    2

    1. Crimp a Straight Cable

    Skin off the cable jacket.

    Untwist and straighten eachwire.

    Arrange the wires according tothe 568B wiring schematic orderfor both ends.

    Cut and insert the wires into aRJ45 connector.

    Crimp the cable using acrimping tool.

    (assessment done on final product)

    Crimpedstraight and

    crossed cables.

    At least 1 meter of UTPcable is recommended.

    Candidate may refer to

    the wiring schematicmanual in the LearningModule.

    The cables must belabelled and kept in asafe place

    Values:

    Precise

    Confident

    Abide

    2

    2. Check the straight cable iscrimped successfully using acable tester.

    2

    1. Crimp a Crossed Cable

    Skin off the cable jacket. Untwist and straighten each

    wire.

    Arrange the wires according to

    the 568A wiring schematic orderfor one end AND 568B wiringschematic order for the otherend.

    Cut and insert the wires into aRJ45 connector.

    Crimp the cable using crimpingtool.

    (assessment done on final product)

    24 Check the crossed cable is

    crimped successfully using acable tester.

    8 TOTAL MARK