S.ritesportal.rites.com/iepis/Circular/Pers9TSOmanRailCS2015.pdf · supply, fire fighting etc...

11

Transcript of S.ritesportal.rites.com/iepis/Circular/Pers9TSOmanRailCS2015.pdf · supply, fire fighting etc...

Page 1: S.ritesportal.rites.com/iepis/Circular/Pers9TSOmanRailCS2015.pdf · supply, fire fighting etc Services provided: My specific responsibilities included were concept development, planning
Page 2: S.ritesportal.rites.com/iepis/Circular/Pers9TSOmanRailCS2015.pdf · supply, fire fighting etc Services provided: My specific responsibilities included were concept development, planning
Page 3: S.ritesportal.rites.com/iepis/Circular/Pers9TSOmanRailCS2015.pdf · supply, fire fighting etc Services provided: My specific responsibilities included were concept development, planning

S. No

.

Position Qualification Role Experience

1 Site Construction Coordinator Senior Engineer / Manager

Team leader at least 15 years in Railways/Infrastructure Project Engineering/Construction Supervision

2 Site Design Engineer Senior Engineer/ Manager

Technical Team leader at least 15 years in Railways/Infrastructure Project Engineering/Construction Supervision

3 Financial Assistant Engineer/Degree in Economics

Financial Expert/Accountant at least 5 years in Contract Accounting

4 Quantity Surveyor Surveyor Quantity Surveyor at least 5 years in Railways/Infrastrucutre Survey

5 Civil Works Engineer Senior Engineer Civil Works leader at least 15 years in Railways/Infrastructure Project Engineering

6 Senior Geotechnical Engineer Senior Engineer Chief Geotechnical Engineer at least 15 years in Railways/Infrastructure Engineering

7 Hydraulic Engineer Engineer Hydraulic expert at least 5 years in Railways/Infrastructure Engineering

8 Senior Earthworks Engineer Engineer Chief Earthworks Engineer at least 10 years in Earthworks Project Engineering

9 Senior Buildings Engineer Engineer/Architect Buildings Chief Engineer at least 10 years in Building Site Engineering

10 Buildings Engineer Engineer Building expert at least 5 years in Railways/Infrastructure Building Engineering

11 Senior Material Engineer Engineer/Surveyor Material expert at least 5 years in Railways Material Management

12 Senior Bridge Engineer Senior Engineer Senior Bridge Expert at least 10 years in Railways/Infrastructure Bridge Engineering

13 Bridge Engineer Engineer Bridge expert at least 5 years in Railways/Infrastructure Bridge Engineering

14 Senior Tunnel Engineer Senior Engineer Senior Tunnel Expert at least 10 years in Railways/Infrastructure Tunnel Engineering

15 Tunnel Engineer Engineer Tunnel expert at least 5 years in Railways/Infrastructure Tunnel Engineering

16 Senior Roads Engineer Senior Engineer Senior Roads expert at least 10 years in Roads construction

17 Roads Engineer Engineer Roads expert at least 5 years in Roads Construction

18 Senior Trackworks Engineer Senior Engineer Senior Trackworks expert at least 10 years in Railways Trackworks Engineering

19 Trackworks Engineer Engineer/Graduate Trackworks expert at least 5 years in Railways Trackworks Engineering/Installation

20 Senior Technology Systems Engineer Senior Engineer Senior Railways technology systems

at least 15 years in Railways Systems Engineering

21 Signaling Systems Engineer Engineer/Graduate Railways Technology Systems expert

at least 10 years in Railways Signaling Systems Engineering/Installation

22 Telecoms Systems Engineer Engineer/Graduate Railways Technology Systems expert

at least 10 years in Railways Telecomms Systems Engineering/Installation

23 Senior Electromechnical/Senior MEP Engineer

Engineer/Graduate Electromechanical expert at least 10 years in Electromechanical/Electronic

/24 System Integration Principal Senior Engineer System Integration Expert at least 10 years in ERTMS/ETCS System Integration with deep knowledge of CENELEC 50126 and 50129 procedures and

Provision of Construction Supervision for Oman Rail Segment -1 EPC contract in OmanKey Staff

Page 4: S.ritesportal.rites.com/iepis/Circular/Pers9TSOmanRailCS2015.pdf · supply, fire fighting etc Services provided: My specific responsibilities included were concept development, planning

S. No

.

Position Qualification Role Experience

Provision of Construction Supervision for Oman Rail Segment -1 EPC contract in OmanKey Staff

25 Senior Quality Assurance Engineer Senior Engineer Senior Quality Assurance Expert at least 15 years in Quality Assurance Management

26 Health, Safety and Environmental Engineer

Senior Engineer Senior Health, Safety and Environmental expert

at least 15 years in HSE Assurance Management

27 Senior Mechanical Engineer (Maintenance Facilities)

Senior Engineer Maintenance Facilities Expert at least 10 years in Maintenance Facilities Engineering/Management

28 Commissioning Manager Senior Engineer Testing and commissioning manager

At least 10 years in Testing and Commissioning of Railway sector

Notes:12a Category 1 (5+ years experience) 6 (Sl. Nos. 4, 11, 13, 15, 17, 19)b Category 2 (10+ years experience) 6 (Sl. Nos. 8, 16, 21, 22, 24, 27)c Category 3 (15+ years experience) 1 (Sl. No. 6)

Total 13

Positions shown above in red colour are proposed to be filled by RITES personnel.Category wise no. of personnnel for Key Staff proposed by RITES.

Page 5: S.ritesportal.rites.com/iepis/Circular/Pers9TSOmanRailCS2015.pdf · supply, fire fighting etc Services provided: My specific responsibilities included were concept development, planning

no.

Position Qualification Role Experience

1 Document Management Assistant Graduate/Surveyor Document Manager at least 3 years in contracting document management

2 Quantity Surveyor Surveyor Quantity Surveyor at least 5 years in Railways/Infrastructure Survey

3 Technical Assistant Employee/surveyor Assistance to staff At least 3 years in assigned task

4 Geotechnical Inspector Engineer/Geologist Geotechnical expert at least 5 years in Railways/Infrastructure Engineering

5 Hydraulic Inspector Engineer Hydraulic expert at least 5 years in Railways/Infrastructure Engineering

6 Earthwork Inspector Engineer Earthworks expert at least 5 years in Earthworks Site Engineering

7 Buildings Inspector Engineer Building expert at least 5 years in Railways/Infrastructure Building Engineering

8 Material Engineer Assistant Engineer Material expert at least 3 years in Railways Material Management

9 Electromechnical/MEP Engineer Engineer/Graduate Electromechanical expert at least 5 years in Electromechanical/Electronic

10 System Integration specialist Engineer System Integration Expert at least 5 years in ERTMS/ETCS System Integration with deep knowledge of

11 Quality Assurance Engineer Civil Works

Engineer/Graduate Quality Assurance Expert at least 5 years in Quality Assurance Management

12 Quality Assurance Engineer Systems Engineer/Graduate Quality Assurance Expert at least 5 years in Quality Assurance Management

13 Quality Assurance Inspector Civil Works

Surveyor/Employee Quality Assurance Expert at least 5 years in Quality Assurance Assistance

14 Quality Assurance Inspector Systems Surveyor/Employee Quality Assurance Expert at least 5 years in Quality Assurance Assistance

15 Quality Control/Material Engineer Engineer/Graduate Quality Assurance Expert at least 5 years in Quality Assurance Management

16 HSE Advisor Surveyor/Employee Health, Safety and Environmental Expert

at least 5 years in HSE Assurance Assistance

17 Mechanical Engineer Sohar Mechanical Engineer

Maintenance Facility Engineer at least 5 years in Maintenance Facilities Engineering/Management

18 ICV Officer Business Graduate In Country Value Officer At least 5 years in Local Sourcing Activities, development of local suppliers and local skill

19 Data Entry Operator Diploma Data Entry Operator At least 3 years in mentioned position

20 GIS Technician Degree in geology, Computer science or

GIS Technician At least 3 years in mentioned position

21 Engineering CAD Operator Associate Degree in CAD Drafting

Engineering CAD Operator At least 3 years in mentioned position

22 Architect Architecture Architect At least 3 years in mentioned position

23 Secretary Diploma or equivalent

Secretary At least 3 years in mentioned position

Total 16Notes:

1

Provision of Construction Supervision for Oman Rail Segment -1 EPC contract in OmanSupport Staff

Positions shown above in red colour are proposed to be filled by RITES personnel. Sl.Nos. are 2-15, 17 and 22

Page 6: S.ritesportal.rites.com/iepis/Circular/Pers9TSOmanRailCS2015.pdf · supply, fire fighting etc Services provided: My specific responsibilities included were concept development, planning

OMAN RAIL

Provision of construction supervision for Oman rail segment -1 EPC contract

1

CURRICULUM VITAE (CV)

Proposed Position: Bridge Engineer

Name of the Firm: RITES Ltd.

Name of the Staff:

Date of Birth:

Years with Firm/Entity: Nationality: Indian

Membership in Professional Societies: •

Detailed Tasks Assigned: • Bridge Engineer

Key Qualifications:

Have nearly 29 years of experience in the field of planning, design and project management / construction of various infrastructure projects mainly related to Railway Sector. Areas of specialization are:- Design of rail bridges, design of different type of steel / composite superstructure with welded, riveted and bolted connections. Use of Euro codes, AREMA, AASHTO Codes. (commercial operating speed of 100 Km/h) Detail engineering of number of Inland container depots involving railway track, heavy duty pavement, buildings , warehouses, underground services including preparation and finalization of tenders, contract management Project Management and Construction Supervision of infrastructure projects -- planning, detailed engineering, estimation, tendering and award of contract, quality assurance, project monitoring etc. Attended training courses on Seismic design of bridges, Euro codes related to bridges. Attended International seminar on Steel bridges

Education:

Degree Institution Date

B.Tech (Civil Engineering) Indian Institute of Technology, Delhi 1984

M.Tech (Civil Engineering) Indian Institute of Technology, Delhi 1992

Photograph

Page 7: S.ritesportal.rites.com/iepis/Circular/Pers9TSOmanRailCS2015.pdf · supply, fire fighting etc Services provided: My specific responsibilities included were concept development, planning

OMAN RAIL

Provision of construction supervision for Oman rail segment -1 EPC contract

2

Employment Record:

From: 05/1987 To: On going Employer: RITES Ltd. Position: Additional/Jt./Dy. General Manager (Bridge Design Expert)

Project 1: Kashmir Rail Link Project Description: Work responsibilities included Project Co-ordination in connection with detailed engineering and designer's association during execution of Quazigund Baramulla (Kashmir) Rail Link project for Indian Railways. This project involves design of approx. 65 major bridges and 725 minor bridges Services provided: Design and proof checking of Steel plate girders of spans 12.2 m, 18.3m, 24.4m and open web girder of spans 30.5m, 45.7m, 61.0m Design and proof checking of composite plate girder(steel plate girder with concrete deck) for curved portion of track having spans 12.2m, 18.3m, 24.4m, 30.5m , 45.7m and composite truss of span 61.0 m Design of Foot over bridges for all the stations of Quazigund Baramulla section of USBRL project 120 Km line from Quazigund to Baramula has been commissioned

Client: Indian Railways Duration: 7years Location: Kashmir,India Budget: Rs.14 crore Commercial Operating Speed: 100 Km/h

From: : 05/1987 To: On going Employer: RITES Ltd. Position: : Additional/Jt. General Manager (Bridge Design Expert)

Project 2: Jubliee Bridge across river Hooghly Description: Design / Drawings of Jubliee bridge alongwih approach viaduct Services provided: Responsible for Design / drawing of continuous superstructure 1x132.65+1x150+1x132.65m having 2 track for Jubliee bridge project. Designer's association involving vetting of fabrication drawings, erection scheme, load testing are also part of scope of work and presently under progress. Present status - erection is under progress.

Client: Indian Railways Duration: 1.5 years Location: West Bengal, India Budget: Rs.3.5 crore Commercial Operating Speed: 100 Km/h

From: : 05/1987 To: On going Employer: RITES Ltd. Position: : Additional/Jt. General Manager (Bridge Design Expert)

Project 3: Ganga Bridge at Patna Description: Design / Drawings of Rail cum road bridge across river Ganga at Patna along with viaduct including topographic / hydrographic survey, model studies etc. Services provided: Design /drawing of 64m span superstructure for rail cum road bridge on river Ganga at Patna. Design of 1.4 km viaduct involving composite superstructure for viaduct portion of Ganga bridge at Patna.

Client: Indian Railways Duration: 0.75 years Location: Bihar, India Budget: Rs.5.5 crore Commercial Operating Speed: 100 Km/h

From: : 05/1987 To: On going Employer: RITES Ltd. Position: Additional/Jt. General Manager (Bridge Design Expert)

Project 4: Rail cum Road Bridge across river Brahmputra at Bogibeel near Dibrugarh, Assam. Description: Hydrographic survey, hydraulic model studies, detail design of main bridge and viaduct Services provided: Design of Welded type composite truss superstructure (1x34+39x125 m +1x34m span) for rail cum Road Bridge (Railway Track on lower deck and RCC slab at upper deck for road bridges) at Bogibeel on river Brahmputra.

Client: Indian Railways Duration: 1.75 years Location: Assam, India Budget: Rs.40 Crore Commercial Operating Speed: 100 Km/h

Page 8: S.ritesportal.rites.com/iepis/Circular/Pers9TSOmanRailCS2015.pdf · supply, fire fighting etc Services provided: My specific responsibilities included were concept development, planning

OMAN RAIL

Provision of construction supervision for Oman rail segment -1 EPC contract

3

Design has been carried out using provisions of Euro Codes along with Ramboll, Denmark. Presently associated with this project for fabrication, erection and launching of these superstructures, preparation of QAP, instrumentation scheme. From: : 05/1987 To: On going Employer: RITES Ltd. Position: Dy. General Manager

(Engineering) Project: Construction of two numbers 35mx150m pre engineered warehouses for Inland Container Depot at Tughlakabad, New Delhi Description: Services provided: Responsible for Proof checking of Contractor’s design and project management for construction of two numbers 35mx150m pre engineered warehouses for Inland Container Depot at Tughlakabad, New Delhi

Client: Container Corporation of India Ltd. Duration: 6 months Location: New Delhi Budget: 4% of cost of construction Commercial Operating Speed: NA

From: : 05/1987 To: On going Employer: RITES Ltd. Position: : Dy. General Manager (Engineering)

Project: Inland Container Depots of M/S CONCOR Description: : Work responsibilities included Site selection, planning, detailed engineering, tender preparation finalization and award of contract, Construction supervision, quality assurance and project management for Inland container depots at following locations. Terminal facilities consists of the Railway track, workshops, heavy duty concrete pavements(for Gantry cranes / Container stacking) , bituminous pavements, warehouses (truss span from 20m to 35m), Administrative building, Underground services like drainage, water supply, fire fighting etc Services provided: My specific responsibilities included were concept development, planning and detail engineering, estimation, tender & award, project management and commissioning i’e from concept to commissioning of Inland container Depot Dadri (U.P.), Tughlakabad (Delhi) involved in this project from 1989 –1991 as Asstt.Manager(RITES) Domestic Container Terminal Khodiyar (Ahmedabad), Inland container Depot Vadodara, Inland container Depot Ludhiana, Inland container Depot Bangalore, Inland container Depot Hyderabad , Inland container Depot Jamshedpur, Inland container Depot Cossipore (Calcutta)

Client: Container Corporation Of India Ltd Duration: 6.0 years Location: All over India Budget: 4% of cost of constructionn Commercial Operating Speed: NA

From: : 05/1987 To: On going Employer: RITES Ltd. Position: Dy . General Manager Project : Repair and overhaul facilities for wagons for Indian Railways Description: Project Management services for design and construction of shed for repair and overhaul facilities for wagons Services provided: Project Management for planning, design and construction supervision & project management of 23mx145m shed for repair and over hauling facilities for wagons of Northern Railway including administration building, storage building, canteen, garages, roads, railway track etc

Client: Container Corporation Of India Ltd Duration: 6 months Location: Delhi , India Budget: 4% cost of construction Commercial Operating Speed: NA

From: : 05/1987 To: On going Employer: RITES Ltd. Position: Dy. General Manager

Project: Domestic Container Terminal at Okhla , New Delhi Client: Container Corporation Of India

Page 9: S.ritesportal.rites.com/iepis/Circular/Pers9TSOmanRailCS2015.pdf · supply, fire fighting etc Services provided: My specific responsibilities included were concept development, planning

OMAN RAIL

Provision of construction supervision for Oman rail segment -1 EPC contract

4

Description & Services provided: Construct Management for execution of Heavy duty concrete pavement (M-50 grade concrete) for Domestic Container Terminal at Okhla , New Delhi

Ltd Duration: 2 months Location: New Delhi Budget: 4% of cost of construction Commercial Operating Speed:

From: 05/1987 To: on going Employer: RITES Ltd. Position: Manager/Astt. Manager

Project: Talcher Super Thermal Power Station of National Thermal Power Corporation Ltd Description: Project management consultancy in connection with design and construction of Merry Go round service for Talcher super thermal mpower stations Services provided: Preparation of tender document, quantity and cost estimation, tender preparation ,finalization and award of contract for Merry Go Round system for Talcher Super Thermal Power Station of National Thermal Power Corporation Ltd .Construction supervision of Railway siding including Major railway bridges as well as road bridges in connection with this project.

Client: National Thermal Power Corporation Ltd Duration: 2 years Location: Talcher, Orissa, India Budget: 7.5% of cost of construction Commercial Operating Speed: NA

From: 06/1987 To: 06/1997 Employer: RITES Ltd. Position: Manager/Astt. Manager

Project: Semi Merry Go Round system for Tenughat Thermal Power Station Description: Project Management consultancy in connection with design and construction of Semi MGR system Services provided: Preparation of tender document , quantity and cost estimation tender finalization and award of contract for Semi Merry Go Round system for Tenughat Thermal Power Station

Client: Tenughat Vidyut nigam limited Duration: 1 years Location: Bihar, India Budget: 7.5% of cost of construction Commercial Operating Speed: NA

From: 06/1987 To: 06/1997 Employer: RITES Ltd. Position: Manager/Astt. Manager

Project: Construction of buildings for Central Silk Board, a World Bank aided projects. Description:& Services provided: Preparation of tender document, quantity and cost estimation, tender finalisation and award of contract for construction of buildings for Central Silk Board, a World Bank aided projects.

Client: Central Silk Board Duration: 3 months Location: All over India Budget: -- Commercial Operating Speed: NA

From: 06/1987 To: 06/1997 Employer: RITES Ltd. Position: Manager/Astt. Manager

Project: Project Quality assurance for execution of civil & structural steel works of 2x67.5 MW Rajghat Thermal Power Station. Description: The work involved were coal handling plant, Ash Handling plant, Water treatment plant, TG building, Bunker bay building, Cooling towers, Administration building, Cooling water pump house, RCC chimney and general civil works for power plants etc. Services provided: Job responsibilities included day to day checking of material, methodology, processes for all civil engineering and structural steel works being executed in connection with this thermal Power Project. Worked as in charge of quality assurance team at the site.

Client: Bharat Heavy Electrical Ltd. Duration: 2 years Location: Delhi Budget: Manpower based Commercial Operating Speed: NA

From: 06/1987 To: 06/1997 Employer: RITES Ltd. Position: Manager/Astt. Manager

Project: Preparation of feasibility studies and detailed project Client: Inland Waterways Authority of

Page 10: S.ritesportal.rites.com/iepis/Circular/Pers9TSOmanRailCS2015.pdf · supply, fire fighting etc Services provided: My specific responsibilities included were concept development, planning

OMAN RAIL

Provision of construction supervision for Oman rail segment -1 EPC contract

5

reports for following projects of Inland Waterways Authority of India Ltd. Description & Services provided: Planning and design of inland waterways terminals at 11 locations from Ballia to Haldia on National Waterway no.1 for Inland Waterways Authority of India (IWAI)

India (IWAI) Duration: 1 years Location: National waterway no.1 Budget: - Commercial Operating Speed: NA

From: 01/1984 To: 05/1987 Employer: Consulting Engg services (I) Pvt. Ltd. India

Position: Engineer (Structural Design)

Project: Design & drawing of anchored RCC diaphragm wall, pre cast piles & deck slab for load out Quay at Hazira of M/S Larsen & Toubro Description: Services provided: Design & drawing of anchored RCC diaphragm wall, pre cast piles & deck slab for load out Quay at Hazira of M/S Larsen & Toubro

Client: M/S Larsen & Toubro Duration: 6 months Location: Hazira Budget: Commercial Operating Speed: NA

From: 01/1984 To: 05/1987 Employer: Consulting Engg services (I) Pvt. Ltd. India

Position: Engineer (Structural Design)

Project: Modernization of Rajabagan Dry Dock No. 3 & 4, Calcutta. Description & Services provided: Design & drawing of cantilevered RCC diaphragm wall, deck slab supported on piles in connection with modernization of Rajabagan Dry Dock No. 3 & 4, Calcutta.

Client: CIWTC Duration: 6 months Location: Calcutta Budget: - Commercial Operating Speed: NA

From: 01/1984 To: 05/1987 Employer: Consulting Engg services (I) Pvt. Ltd. India

Position: Engineer (Structural Design)

Project: Design of jetty at Tea Transit shed Calcutta for Central Inland Water Transport Corporation Description & Services provided: Design of jetty at Tea Transit shed Calcutta for Central Inland Water Transport Corporation

Client: Central Inland Water Transport Corporation Duration: 6 months Location: Calcutta Budget: - Commercial Operating Speed: NA

From: 01/1984 To: 05/1987 Employer: Consulting Engg services (I) Pvt. Ltd. India

Position: Engineer (Structural Design)

Project: Design of fitting out jetty at Goa Shipyard Limited. Description: Services provided: Design of fitting out jetty at Goa Shipyard Limited.

Client: Goa Shipyard Limited Duration: 6 months Location: Goa Budget: - Commercial Operating Speed: NA

From: 01/1984 To: 05/1987 Employer: Consulting Engg services (I) Pvt. Ltd. India

Position: Engineer (Structural Design)

Project: Burma Out ports Project - an ADB aided project Description: Services provided: Recommendation of dredger and calculation of dredging quantities for Burma Out ports Project - an ADB aided project

Client: Burma Port Duration:3 months Location: Burma Budget: - Commercial Operating Speed: NA

From: 01/1984 To: 05/1987 Employer: Consulting Engg services (I) Pvt. Ltd. India

Position: Engineer (Structural Design)

Project: All India inland water transport system study for Planning Client: Planning Commission of India

Page 11: S.ritesportal.rites.com/iepis/Circular/Pers9TSOmanRailCS2015.pdf · supply, fire fighting etc Services provided: My specific responsibilities included were concept development, planning

OMAN RAIL

Provision of construction supervision for Oman rail segment -1 EPC contract

6

Commission of India Description& Services provided: All India inland water transport system study for Planning Commission of India -

Duration: 6 months Location: all over India Budget: - Commercial Operatingspeed: NA

Languages:

Speaking Reading Writing

English Excellent Excellent Excellent

Arabic - - -

Certification:

I, the undersigned, certify that to the best of my knowledge and belief, these data correctly describe my qualifications, my experience, and me.

Date:

Day/Month/Year

(Signature of staff member and authorized representative of the firm)

Full name of staff member:

Full name of authorized representative: