Rural Electric Safety Achievement Program · The Summit will provided an opportunity for leaders...
Transcript of Rural Electric Safety Achievement Program · The Summit will provided an opportunity for leaders...
2012 Spring Meeting Arlington, VA - April 24-25, 2012
Rural Electric Safety Achievement Program
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
April 24, 2011 – 8:30am to 5pm - General Session
Welcome and introduction Bud Branham
2011 Fall meeting action item update Bud Branham
Update on RESMA and NRECA board meeting Bud Branham
RESAP implementation status & process review All
Safety Leadership Summit and Leading Practices Showcase update
Lunch (provided)
RESAP special activity All
Online system update and future plans Dave Horner/Bud Branham
Review onsite observer training content and plans All
End 2
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
Action Item Review
3
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
Action Items - 2011 Fall RESAP Meeting
Item Status Develop online module to clarify the expectation for co-ops self-assessing safety performance
In progress
Update onsite observer training curriculum for 2012 Complete
Complete record retention recommendation for RESAP documents Complete
Download onsite observation summary report to Word document Need to discuss
4
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
Action Items from Spring RESAP Meeting
Item Status
Finalize legal review of application and revise based on timing Complete
Update onsite observation surveys with team recommendations
Distribution complete/ G&T in progress
5
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
Update on December Board and RESMA Meetings
6
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
RESAP implementation status & process review
7
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
RESAP Redesign Process
8
Application Document Verification
Onsite Observation
Annual Performance
Measures
Safety Improvement
Plan
Onsite Out-Report
Self- Assessment
Leadership Commitment
Survey form completed by CEO
Leadership Commitment updated in year of onsite
New Survey Form Added
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
RESAP Status Overview
Description Count
2012 Onsite Observation Planned 188
2011 Onsite Observations Completed 159
Total 2011 2012
2011 Onsite Observations with SIP completed 130 118 22
2011 Onsite Observations with SIP NOT completed or entered online 29
SIP completed in 2011 with NO onsite scheduled 18
SIP completed in 2012 prior to onsite or with NO requirement 26
9
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
RESAP System Process Steps
10
Application Survey
Onsite Observation Survey APM Survey
SIP Completion
Survey
LC Survey
Online survey forms completed within annual cycle
Jan Jan Jul Apr Jan Oct Jul Apr Oct
2011 2012
APM Survey SIP
Completion Survey
Application Survey
Onsite Observation Survey APM Survey
SIP Completion
Survey
LC Survey
SIP completion survey form overlaps into 2012
APM Survey SIP
Completion Survey
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
RESAP Scheduling Requirements
11
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
Safety Leadership Summit and Leading Practices Showcase Update
12
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
Overview of Safety Leadership Summit
The Summit will provided an opportunity for leaders from many disciplines to come together with the common goal of Leading the Quest for Zero.
The program will center on the key focus areas that if effectively applied have the power to radically transform organizational safety performance.
13
Where safety leaders emerge Continual leadership development and
understanding Understanding the essentials of systematic
process improvement
Facilitators of organizational change Team leaders and facilitators Understanding the impact of organizational
culture and leadership Leading continuous process improvement
Developing safety leaders Establishing and aligning safety activities to
achieve results Roles and responsibilities for safety
performance Managing continuous process improvement
Understanding the importance of leadership engagement
Setting and alignment of safety expectations Establishing a process for continual
improvement Establishing vision and principles for safety
Front-Line Personnel Safety Professional
CEO/GMManagement
Cooperative Leaders
Program Focus Areas
Safety Leadership
Safety Planning / Processes
Safety Culture / Engagement
Showcase Leading Practices
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
What to Expect:
Pre-conference workshops – Take a comprehensive look at winning safety practices and learn how to engage staff throughout the co-op to become leaders in this crucial effort.
Breakout sessions – Learn why it takes collaboration throughout the co-op to Lead the Quest for Zero. Gain insights from top industry safety practitioners on a wide variety of topics to inspire new approaches for improving safety performance at your co-op from the CEO to HR to the front line crews.
Leading Practices Showcase – Provides an opportunity for co-op leaders to reward and recognize employees for significant or unique contributions to safety improvements. For showcase attendees, this is an opportunity to learn some practical tools that you might implement at your own co-op. Plus, attendees can check out the latest in safety tools, supplies and innovations from vendors.
Networking events – Chat with colleagues about their safety challenges and successes, and learn more about what’s working for them.
14
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
2012 Safety Summit - Time and Place
October 23-25, 2012
Hilton St. Louis at the Ballpark
1 South Broadway St. Louis, MO, 63102
15
Spring 2012 RESAP Meeting (Apr. 24-25, 2012) 16 Showcase Templates & Process 04.04.12
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
Potential Showcase Initiatives
Topic Who?
Front line leadership training South Carolina Statewide
Journeyman refresher training South Carolina Statewide
Leadership driven crew rubber gloving testing process Great Lakes Energy
Transforming to an effective safety committee Mecklenburg Electric Cooperative
Onsite Site Assessment w employee participation Peggy (SC)
Near Miss Reporting – safety team initiative Golden Valley
Safety meeting improvement initiative Dakota Electric Association
Increase awareness of incident reporting – stop light suggestion Randolph EMC
Creating a leadership-driven vision for safety – AVT2 Mid-South Synergy
Outage scenarios for training/safety meetings Colorado Statewide
Job briefing improvement initiative Glacier EC
Accident investigation process - TAP Colorado Statewide
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
Potential Showcase Initiatives
Topic Who?
Teamwork to create an effective lineman rodeo Virginia Statewide
Fleet management tagging equipment to verify behaviors Colorado Co-op
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
Leading Practices Showcase - Example
19
Spring 2012 RESAP Meeting (Apr. 24-25, 2012) 20
Spring 2012 RESAP Meeting (Apr. 24-25, 2012) 21
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
CEO decides to submit safety improvement idea for
Showcase consideration
Send Detailed Submittal Form to Co-op Cooperative.com
Conference & Events Safety Summit
Showcase Submittal and Selection Process
22
Notify Area Administrators / Co-ops
Showcase Presentation Specs
Evaluation Criteria
Showcase Coordinator Notified Power Point Template
Complete online form
Intent to Submit Form
Title:
Safety Improvement Area:
Source of Safety Imp Activity:
Safety Imp Process Step:
Brief Description:
Describe Results Achieved:
Validates Submittal
Valid Submittal? N Y
Validates and Collects Submittals
Showcase Submittal Form
Title:
Safety Improvement Statement:
Description of Imp Situation:
Solution Employed:
Results Achieved:
General Overview Information
Contact Information
Completes Submittal Form
• Space Limitations • Consider: – Type of Co-op – State / Region – Size, etc.
• Level of creativity or uniqueness
• Impact on Safety Imp
• Linkage to purpose
Evaluate Submittals against Evaluation Criteria Select Showcase
Participants
Co-ops Prepare Showcase Presentation
Showcase Event
Blind Review
Spring 2012 RESAP Meeting (Apr. 24-25, 2012) 23
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
Draft Showcase Submittal Form
Showcase – Intent to Submit Online Form
Title:
Safety Improvement Area: Drop down box
Source of Improvement Activity: Drop down box
Brief Description:
Briefly Describe Positive Results Achieved:
Contact Information
CEO Name:
Cooperative Name & State: Name: State:
Showcase Lead Person:
Other Personnel to participate:
Lead Person Email:
Lead Person Phone #:
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
Showcase Presentation Board - Layout
Safety Improvement Title
Safety Improvement Statement:
Description of Improvement Situation:
Solution Employed:
Results Achieved / Next Steps:
Co-op Name
Statewide Association
CEO & Contributing Employees
Co-op Demographics / Map
Safety Improvement Subject Area:
Source of Safety Improvement Activity:
Presentation Poster with Standardized Formats Improvement Summary Section General Overview Section
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
Standardized Definitions and Criteria
Improvement Title: Title of the Improvement Activity (example: Improved Journeyman Refresher Training)
Safety Improvement Statement: Clear concise statement that fames the safety improvement initiative (one sentence)
Description of the Improvement
Situation:
Describe and/or quantify the problem or issue the activity is trying to improve (a paragraph or two) - include pictures, videos, quantitative analysis, flow chart, and props
Solution Employed: Describe the solution employed to address or solve the problem – include pictures, videos, graphs and props to clarify understanding
Results / Next Steps Summarize results obtained from the solution and next steps – include graphs, interviews as appropriate
26
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
Standardized Definitions and Criteria
Safety Improvement Areas:
Training Work processes or procedures Safety rule Employee awareness /
communications Leadership Employee Behaviors Planning / process Rewards and Recognition
Tools and Equipment Facilities Employee Involvement Safety culture Hazard correction / Risk mitigation Incident analysis Other explain
Source of Safety Improvement
Activity:
Employee suggestion / idea Team improvement initiative Inspections / assessments
Strategic initiative Safety improvement plan Management / Supervisor initiative
Safety Improvement Process Steps:
Engage Assess Plan Implement Measure
27
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
Showcase General Discussion Issues
Showcase flyer and formal invitation
Showcase poster specs
Showcase exhibit spaces – 25 to 30
Pricing
Peer review panel
28
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
RESAP Special Activity – “Dog eat Dog” Jeopardy
29
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
Online System Update
30
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
Online System Update and Future Plans
Changes to Comparative Performance Report
Update on spell check implementation
Improved accessibility to electronic tablets
Online formatting enhancements
Update on future plans
31
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
Comparative Safety Performance Report - Example
32
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
Online formatting enhancements
33
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
RESAP ENHANCEMENTS • Larger Screen Width, Larger Fonts
Match coop.com background and width Page is centered Changed from800px to over 1000px
(people have larger monitors now)
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
Online formatting enhancements
Added submit warnings:
Added 100% complete but not submitted warning:
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
Online formatting enhancements
Top Level Report Menu
Moved report menu from underneath home menu to top level (no longer need to hover over home)
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
Review Onsite Observer Training Content and Plans
37
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
Onsite Observer Training – Content Elements
General overview
Onsite assessment questions & criteria
Observation scenarios
Interviewing videos
38
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
Questions and Comments
End of Day 1
39
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
Wednesday, April 25, 2012 – 8:00 a.m. to 12 noon
Discussion on general program issues All
Orientation for new Area Administrators
Review revised application
Guide for Rationale behind RESAP requirements
Feedback from safety facilitator training
Online regulatory/compliance training
Review self-assessment process
Review research findings on Serious Injuries & Fatalities (SIF) All
Summary and next steps
Meeting evaluation All
End
40
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
Discussion of General Program Issues
41
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
Orientation for New Area Administrators
42
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
Revised Application Review
43
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
Revised Application Examples
3.3 Identify the type of safety position that currently serves as focal point for safety initiatives and a compliance resource. Full time safety position/s Coordinates safety activities as part of another job Other, specify:
3.4 What is the frequency a safety committee meets on an annual basis? Once a week Once a month Once a quarter Twice a year Other, specify:
44
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
Guide for Rationale behind RESAP Requirements
45
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
Review Self-Assessment Online Module Content
46
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
RESAP Self-assessment Model
47
Purpose: Understand the current state of safety performance and identify the top improvement opportunities
Decide on Approach Identify Areas to Investigate
Assess Performance in Selected Areas
Safety Improvement Plan
Self Assessment Steps – 1st Phase of Developing a Safety Improvement Plan
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
RESAP Self-assessment Model – First Step
48
Decide on Approach
Safety Improvement Team
Include Selected Field
Employees
1
2 Executive Staff
Improvement Team
Choose best approach?
Assign Executive Sponsor
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
RESAP Self-assessment Model – Second Step
49
Identify Areas to Investigate
Job Briefings Unsafe Behaviors / Conditions Rewards & Recognition Leadership Development Operating Procedures Safety Rules Inspection Processes Supervisor Training Employee Involvement Supervisory Engagement Alignment of Expectations
Top Leader Engagement Safety Meetings Safety Committee New Employees Safety Communication Safety Measures Safety Culture Employee Training Hazard Recognition /
Correction Incident Analysis Safe Measures
Where are our greatest opportunities?
Top 5 to 6 Priorities
Select top priorities for in-depth investigation
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
RESAP Self-assessment Model – Third Step
50
Assess Performance in Selected Areas
Assessment Methods • Onsite assessment results • Statewide safety rep input • Online self assessment guides • Supervisory input • Executive interviews • Employee interviews • Employee surveys • HR input (i.e. exit interviews,
etc.) • Field inspection data • Normal field observations • Data analysis • Other assessments
Top 5 to 6 Priorities
Top 1 to 3 Priorities
1. Priority A
2. Priority B
3. Priority C
Narrow down based on
assessment
Safety Improvement Plan
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
Safety Follow-up Initiatives
51
Safety Improvement - Action Levels
Action Levels Description Comment
Level 1 Direct leadership action
Within normal supervisor lines of authority – “gitter’ done”
Level 2 More complex leadership action
Requires a more significant resource commitment, higher level approvals and/or cross functional management review
Level 3
Complex organizational action (requires leadership oversight and support)
Requires special analysis, problem solving, and/or employee buy-in and involvement for effective implementation, usually requires a significant commitment of organizational time and resources
Consider the type of follow up action required:
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
Organize a Plan for Action
Formulate the goals and initiatives into an organized plan with clear assignments, responsibilities, and timeline for achievement.
52
Three-year Goals:
Annual Objectives:
Planned Initiative Key Actions Responsibility for Completion Timeframe for Completion
What goals do we want to achieve over the next three years?
What do we want to achieve this year?
What initiatives are required to achieve
our objectives?
What key actions are required for
each initiative?
Align responsibilities for
initiatives and actions
Set expectations
for completion
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
Serious Injury & Fatality Research
53
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
Video on Recent SIF Research
www.youtube.com/watch?v=-O-LHgTRCvU
54
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
Serious Injury & Fatalities
Serious Injury & Fatalities (SIF) – defined as life altering incidents
Typically a very low probability of occurrence
For a workforce of a 1,000 employees, working three years;
• 1 fatality / 5 SIF injuries will occur
The traditional bias is SIF events are flukes and not due to systemic problems in organizations
Reducing frequency of recordable injury cases does not necessarily reduce SIF’s
55
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
Fatality
Serious Injuries (loss time /
restricted duty)
Accidents, incidents, and minor injuries
Unsafe acts and conditions
The Safety Triangle
Results
Behavior & Conditions
Leadership Action
Probability of Unsafe Acts to Serious Accidents
• Investigations • Coaching • Supervisory Interactions
• Accountability • Communication • Recognition
56
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
Serious Injury & Fatalities
Example - working at heights and tying off - studies show 50% of the time employees do not tie off
Research shows that SIF occur as follows:
• 42% relate to the violation of a Cardinal Safety Rule (CSR)
• 29% relate to pre-task risk assessment
20% of non-related SIF events have the potential to be an SIF event
• Assess High Low SIF potential • Example – employee slips while working on rail car; sprains back verse
employee slips in meeting room; sprains back
57
High Risk Activity Unmitigated High
Risk Condition (precursor)
SIF Potential
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
Serious Injury & Fatalities
Recommendations
1. Educate organization on SIF findings
2. Create an SIF incident rate and monitor
3. Integrate findings with existing safety processes:
Incident investigation
Observation and feedback
Pre-task risk assessment
Data analysis
4. Develop mechanism to identify and correct SIF precursors
58
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
Agreements & Follow-up Items
59
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
Agreements & Follow-up Items
As a group we will make every effort to enforce the RESAP schedule requirements shown on the enclosed timeline (slide 14)
• We (NRECA) will send out periodic reminders at key process points
SIP are due for completion by year-end and the associated online form
• States can set different expectations based on local agreements
We will send out reminders to co-ops who have not completed SIP-C forms for 2011 and APM forms for 2012
Email from Glenn English will be sent to CEOs on Safety Summit
• We will copy Area Administrators shortly thereafter
A formal invitation will also be sent to CEOs from NRECA - following Glenn’s email
60
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
Agreements & Follow-up Items
Safety Summit flyers, both hard copies & PDF will be sent to Area Administrators (complete sign up form & provide # needed)
Investigate creation of a Safety Leadership Summit library of Best Practices Showcase ideas and make available for online access
We will study the option of a web conference to review the purpose and process of the Safety Leadership Summit and Leading Practices Showcase
• We will notify the Area Administrators in advance, if established
We will check with Gary Pfann on the possibility of continuing education credits for the safety summit
Begin project to create a “RESAP Requirements Guide” to clarify the reasoning behind RESAP Requirements that exceed regulatory requirements
61
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
Agreements & Follow-up Items
Touchstone weather app will be available to those who desire it (complete sign up form)
We will check our ability to post Jeopardy and additional games online and make available for use – will notify you when posted
Notify us if you wish use Onsite Observation training materials or would like to schedule training with our support
• Discuss national training at a central location
Federated discount approach – “all RESAP process steps in a given year must be completed prior to the premium renewal date to receive the discount”
Review ways to summarize and graphically depict the application results
62
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
Agreements & Follow-up Items
Check application questions for the ability to verify and include all such questions for random selection in the document verification process
Provide an N/A selection option for each onsite observer section
Adjust wording on applications questions as needed, based on feedback
Online system priorities in the short term will be:
• Spell check
• Create open access to Achievement Status Report
• Clean up noted Achievement Status Report discrepancies
• Check ability to add co-op name to report logo page
63
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
Volunteer Needs
Safety Summit Peer Review Panel
RESAP online system usability study
“RESAP Requirements Guide” development task team
RESAP Orientation – Safety Leadership Summit
RESAP Observation Training Session – Safety Leadership Summit
64
Spring 2012 RESAP Meeting (Apr. 24-25, 2012)
Summary and Next Steps
65