S. Matsuzaki Director Engineering S. Matsuzaki Director Engineering & & VDL Mode 2/AOA Initial...

15
S. Matsuzaki Director Engineering & VDL Mode 2/AOA Initial Operating Conditions Experience ACARS @ AVICOM Japan

Transcript of S. Matsuzaki Director Engineering S. Matsuzaki Director Engineering & & VDL Mode 2/AOA Initial...

Page 1: S. Matsuzaki Director Engineering S. Matsuzaki Director Engineering & & VDL Mode 2/AOA Initial Operating Conditions Experience VDL Mode 2/AOA Initial Operating.

S. MatsuzakiDirector EngineeringS. MatsuzakiDirector Engineering

&&VDL Mode 2/AOA

Initial Operating Conditions                           &Experience                

VDL Mode 2/AOA

Initial Operating Conditions                           &Experience                

ACARS ACARS

@ AVICOM Japan@ AVICOM Japan

Page 2: S. Matsuzaki Director Engineering S. Matsuzaki Director Engineering & & VDL Mode 2/AOA Initial Operating Conditions Experience VDL Mode 2/AOA Initial Operating.

AVICOM JapanAVICOM JapanACARS Service deployed APR. 1990

AOC Interoperability was established    between SITA (1990) and ARINC (1991)

Connected to KDD Yamaguchi GES for SATCOM Data service (1990)

Head Office. Minato-ku, Tokyo

Capital. 1,310 Million Yen

StockholdersJAL, ANA, JAS, NTT, KDDI, NTT data etc

ACARS Service deployed APR. 1990

AOC Interoperability was established    between SITA (1990) and ARINC (1991)

Connected to KDD Yamaguchi GES for SATCOM Data service (1990)

Head Office. Minato-ku, Tokyo

Capital. 1,310 Million Yen

StockholdersJAL, ANA, JAS, NTT, KDDI, NTT data etc

Page 3: S. Matsuzaki Director Engineering S. Matsuzaki Director Engineering & & VDL Mode 2/AOA Initial Operating Conditions Experience VDL Mode 2/AOA Initial Operating.

ACARS Current Status    as of Oct. 2003

ACARS Current Status    as of Oct. 2003

49 ACARS RGS in operation now.

Base Frequency = 131.45 MHz

2nd Frequency = 131.25 MHz                               at 7 Major airport

Approx. 2.2 Million Blocks / month

Up link success rate : Approx. 92 %

49 ACARS RGS in operation now.

Base Frequency = 131.45 MHz

2nd Frequency = 131.25 MHz                               at 7 Major airport

Approx. 2.2 Million Blocks / month

Up link success rate : Approx. 92 %

Page 4: S. Matsuzaki Director Engineering S. Matsuzaki Director Engineering & & VDL Mode 2/AOA Initial Operating Conditions Experience VDL Mode 2/AOA Initial Operating.

Ave Monthly Traffic

0

500,000

1,000,000

1,500,000

2,000,000

2,500,000

97 98 99 00 01 02 03

Ave Monthly Traffic

0

500,000

1,000,000

1,500,000

2,000,000

2,500,000

97 98 99 00 01 02 03

ACARS Traffic trendACARS Traffic trend

BlocksBlocks

Page 5: S. Matsuzaki Director Engineering S. Matsuzaki Director Engineering & & VDL Mode 2/AOA Initial Operating Conditions Experience VDL Mode 2/AOA Initial Operating.

Success rate historySuccess rate history

全体平均

70.0

75.0

80.0

85.0

90.0

95.0

100.0

<97>

<99>

<01>

02/5

02/7

02/9

02/1

1

03/1

03/3

03/5

03/7

03/9

全体平均

70.0

75.0

80.0

85.0

90.0

95.0

100.0

<97>

<99>

<01>

02/5

02/7

02/9

02/1

1

03/1

03/3

03/5

03/7

03/9

Uplink successUplink success

Page 6: S. Matsuzaki Director Engineering S. Matsuzaki Director Engineering & & VDL Mode 2/AOA Initial Operating Conditions Experience VDL Mode 2/AOA Initial Operating.

Driving factor toward VDL AOA Driving factor toward VDL AOA

Steady growth of data link traffic

Need faster & reliable means to avoid capacity constraint.

Steady growth of data link traffic

Need faster & reliable means to avoid capacity constraint.

ATN (VDL M2) as 2nd step for ATS ATN (VDL M2) as 2nd step for ATS

VDL AOA (ACARS Over AVLC) 1st step for AOC delivery improvement VDL AOA (ACARS Over AVLC) 1st step for AOC delivery improvement

Page 7: S. Matsuzaki Director Engineering S. Matsuzaki Director Engineering & & VDL Mode 2/AOA Initial Operating Conditions Experience VDL Mode 2/AOA Initial Operating.

VDL/AOA implementationVDL/AOA implementation

Contract with ARINC @ Mar. 2002

IOC : September 2003             at Narita & Kansai A/P.

10 airports were selected as VDL/AOA site at initial phase.

Contract with ARINC @ Mar. 2002

IOC : September 2003             at Narita & Kansai A/P.

10 airports were selected as VDL/AOA site at initial phase.

Page 8: S. Matsuzaki Director Engineering S. Matsuzaki Director Engineering & & VDL Mode 2/AOA Initial Operating Conditions Experience VDL Mode 2/AOA Initial Operating.

ACARS and VDL/AOA Architecture at AVICOM Japan

ACARS and VDL/AOA Architecture at AVICOM Japan

RGS

ACARS

RGS

ARINC  SITAARINC  SITA

Airline

AVICOM Center

Existing ACARS System

JDLC

ACARS

VGS

NMSNMS

Gate WayGate Way

AGRMAGRM

VDL Mode-2/AOA System

Page 9: S. Matsuzaki Director Engineering S. Matsuzaki Director Engineering & & VDL Mode 2/AOA Initial Operating Conditions Experience VDL Mode 2/AOA Initial Operating.

AGRM

GatewayNMS

VDL System components

Page 10: S. Matsuzaki Director Engineering S. Matsuzaki Director Engineering & & VDL Mode 2/AOA Initial Operating Conditions Experience VDL Mode 2/AOA Initial Operating.

VGSRGS

VDL Ground Station

VDL Ground Station

ACARS Remote Ground Station

ACARS Remote Ground Station

Page 11: S. Matsuzaki Director Engineering S. Matsuzaki Director Engineering & & VDL Mode 2/AOA Initial Operating Conditions Experience VDL Mode 2/AOA Initial Operating.

Performance - VDLPerformance - VDL Initial two weeks experience after IOC.

Two aircraft, B767-300ER have logged on to VGS.

The airplane has flown Kansai – China (Beijing, Shanghai) Kansai – Haneda

Up link success = 98 % @ Gateway per message block

Initial two weeks experience after IOC.

Two aircraft, B767-300ER have logged on to VGS.

The airplane has flown Kansai – China (Beijing, Shanghai) Kansai – Haneda

Up link success = 98 % @ Gateway per message block

Page 12: S. Matsuzaki Director Engineering S. Matsuzaki Director Engineering & & VDL Mode 2/AOA Initial Operating Conditions Experience VDL Mode 2/AOA Initial Operating.

Difficulties - VDLDifficulties - VDL VDL range seems slightly smaller than that

of ACARS VDL cloud seems not continuous between Narita and

Kansai.

Need more VGSs to cover whole airspace over Japan.

Blind area at Kansai airport

Installation of one more VGS at the other side of the terminal

VDL range seems slightly smaller than that of ACARS VDL cloud seems not continuous between Narita and

Kansai.

Need more VGSs to cover whole airspace over Japan.

Blind area at Kansai airport

Installation of one more VGS at the other side of the terminal

Page 13: S. Matsuzaki Director Engineering S. Matsuzaki Director Engineering & & VDL Mode 2/AOA Initial Operating Conditions Experience VDL Mode 2/AOA Initial Operating.

KUH 

FUK 

OKA

CTS

KIXKOJ

PlannedVGS deployment

NRT

HND

KIJ

SDJ  

1st phase

2nd phase

KCZ

IZO

NGO

Page 14: S. Matsuzaki Director Engineering S. Matsuzaki Director Engineering & & VDL Mode 2/AOA Initial Operating Conditions Experience VDL Mode 2/AOA Initial Operating.

Emerging ATNEmerging ATN

VDL/AOA Sys can be upgraded to an ATN compliant system by adding; Software to handle ATN message Routers for distribution of ATN message And some others. (Hard & Soft)

Time for the upgrade depend on the progress of ATN implementation in Japan and World wide.

VDL/AOA Sys can be upgraded to an ATN compliant system by adding; Software to handle ATN message Routers for distribution of ATN message And some others. (Hard & Soft)

Time for the upgrade depend on the progress of ATN implementation in Japan and World wide.

Page 15: S. Matsuzaki Director Engineering S. Matsuzaki Director Engineering & & VDL Mode 2/AOA Initial Operating Conditions Experience VDL Mode 2/AOA Initial Operating.

 

ARINC  SITA

AIRLINES HOST

AOA  N/WAOA  N/WACARS  

N/WACARS  N/W

TOKYO  ACC

Thank you !GEO