RT2010, Lisboa Portugal, May 28, 2009 Page 1 Baseline architecture of ITER control system Anders...

26
RT2010, Lisboa Portugal, May 28, 2009 Page 1 Baseline architecture of Baseline architecture of ITER control system ITER control system Anders Wallander , Franck Di Maio, Jean-Yves Journeaux, Wolf-Dieter Klotz, Petri Makijarvi, Izuru Yonekawa ITER Organization (IO) 13067 St. Paul lez Durance, France
  • date post

    21-Dec-2015
  • Category

    Documents

  • view

    213
  • download

    0

Transcript of RT2010, Lisboa Portugal, May 28, 2009 Page 1 Baseline architecture of ITER control system Anders...

Page 1: RT2010, Lisboa Portugal, May 28, 2009 Page 1 Baseline architecture of ITER control system Anders Wallander, Franck Di Maio, Jean-Yves Journeaux, Wolf-Dieter.

RT2010, Lisboa Portugal, May 28, 2009Page 1

Baseline architecture of Baseline architecture of ITER control systemITER control system

Anders Wallander, Franck Di Maio, Jean-Yves Journeaux, Wolf-Dieter Klotz, Petri Makijarvi, Izuru Yonekawa

ITER Organization (IO) 13067 St. Paul lez Durance, France

Page 2: RT2010, Lisboa Portugal, May 28, 2009 Page 1 Baseline architecture of ITER control system Anders Wallander, Franck Di Maio, Jean-Yves Journeaux, Wolf-Dieter.

RT2010, Lisboa Portugal, May 28, 2009Page 2

Basics

Goal: Demonstrate feasibility of fusion as an energy source (Q=10 means output power equal 10 times input power)

Schedule: 10 years construction phaseFirst plasma 2019, first D-T plasma 2027

Collaboration: CN, EU, IN, JA, KO, RF, US

Page 3: RT2010, Lisboa Portugal, May 28, 2009 Page 1 Baseline architecture of ITER control system Anders Wallander, Franck Di Maio, Jean-Yves Journeaux, Wolf-Dieter.

RT2010, Lisboa Portugal, May 28, 2009Page 3

This is ITER

Page 4: RT2010, Lisboa Portugal, May 28, 2009 Page 1 Baseline architecture of ITER control system Anders Wallander, Franck Di Maio, Jean-Yves Journeaux, Wolf-Dieter.

RT2010, Lisboa Portugal, May 28, 2009Page 4

This is the ITER Agreement

140 slices

Page 5: RT2010, Lisboa Portugal, May 28, 2009 Page 1 Baseline architecture of ITER control system Anders Wallander, Franck Di Maio, Jean-Yves Journeaux, Wolf-Dieter.

RT2010, Lisboa Portugal, May 28, 2009Page 5

A bit of interface problems

Page 6: RT2010, Lisboa Portugal, May 28, 2009 Page 1 Baseline architecture of ITER control system Anders Wallander, Franck Di Maio, Jean-Yves Journeaux, Wolf-Dieter.

RT2010, Lisboa Portugal, May 28, 2009Page 6

Island mentality

Page 7: RT2010, Lisboa Portugal, May 28, 2009 Page 1 Baseline architecture of ITER control system Anders Wallander, Franck Di Maio, Jean-Yves Journeaux, Wolf-Dieter.

RT2010, Lisboa Portugal, May 28, 2009Page 7

Missing Items

Page 8: RT2010, Lisboa Portugal, May 28, 2009 Page 1 Baseline architecture of ITER control system Anders Wallander, Franck Di Maio, Jean-Yves Journeaux, Wolf-Dieter.

RT2010, Lisboa Portugal, May 28, 2009Page 8

The control system can help to fix this

Page 9: RT2010, Lisboa Portugal, May 28, 2009 Page 1 Baseline architecture of ITER control system Anders Wallander, Franck Di Maio, Jean-Yves Journeaux, Wolf-Dieter.

RT2010, Lisboa Portugal, May 28, 2009Page 9

The control system is horizontal

Page 10: RT2010, Lisboa Portugal, May 28, 2009 Page 1 Baseline architecture of ITER control system Anders Wallander, Franck Di Maio, Jean-Yves Journeaux, Wolf-Dieter.

RT2010, Lisboa Portugal, May 28, 2009Page 10

it connects to everything

Page 11: RT2010, Lisboa Portugal, May 28, 2009 Page 1 Baseline architecture of ITER control system Anders Wallander, Franck Di Maio, Jean-Yves Journeaux, Wolf-Dieter.

RT2010, Lisboa Portugal, May 28, 2009Page 11

it identifies and may eliminate missing items

Page 12: RT2010, Lisboa Portugal, May 28, 2009 Page 1 Baseline architecture of ITER control system Anders Wallander, Franck Di Maio, Jean-Yves Journeaux, Wolf-Dieter.

RT2010, Lisboa Portugal, May 28, 2009Page 12

it integrates

Page 13: RT2010, Lisboa Portugal, May 28, 2009 Page 1 Baseline architecture of ITER control system Anders Wallander, Franck Di Maio, Jean-Yves Journeaux, Wolf-Dieter.

RT2010, Lisboa Portugal, May 28, 2009Page 13

and is the primary tool for operation

Page 14: RT2010, Lisboa Portugal, May 28, 2009 Page 1 Baseline architecture of ITER control system Anders Wallander, Franck Di Maio, Jean-Yves Journeaux, Wolf-Dieter.

RT2010, Lisboa Portugal, May 28, 2009Page 14

But this will only work if…

…all these links work

StandardsArchitecture

Page 15: RT2010, Lisboa Portugal, May 28, 2009 Page 1 Baseline architecture of ITER control system Anders Wallander, Franck Di Maio, Jean-Yves Journeaux, Wolf-Dieter.

RT2010, Lisboa Portugal, May 28, 2009Page 15

Finite set of “Lego blocks”, which can be selected and connected as required

Page 16: RT2010, Lisboa Portugal, May 28, 2009 Page 1 Baseline architecture of ITER control system Anders Wallander, Franck Di Maio, Jean-Yves Journeaux, Wolf-Dieter.

RT2010, Lisboa Portugal, May 28, 2009Page 16

Plant System I&C

Is a deliverable by ITER member state.Set of standard components selected from catalogue.One and only one plant system host.

Page 17: RT2010, Lisboa Portugal, May 28, 2009 Page 1 Baseline architecture of ITER control system Anders Wallander, Franck Di Maio, Jean-Yves Journeaux, Wolf-Dieter.

RT2010, Lisboa Portugal, May 28, 2009Page 17

ITER Subsystem

is a set of related plant system I&C

Page 18: RT2010, Lisboa Portugal, May 28, 2009 Page 1 Baseline architecture of ITER control system Anders Wallander, Franck Di Maio, Jean-Yves Journeaux, Wolf-Dieter.

RT2010, Lisboa Portugal, May 28, 2009Page 18

Plant Operation Network

is the work horse general purpose flat network utilizing industrial managed switches and mainstream IT technology

Page 19: RT2010, Lisboa Portugal, May 28, 2009 Page 1 Baseline architecture of ITER control system Anders Wallander, Franck Di Maio, Jean-Yves Journeaux, Wolf-Dieter.

RT2010, Lisboa Portugal, May 28, 2009Page 19

Plant System Host

is an IO furnished hardware and software component installed in a Plant System I&C cubicle. There is one and only one PSH in a Plant System I&C. PSH runs RHEL (Red Hat Enterprise Linux) and EPICS (Experimental Physics and Industrial Control System) soft IOC (Input Output Controller). It provides standard functions like maintaining (monitoring and controlling) the Common Operation State (COS) of the Plant System. PSH is fully data driven, i.e. it is customized for a particular Plant System I&C by configuration. There is no plant specific code in a PSH. PSH has no I/O.

Page 20: RT2010, Lisboa Portugal, May 28, 2009 Page 1 Baseline architecture of ITER control system Anders Wallander, Franck Di Maio, Jean-Yves Journeaux, Wolf-Dieter.

RT2010, Lisboa Portugal, May 28, 2009Page 20

Fast Controller

is a dedicated industrial controller implemented in PCI family form factor and PCIe and Ethernet communication fabric. There may be zero, one or many Fast Controllers in a Plant System I&C. A Fast Controller runs RHEL and EPICS IOC. It acts as a channel access server and exposes process variables (PV) to PON. A Fast Controller has normally I/O and IO supports a set of standard I/O modules with associated EPICS drivers. A Fast Controller may have interface to High Performance Networks (HPN), i.e. SDN for plasma control and TCN for absolute time and programmed triggers and clocks. Fast Controllers involved in critical real-time runs a RT enabled (TBD) version of Linux on a separate core or CPU. A Fast Controller can have plant specific logic. A Fast Controller can act as supervisor for other Fast Controllers and/or Slow Controllers. The supervisor maintains Plant System Operating State.

Page 21: RT2010, Lisboa Portugal, May 28, 2009 Page 1 Baseline architecture of ITER control system Anders Wallander, Franck Di Maio, Jean-Yves Journeaux, Wolf-Dieter.

RT2010, Lisboa Portugal, May 28, 2009Page 21

High Performance Computer

are dedicated computers (multi core, GPU) running plasma control algorithms.

Page 22: RT2010, Lisboa Portugal, May 28, 2009 Page 1 Baseline architecture of ITER control system Anders Wallander, Franck Di Maio, Jean-Yves Journeaux, Wolf-Dieter.

RT2010, Lisboa Portugal, May 28, 2009Page 22

High Performance Networks

are physically dedicated networks to implement functions not achievable by the conventional Plant Operation Network. These functions are distributed real-time feedback control, high accuracy time synchronization and bulk video distribution.

Page 23: RT2010, Lisboa Portugal, May 28, 2009 Page 1 Baseline architecture of ITER control system Anders Wallander, Franck Di Maio, Jean-Yves Journeaux, Wolf-Dieter.

RT2010, Lisboa Portugal, May 28, 2009Page 23

ITER subsystem # of PS I&C # of PSH+controllers # of servers+terminals

Tokamak 6 55 6

Cryo and cooling water 5 40 3

Magnets and coil power supply 8 30 3

Building and power 37 66 3

Fuelling and vacuum 6 45 3

Heating 8 55 4

Remote handling 2 15 2

Hot cell and environment 3 20 2

Test blanket 6 24 7

Diagnostics 89 400 20

Central 0 0 170

TOTAL 167 750 220

Estimate of system size

~1000 computers connected to PON

Page 24: RT2010, Lisboa Portugal, May 28, 2009 Page 1 Baseline architecture of ITER control system Anders Wallander, Franck Di Maio, Jean-Yves Journeaux, Wolf-Dieter.

RT2010, Lisboa Portugal, May 28, 2009Page 24

Timing System

• It is common practice by large experimental facilities to invent their own home made timing system and we want to avoid that• We believe that IEEE 1588-2008 (PTP v2) provides a COTS alternative fulfilling ITER requirements• IEEE 1588, 2008, provides 50 ns RMS synchronization accuracy of absolute time over Ethernet with possibility to program triggers and clocks synchronized with this absolute time using COTS• This standard is being endorsed by more and more suppliers and we will see many new COTS products in the future• This also provides an evolution path to White Rabbit being developed by CERN

• Therefore we have baselined IEEE 1588-2008 for TCN and will confirm this decision by further evaluations in 2nd half of 2010

Main requirements: 50 ns RMS absolute time synchronization (off-line correlation of diagnostics)

Page 25: RT2010, Lisboa Portugal, May 28, 2009 Page 1 Baseline architecture of ITER control system Anders Wallander, Franck Di Maio, Jean-Yves Journeaux, Wolf-Dieter.

RT2010, Lisboa Portugal, May 28, 2009Page 25

Distributed real-time plasma control

• ITER distributed plasma control main characteristics• decoupling and separation of concern• data driven• multiple in multiple out (MIMO)• non intrusive probing• flexibility• scalability• simulation support• minimize latency and jitter

• Two schools of thoughts for real-time network• Reflective memory• Ethernet based (e.g. UDP, RTnet)

• Decision on technology delayed while watching the market• Further test beds and evaluations in 2011

Main requirements: control cycles Hz-kHz, peak bandwidth 25 MB/s, number of nodes participating 50-100

Page 26: RT2010, Lisboa Portugal, May 28, 2009 Page 1 Baseline architecture of ITER control system Anders Wallander, Franck Di Maio, Jean-Yves Journeaux, Wolf-Dieter.

RT2010, Lisboa Portugal, May 28, 2009Page 26

Conclusions

• The non-technical peculiarities of the ITER project has been addressed• Components making up ITER control system have been defined and a baseline architecture outlined• Flexibility in combining these standard components have been emphasized• Having a set of standard components and a sound architecture will ease integration• Issues on timing and feedback control have been touched

We intend to continue working with our partners all over the world to make the ITER control system contribute to ITER success.

https://www.iter.org/org/team/chd/cid/codac/Pages/