES WHERE INDICATED OR REQUIRED SHALL BE MULTI-PLYS AS
DETERMINED BY MANUFACTURER. CONTRACTOR SHALL PROVIDE STUDS FULL
HEIGHT EQUAL TO THE NUMBER OF PLYS. PROVIDE BLOCKING IN FLOOR TRUSS
SPACE TO TRANSFER CONTINUOUS SUPPORT.
25. REFERENCE A-SERIES DRAWINGS FOR DRAFTSTOP LOCATIONS IN FLOOR
AND ROOF FRAMING. DESIGN TRUSSES SO AS TO MINIMIZE ADDITIONAL FIELD
FRAMING AT THESE LOCATIONS AND TO ALLOW DRAFTSTOP SHEATHING TO BE
APPLIED IN SEQUENCE WITH TRUSS INSTALLATION.
26. TRUSS SHOP DRAWINGS ARE TO BE PREPARED AND SEALED BY A LICENSED
STRUCTURAL ENGINEER IN THE STATE OF IOWA AND SUBMITTED FOR REVIEW
BY JCorp, Inc. AND ARCHITECT PRIOR TO FABRICATION.
27. ROOF TRUSSES SHALL BE SECURED WITH SIMPSON H1 HOLD-DOWN FASTENERS
(OR APPROVED EQUAL) AT ALL BEARING LOCATIONS
STRUCTURAL NOTES
SCALE:
1
Framing Section
3/4"=1'-0" SCALE:
2
Framing Section
3/4"=1'-0" SCALE:
3
Framing Section
3/4"=1'-0" SCALE:
4
Framing Section
3/4"=1'-0" SCALE:
5
Framing Section
3/4"=1'-0"
2nd FLOOR THRU 3rd FLOOR
SHEAR WALL SHEATHING AND FASTENING PER
STRUCTURAL NOTE 15 AT ALL EXTERIOR WALLS & NOTE
16 AT ALL UNIT SEPARATION, STAIR TOWER WALLS &
NOTE 17 AT ALL CORRIDOR WALLS
1st FLOOR
ROOF
SH
2 (T
YP
)
SH1 (TYP)
SH
(T
YP
) R
E:
4, 5
&
6
/S
2
SCALE:
6
Roof Framing Plan
3/32"=1'-0"
SHEAR WALL PLANS
NOTES:
SH1 - EXTERIOR - (SEE NOTE 15 ON SHEET S3)
SH2 - UNIT SEPARATION / STAIRS - (SEE NOTE 16 ON SHEET S3)
SH3 - CORRIDOR - (SEE NOTE 17 ON SHEET S3)
SH3 (TYP)
SH1 (TYP)
SH
2 (T
YP
)
SH
2 (T
YP
)
SH1 (TYP)
SH3 (TYP)
SH1 (TYP)
SH
2 (T
YP
)
SH
1 (T
YP
)
SH
1 (T
YP
)
SH
1 (T
YP
)
SH
1 (T
YP
)
SH2 SH2
SH2 SH2
SH2 SH2
SH
2S
H2
SH
2
SH
2
SH
2
SH
2
SH
(T
YP
) R
E:
4, 5
&
6
/S
2
SH2
SH
2
SH
2
SH
2S
H2