RUMSL Indian Railway Transaction - railsaver.gov.inRUMSL Indian Railway Transaction 4th September,...
Transcript of RUMSL Indian Railway Transaction - railsaver.gov.inRUMSL Indian Railway Transaction 4th September,...
RUMSL Indian Railway Transaction
4th September, 2018
Strictly Private and Confidential
Agenda
1 Background 3
2 Details of Transaction 8
3 Savings due to Transaction 13
4 A Concept, for thought and can be implemented, together
16
Page
2 RUMSL
Agenda
Background
3 RUMSL
1 Background Agenda
India to reduce the “Emission Intensity” of its GDP by 33 to 35% by 2030 from 2005 level;
India’s share of non-fossil fuel in the total installed capacity is projected to change from 30% in 2015 to about 40% by 2030;
Installation of Renewable Energy of 175 GW by 2021-22 including 100 GW of Solar Energy;
INDC Target of India
4 RUMSL
1 Background Agenda
Impact of Rewa Transaction
5
1 Background
25
75
27
0
100
50
0
30
0
20
00
50
0
170
150
117
0
50
0
40
0
35
0
100
0
100
130
45
0
45
0
100
50
0
75
0
25
0
25
0
50
0
50
0
20
00
20
0
20
00
7.00
6.45
7.20
6.47
6.46
5.05
5.17
5.09
5.59
5.08
4.69
4.78 4.43
4.66
4.43
4.43 4.35
4.43
4.42
4.84
4.48
3.15 2.62 2.44 2.65
2.44
2.79 2.59
Bid Capacity (MW) Lowest Tariff (Rs./kWh)
RUMSL
3.30
Agenda
Generation and Consumption Profile
6:0
0
6:1
5
6:3
0
6:4
5
7:0
0
7:1
5
7:3
0
7:4
5
8:0
0
8:1
5
8:3
0
8:4
5
9:0
0
9:1
5
9:3
0
9:4
5
10:0
0
10:1
5
10:3
0
10:4
5
11:0
0
11:1
5
11:3
0
11:4
5
12:0
0
12:1
5
12:3
0
12:4
5
13:0
0
13:1
5
13:3
0
13:4
5
14:0
0
14:1
5
14:3
0
14:4
5
15:0
0
15:1
5
15:3
0
15:4
5
16:0
0
16:1
5
16:3
0
16:4
5
17:0
0
17:1
5
17:3
0
17:4
5
Solar Power Generation and Railway Consumption Profile
Generation Profile of Solar Project Consumption Profile of Railway
6 RUMSL
1 Background Agenda
Optimum Scheduling
6:0
0
6:1
5
6:3
0
6:4
5
7:0
0
7:1
5
7:3
0
7:4
5
8:0
0
8:1
5
8:3
0
8:4
5
9:0
0
9:1
5
9:3
0
9:4
5
10:0
0
10:1
5
10:3
0
10:4
5
11:0
0
11:1
5
11:3
0
11:4
5
12:0
0
12:1
5
12:3
0
12:4
5
13:0
0
13:1
5
13:3
0
13:4
5
14:0
0
14:1
5
14:3
0
14:4
5
15:0
0
15:1
5
15:3
0
15:4
5
16:0
0
16:1
5
16:3
0
16:4
5
17:0
0
17:1
5
17:3
0
17:4
5
Time block wise Optimum Scheduling explained for a day
Generation from Solar Parks Normal Scheduling for 757 MUs
Optimum Scheduling for 757 MUs
7 RUMSL
1 Background Agenda
Details of Transaction
8 RUMSL
2 Details of Transaction Agenda
Solar Park Capacity Land Required Land Identified
Neemuch-Mandsaur 450 1,050 1,091
Agar 550 1,150 1,400
Shajapur 500 1,050 1,245
Solar Parks and its preparedness
o Rewa Ultra Mega Solar Limited will be an implementing agency for all three solar parks.
o Allotment of revenue land (GoMP land) to RUMSL is under process.
o IFC as a Transaction advisor has been appointed by GoMP for this transaction.
o RUMSL has applied for Stage-I connectivity for each solar park.
o RUMSL is in discussion with World Bank for loan towards expenses of internal evacuation
infrastructure of each solar park.
o RUMSL is in discussion with PGCIL to appoint them as a PMC for construction of internal
evacuation infrastructure.
o RUMSL has appointed PwC for making of DPR of each solar park.
9 RUMSL
2 Details of Transaction Agenda
Solar Park Scheduling
10
2 Details of Transaction
RUMSL
450 MW Solar Generation (Neemuch
Solar Park)
Railways in Northern Region – 66 MW
MPPMCL – 384 MW
1500 MW Optimal Scheduling
1050 MW Solar Generation (Agar &
Shajapur Solar Park)
Railways in Western & Eastern Region – 141 MW
MPPMCL – 843 MW
1500 MW MW (LTA with
ISTS)
MUs
MPPMCL 1293 2630
Indian Railway
207 782
Agenda
State MW requirement at Drawl point
Railway OA (MW) tied up
Solar Park OA (MW) to be tied up
UP – ISTS 140 85 17
UP - STU 115 100 28
Jharkhand 79 70 15
DVC 125 75 24
Haryana 48 40 11
Rajasthan 51 55 10
Gujarat 87 90 17
Bihar 76 50 15
Maharashtra 354 340 70
1075 905 207
Existing supply arrangement of IR and supply of solar power
Note: Drawl point will be @ STU for all states and in UP drawl point is at both STU and CTU.
11 RUMSL
2 Details of Transaction Agenda
Scheduling for Indian Railways post commissioning of MP Solar
12
2 Details of Transaction
RUMSL
17
28
15
24
11
10
17
15
70
38
64
73
202
35
75
50
82
0 50 100 150 200 250 300 350
UP ISTS
UP STU
JH
DVC
HY
RJ
GJ
Bihar
MH
Sequence of Scheduling in MW for Railways along with RGPPL and BRBCL between 06:00 hrs to 18:00 hrs
Solar RGPPL BRBCL
Scheduling sequence based on merit order for solar, gas and coal power plant for Indian railways under this transaction for 782 MUs or 207 MW capacity.
Agenda
Savings due to Transaction
13 RUMSL
3 Savings due to Transaction Agenda
Benefits of Transaction If power is procured to comply with RPO
Major advantage is replacement of costlier thermal power under open access arrangement through
ISTS by cheaper solar power.
Other benefits due to Optimum Scheduling are:
o Lower STU charges on account of optimum scheduling (since lower LTA required as compared to normal solar power procurement transactions). Approximate saving would be INR 19 crore.
o Stable supply during day time.
o Eliminating the risk of time required by STU for approval of LTA since lower capacity can be accommodated conveniently.
14
RUMSL
3 Savings due to Transaction Agenda
Benefits of Transaction If IR procuring solar power over and above RPO requirement
Comparing landed cost of solar power and DISCOM tariff:
o Discom tariff for Railway traction is varies from INR 4.6/kWh to INR 8.8/kWh.
o Average Discom Tariff in all the given States is around ~ INR 6.0/kWh.
o IR’s saving on procurement of solar power over and above RPO requirement is ~ INR
37.7 crore.
Comparing landed cost of solar power and thermal power under OA
arrangement:
o Average power procurement cost of IR from RGPPL and BRBCL is ~ INR 5.17/kWh.
o IR’s saving on procurement of solar power over and above RPO requirement is ~ INR
10.2 crore.
15
RUMSL
3 Savings due to Transaction Agenda
A Concept, for thought and can be implemented, together
16 RUMSL
4 A Concept, for thought and can be implemented, together Agenda
Savings to MPPMCL from banking facility
17 RUMSL
4 A Concept, for thought and can be implemented, together
-
50
100
150
200
250
300
-
2,000
4,000
6,000
8,000
10,000
Hourly State Load Sample and Solar Generation (MW)
State Load Solar Power Generation Consumer Requirement
Banked Power: Avoided generation from high cost stations for power purchase by State Discom.
Supply of Banked Power to Institutional Consumer from low cost stations of State Discom.
Agenda
Towards cleaner and greener future….
Thank you