    Wastewater Treatment Plant

    Storage lagoons

    1 Wastewater Treatment Plant Screen

    2 Primary Sedimentation Tank 3  Aerobic Sludge Digestion Tank 

    4 Sludge Storage Tanks

    MP1 Maturation Pond

    WS2 Winter Storage Lagoons

    IP Irrigation Pump

    SOME FACTS AND FIGURES

    Peak Winter Inflow = 0.23 Ml/day

     Average Daily Dry Weather Flow = 0.06 Ml/day

    Raw Sewage B.O.D. = 350 mg/l

    Raw Sewage Suspended Solids = 300 mg/l

    Pond 5 Final Effluent Average B.O.D. = 15 mg/l

    Pond 5 Final Effluent Av. Susp. Solids = 20 mg/l

    Irrigation to alpine woodland

     wastewater 

    Dinner Plain wastewater treatment plantSchematic diagram