RWS2 - Dinner…Lain Wastewat
-
Upload
ibrahim3318 -
Category
Documents
-
view
212 -
download
0
Transcript of RWS2 - Dinner…Lain Wastewat
-
8/18/2019 RWS2 - Dinner…Lain Wastewat
1/2
-
8/18/2019 RWS2 - Dinner…Lain Wastewat
2/2
Wastewater Treatment Plant
Storage lagoons
1 Wastewater Treatment Plant Screen
2 Primary Sedimentation Tank 3 Aerobic Sludge Digestion Tank
4 Sludge Storage Tanks
MP1 Maturation Pond
WS2 Winter Storage Lagoons
IP Irrigation Pump
SOME FACTS AND FIGURES
Peak Winter Inflow = 0.23 Ml/day
Average Daily Dry Weather Flow = 0.06 Ml/day
Raw Sewage B.O.D. = 350 mg/l
Raw Sewage Suspended Solids = 300 mg/l
Pond 5 Final Effluent Average B.O.D. = 15 mg/l
Pond 5 Final Effluent Av. Susp. Solids = 20 mg/l
Irrigation to alpine woodland
wastewater
Dinner Plain wastewater treatment plantSchematic diagram
Dinner Plain Village
1
2
MP1 IP
Not in use
WS5
WS
2
WS3
WS 4
34
4
EAST GIPPSLANDWATER