Rural Electrification Corporation Limited
Rural ElectrificationRajiv Gandhi Grameen Vidyutikaran Yojana
(RGGVY)
Hyderabad
29.10.2010
Rural Electrification Corporation Limited
Rural Electrification – Indian Perpsective
A vital programme for socio-economic development of rural areas
To ensure rapid economic development by providing electricity as an input for productive uses in agriculture, rural industries, etc.
To improve the quality of life of the rural people by supplying electricity for lighting of rural homes and hearths, shops, community centres, public places etc.
2
Rural Electrification Corporation Limited
Genesis of India’s RE Programme
Evolution of India’s rural electrification programme can be divided into five distinctive stages.
Stage I
1951-planned electrification of villages taken up with the main objective of providing electricity as a social amenity-
More than 45,000 villages covered.
Stage II
Mid Sixties- focus on the role of electricity as development input with a primary objective of energizing pump sets-
More than 2 lakh villages and more than one crore pump sets energised
Rural Electrification Corporation Limited
Genesis of India’s RE Programme
Stage III
Decade of Eighties- RE seen as a tool for correcting regional inequalities
More than 2.20 lakh villages electrified, around 43 lakh pump sets energised
Stage IV
Decade of Nineties – Deteriorating financial conditions of SEBs break the tempo.
Emphasis on improving system efficiencies rather than extensive coverage
Only 41,000 villages electrified
Rural Electrification Corporation Limited
Genesis of India’s RE Programme
Stage V
2001 onward-
Household electrification rather than village electrification is the new focus of RE programme
Rural Electrification Corporation Limited
Major RE Programmes
Minimum Needs Programme
Started in Vth Plan
Targetted states with village electrification lower than national average
100% loans for last mile connectivity
Discontinued in 2004-05 because of lack of response from States
Rural Electrification Corporation Limited
Major RE Programmes
Kutir Jyoti Programme
Initiated in 1988-89
Single point connection to BPL households
100% grant
Rs. 612 crore released
71.7 lakh BPL household connected in 16 years
Merged with AREP in 2004 and now with RGGVY
Rural Electrification Corporation Limited
Major RE Programmes
Pradhan Mantri Gramodaya Yojana (PMGY)
Launched in 2000-2001
Funding provided for minimum services in rural areas (health, education, drinking water and electrification etc)
Funding as additional central assistance on 90% loan and 10% grant principle
Flexibility to states to decide on inter-allocation amongst basic services
Discontinued from 2005
Rural Electrification Corporation Limited
Major RE Programmes
Accelerated Rural Electrification Programme (AREP)
Launched in 2002
Interest subsidy of 4%
Applicable on loans given through PFC/REC and NABARD
Rural Electrification Corporation Limited
Major RE Programmes
Accelerated Electrification of one lakh villages and one crore households
Launched in 2004
40% capital subsidy and 60% loan
AREP and Kutir Jyoti schemes merged with the programme
Rural Electrification Corporation Limited
Trend in Village Electrification
Achievement per annum in Village Electrification
16599 15511
2410620101
2333 2663
8261
1969-74 1974-80 1980-85 1985-90 1992-97 1997-02 2002-07(P)
Time period
No
. of
Vill
ages
ele
ctri
fice
d
per
an
nu
m
Rural Electrification Corporation Limited
Status of Village Electrification (As per 2001 Census)
593732
474162
119570
0
100000
200000
300000
400000
500000
600000
700000
Total Villages Electrified Villages
Unelectrified Villages
Rural Electrification Corporation Limited
Status of Rural Household Electrification (2001 census)
Number in Crores
13.83
6.02 (44%)
7.81(56%)
Total Households Electrif ied Households Unelectrif ied Households
Rural Electrification Corporation Limited
Characteristics of RE Programme
Utilities view point
High cost per unit
Difficult recovery of cost of operations
Sub-optimal and risky investment
Involves large capital and revenue subsidy
Sustainability
Rural Electrification Corporation Limited
Characteristics of RE Programme
Users view point
Accessibility
Availability
Reliability
Affordability
Quality
Rural Electrification Corporation Limited
Accessibility
States with more the 10% villages to be electrified
• Barring these eight
States, others have
electrified more than
90% of their villages
• Has this apparent
success led to
access of
electricity by the
rural households ?
0%
20%
40%
60%
80%
100%
WB
Orissa
Assam
Bihar
Arunachal
UP
Meghalaya
Jharkhand
Rural Electrification Corporation Limited
States with > 25% households to be electrified
25%
28%
28%
29%
30%
32%
34%
35% 38%
40%
43% 47%
50% 55%
56%
56%
68%
70%
80%
80%
81%
83%
95%
90%J&
K
K'taka
Guj
TN
Chattisgarh
Andam
an
Kerala
M'tra
MP
AP
Nagaland
Manipur
Uttaranchal
Arunachal
Mizoram
Rajasthan
Tripura
Meghalaya
WB
UP
Orissa
Assam
Jharkhand
Bihar
25%
28%
28%
29%
30%
32%
34%
35% 38%
40%
43% 47%
50% 55%
56%
56%
68%
70%
80%
80%
81%
83%
95%
90%J&
K
K'taka
Guj
TN
Chattisgarh
Andam
an
Kerala
M'tra
MP
AP
Nagaland
Manipur
Uttaranchal
Arunachal
Mizoram
Rajasthan
Tripura
Meghalaya
WB
UP
Orissa
Assam
Jharkhand
Bihar
Availability
Rural Electrification Corporation Limited
Changing Definitions of village Electrification
Prior to October 1997
village was classified as electrified if electricity is being used within its revenue area for any purpose whatsoever.
In 1997, the definition was modified to provide for the use of electricity to village habitations.
a village will be deemed to be electrified if the electricity is used in the inhabited locality within the revenue boundary of the village, for any purpose whatsoever.
Rural Electrification Corporation Limited
Changing Definitions of village Electrification
February 2004
a village would be declared electrified if:
Basic infrastructure such as distribution transformer and distribution lines are provided in the inhabited locality as well as the dalit basti/hamlet where is exists. (For electrification through non-conventional sources a distribution transformer may not be necessary)
Electricity is provided to public places like schools, panchayat offices, health centres, dispensaries, community centres etc, and
The number of households electrified should be at least 10% of te total number of households in the village.
Rural Electrification Corporation Limited
Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY)
Aims at…
Electrifying all villages and habitations.
Providing access to electricity to all rural households.
Giving Electricity Connection to Below Poverty Line (BPL) families free of charge.
Main Features
All ongoing schemes merged in “Rajiv Gandhi Grameen Vidyutikaran Yojana” (RGGVY)
90% grant and 10% loan
Electrification as per new definition
Franchisee arrangement for revenue sustainability
Rural Electrification Corporation Limited
Through creation of :
Rural Electricity Distribution Backbone (REDB) with 33/11 KV (or 66/11 KV) sub-station of adequate capacity in blocks where these do not exist.
Village Electrification Infrastructure (VEI) with provision of distribution transformer of appropriate capacity in villages/habitations.
Decentralised Distributed Generation (DDG) Systems based on conventional & non conventional energy sources where grid supply is not feasible or cost-effective.
Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY)
Rural Electrification Corporation Limited
RGGVY – Implementation FrameworkFor effective and expeditious implementation, REC has prepared-
Guidelines for project formulation
Guidelines for procurement
Tripartite / Quadripartite agreements
MOUs with CPSUs for providing services to states
Specifications of equipment / material
Construction standards
Franchisee guidelines
3rd party quality monitoring guidelines
Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY)
Rural Electrification Corporation Limited
Role of REC….. Nodal Agency
Project scrutiny and Appraisal
Preparation of specification for equipment & material and Construction standard for erection
Co-ordination with MOP, Implementing agencies/ State Govts.
Release of funds to implementing agencies
Monitoring of projects
Ensuring appointment of the franchisee by SPUs.
Rajiv Gandhi Grameen Vidyutikaran Yojana (RGGVY)
Rural Electrification Corporation Limited
Rajiv Gandhi Grameen Vidhyutikaran Yojana (RGGVY)
Role of MOPPolicy framework
Sanction of projects through Monitoring Committee
Release of Capital Subsidy
Monitoring of programme
Rural Electrification Corporation Limited
Role of CPSUs
State may opt services of CPSUs for-
Project Formulation
System planning
Design engineering
Procurement of goods and services
Construction/implementation/ Commission
Project monitoring and supervision of quality of work.
Rajiv Gandhi Grameen Vidhyutikaran Yojana (RGGVY)
Rural Electrification Corporation Limited
Role of State Govts./state power utility
Appointment of independent agency for monitoring and supervision of quality of works
Deployment of franchisees for the management of rural distribution
Determination of Bulk Supply Tariff to ensure commercial viability of franchisees
Provision of requisite revenue subsidy to the state utilities, as required under Electricity Act, 2003.
Adequate arrangement for supply of electricity
Providing authenticated BPL List
Rajiv Gandhi Grameen Vidhyutikaran Yojana (RGGVY)
Rural Electrification Corporation Limited
Role of Monitoring Committee
Ministry of Power has constituted monitoring committee under the Chairmanship of Secretary (Power) with representatives from Planning Commission, Dept. of Expenditure, MNRE, Ministry of Rural Development and Ministry of Panchayti Raj
Monitoring Committee review and monitor the implementation of scheme including sanction of projects, revised cost estimates and issue necessary guidelines from time to time for effective implementation of the scheme.
Rajiv Gandhi Grameen Vidhyutikaran Yojana (RGGVY)
Rural Electrification Corporation Limited
Projects No. of Projects
Un-electrified Villages
Intensive Electrification
of Villages
BPL HH covered
Outlay in Rs. Cr.
(Sanctioned cost)
Approved under 10th Plan
235 68763 111936 83.10
Lakh
9733
Approved under 11th Plan
338 49736 243031 163.35 Lakh
16620
Total 573 118499 354967 246.45 Lakh
26353
As on 15.10.2010
Project Outlay and Coverage (All India)
Rajiv Gandhi Grameen Vidhyutikaran Yojana (RGGVY)
Rural Electrification Corporation Limited
Projects No. of Projects
Un-electrified Villages
Intensive Electrification
of Villages
BPL HH covered
Outlay in Rs. Cr.
(Sanctioned cost)
Approved under 10th Plan
35 46* 42813 27.64
Lakh
1043
Approved under 11th Plan
49 23* 25905 13.22
Lakh
979
Total 84 69* 68718 40.86
Lakh
2022
As on 15.10.2010
* Revised Coverage in Karnataka
Project Outlay and Coverage (Southern Region)
Rajiv Gandhi Grameen Vidhyutikaran Yojana (RGGVY)
Rural Electrification Corporation Limited
States No. of Projects
Un-electrified Villages (Revised
Coverage)
Intensive Electrification
of Villages
BPL HH covered
Outlay in Rs. Cr. (Sanctioned
cost)
Andhra Pradesh
X Plan 17 - 21623 21.14 Lakh 648
XI Plan 9 - 5858 4.78 Lakh 192
Total 26 - 27481 25.92 Lakh 840
Karnataka
X Plan 17 46* 21152 6.32 Lakh 375
XI Plan 8 23* 7039 2.60 Lakh 225
Total 25 69* 28191 8.92 Lakh 600
Kerala
X Plan 1 - 38 0.18 Lakh 20
XI Plan 6 - 592 0.38 Lakh 114
Total 7 - 630 0.56 Lakh 134
Tamil Nadu
X Plan - - - - -
XI Plan 26 - 12416 5.45 Lakh 447
Total 26 - 12416 5.45 Lakh 447
Total (Southern Region)
X Plan 35 46* 42813 27.64 Lakh 1043
XI Plan 49 23* 25905 13.22 Lakh 979
Total 84 69* 68718 40.86 Lakh 2022
Project Outlay and Coverage (Southern Region – State wise)
Rural Electrification Corporation Limited
Physical Achievement so far – As on 15.10.2010 (All India)
Particulars Electrification of UEV Intensive Electrification of Electrified Villages
Connections to BPL H/Hs
Coverage Achievement Coverage Achievement Coverage Achievement
X Plan 68763 62047 (90%) 111936 90743(81%) 83.10 Lakh
68.96 Lakh (83%)
XI Plan 49736 23096(46%) 243031 61000(25%) 163.35 (Lakh)
60.82 Lakh (37%)
Grand Total 118499 85143(72%) 354967 151743(43%) 246.45
(Lakh)
129.78 Lakh
(53%)
31
Rajiv Gandhi Grameen Vidhyutikaran Yojana (RGGVY)
Rural Electrification Corporation Limited
Physical Achievement so far – As on 15.10.2010 (Southern Region)
Particulars Electrification of UEV Intensive Electrification of Electrified Villages
Connections to BPL H/Hs
Coverage Achievement Coverage Achievement Coverage Achievement
X Plan 46* 46 (100%) 42813 37009(86%) 27.64
Lakh
27.73 Lakh (100%)
XI Plan 23* 13(57%) 25905 11128(43%) 13.22
Lakh
10.14 Lakh (77%)
Grand Total
69* 59(86%) 68718 48137(70%) 40.86
Lakh
37.87 Lakh
(93%)
32
Rajiv Gandhi Grameen Vidhyutikaran Yojana (RGGVY)
*Revised Coverage in Karnataka
Rural Electrification Corporation Limited
Physical Achievement so far - As on 15.10.2010 (Southern Region – State wise)
States
Electrification of UEVIntensive
Electrification of Electrified Villages
Connections to BPL H/Hs
Revised Coverage
Achd
%Covera
geAchd. % Coverage Achd. %
Andhra Pradesh
X Plan - - - 21623 17773 82% 21.14 Lakh 21.20 Lakh 100%
XI Plan - - - 5858 3421 58% 4.78 Lakh 3.93 Lakh 82%
Total - - - 27481 21194 77% 25.92 Lakh 25.13 Lakh 97%
Karnataka
X Plan 46* 46 100% 21152 19199 91% 6.32 Lakh 6.36 Lakh 100%
XI Plan 23* 13 57% 7039 3636 52% 2.60 Lakh 1.23 Lakh 47%
Total 69* 59 86% 28191 22835 81% 8.92 Lakh 7.59 Lakh 85%
Kerala
X Plan - - - 38 37 97% 0.18 Lakh 0.17 Lakh 97%
XI Plan - - - 592 - - 0.38 Lakh - -
Total - - - 630 37 6% 0.56 Lakh 0.17 Lakh 31%
Tamil Nadu
X Plan - - - - - - - - -
XI Plan - - - 12416 4071 33% 5.45 Lakh 4.98 Lakh 91%
Total - - - 12416 4071 33% 5.45 Lakh 4.98 Lakh 91%
Total(Southe
rn Region)
X Plan 46* 46 100% 42813 37009 86% 27.64 Lakh 27.73 Lakh 100%
XI Plan 23* 13 57% 25905 11128 43% 13.21 Lakh 10.14 Lakh 77%
Total 69* 59 86% 68718 48137 70% 40.85 Lakh 37.87 Lakh 93%
Rural Electrification Corporation Limited
Thank You
Rural Electrification Corporation Limited
BACK UP SLIDES
Rural Electrification Corporation Limited
X Plan Projects (Andhra Pradesh)
SL. No. Name of District
Name of State Power Utility and
Implementing agency
Coverage
BPL HH
Total sanctioned project cost
(Lacs)
Total Award project cost
(Lacs)Date of Saction
Award DateUE Villages
IE Villages
1 Anantapur CPDCL - 926 51408 2355.05 2355.05 7-Oct-05 7-Jun-06
2 Mahboob-nagar CPDCL - 1477 220158 5661.54 5661.54 24-Oct-05 20-Aug-06
3 Kurnool CPDCL - 902 135203 3718.15 3718.15 25-Oct-05 10-Apr-07
4 Nalgonda CPDCL - 1124 78352 3140.16 3140.16 26-Oct-05 17-Jan-06
5 Srikakulam EPDCL - 1819 194941 5517.61 5517.61 26-Oct-05 17-Mar-06
6 Vizianangaram EPDCL - 1438 149755 4186.74 4186.74 27-Oct-05 4-Mar-06
7 West Godavari EPDCL - 1141 87831 3273.04 3273.04 28-Oct-05 4-Mar-06
8 Vishakhapatnam ESDCL - 2620 204113 6667.56 6667.56 7-Oct-05 4-Mar-06
9 Khammam NPDCL - 1245 132334 3891.85 3891.85 7-Oct-05 10-Apr-06
Rural Electrification Corporation Limited
SL. No. Name of District
Name of State Power Utility and
Implementing agency
Coverage
BPL HH
Total sanctioned project cost
(Lacs)
Total Award project cost
(Lacs)Date of
SanctionAward DateUE
VillagesIE
Villages
10 Nizamabad NPDCL - 1050 60036 2639.28 2639.28 5-Mar-08 10-Apr-06
11 Adilabad NPDCL - 1760 103184 4202.24 4202.24 24-Oct-05 10-Apr-06
12 Guntur SPDCL - 694 135273 3180.80 3180.80 7-Oct-05 2-Aug-06
13 Chittoor SPDCL - 1274 120186 3653.20 3653.20 24-Oct-05 23-Feb-06
14 Krishna SPDCL - 1005 87774 2776.05 2776.05 24-Oct-05 23-Feb-06
15 Kadapa SPDCL - 954 104205 3146.58 3146.58 24-Oct-05 23-Feb-06
16 Prakasham SPDCL - 1067 127633 3384.85 3384.85 24-Oct-05 23-Feb-06
17 Nellore SPDCL - 1127 121931 3420.91 3420.91 24-Oct-05 10-Mar-06
17 Total (Ar.P.) 21623 2114317 64815.60 64815.60
X Plan Projects (Andhra Pradesh)
Rural Electrification Corporation Limited
XI Plan Projects (Andhra Pradesh)
Sr.No.Name of the District(s)
Name of Implementing
Agency
Coverage
BPL HHSanctioned Project Cos
t (Lacs)
Total Award project cost
(Lacs)Date of
approvalStatus of Award
UE Villages
IE Villages
1 3 4 5 6 7 8 9 10 11
1 Medak CPDCL 0 1061 34367 2176.46 2973.12 22-Jan-08 Awarded 23-02-10
2 Ranga Reddy CPDCL 0 893 14883 940.83 1358.36 22-Jan-08 Awarded 23-02-10
3 East Godavari EPDCL 0 1323 245334 8021.12 9322.34 22-Jan-08 Awarded 23-09-06
4 Karimnagar NPDCL 0 935 19417 1903.84 1297.12 22-Jan-08 Awarded 10-04-06
5 Warangal NPDCL 0 1003 71199 3177.61 1569.83 22-Jan-08 Awarded 10-04-06
6Anakapalle(Visha
khapattnam)RE-coop society 0 143 39368 1094.00 1094.00 22-Jan-08 Awarded 04.02.09
7Cheepurupalli (Vizianagaram)
RE-coop society 0 104 29200 804.13 804.13 22-Jan-08 Awarded 08.12.08
8 Kuppam(Chittor) RE-coop society 0 223 14835 594.20 594.20 22-Jan-08 Awarded 18.12.08
9Sircilla
(Karimnagar)RE-coop society 0 173 9220 481.67 481.67 22-Jan-08 Awarded 20.01.09
9 0 5858 477823 19193.86 19494.77
Rural Electrification Corporation Limited
X Plan Projects (Karnataka)
SL. No.
Name of District
Name of State Power Utility
and Implementing
agency
Coverage
BPL HHTotal
sanctioned project cost
Date of Saction
Award DateUE Villages
IE Villages
1 Tumkur BESCOM 10* 3224 26094 1626.24 14-Sep-05 17-Mar-06
2 Bangalore (Rural) BESCOM - 2043 39406 2604.31 14-Sep-05 17-Mar-06
3 Kolar BESCOM - 3307 36744 2201.02 14-Sep-05 17-Mar-06
4 Davangere BESCOM - 795 50472 2972.00 14-Sep-05 27-Mar-06
5 Chitradurga BESCOM 2 1174 36188 2923.54 14-Sep-05 17-Mar-06
6 Hassan CESCOM 34* 2471 41565 3253.64 4-Oct-05 2-Jan-06
7 Mandya CESCOM - 1404 8760 819.03 4-Oct-05 2-Jan-06
8 Mysore CESCOM - 1478 92345 3741.88 4-Oct-05 2-Jan-06
9 Bidar GESCOM - 613 25863 1673.53 4-Oct-05 3-Feb-06
10 Koppal GESCOM - 624 28515 1732.68 4-Oct-05 3-Feb-06
11 Raichur GESCOM - 814 28335 2178.25 4-Oct-05 3-Feb-06
12 Bellary GESCOM - 537 45889 2253.91 4-Oct-05 3-Feb-06
13 Dharwad HESCOM - 388 21936 1329.37 14-Sep-05 20-Jan-06
14 Haveri HESCOM - 690 39429 1961.37 4-Oct-05 20-Jan-06
15 Bijapur HESCOM - 665 48899 2329.21 4-Oct-05 20-Jan-06
16 Gadag HESCOM - 321 27911 1382.01 4-Oct-05 20-Jan-06
17 Bagalkot HESCOM - 604 33477 2557.08 4-Oct-05 20-Jan-06
17 Total (Karnataka) 46* 21152 631828 37539.07
*Revised Coverage
Rural Electrification Corporation Limited
XI Plan Projects (Karnataka)
Sr.No.Name of the District(s)
Name of Implementing
Agency
Coverage
BPL HHSanctioned Project Cost
Date of Sanction Status of Award UE
VillagesIE
Villages
1 Chamrajnagar CESCOM 0 422 22781 1131.81 22-Jan-08 Awarded 27.09.08
2 Kodagu CESCOM 0 296 39669 3839.09 04-Aug-09 Awarded 04.08.09
3 Gulbarga GESCOM 0 1344 58973 4325.24 22-Jan-08 Awarded 08.02.06
4 Belgaum HESCOM 5 1131 62430 4580.21 22-Jan-08 Awarded 13.02.07
5 Uttar Kannada HESCOM 18* 1219 19657 2487.24 22-Jan-08 Awarded 13.02.07
6 Hukeri HESCOM 0 123 14074 721.80 13-Mar-08 Awarded 13.02.07
7 Shimoga MESCOM 0* 1471 23098 2344.15 22-Jan-08 Awarded 02.03.09
8 Chickmagulur MESCOM 0* 1033 19429 3041.15 22-Jan-08 Awarded 02.03.09
8Total (karnataka)
23* 7039 260111 22470.69
*Revised Coverage
Rural Electrification Corporation Limited
X Plan Projects (Kerala)
SL. No.
Name of District
Name of State Power Utility
and Implementing
agency
Coverage
BPL HHTotal
sanctioned project cost
Date of Saction
Award DateUE
VillagesIE
Villages
1 Idukki KSEB - 38 17834 1975.95 5-Aug-05 27-Jan-07
1 Total (Kerala) 38 17834 1975.95
Rural Electrification Corporation Limited
XI Plan Projects (Kerala)
SL. No.
Name of DistrictName of
Implementing agency
Coverage
BPL HHTotal
sanctioned project cost
Date of SanctionUE
VillagesIE
Villages
1 Kozhikode KSEB - 87 11920 1692.93 23-Feb-10
2 Kannur KSEB - 78 5136 1971.40 23-Feb-10
3 Mallapuram KSEB - 122 7897 3263.46 23-Feb-10
4 Kasargod KSEB - 113 4194 1460.71 23-Feb-10
5 Pallakad KSEB - 144 3955 1635.40 23-Feb-10
6 Wyanad KSEB - 48 5415 1433.44 23-Feb-10
6 Total (Kerala) - 592 38517 11457.32
Rural Electrification Corporation Limited
XI Plan Projects (Tamil Nadu)
Sr.No.Name of the District(s)
Name of Implementing
Agency
Coverage
BPL HHSanctioned Project Cost
(Lacs)
Total Award Project Cost
(Lacs)
Date of Sanction
Status of Award / Award expected to
be finalisedUE
VillagesIE Villages
1 Karur TNEB 0 154 16679 950.820 950.820* 04-Feb-08 Awarded 18.06.08
2 Salem TNEB 0 380 27586 2075.34 2075.34* 04-Feb-08 Awarded 18.06.08
3 Trichirapalli TNEB 0 451 23047 2353.20 2353.20* 04-Feb-08 Awarded 18.06.08
4 Coimbatore TNEB 388 27935 1731.82 1731.82* 22-Jan-08 Awarded 18.06.08
5 Cuddalore TNEB 685 37703 2451.82 2451.82* 22-Jan-08 Awarded 18.06.08
6 Dindigul TNEB 337 13321 1118.31 1118.31* 22-Jan-08 Awarded 18.06.08
7 Erode TNEB 343 17369 1336.86 1336.86* 22-Jan-08 Awarded 18.06.08
8Kancheepura
mTNEB 904 18723 2475.82 2475.82* 22-Jan-08 Awarded 18.06.08
9Kanya Kumari
TNEB 81 3095 269.81 269.81* 22-Jan-08 Awarded 18.06.08
10 Krishnagari TNEB 345 8602 1038.55 1038.55* 22-Jan-08 Awarded 18.06.08
11 Madurai TNEB 425 16152 1891.78 1891.78* 22-Jan-08 Awarded 18.06.08
12Nagapattina
mTNEB 424 32252 1254.20 1254.20* 22-Jan-08 Awarded 18.06.08
13 Namakkal TNEB 300 13981 889.31 889.31* 22-Jan-08 Awarded 18.06.08
Rural Electrification Corporation Limited
XI Plan Projects (Tamil Nadu)
Sr.No.
Name of the District(s)
Name of Implementing
Agency
Coverage
BPL HH
Sanctioned
Project Cost
(Lacs)
Total Award Project
Cost (Lacs)
Date of Sanction
Status of AwardUE
Villages
IE Villages
14 Perambalur TNEB - 346 16826 1612.21 1612.21* 22-Jan-08 Awarded 18.06.08
15 Pudukkottai TNEB - 765 27073 2749.70 2749.70* 22-Jan-08 Awarded 18.06.08
16 Ramnathpuram TNEB - 385 18931 1518.54 1518.54* 22-Jan-08 Awarded 18.06.08
17 Sivaganga TNEB - 445 12862 1571.49 1571.49* 22-Jan-08 Awarded 18.06.08
18 Thanjavur TNEB - 589 35525 2392.04 2392.04* 22-Jan-08 Awarded 18.06.08
19 Theni TNEB - 133 7333 594.09 594.09* 22-Jan-08 Awarded 18.06.08
20 Thiruvannmalai TNEB - 860 35106 2189.11 2189.11* 22-Jan-08 Awarded 18.06.08
21 Thiruvar TNEB - 413 19175 1319.90 1319.90* 22-Jan-08 Awarded 18.06.08
22 Tiruvallur TNEB - 539 16543 2133.29 2133.29* 22-Jan-08 Awarded 18.06.08
23 Tuticorin TNEB - 408 528 1029.81 1029.81* 22-Jan-08 Awarded 18.06.08
24 Vellore TNEB - 762 32517 2476.92 2476.92* 22-Jan-08 Awarded 18.06.08
25 Villupuram TNEB - 1104 55674 3509.60 3509.60* 22-Jan-08 Awarded 18.06.08
26 Virudhunagar TNEB - 450 10973 1806.70 1806.70* 22-Jan-08 Awarded 18.06.08
26 - 12416 545511 44741.03 44741.03*
Rural Electrification Corporation Limited
Project Wise Coverage and Achievement
Sl. No. Name of DistrictName of
Implementing agency
Award Date
Proposed Coverage Cumulative Achievement
(15-10-2010)Un/De-
electrified Villages
Electrified Villages
BPL HH`sUn/De-
electrified Villages
Electrified Villages
BPL HH`s
1 2 3 4 6 7 8 9 10 11 Andhra Pradesh X Plan
1 Anantapur CPDCL 7-Jun-06 - 926 51408 904 1018032 Mahboob-nagar CPDCL 20-Aug-06 - 1477 220158 1117 1215773 Kurnool CPDCL 10-Apr-07 - 902 135203 575 1267794 Nalgonda CPDCL 17-Jan-06 - 1124 78352 1124 710274 Total CPDCL 4429 485121 3720 4211865 Srikakulam EPDCL 17-Mar-06 - 1819 194941 1702 1536956 Vizianangaram EPDCL 4-Mar-06 - 1438 149755 1349 1189007 West Godavari EPDCL 4-Mar-06 - 1141 87831 834 815338 Vishakhapatnam EPDCL 4-Mar-06 - 2620 204113 2620 1416354 Total EPDCL 7018 636640 6505 4957639 Khammam NPDCL 10-Apr-06 - 1245 132334 955 92139
10 Nizamabad NPDCL 10-Apr-06 - 1050 60036 538 8692711 Adilabad NPDCL 10-Apr-06 - 1760 103184 1314 1178343 Total NPDCL ` 4055 295554 2807 296900
12 Guntur SPDCL 2-Aug-06 - 694 135273 416 18829013 Chittoor SPDCL 23-Feb-06 - 1274 120186 1025 16689714 Krishna SPDCL 23-Feb-06 - 1005 87774 725 13071415 Kadapa SPDCL 23-Feb-06 - 954 104205 890 12157816 Prakasham SPDCL 23-Feb-06 - 1067 127633 688 15935017 Nellore SPDCL 10-Mar-06 - 1127 121931 997 1398896 Total SPDCL 6121 697002 4741 906718
17 Total (Ar.P. X Paln) 21623 2114317 17773 2120567
Rural Electrification Corporation Limited
Project Wise Coverage and Achievement
Sl. No. Name of DistrictName of
Implementing agency
Award Date
Proposed Coverage Cumulative Achievement
(15-10-2010)Un/De-
electrified Villages
Electrified Villages
BPL HH`sUn/De-
electrified Villages
Electrified Villages
BPL HH`s
1 2 3 4 6 7 8 9 10 11
Andhra Pradesh XI Plan 1 Medak CPDCL 23-Feb-10 - 1061 34367 528 444992 Ranga Reddy CPDCL 23-Feb-10 - 893 14883 495 271842 Total CPDCL 1954 49250 1023 716833 East Godavari EPDCL 23-Sep-06 1323 245334 448 1105631 Total EPDCL 1323 245334 448 1105633 Karimnagar NPDCL 10-Apr-06 935 19417 723 886124 Warangal NPDCL 10-Apr-06 1003 71199 858 817832 Total NPDCL 1938 90616 1581 170395
5Anakapalle(Vish
akhapattnam)RE-coop society 4-Feb-09 143 39368 76 18925
6Cheepurupalli (Vizianagaram)
RE-coop society 8-Dec-08 104 29200 57 9673
7 Kuppam(Chittor) RE-coop society 18-Dec-08 223 14835 176 6336
8Sircilla (Karimnagar)
RE-coop society 20-Jan-09 173 9220 60 5961
4 Total RE-coop 643 92623 369 408959 Total (Ar.P XI Plan) 5858 477823 3421 393536
26 Total (Ar.P. X Paln & XI Plan) 27481 2592140 21194 2514103
Rural Electrification Corporation Limited
Project Wise Coverage and Achievement
Sl. No. Name of DistrictName of
Implementing agency
Award Date
Proposed Coverage Cumulative Achievement
(15-10-2010)Un/De-
electrified Villages
Electrified Villages
BPL HH`sUn/De-
electrified Villages
Electrified Villages
BPL HH`s
1 2 3 4 6 7 8 9 10 11Karnataka X Plan
1 Tumkur BESCOM 17-Mar-06 10* 3224 26094 10 2849 283792 Bangalore (Rural) BESCOM 17-Mar-06 2043 39406 1793 351033 Kolar BESCOM 17-Mar-06 3307 36744 3248 421654 Davangere BESCOM 27-Mar-06 795 50472 755 412665 Chitradurga BESCOM 17-Mar-06 2 1174 36188 2 1113 395715 Total BESCOM 12 10543 188904 12 9758 1864846 Hassan CESCOM 2-Jan-06 34* 2471 41565 34 2274 600627 Mandya CESCOM 2-Jan-06 1404 8760 1216 301098 Mysore CESCOM 2-Jan-06 1478 92345 1122 881093 Total CESCOM 34* 5353 142670 34 4612 1782809 Bidar GESCOM 3-Feb-06 613 25863 610 23978
10 Koppal GESCOM 3-Feb-06 624 28515 438 2797911 Raichur GESCOM 3-Feb-06 814 28335 680 2833512 Bellary GESCOM 3-Feb-06 537 45889 526 383614 Total GESCOM 2588 128602 2254 118653
13 Dharwad HESCOM 20-Jan-06 388 21936 388 2193614 Haveri HESCOM 20-Jan-06 690 39429 682 3993915 Bijapur HESCOM 20-Jan-06 665 48899 583 3243916 Gadag HESCOM 20-Jan-06 321 27911 318 2135117 Bagalkot HESCOM 20-Jan-06 604 33477 604 364275 Total HESCOM 2668 171652 2575 152092
17 Total (Karnataka X Plan) 46* 21152 631828 46 19199 635509
Rural Electrification Corporation Limited
Project Wise Coverage and Achievement
Sl. No. Name of DistrictName of
Implementing agency
Award Date
Proposed Coverage Cumulative Achievement
(15-10-2010)Un/De-
electrified Villages
Electrified Villages
BPL HH`sUn/De-
electrified Villages
Electrified Villages
BPL HH`s
1 2 3 4 6 7 8 9 10 11Karnataka XI Plan
1 Kodagu CESCOM 4-Aug-09 296 39669 108 35162 Chamrajnagar CESCOM 27-Sep-08 422 22781 364 367802 Total CESCOM 718 62450 472 402961 Gulbarga GESCOM 8-Feb-06 1344 58973 545 30141 Total GESCOM 1344 58973 545 30141 Belgaum HESCOM 13-Feb-07 5 1131 62430 921 42373
2 Hukeri HESCOMNot
awarded 123 14074
3 Uttar Kannada HESCOM 13-Feb-07 18* 1219 19657 13 668 184143 Total HESCOM 23* 2473 96161 13 1589 607871 Shimoga MESCOM 2-Mar-09 0* 1471 23098 695 123052 Chickmagulur MESCOM 2-Mar-09 0* 1033 19429 335 61222 Total MESCOM 2504 42527 1030 184278 Total (Karnataka XI Plan) 23* 7039 260111 13 3636 122524
25 Total (Karnataka X & XI Plan) 69* 28191 891939 59 22835 758033
Rural Electrification Corporation Limited
Project Wise Coverage and Achievement
Sl. No. Name of DistrictName of
Implementing agency
Award Date
Proposed Coverage Cumulative Achievement
(15-10-2010)Un/De-
electrified Villages
Electrified Villages
BPL HH`sUn/De-
electrified Villages
Electrified Villages
BPL HH`s
1 2 3 4 6 7 8 9 10 11Kerala (X Plan)
1 Idukki KSEB 27-Jan-07 - 38 17834 37 17238 1 Total (Kerala X Plan) 38 17834 37 17238
Kerala (XI Plan)
1 Kozhikode KSEBNot
awarded 87 11920
2 Kannur KSEBNot
awarded 78 5136
3 Mallapuram KSEBNot
awarded 122 7897
4 Kasargod KSEBNot
awarded 113 4194
5 Pallakad KSEBNot
awarded 144 3955
6 Wyanad KSEBNot
awarded 48 5415
6 Total (Kerala XI Plan) 592 38517 7 Total (Kerala X & XI Plan) 630 56351 37 17238
Rural Electrification Corporation Limited
Project Wise Coverage and Achievement
Sl. No. Name of DistrictName of
Implementing agency
Award Date
Proposed Coverage Cumulative Achievement
(15-10-2010)
Un/De-electrified Villages
Electrified Villages
BPL HH`sUn/De-
electrified Villages
Electrified Villages
BPL HH`s
1 2 3 4 6 7 8 9 10 11
Tamil Nadu XI Plan
1 Karur TNEB 18-Jun-08 154 16679 74 6937
2 Salem TNEB 18-Jun-08 380 27586 169 16396
3 Trichirapalli TNEB 18-Jun-08 451 23047 243 18056
4 Coimbatore TNEB 18-Jun-08 388 27935 338 24553
5 Cuddalore TNEB 18-Jun-08 685 37703 290 42758
6 Dindigul TNEB 18-Jun-08 337 13321 72 11938
7 Erode TNEB 18-Jun-08 343 17369 224 15960
8 Kancheepuram TNEB 18-Jun-08 904 18723 208 18780
9 Kanya Kumari TNEB 18-Jun-08 81 3095 70 6381
10 Krishnagari TNEB 18-Jun-08 345 8602 102 11423
11 Madurai TNEB 18-Jun-08 425 16152 92 19223
12 Nagapattinam TNEB 18-Jun-08 424 32252 30 23737
13 Namakkal TNEB 18-Jun-08 300 13981 84 7774
14 Perambalur TNEB 18-Jun-08 346 16826 57 14907
Rural Electrification Corporation Limited
Project Wise Coverage and Achievement
Sl. No. Name of DistrictName of
Implementing agency
Award Date
Proposed Coverage Cumulative Achievement
(15-10-2010)
Un/De-electrified Villages
Electrified Villages
BPL HH`sUn/De-
electrified Villages
Electrified Villages
BPL HH`s
1 2 3 4 6 7 8 9 10 11
15 Pudukkottai TNEB 18-Jun-08 765 27073 210 22382
16 Ramnathpuram TNEB 18-Jun-08 385 18931 21 6305
17 Sivaganga TNEB 18-Jun-08 445 12862 101 10814
18 Thanjavur TNEB 18-Jun-08 589 35525 76 39200
19 Theni TNEB 18-Jun-08 133 7333 131 8541
20 Thiruvannmalai TNEB 18-Jun-08 860 35106 144 37756
21 Thiruvar TNEB 18-Jun-08 413 19175 65 19461
22 Tiruvallur TNEB 18-Jun-08 539 16543 260 18798
23 Tuticorin TNEB 18-Jun-08 408 528 40 6504
24 Vellore TNEB 18-Jun-08 762 32517 383 29810
25 Villupuram TNEB 18-Jun-08 1104 55674 451 50786
26 Virudhunagar TNEB 18-Jun-08 450 10973 136 8323
26 Total (Tamil Nadu XI Plan) 12416 545511 4071 497503
Rural Electrification Corporation Limited
Salient Features of DDG Projects under DDG
Guidelines for DDG Projects under RGGVY issued by MOP on 12.01.2009.
Capital subsidy of Rs 540 crore for DDG projects during XI th Plan
Projects can be based on conventional or renewable sources
REC to be the Nodal Agency
Ownership with State Governments
Implementing agencies would be SREDAs / Depts. dealing with renewable / State Utilities / CPSUs
Projects will be approved and monitored by Monitoring Committee of MoP
Rural Electrification Corporation Limited
Selection of villages / hamlets
List to be finalized by SREDA/ Depts. dealing with renewable in consultation with state utilities and MNRE
Villages / hamlets with population less than 100 to be excluded
Villages / hamlets included in MNRE plans to be excluded
Rural Electrification Corporation Limited
Selection of Technology
Technology choices for DDG
Small / Mini Hydro
Diesel generating sets powered by biofuels (non-edible vegetable oils such as Jatropha, Pongamia, etc)
Biogas
Solar Photo Voltaic
Wind / diesel / hybrid / new technology etc
Rural Electrification Corporation Limited
Pattern of payment
90% of capital cost + DPR cost to be paid as subsidy
Balance 10% to be arranged by implementing agency at their own or loan from any FI/REC.
Rural Electrification Corporation Limited
Project implementation procedure
Implementing Agencies will invite tenders on Build, Operate, Maintain & Transfer (BOMT) basis.
Successful developer to run the project for a period of 5 years.
Successful developer to collect the tariff from villagers.
The reimbursement of gap between O&M cost and revenue recovery from villagers will be paid out of service charges of Implementing Agencies (@ 8% for State Governments and 9% for CPSUs)
Rural Electrification Corporation Limited
State-wise Projects Sanctioned under 10th plan
Sl StateNo. of
Projects
No. of un-ElectrifiedVillagescovered
No. ofelectrified villages covered
No. of BPL households
covered
Total Sanctioned Project Cost
(Rs. Cr)
1 2 3 4 5 6 7
1 Andhra Pr. 17 0 21623 2114317 648.15
2 Arunachal Pr. 2 237 321 4377 43.30
3 Assam 3 903 1746 148971 158.03
4 Bihar 26 17125 0 843499 1495.80
5 Chhattisgarh 3 117 3504 122326 148.94
6 Gujarat 3 0 2409 188471 60.84
7 Haryana 4 0 1075 49198 48.48
8 Himachal Pr. 1 0 1118 647 25.02
9 J & K 3 103 1444 59731 97.62
10 Jharkhand 13 8727 4379 942319 1287.67
Rural Electrification Corporation Limited
State-wise Projects Sanctioned under 10th plan (Contd…)
Sl. StateNo. of
Projects
No. of
un-electrified
villages
covered
No. of
Electrified
villages
covered
No. of
BPLhouse
holds
covered
Total
Sanctioned
Project Cost
(Rs. Cr.)
1 2 3 4 5 6 7
11 Karnataka 17 49 21152 631828 375.39
12 Kerala 1 0 38 17834 19.75
13 M. P. 8 115 9653 311295 395.57
14 Maharashtra 4 0 4052 262538 78.86
15 Manipur 2 186 270 14447 64.07
16 Meghalaya 2 174 797 23676 45.99
17 Mizoram 2 90 209 8618 41.75
18 Nagaland 2 12 279 14290 16.25
19 Orissa 4 2602 4637 335080 434.10
20 Punjab 0 0 0 0 0
Rural Electrification Corporation Limited
State-wise Projects Sanctioned under 10th plan (cont..)
Sl. StateNo. of
Projects
No. of un-
electrified
villages
covered
No. of
Electrified
villages
covered
No. of BPL
households
covered
Total
Sanctioned
Project Cost
(Rs. Cr)
1 2 3 4 5 6 7
21 Rajasthan 25 1705 15608 699951 453.23
22 Sikkim 2 16 158 3724 26.09
23 Tamilnadu 0 0 0 0 0
24 Tripura 1 48 72 13119 19.57
25 Uttar Pradesh 64 30802 3287 1120648 2719.51
26 Uttarakhand 13 1469 14105 281615 643.89
27 West Bengal 13 4283 0 97847 385.03
Total 235 68763 111936 8310366 9732.90
Rural Electrification Corporation Limited
State-wise Projects Sanctioned under 11th plan
Sl StateNo. of
Projects
No. of un-ElectrifiedVillagescovered
No. ofelectrified villages covered
No. of BPL households
covered
Total Sanctioned Project Cost
(Rs. Cr)
1 2 3 4 5 6 7
1 Andhra Pr. 9 0 5858 477823 191.94
2 Arunachal Pr. 14 1892 1435 36433 494.39
3 Assam 20 7622 11584 842685 1501.97
4 Bihar 17 6086 6651 1918956 1480.09
5 Chhattisgarh 11 1015 12829 654839 956.27
6 Gujarat 22 0 15525 766679 299.59
7 Haryana 14 0 4910 174875 148.92
8 Himachal Pr. 11 93 9548 11801 180.23
9 J & K 11 180 4606 76999 538.31
10 Jharkhand 9 11010 3243 749478 1374.94
Rural Electrification Corporation Limited
State-wise Projects Sanctioned under 11th plan (Contd…)
Sl. StateNo. of
Projects
No. of
un-electrified
villages
covered
No. of
Electrified
villages
covered
No. of
BPLhouse
holds
covered
Total
Sanctioned
Project Cost
(Rs. Cr.)
1 2 3 4 5 6 7
11 Karnataka 8 83 7039 260111 224.71
12 Kerala 6 0 592 38517 114.57
13 M. P. 24 691 24441 1064947 1137.77
14 Maharashtra 30 6 36240 1613853 634.58
15 Manipur 7 696 1108 92922 293.72
16 Meghalaya 5 1769 2739 92771 244.42
17 Mizoram 6 47 361 18799 62.50
18 Nagaland 9 93 873 55610 94.92
19 Orissa 27 15293 24355 2850783 3141.01
20 Punjab 17 0 11840 148860 154.59
Rural Electrification Corporation Limited
State-wise Projects Sanctioned under 11th plan (Contd…)
Sl. StateNo. of
Projects
No. of un-
electrified
villages
covered
No. of
Electrified
villages
covered
No. of BPL
households
covered
Total
Sanctioned
Project Cost
(Rs. Cr)
1 2 3 4 5 6 7
21 Rajasthan 15 2749 19233 1050167 801.26
22 Sikkim 2 9 260 7734 31.01
23 Tamilnadu 26 0 12416 545511 447.41
24 Tripura 3 112 570 181611 111.89
25 Uttar Pradesh 0 0 0 0 0
26 Uttarakhand 0 0 0 0 0
27 West Bengal 15 290 24775 2601887 1959.60
Total 338 49736 243031 16334651 16620.61