RURAL TRANSIT PLANNING Shilpa Panicker – ADOT Jorge Luna – MAG Deron Lozano – Valley Metro...
-
Upload
sydney-baldwin -
Category
Documents
-
view
219 -
download
0
Transcript of RURAL TRANSIT PLANNING Shilpa Panicker – ADOT Jorge Luna – MAG Deron Lozano – Valley Metro...
![Page 1: RURAL TRANSIT PLANNING Shilpa Panicker – ADOT Jorge Luna – MAG Deron Lozano – Valley Metro Scott Miller – HDR Engineering.](https://reader035.fdocuments.us/reader035/viewer/2022062321/56649eef5503460f94bfef97/html5/thumbnails/1.jpg)
RURAL TRANSIT PLANNINGRURAL TRANSIT PLANNING
Shilpa Panicker – ADOTJorge Luna – MAG
Deron Lozano – Valley MetroScott Miller – HDR Engineering
![Page 2: RURAL TRANSIT PLANNING Shilpa Panicker – ADOT Jorge Luna – MAG Deron Lozano – Valley Metro Scott Miller – HDR Engineering.](https://reader035.fdocuments.us/reader035/viewer/2022062321/56649eef5503460f94bfef97/html5/thumbnails/2.jpg)
Introduction Transit Service Modes Route Planning Elements Route Planning Exercise Additional Considerations
Session Overview
![Page 3: RURAL TRANSIT PLANNING Shilpa Panicker – ADOT Jorge Luna – MAG Deron Lozano – Valley Metro Scott Miller – HDR Engineering.](https://reader035.fdocuments.us/reader035/viewer/2022062321/56649eef5503460f94bfef97/html5/thumbnails/3.jpg)
Transit Service Modes
Commuter Rail
Light Rail
Streetcar
Bus Rapid Transit
Rapid/Express Bus
Local BusCirculator
Rural Transit
Paratransit
![Page 4: RURAL TRANSIT PLANNING Shilpa Panicker – ADOT Jorge Luna – MAG Deron Lozano – Valley Metro Scott Miller – HDR Engineering.](https://reader035.fdocuments.us/reader035/viewer/2022062321/56649eef5503460f94bfef97/html5/thumbnails/4.jpg)
Rural Transit Services
ModeFrequenc
y
Stop Spacing (miles)
Relative Capital
Cost / Mile
RelativeOper. Cost / Passenger
Demand Response
NA NA $ $$$$
Deviated Local Bus
Low – Mod 1/8 – 1 $ $$$
Local Bus Low – High 1/8 – 1/4 $ $$
![Page 5: RURAL TRANSIT PLANNING Shilpa Panicker – ADOT Jorge Luna – MAG Deron Lozano – Valley Metro Scott Miller – HDR Engineering.](https://reader035.fdocuments.us/reader035/viewer/2022062321/56649eef5503460f94bfef97/html5/thumbnails/5.jpg)
Rural Transit Service
![Page 6: RURAL TRANSIT PLANNING Shilpa Panicker – ADOT Jorge Luna – MAG Deron Lozano – Valley Metro Scott Miller – HDR Engineering.](https://reader035.fdocuments.us/reader035/viewer/2022062321/56649eef5503460f94bfef97/html5/thumbnails/6.jpg)
Land Use• Origins• Destinations
Performance Running Time Fleet Requirements Cost Other
Route Planning
![Page 7: RURAL TRANSIT PLANNING Shilpa Panicker – ADOT Jorge Luna – MAG Deron Lozano – Valley Metro Scott Miller – HDR Engineering.](https://reader035.fdocuments.us/reader035/viewer/2022062321/56649eef5503460f94bfef97/html5/thumbnails/7.jpg)
Annual budget of $350,000 Plan up two (2) routes on map
• Data says… Assume local fixed-route bus
mode Cannot exceed 10 miles\route Identify activity centers served
• Shopping, medical, work, educational… Calculate running & cycle time Calculate fleet requirements
Route Planning Exercise
![Page 8: RURAL TRANSIT PLANNING Shilpa Panicker – ADOT Jorge Luna – MAG Deron Lozano – Valley Metro Scott Miller – HDR Engineering.](https://reader035.fdocuments.us/reader035/viewer/2022062321/56649eef5503460f94bfef97/html5/thumbnails/8.jpg)
8-Mile Route
![Page 9: RURAL TRANSIT PLANNING Shilpa Panicker – ADOT Jorge Luna – MAG Deron Lozano – Valley Metro Scott Miller – HDR Engineering.](https://reader035.fdocuments.us/reader035/viewer/2022062321/56649eef5503460f94bfef97/html5/thumbnails/9.jpg)
![Page 10: RURAL TRANSIT PLANNING Shilpa Panicker – ADOT Jorge Luna – MAG Deron Lozano – Valley Metro Scott Miller – HDR Engineering.](https://reader035.fdocuments.us/reader035/viewer/2022062321/56649eef5503460f94bfef97/html5/thumbnails/10.jpg)
Survey:
Demographics:
Data says…
![Page 11: RURAL TRANSIT PLANNING Shilpa Panicker – ADOT Jorge Luna – MAG Deron Lozano – Valley Metro Scott Miller – HDR Engineering.](https://reader035.fdocuments.us/reader035/viewer/2022062321/56649eef5503460f94bfef97/html5/thumbnails/11.jpg)
Route Planning
Running Time
Distance / AVG. Speed X 60Miles / MPH
5miles / 20mph X 60 = 15 min
![Page 12: RURAL TRANSIT PLANNING Shilpa Panicker – ADOT Jorge Luna – MAG Deron Lozano – Valley Metro Scott Miller – HDR Engineering.](https://reader035.fdocuments.us/reader035/viewer/2022062321/56649eef5503460f94bfef97/html5/thumbnails/12.jpg)
Route Planning
Fleet Requirements
Cycle Time* / HeadwayMinutes / Minutes
60 min / 20 minutes = 3 Buses
*Cycle Time = Round Trip Running Time + Operator Layover
![Page 13: RURAL TRANSIT PLANNING Shilpa Panicker – ADOT Jorge Luna – MAG Deron Lozano – Valley Metro Scott Miller – HDR Engineering.](https://reader035.fdocuments.us/reader035/viewer/2022062321/56649eef5503460f94bfef97/html5/thumbnails/13.jpg)
Route Planning
Gross Annual Operating CostDaily Trips X Trips per mile X
Days X Rate per Mile
26 Trips X 255 Days X 5 Miles X $3 = $99,450
![Page 14: RURAL TRANSIT PLANNING Shilpa Panicker – ADOT Jorge Luna – MAG Deron Lozano – Valley Metro Scott Miller – HDR Engineering.](https://reader035.fdocuments.us/reader035/viewer/2022062321/56649eef5503460f94bfef97/html5/thumbnails/14.jpg)
Why the change? Analysis Communication with
• Officials • Public• Partners
General items For more info on deviated routes
visit:• http://www.rtd-denver.com • http://www.dart.org • http://www.the-t.com• http://www.gonctd.com
Additional Consideration
![Page 15: RURAL TRANSIT PLANNING Shilpa Panicker – ADOT Jorge Luna – MAG Deron Lozano – Valley Metro Scott Miller – HDR Engineering.](https://reader035.fdocuments.us/reader035/viewer/2022062321/56649eef5503460f94bfef97/html5/thumbnails/15.jpg)