rt3
description
Transcript of rt3
-
-25.0 -22.5 -20.0 -17.5 -15.0 -12.5 -10.0 -7.5 -5.0 -2.5 0.0 2.5 5.0 7.5 10.0 12.5 15.0 17.5 20.0
37.0
37.5
38.0
38.5
39.0
39.5
40.0
40.5
41.0
Center Line
3 4 5 6 7
0 + 050.000
Ground SectionNo. Offset Level
1 -40.000 36.9322 -30.000 37.0523 -20.000 37.0324 -10.000 37.0045 0.000 37.0226 10.000 37.1027 20.000 36.9528 30.000 37.0279 40.000 37.097
INTERCHANGE 128+129.57 (RT # 03)0+000 TO 0+287.431
Consultant ITALCONSULT Contractor SAPAC
Date 01/06/2015 1Page
Draw ScaleHoriz. = 1 : 255.31Vert. = 1 : 89.05
1
2
3 456
789 10 11
12131415
1617
18
19
Profile Grade = 41.947Super ElevationLeft Side = -0.005Right Side = -0.005
Side SlopeLeft Side = 1 : 3.00Right Side = 1 : 3.00
Road SectionNo. Offset Level
1 -24.342 37.0412 -11.992 41.1533 -7.000 41.9854 -6.500 41.9825 -6.751 41.7316 -6.951 41.7327 -7.253 41.4318 -7.453 41.4329 -7.755 41.130
10 0.000 41.09711 3.745 41.08612 3.447 41.38413 3.247 41.38514 2.949 41.68415 2.749 41.68516 2.500 41.93317 3.000 41.93118 8.215 41.06119 20.532 36.956
Sub Areas & VolumesCurrent Section Previous Section
No. Area Volume Distance Volume Area0 136.389
Total Areas & VolumesTotal Fill Total Cut
Curr. Sec. AreaPrev. Sec. AreaIntermediate vol.Accum. Volumes
136.389 0.000
0.000 0.000
-
-25.0 -22.5 -20.0 -17.5 -15.0 -12.5 -10.0 -7.5 -5.0 -2.5 0.0 2.5 5.0 7.5 10.0 12.5 15.0 17.5 20.0
37.0
37.5
38.0
38.5
39.0
39.5
40.0
40.5
41.0
41.5
Center Line
3 4 5 6 7
0 + 075.000
Ground SectionNo. Offset Level
1 -40.000 37.0722 -30.000 37.0923 -20.000 37.1724 -10.000 37.2925 0.000 37.3526 10.000 37.1927 20.000 37.1678 30.000 37.1529 40.000 37.232
INTERCHANGE 128+129.57 (RT # 03)0+000 TO 0+287.431
Consultant ITALCONSULT Contractor SAPAC
Date 01/06/2015 2Page
Draw ScaleHoriz. = 1 : 266.04Vert. = 1 : 98.43
1
2
3456
789 10 11
12131415
1617
18
19
Profile Grade = 42.374Super ElevationLeft Side = -0.021Right Side = -0.021
Side SlopeLeft Side = 1 : 3.00Right Side = 1 : 3.00
Road SectionNo. Offset Level
1 -25.552 37.1282 -11.729 41.7313 -7.000 42.5194 -6.500 42.5085 -6.755 42.2536 -6.955 42.2577 -7.262 41.9518 -7.462 41.9559 -7.768 41.649
10 0.000 41.52411 3.733 41.48112 3.439 41.77513 3.239 41.77914 2.945 42.07315 2.745 42.07716 2.500 42.32217 3.000 42.31218 8.586 41.38119 21.234 37.165
Sub Areas & VolumesCurrent Section Previous Section
No. Area Volume Distance Volume Area0 147.887 0.000 25.000 3553.450 136.389
Total Areas & VolumesTotal Fill Total Cut
Curr. Sec. AreaPrev. Sec. AreaIntermediate vol.Accum. Volumes
147.887136.389
0.0000.000
3,553.4503,553.450
0.0000.000
-
-25.0 -22.5 -20.0 -17.5 -15.0 -12.5 -10.0 -7.5 -5.0 -2.5 0.0 2.5 5.0 7.5 10.0 12.5 15.0 17.5 20.0 22.5
37.0
37.5
38.038.5
39.0
39.540.0
40.5
41.041.5
42.0
Center Line
3 4 5 6 7
0 + 100.000
Ground SectionNo. Offset Level
1 -40.000 37.2272 -30.000 37.2723 -20.000 37.3424 -10.000 37.4225 0.000 37.4426 10.000 37.3847 20.000 37.3128 30.000 37.2629 40.000 37.285
INTERCHANGE 128+129.57 (RT # 03)0+000 TO 0+287.431
Consultant ITALCONSULT Contractor SAPAC
Date 01/06/2015 3Page
Draw ScaleHoriz. = 1 : 271.69Vert. = 1 : 101.55
1
2
3456
789
10 111213
14151617
18
19
Profile Grade = 42.643Super ElevationLeft Side = -0.036Right Side = -0.036
Side SlopeLeft Side = 1 : 3.00Right Side = 1 : 3.00
Road SectionNo. Offset Level
1 -26.053 37.3002 -11.508 42.1433 -7.000 42.8944 -6.500 42.8765 -6.759 42.6176 -6.959 42.6247 -7.270 42.3138 -7.470 42.3209 -7.782 42.009
10 0.000 41.79311 3.721 41.71812 3.431 42.00813 3.231 42.01514 2.941 42.30515 2.741 42.31216 2.500 42.55317 3.000 42.53518 9.050 41.52719 21.720 37.303
Sub Areas & VolumesCurrent Section Previous Section
No. Area Volume Distance Volume Area0 155.561 0.000 25.000 3793.100 147.887
Total Areas & VolumesTotal Fill Total Cut
Curr. Sec. AreaPrev. Sec. AreaIntermediate vol.Accum. Volumes
155.561147.887
0.0000.000
3,793.1007,346.550
0.0000.000
-
-25.0 -22.5 -20.0 -17.5 -15.0 -12.5 -10.0 -7.5 -5.0 -2.5 0.0 2.5 5.0 7.5 10.0 12.5 15.0 17.5 20.0 22.537.0
37.538.0
38.539.0
39.540.0
40.5
41.041.5
42.0
Center Line
3
45 6 7
0 + 125.000
Ground SectionNo. Offset Level
1 -40.000 37.5122 -30.000 37.3723 -20.000 37.8824 -10.000 37.3175 0.000 37.5526 10.000 37.5627 20.000 37.4458 30.000 37.4029 40.000 37.352
INTERCHANGE 128+129.57 (RT # 03)0+000 TO 0+287.431
Consultant ITALCONSULT Contractor SAPAC
Date 01/06/2015 4Page
Draw ScaleHoriz. = 1 : 267.74Vert. = 1 : 103.11
1
2
3456
789
10 111213
14151617
18
19
Profile Grade = 42.724Super ElevationLeft Side = -0.042Right Side = -0.042
Side SlopeLeft Side = 1 : 3.00Right Side = 1 : 3.00
Road SectionNo. Offset Level
1 -25.475 37.6032 -11.431 42.2803 -7.000 43.0184 -6.500 42.9975 -6.761 42.7366 -6.961 42.7447 -7.274 42.4318 -7.474 42.4409 -7.787 42.127
10 0.000 41.87411 3.716 41.78612 3.428 42.07413 3.228 42.08314 2.940 42.37115 2.740 42.37916 2.500 42.61917 3.000 42.59818 9.268 41.55319 21.614 37.438
Sub Areas & VolumesCurrent Section Previous Section
No. Area Volume Distance Volume Area0 152.428 0.000 25.000 3849.863 155.561
Total Areas & VolumesTotal Fill Total Cut
Curr. Sec. AreaPrev. Sec. AreaIntermediate vol.Accum. Volumes
152.428155.561
0.0000.000
3,849.86311,196.413
0.0000.000
-
-25.0 -22.5 -20.0 -17.5 -15.0 -12.5 -10.0 -7.5 -5.0 -2.5 0.0 2.5 5.0 7.5 10.0 12.5 15.0 17.5 20.0
37.5
38.0
38.5
39.039.5
40.0
40.5
41.0
41.5
Center Line
34
5 6 7
0 + 150.000
Ground SectionNo. Offset Level
1 -40.000 38.1622 -30.000 37.7323 -20.000 37.4824 -10.000 37.8695 0.000 37.4146 10.000 37.5327 20.000 37.4928 30.000 37.4679 40.000 37.458
INTERCHANGE 128+129.57 (RT # 03)0+000 TO 0+287.431
Consultant ITALCONSULT Contractor SAPAC
Date 01/06/2015 5Page
Draw ScaleHoriz. = 1 : 263.22Vert. = 1 : 99.99
1
2
3456
789
10 111213
14151617
18
19
Profile Grade = 42.618Super ElevationLeft Side = -0.042Right Side = -0.042
Side SlopeLeft Side = 1 : 3.00Right Side = 1 : 3.00
Road SectionNo. Offset Level
1 -25.134 37.6102 -11.431 42.1743 -7.000 42.9124 -6.500 42.8915 -6.761 42.6306 -6.961 42.6387 -7.274 42.3258 -7.474 42.3349 -7.787 42.021
10 0.000 41.76811 3.716 41.68012 3.428 41.96813 3.228 41.97714 2.940 42.26515 2.740 42.27316 2.500 42.51317 3.000 42.49218 9.268 41.44719 21.143 37.489
Sub Areas & VolumesCurrent Section Previous Section
No. Area Volume Distance Volume Area0 146.392 0.000 25.000 3735.250 152.428
Total Areas & VolumesTotal Fill Total Cut
Curr. Sec. AreaPrev. Sec. AreaIntermediate vol.Accum. Volumes
146.392152.428
0.0000.000
3,735.25014,931.663
0.0000.000
-
-22.5 -20.0 -17.5 -15.0 -12.5 -10.0 -7.5 -5.0 -2.5 0.0 2.5 5.0 7.5 10.0 12.5 15.0 17.5 20.0
37.5
38.0
38.5
39.0
39.5
40.0
40.5
41.0
41.5
Center Line
34 5
6 7
0 + 175.000
Ground SectionNo. Offset Level
1 -40.000 38.9172 -30.000 38.3823 -20.000 37.9074 -10.000 37.7225 0.000 37.6986 10.000 37.4577 20.000 37.5088 30.000 37.5089 40.000 37.552
INTERCHANGE 128+129.57 (RT # 03)0+000 TO 0+287.431
Consultant ITALCONSULT Contractor SAPAC
Date 01/06/2015 6Page
Draw ScaleHoriz. = 1 : 245.71Vert. = 1 : 90.61
1
2
3 456
789
10 111213
14151617
18
19
Profile Grade = 42.325Super ElevationLeft Side = -0.042Right Side = -0.042
Side SlopeLeft Side = 1 : 3.00Right Side = 1 : 3.00
Road SectionNo. Offset Level
1 -22.943 38.0472 -11.431 41.8813 -7.000 42.6194 -6.500 42.5985 -6.761 42.3376 -6.961 42.3457 -7.274 42.0328 -7.474 42.0419 -7.787 41.728
10 0.000 41.47511 3.716 41.38712 3.428 41.67513 3.228 41.68414 2.940 41.97215 2.740 41.98016 2.500 42.22017 3.000 42.19918 9.268 41.15419 20.207 37.508
Sub Areas & VolumesCurrent Section Previous Section
No. Area Volume Distance Volume Area0 128.568 0.000 25.000 3437.000 146.392
Total Areas & VolumesTotal Fill Total Cut
Curr. Sec. AreaPrev. Sec. AreaIntermediate vol.Accum. Volumes
128.568146.392
0.0000.000
3,437.00018,368.663
0.0000.000
-
-22.5 -20.0 -17.5 -15.0 -12.5 -10.0 -7.5 -5.0 -2.5 0.0 2.5 5.0 7.5 10.0 12.5 15.0 17.5
37.5
38.0
38.5
39.0
39.5
40.0
40.5
41.0
41.5
Center Line
3
45
6
0 + 200.000
Ground SectionNo. Offset Level
1 -40.000 39.6542 -30.000 39.5923 -20.000 38.6744 -10.000 38.1575 0.000 38.0046 10.000 37.6007 20.000 37.6608 30.000 37.7599 40.000 37.844
INTERCHANGE 128+129.57 (RT # 03)0+000 TO 0+287.431
Consultant ITALCONSULT Contractor SAPAC
Date 01/06/2015 7Page
Draw ScaleHoriz. = 1 : 229.33Vert. = 1 : 81.24
1
2
3 456
789
10 111213
14151617
18
19
Profile Grade = 41.893Super ElevationLeft Side = -0.042Right Side = -0.042
Side SlopeLeft Side = 1 : 4.00Right Side = 1 : 3.00
Road SectionNo. Offset Level
1 -21.850 38.8442 -11.431 41.4493 -7.000 42.1874 -6.500 42.1665 -6.761 41.9056 -6.961 41.9137 -7.274 41.6008 -7.474 41.6099 -7.787 41.296
10 0.000 41.04311 3.716 40.95512 3.428 41.24313 3.228 41.25214 2.940 41.54015 2.740 41.54816 2.500 41.78817 3.000 41.76718 9.268 40.72219 18.482 37.651
Sub Areas & VolumesCurrent Section Previous Section
No. Area Volume Distance Volume Area0 100.221 0.000 25.000 2859.863 128.568
Total Areas & VolumesTotal Fill Total Cut
Curr. Sec. AreaPrev. Sec. AreaIntermediate vol.Accum. Volumes
100.221128.568
0.0000.000
2,859.86321,228.525
0.0000.000
-
-17.5 -15.0 -12.5 -10.0 -7.5 -5.0 -2.5 0.0 2.5 5.0 7.5 10.0 12.5 15.0 17.5
38.0
38.5
39.0
39.5
40.0
40.5
41.0
Center Line
4
5
6
0 + 225.000
Ground SectionNo. Offset Level
1 -40.000 39.3142 -30.000 39.7803 -20.000 39.7844 -10.000 39.0845 0.000 38.3146 10.000 37.9447 20.000 37.8668 30.000 37.9049 40.000 37.904
INTERCHANGE 128+129.57 (RT # 03)0+000 TO 0+287.431
Consultant ITALCONSULT Contractor SAPAC
Date 01/06/2015 8Page
Draw ScaleHoriz. = 1 : 206.74Vert. = 1 : 71.87
1
2
3 456
789
10 111213
14151617
18
19
Profile Grade = 41.500Super ElevationLeft Side = -0.042Right Side = -0.042
Side SlopeLeft Side = 1 : 4.00Right Side = 1 : 4.00
Road SectionNo. Offset Level
1 -17.279 39.5942 -11.431 41.0563 -7.000 41.7944 -6.500 41.7735 -6.761 41.5126 -6.961 41.5207 -7.274 41.2078 -7.474 41.2169 -7.787 40.903
10 0.000 40.65011 3.716 40.56212 3.428 40.85013 3.228 40.85914 2.940 41.14715 2.740 41.15516 2.500 41.39517 3.000 41.37418 9.268 40.32919 19.093 37.873
Sub Areas & VolumesCurrent Section Previous Section
No. Area Volume Distance Volume Area0 67.218 0.000 25.000 2092.988 100.221
Total Areas & VolumesTotal Fill Total Cut
Curr. Sec. AreaPrev. Sec. AreaIntermediate vol.Accum. Volumes
67.218100.221
0.0000.000
2,092.98823,321.513
0.0000.000
-
-5.0 -2.5 0.0 2.5 5.0 7.5 10.0 12.5 15.0
38.0
38.5
39.0
39.5
40.0
40.5
Center Line
56
0 + 250.000
Ground SectionNo. Offset Level
1 -40.000 38.8542 -30.000 39.6643 -20.000 39.8904 -10.000 39.3515 0.000 38.7346 10.000 38.4747 20.000 38.0248 30.000 38.0329 40.000 37.974
INTERCHANGE 128+129.57 (RT # 03)0+000 TO 0+287.431
Consultant ITALCONSULT Contractor SAPAC
Date 01/06/2015 9Page
Draw ScaleHoriz. = 1 : 123.70Vert. = 1 : 53.12
1
23 4
56
789 10
11
12
Profile Grade = 41.165Super ElevationLeft Side = -0.035Right Side = -0.035
Side SlopeLeft Side = Vert.Right Side = 1 : 4.00
Road SectionNo. Offset Level
1 -5.000 39.0432 -5.000 40.4913 0.000 40.3154 3.721 40.2425 3.431 40.5326 3.231 40.5397 2.941 40.8288 2.741 40.8359 2.500 41.077
10 3.000 41.05911 9.026 40.05512 16.524 38.180
Sub Areas & VolumesCurrent Section Previous Section
No. Area Volume Distance Volume Area0 29.945 0.000 25.000 1214.538 67.218
Total Areas & VolumesTotal Fill Total Cut
Curr. Sec. AreaPrev. Sec. AreaIntermediate vol.Accum. Volumes
29.94567.218
0.0000.000
1,214.53824,536.050
0.0000.000
-
-2.5 0.0 2.5 5.0 7.5 10.0 12.5 15.0
38.5
39.0
39.5
40.0
40.5
Center Line
5
6
0 + 275.000
Ground SectionNo. Offset Level
1 -40.000 38.9142 -30.000 39.6543 -20.000 40.0064 -10.000 39.8415 0.000 38.8946 10.000 38.4147 20.000 38.0898 30.000 37.9049 40.000 37.944
INTERCHANGE 128+129.57 (RT # 03)0+000 TO 0+287.431
Consultant ITALCONSULT Contractor SAPAC
Date 01/06/2015 10Page
Draw ScaleHoriz. = 1 : 110.15Vert. = 1 : 48.43
1
23 4
56
78
9 10
11
12
Profile Grade = 40.884Super ElevationLeft Side = -0.022Right Side = -0.022
Side SlopeLeft Side = Vert.Right Side = 1 : 4.00
Road SectionNo. Offset Level
1 -4.062 39.2792 -4.062 40.1223 0.000 40.0344 3.732 39.9895 3.438 40.2836 3.238 40.2877 2.945 40.5818 2.745 40.5859 2.500 40.830
10 3.000 40.81911 8.615 39.88312 15.162 38.246
Sub Areas & VolumesCurrent Section Previous Section
No. Area Volume Distance Volume Area0 21.896 0.000 25.000 648.013 29.945
Total Areas & VolumesTotal Fill Total Cut
Curr. Sec. AreaPrev. Sec. AreaIntermediate vol.Accum. Volumes
21.89629.945
0.0000.000
648.01325,184.063
0.0000.000
-
-2.5 0.0 2.5 5.0 7.5 10.0 12.5
38.5
39.0
39.5
40.0
40.5
Center Line
5
6
0 + 287.431
Ground SectionNo. Offset Level
1 -40.000 39.0742 -30.000 39.6243 -20.000 40.0244 -10.000 39.9245 0.000 38.9746 10.000 38.5447 20.000 38.0868 30.000 37.9599 40.000 38.024
INTERCHANGE 128+129.57 (RT # 03)0+000 TO 0+287.431
Consultant ITALCONSULT Contractor SAPAC
Date 01/06/2015 11Page
Draw ScaleHoriz. = 1 : 102.80Vert. = 1 : 45.31
1
2 3 4
56
78
9 10
11
12
Profile Grade = 40.751Super ElevationLeft Side = -0.015Right Side = -0.015
Side SlopeLeft Side = Vert.Right Side = 1 : 4.00
Road SectionNo. Offset Level
1 -3.650 39.3212 -3.650 39.9563 0.000 39.9014 3.737 39.8705 3.442 40.1666 3.242 40.1697 2.946 40.4648 2.746 40.4679 2.500 40.714
10 3.000 40.70611 8.439 39.80012 14.237 38.350
Sub Areas & VolumesCurrent Section Previous Section
No. Area Volume Distance Volume Area0 17.407 0.000 12.431 244.288 21.896
Total Areas & VolumesTotal Fill Total Cut
Curr. Sec. AreaPrev. Sec. AreaIntermediate vol.Accum. Volumes
17.40721.896
0.0000.000
244.28825,428.350
0.0000.000