RTF Subcommittee Meeting
description
Transcript of RTF Subcommittee Meeting
![Page 1: RTF Subcommittee Meeting](https://reader036.fdocuments.us/reader036/viewer/2022081520/56816268550346895dd2d4b1/html5/thumbnails/1.jpg)
RTF Subcommittee Meeting
RTF Technical Support Needs for Small & Rural Utilities
October 27, 2010
1
![Page 2: RTF Subcommittee Meeting](https://reader036.fdocuments.us/reader036/viewer/2022081520/56816268550346895dd2d4b1/html5/thumbnails/2.jpg)
Agenda
Introductions Review revised project timeline Analysis methodology Analysis findings Next steps Q&A
2
![Page 3: RTF Subcommittee Meeting](https://reader036.fdocuments.us/reader036/viewer/2022081520/56816268550346895dd2d4b1/html5/thumbnails/3.jpg)
Revised Project Timeline
3
October 27 Subcommittee meeting to discuss revised schedule and overall approach to analyzing the measure data from the PTR and C&RD.
October 29 All data due to Ecotope (w/ exception of IDEA and maybe PNGC…)
November 19 Ecotope sends draft list of utilities and proposed interview questions to subcommittee for review
December 2/3 Subcommittee meeting – list of utilities finalized; discuss interview questions.
December 6-10
Ecotope to start scheduling interviews
December 10 Final interview questions
December 13 – January 21
Utility interviews
February 11 Draft report due February 18 Subcommittee to provide feedback on draft reportFebruary 21-25
Subcommittee meeting – presentation on draft report
March 1 Presentation on draft report to full RTFMarch 18 Final report due
![Page 4: RTF Subcommittee Meeting](https://reader036.fdocuments.us/reader036/viewer/2022081520/56816268550346895dd2d4b1/html5/thumbnails/4.jpg)
Interim Analysis Methodology
4
Characterize utilities– Clean/prune data (remove misc. “non-utility” entities)– Small (<15 aMW)– Rural (LDD recipients)– Residential (> 60%)
Use 2007-2010 PTR dataset as base – C&RD to be available for next round– PNGC and IDEA pools to be broken out in next round
Develop measure bins based on PTR categories
Develop high-level summaries of measure implementation behavior
![Page 5: RTF Subcommittee Meeting](https://reader036.fdocuments.us/reader036/viewer/2022081520/56816268550346895dd2d4b1/html5/thumbnails/5.jpg)
Analysis Categories Renewables Measure Bins
– Commercial Envelope– Commercial Equipment– Commercial Lighting– Commercial Third Party– Residential Appliances– Residential Envelope– Residential HVAC– Residential Water Heating– Low Income Weatherization– Agricultural– Industrial – Utility Systems– Traffic Signals
5
![Page 6: RTF Subcommittee Meeting](https://reader036.fdocuments.us/reader036/viewer/2022081520/56816268550346895dd2d4b1/html5/thumbnails/6.jpg)
Utility Breakdowns
Small = 41 Rural = 36 Small or rural = 77 Small/rural = 13 Residential = 36 Small/residential = 12 Rural/residential = 16 Small/rural/residential = 6
6
![Page 7: RTF Subcommittee Meeting](https://reader036.fdocuments.us/reader036/viewer/2022081520/56816268550346895dd2d4b1/html5/thumbnails/7.jpg)
Potential Utility Selection Criteria
Utility characterization breakdowns
Volume of savings
Patterns of measure implementation of various utilities
Residential vs. commercial
Renewables vs. measures
Climate
7
![Page 8: RTF Subcommittee Meeting](https://reader036.fdocuments.us/reader036/viewer/2022081520/56816268550346895dd2d4b1/html5/thumbnails/8.jpg)
Distribution of Utilities by Load & Customer Base (All Utilities)
8
![Page 9: RTF Subcommittee Meeting](https://reader036.fdocuments.us/reader036/viewer/2022081520/56816268550346895dd2d4b1/html5/thumbnails/9.jpg)
Overall Distribution of Measures (All Utilities)
9
![Page 10: RTF Subcommittee Meeting](https://reader036.fdocuments.us/reader036/viewer/2022081520/56816268550346895dd2d4b1/html5/thumbnails/10.jpg)
Overall Distribution of Measures, Not Renewables (All Utilities)
10
![Page 11: RTF Subcommittee Meeting](https://reader036.fdocuments.us/reader036/viewer/2022081520/56816268550346895dd2d4b1/html5/thumbnails/11.jpg)
Distribution of Measures by Small/Rural
11
![Page 12: RTF Subcommittee Meeting](https://reader036.fdocuments.us/reader036/viewer/2022081520/56816268550346895dd2d4b1/html5/thumbnails/12.jpg)
Distribution of Measures vs. Renewables by Small/Rural Utilities
12
![Page 13: RTF Subcommittee Meeting](https://reader036.fdocuments.us/reader036/viewer/2022081520/56816268550346895dd2d4b1/html5/thumbnails/13.jpg)
Next Steps
Incorporate C&RD and individual utilities from PNGC and IDEA
Perform analysis on complete dataset
Take a closer look at individual measures, normalize across utilities for comparative analysis
Refine utility selection criteria
Develop list of recommended utilities
Develop draft survey questions
13
![Page 14: RTF Subcommittee Meeting](https://reader036.fdocuments.us/reader036/viewer/2022081520/56816268550346895dd2d4b1/html5/thumbnails/14.jpg)
Questions & Answers
14
![Page 15: RTF Subcommittee Meeting](https://reader036.fdocuments.us/reader036/viewer/2022081520/56816268550346895dd2d4b1/html5/thumbnails/15.jpg)
Ecotope Contact:Poppy Storm, Project Manager
4056 9th Avenue NE − Seattle, Washington, 98105PH: (206) 322-3753, FAX: (206) 325-7270
www.ecotope.com
15