RTF Work PlanMid-Year Re-Programming
July 15, 2014
![Page 2: RTF Work Plan Mid-Year Re-Programming July 15, 2014.](https://reader036.fdocuments.us/reader036/viewer/2022082710/56649e8a5503460f94b905d6/html5/thumbnails/2.jpg)
Current Status of 2014 Work Plan
• Not-yet-committed tasks soon to be underway:• Task Order for Small/Rural Work plan items• Task Order for HVAC Interaction Factors (once CBSA data is available)• Task Order for End-Use updates from RBSA metering• Task Order for Cost-effectiveness volume of Guidelines
$0 $100,000 $200,000 $300,000 $400,000 $500,000 $600,000
Contract Budget Snapshot (through May, 2014)Allocated through WorkPlan 2014 Committed to Contracts 2014 Spent in 2014
2014
Bud
get
Dol
lars
![Page 3: RTF Work Plan Mid-Year Re-Programming July 15, 2014.](https://reader036.fdocuments.us/reader036/viewer/2022082710/56649e8a5503460f94b905d6/html5/thumbnails/3.jpg)
Existing Measure Reviews
• 14 measure updates remaining for 2014– Workplan budgeted for 24; so far 10 are done• 3 more might be done today!• After this year, all UES measures will have gone through
Guidelines compliance*
• Current budget allocation seems sufficient– Standard Protocols continue to move slowly• Budgeted for 5 Protocols per year; so far 0 done
– SIS effort has been large, but has not yet resulted in a protocol– CVR & VO slow to start due to SEEM calibration work
*Except MF weatherization due to sunset in 8/2015
![Page 4: RTF Work Plan Mid-Year Re-Programming July 15, 2014.](https://reader036.fdocuments.us/reader036/viewer/2022082710/56649e8a5503460f94b905d6/html5/thumbnails/4.jpg)
New Measure Reviews
• Upcoming measures requiring RTF Staff support– DHP for Forced Air Furnaces for Single Family and
Manufactured Homes– Duct Insulation for SF & MH– Prescriptive Duct Sealing– RTU Provisional Protocol for Heat Pumps
• Current allocation seems sufficient at this time– Assumed proposers did most development work– If no new measures submitted by fall, should
reallocate budget dollars elsewhere
![Page 5: RTF Work Plan Mid-Year Re-Programming July 15, 2014.](https://reader036.fdocuments.us/reader036/viewer/2022082710/56649e8a5503460f94b905d6/html5/thumbnails/5.jpg)
Small/Rural Work
• Light on work this year after large effort in 2013– Scoping a small task order for MH Decommissioning– Other small efforts likely to arise
• Allocation seems sufficient, but excess funds may be available from this category
• As a reminder, SRR used general RTF funds last year to accomplish some work
![Page 6: RTF Work Plan Mid-Year Re-Programming July 15, 2014.](https://reader036.fdocuments.us/reader036/viewer/2022082710/56649e8a5503460f94b905d6/html5/thumbnails/6.jpg)
Items Shifting to Staff Work
• ProCost Engine Updates & QC– Contract staff has in-depth VBA knowledge– Doing QC of ProCost model including new elements
added in past few years– Some components may still require external contract
depending on timeframe & workload• SEEM updates– Staff has already made several updates (template)
however some items may still require external contract• Annual Report done mostly in-house
![Page 7: RTF Work Plan Mid-Year Re-Programming July 15, 2014.](https://reader036.fdocuments.us/reader036/viewer/2022082710/56649e8a5503460f94b905d6/html5/thumbnails/7.jpg)
Items Added, Changed or Removed
• Likely to add small task order for QC of Grocersmart results
• Increase QC budget to AEG (formerly EnerNOC) to handle remaining UES updates
• Small contract to Abt for follow-up work on Wood Smoke analysis
![Page 8: RTF Work Plan Mid-Year Re-Programming July 15, 2014.](https://reader036.fdocuments.us/reader036/viewer/2022082710/56649e8a5503460f94b905d6/html5/thumbnails/8.jpg)
Remaining 2014 funds to allocate
Approved 2014 Allocated in Contracts$0
$200,000
$400,000
$600,000
$800,000
$1,000,000
$1,200,000
$1,400,000
$1,600,000
$51,600
Remaining to AllocateExisting Measure Review & UpdatesNew Measure Development & Review of Unsolicited ProposalsStandardization of Technical AnalysisTool DevelopmentResearch Projects & Data Devel-opmentRegional CoordinationRTF Member Support & Administra-tionRTF Management
![Page 9: RTF Work Plan Mid-Year Re-Programming July 15, 2014.](https://reader036.fdocuments.us/reader036/viewer/2022082710/56649e8a5503460f94b905d6/html5/thumbnails/9.jpg)
July – December Requests
• Inform RTF staff about any upcoming:– New UES measures– New Standard Protocols & calculators– Research projects within RTF scope to perform
• Ops Committee will be informed of how funds get re-allocated if not used for specified work plan items