Rt 29 Solutions Hydraulic Planning Advisory Panel May 25, 2017

Transcript of Rt 29 Solutions Hydraulic Planning Advisory Panel_… · information about the project. • Writer...

Page 1: Rt 29 Solutions Hydraulic Planning Advisory Panel_… · information about the project. • Writer states that whatever solution is derived for Hydraulic it must be centered around

Rt 29 Solutions Hydraulic Planning Advisory Panel

May 25, 2017

Page 2: Rt 29 Solutions Hydraulic Planning Advisory Panel_… · information about the project. • Writer states that whatever solution is derived for Hydraulic it must be centered around

Rt 29 Solutions

2

Agenda Item 1: Introductions Hydraulic Planning Advisory Panel members Technical Team members

Page 3: Rt 29 Solutions Hydraulic Planning Advisory Panel_… · information about the project. • Writer states that whatever solution is derived for Hydraulic it must be centered around

Rt 29 Solutions

3

Agenda item 2: Public Interaction and Feedback Live Streaming May 11, 2017 Apr 27, 2017

• Live Stream Viewers: 14 16

Page 4: Rt 29 Solutions Hydraulic Planning Advisory Panel_… · information about the project. • Writer states that whatever solution is derived for Hydraulic it must be centered around

Rt 29 Solutions

4

Agenda item 2: Public Interaction and Feedback (continued) For the period May 9 - May 23, 2017 Inbox and Phone • Caller states that he/she owns property along Emmet Street in the vicinity

of the Route 29/Hydraulic intersection. Requested information about the project and would like to be added to the distribution list for future information about the project.

• Writer states that whatever solution is derived for Hydraulic it must be centered around moving people from one side of the intersection to the other. It is logical that this solution will be focused primarily on vehicular traffic, but alternatives should also be evaluated based on pedestrian and bicycle modes. The writer suggests the use of a rubric that could help to evaluate alternatives for several different criteria including multi-modal transportation. Writer provided an example rubric for consideration.

Page 5: Rt 29 Solutions Hydraulic Planning Advisory Panel_… · information about the project. • Writer states that whatever solution is derived for Hydraulic it must be centered around

Rt 29 Solutions

5

Agenda item 2: Public Interaction and Feedback (continued) For the period May 9 - May 23, 2017 Website input • None

Page 6: Rt 29 Solutions Hydraulic Planning Advisory Panel_… · information about the project. • Writer states that whatever solution is derived for Hydraulic it must be centered around

Rt 29 Solutions

6

Agenda item 3: Response to Panel Feedback Finalization of Vision Statement and Goals

• Agenda Item 4 Neighborhood Outreach Plan Update

• Agenda Item 6

Page 7: Rt 29 Solutions Hydraulic Planning Advisory Panel_… · information about the project. • Writer states that whatever solution is derived for Hydraulic it must be centered around

Rt 29 Solutions

7

Agenda item 4: Phase 1 Completed and Upcoming Tasks To be complete by:

PROJECT KICK-OFF MEETING MAR 9 ✓

INITIAL SITE RECONNASAINCE MAR 23✓

SITE RECONNAISSANCE MAR 31✓

DATA COLLECTION, RESEARCH AND MAP REVIEW APR 7 ✓

PROJECT BASE MAP DEVELOPMENT APR 7 ✓

REVIEW OF RELEVANT STUDIES APR 7 ✓

SITE INVENTORY AND ANALYSIS SUMMARY APR 7 ✓

BEGIN LAND USE PLAN DEVELOPMENT APR 7 ✓

CLIENT CHARETTE APR 11✓

Page 8: Rt 29 Solutions Hydraulic Planning Advisory Panel_… · information about the project. • Writer states that whatever solution is derived for Hydraulic it must be centered around

Rt 29 Solutions

8

Agenda item 4: Phase 1 Completed and Upcoming Tasks (continued) To be complete by:

PUBLIC MEETING # 1 APR 26 ✓

ALTERNATIVE LAND USE SCENARIOS MAY 15 ✓

INTERNAL TRANSPORTATION INPUTS MAY 15 ✓

EXTERNAL TRANSPORTATION INPUTS MAY 15 ✓

CONCEPT SCREENING JUN 23

EXTERNAL TRANSPORTATION INPUTS JUL 14

CORE AREA PLAN AUG 21

PUBLIC MEETING # 2 AUG 23

DRAFT SMALL AREA PLAN SEP 15

Page 9: Rt 29 Solutions Hydraulic Planning Advisory Panel_… · information about the project. • Writer states that whatever solution is derived for Hydraulic it must be centered around

Rt 29 Solutions

9

Agenda item 4: Phase 1 Completed and Upcoming Tasks (continued)

To be complete by:

FINAL SMALL AREA PLAN SEP 29

PROJECT ABSTRACT SEP 29

COUNTY PLANNING COMMISSION SEP (date tbd)

CITY PLANNING COMMISSION SEP (date tbd)

Page 10: Rt 29 Solutions Hydraulic Planning Advisory Panel_… · information about the project. • Writer states that whatever solution is derived for Hydraulic it must be centered around

Rt 29 Solutions

10

Agenda item 4: Phase 1 Study Progress and Work Underway Work completed since May 11 meeting

• Additional Land Use Concept Alternatives

• Final Vision Statement and goals

Work currently underway

• Additional Land Use Concept Alternatives

• Transportation inputs

Page 11: Rt 29 Solutions Hydraulic Planning Advisory Panel_… · information about the project. • Writer states that whatever solution is derived for Hydraulic it must be centered around

Rt 29 Solutions

11

As we plan let’s…

Choose a desired Outcome ……then develop Path

Develop Framework first ……then Land Use

Plan for Flexibility and Change… embrace the unknown

Find our “Ocean” ……create great places

Create Demand first ……then build

Page 12: Rt 29 Solutions Hydraulic Planning Advisory Panel_… · information about the project. • Writer states that whatever solution is derived for Hydraulic it must be centered around

Rt 29 Solutions

12

Agenda item 4: Phase 1 Study Progress and Work Underway (continued)

• Key Land Use Plan Elements

• Plan elements common to each concept:

– Reduced block size for better connectivity, walkability, and scale – Integrated multi-modal systems along public streets and greenways – Increase residential uses in core area – Expanded mixed-use residential sub-area and corridors – Develop updated street typology and improve quality of public realm

– Introduction of traffic calming where appropriate, including roundabouts

Page 13: Rt 29 Solutions Hydraulic Planning Advisory Panel_… · information about the project. • Writer states that whatever solution is derived for Hydraulic it must be centered around

Rt 29 Solutions

13

Agenda item 4: Phase 1 Study Progress and Work Underway (continued)

• Key Land Use Plan Elements

• Plan elements common to each concept (continued):

– Alternatives for grade separated options – Contemplates long-term redevelopment of large single-user parcels – Enhanced connectivity between core area and legacy residential

neighborhoods – Integration of green infrastructure within core area, significant public

gathering spaces – Explore transit opportunities including a potential transit hub

Page 14: Rt 29 Solutions Hydraulic Planning Advisory Panel_… · information about the project. • Writer states that whatever solution is derived for Hydraulic it must be centered around

Rt 29 Solutions

14

Agenda item 4: Phase 1 Study Progress and Work Underway External Transportation Inputs - Initial Thoughts: • Removing heaviest turning movements at 29 / Hydraulic for biggest

impact on intersection operations • Consider impact to parallel street network as result of limiting

movements at 29/Hydraulic • How will changes to parallel network impact decisions about land use,

especially residential uses? • Consider roundabouts to calm traffic and improve intersections on

secondary network

Page 15: Rt 29 Solutions Hydraulic Planning Advisory Panel_… · information about the project. • Writer states that whatever solution is derived for Hydraulic it must be centered around

Rt 29 Solutions

15

Agenda item 4: Phase 1 Study Progress and Work Underway (continued) Conceptual Framework Plans: Route 29 at Hydraulic Focus Area Framework Plans focus on block structure, circulation and key organizing principles (such as

public space). Land Use is a secondary supportive element.

• Framework Concept 1: Route 29 / Hydraulic Activity Center – Route 29 Over

• Framework Concept 2: Route 29 / Hydraulic Activity Center – Route 29 Under

• Framework Concept 3: Mid-Block Activity Center (29/Hydraulic at grade)

Page 16: Rt 29 Solutions Hydraulic Planning Advisory Panel_… · information about the project. • Writer states that whatever solution is derived for Hydraulic it must be centered around

Rt 29 Solutions

16

Agenda item 4: Phase 1 Study Progress and Work Underway (continued) Framework Plan Concept 1 – Hydraulic Activity Center: Route 29 Over

Page 17: Rt 29 Solutions Hydraulic Planning Advisory Panel_… · information about the project. • Writer states that whatever solution is derived for Hydraulic it must be centered around

Rt 29 Solutions

17

Agenda item 4: Phase 1 Study Progress and Work Underway (continued)

Lower Level Plaza Concept

Page 18: Rt 29 Solutions Hydraulic Planning Advisory Panel_… · information about the project. • Writer states that whatever solution is derived for Hydraulic it must be centered around

Rt 29 Solutions

18

Agenda item 4: Phase 1 Study Progress and Work Underway (continued)

Section: Lower Level Plaza at Hydraulic / 29

Page 19: Rt 29 Solutions Hydraulic Planning Advisory Panel_… · information about the project. • Writer states that whatever solution is derived for Hydraulic it must be centered around

Rt 29 Solutions

19

Agenda item 4: Phase 1 Study Progress and Work Underway (continued)

Framework Plan Concept 2 – Hydraulic Activity Center: Route 29 Under

Page 20: Rt 29 Solutions Hydraulic Planning Advisory Panel_… · information about the project. • Writer states that whatever solution is derived for Hydraulic it must be centered around

Rt 29 Solutions

20

Agenda item 4: Phase 1 Study Progress and Work Underway (continued)

Page 21: Rt 29 Solutions Hydraulic Planning Advisory Panel_… · information about the project. • Writer states that whatever solution is derived for Hydraulic it must be centered around

Rt 29 Solutions

21

Agenda item 4: Phase 1 Study Progress and Work Underway (continued) Conceptual Framework Plans: Study Area Framework Plans focus on block structure and key organizing principles (such as public

space). Land Use is a secondary supportive element.

• Framework Concept 1: Route 29 / Hydraulic Activity Center – Route 29 Over

• Framework Concept 2: Route 29 / Hydraulic Activity Center – Route 29 Under

• Framework Concept 3: Mid-Block Activity Center

Page 22: Rt 29 Solutions Hydraulic Planning Advisory Panel_… · information about the project. • Writer states that whatever solution is derived for Hydraulic it must be centered around

Rt 29 Solutions

22

Agenda item 4: Phase 1 Study Progress and Work Underway (continued)

Existing

Framework

Page 23: Rt 29 Solutions Hydraulic Planning Advisory Panel_… · information about the project. • Writer states that whatever solution is derived for Hydraulic it must be centered around

Rt 29 Solutions

23

Agenda item 4: Phase 1 Study Progress and Work Underway (continued)

Overall Framework Plan #1

Plan #1

Page 24: Rt 29 Solutions Hydraulic Planning Advisory Panel_… · information about the project. • Writer states that whatever solution is derived for Hydraulic it must be centered around

Rt 29 Solutions

24

Agenda item 4: Phase 1 Study Progress and Work Underway (continued)

Conceptual Land Use Plan #1

Plan #1

Page 25: Rt 29 Solutions Hydraulic Planning Advisory Panel_… · information about the project. • Writer states that whatever solution is derived for Hydraulic it must be centered around

Rt 29 Solutions

25

Agenda item 4: Phase 1 Study Progress and Work Underway (continued)

Mixed-Use

Walkable

Sense of Place

Page 26: Rt 29 Solutions Hydraulic Planning Advisory Panel_… · information about the project. • Writer states that whatever solution is derived for Hydraulic it must be centered around

Rt 29 Solutions

26

Agenda item 4: Phase 1 Study Progress and Work Underway (continued)

Overall Framework Plan #2

Page 27: Rt 29 Solutions Hydraulic Planning Advisory Panel_… · information about the project. • Writer states that whatever solution is derived for Hydraulic it must be centered around

Rt 29 Solutions

27

Agenda item 4: Phase 1 Study Progress and Work Underway (continued)

Conceptual Land Use Plan #2

Plan #1

Page 28: Rt 29 Solutions Hydraulic Planning Advisory Panel_… · information about the project. • Writer states that whatever solution is derived for Hydraulic it must be centered around

Rt 29 Solutions

28

Agenda item 4: Phase 1 Study Progress and Work Underway (continued)

Overall Framework Plan #3

Page 29: Rt 29 Solutions Hydraulic Planning Advisory Panel_… · information about the project. • Writer states that whatever solution is derived for Hydraulic it must be centered around

Rt 29 Solutions

29

Agenda item 4: Phase 1 Study Progress and Work Underway (continued)

“Park” Crossing

Page 30: Rt 29 Solutions Hydraulic Planning Advisory Panel_… · information about the project. • Writer states that whatever solution is derived for Hydraulic it must be centered around

Rt 29 Solutions

30

Agenda item 4: Phase 1 Study Progress and Work Underway (continued)

“Park” Crossings

Page 31: Rt 29 Solutions Hydraulic Planning Advisory Panel_… · information about the project. • Writer states that whatever solution is derived for Hydraulic it must be centered around

Rt 29 Solutions

31

Agenda item 4: Phase 1 Study Progress and Work Underway (continued)

Conceptual Land Use Plan #3

Plan #1

Page 32: Rt 29 Solutions Hydraulic Planning Advisory Panel_… · information about the project. • Writer states that whatever solution is derived for Hydraulic it must be centered around

Rt 29 Solutions

32

Agenda item 4: Phase 1 Study Progress and Work Underway (continued)

Stormwater

ra

Page 33: Rt 29 Solutions Hydraulic Planning Advisory Panel_… · information about the project. • Writer states that whatever solution is derived for Hydraulic it must be centered around

Rt 29 Solutions

33

Agenda item 4: Vision Statement: How are we doing?

Page 34: Rt 29 Solutions Hydraulic Planning Advisory Panel_… · information about the project. • Writer states that whatever solution is derived for Hydraulic it must be centered around

Rt 29 Solutions

34

Agenda item 4: Phase 1 Study Progress and Work Underway (continued)

Marietta, GA

ra

Page 35: Rt 29 Solutions Hydraulic Planning Advisory Panel_… · information about the project. • Writer states that whatever solution is derived for Hydraulic it must be centered around

Rt 29 Solutions

35

Agenda item 5: Pedestrian and Bicycle Recommendations

Page 36: Rt 29 Solutions Hydraulic Planning Advisory Panel_… · information about the project. • Writer states that whatever solution is derived for Hydraulic it must be centered around

Rt 29 Solutions

36

Agenda item 6: Neighborhood Outreach Plan Update Hold small, informal neighborhood meetings with interested neighborhoods

Meetings will be focused on listening to members of the community to shape desires into overall Hydraulic land-use and transportation plans

Keen focus on transportation and connectivity, including multi-modal transportation, potential "mini-charette" style

Update since last meeting: • Meeting held with stakeholder groups

• Three meetings scheduled so far

• Greenbrier - Location - Greenbrier Elementary, May 30th at 6:00 pm

• Senior Center - Location - Senior Center, June 6 at noon

• International Rescue Committee - Location - Church of Incarnation, Date and Time TBD

Page 37: Rt 29 Solutions Hydraulic Planning Advisory Panel_… · information about the project. • Writer states that whatever solution is derived for Hydraulic it must be centered around

Rt 29 Solutions

37

Agenda item 6: Neighborhood Outreach Plan (continued)

Charlottesville PC Informational Presentation FEB 14 ✓

HPAP 1 MAR 9 ✓

HPAP 2 MAR 23✓

HPAP 3 - First Charette APR 11 ✓

Meadows Neighborhood Meeting APR 12 ✓

Public Information Meeting APR 26 ✓

HPAP 4 APR 27 ✓

HPAP 5 MAY 11 ✓

Housing/Neighborhood/Business Leader Meeting MAY 15 ✓

Hold neighborhood meetings MAY 22 - June 22

Page 38: Rt 29 Solutions Hydraulic Planning Advisory Panel_… · information about the project. • Writer states that whatever solution is derived for Hydraulic it must be centered around

Rt 29 Solutions

38

Agenda item 6: Neighborhood Outreach Plan (continued)

HPAP 6 MAY 25 ✓

Greenbrier Neighborhood Meeting MAY 30

Senior Center Neighborhood Meeting JUN 6

HPAP 7 JUN 8

HPAP 8 JUN 22

Second Charette JUN 23

HPAP 9 AUG 10

Public Information Meeting # 2 AUG 23

Joint Planning Commission Work Session AUG 24 AM

HPAP 10 AUG 24 PM

Page 39: Rt 29 Solutions Hydraulic Planning Advisory Panel_… · information about the project. • Writer states that whatever solution is derived for Hydraulic it must be centered around

Rt 29 Solutions

39

Agenda item 6: Neighborhood Outreach Plan (continued)

Joint Planning Commission Draft Review SEP 12

HPAP 11 SEP 14

Draft Small Area Plan SEP 15

HPAP 12 SEP 28

Page 40: Rt 29 Solutions Hydraulic Planning Advisory Panel_… · information about the project. • Writer states that whatever solution is derived for Hydraulic it must be centered around

Rt 29 Solutions

40

Agenda item 7: Review of Upcoming Phase 1 Tasks To be complete by:

CONCEPT SCREENING JUN 23

EXTERNAL TRANSPORTATION INPUTS JUL 14

Page 41: Rt 29 Solutions Hydraulic Planning Advisory Panel_… · information about the project. • Writer states that whatever solution is derived for Hydraulic it must be centered around

Rt 29 Solutions

41

Agenda item 8: Open Discussion and Future Agenda Items

Page 42: Rt 29 Solutions Hydraulic Planning Advisory Panel_… · information about the project. • Writer states that whatever solution is derived for Hydraulic it must be centered around

Rt 29 Solutions

42

Agenda Item 9: New business and wrap up Agenda item 10: Adjourn

Page 43: Rt 29 Solutions Hydraulic Planning Advisory Panel_… · information about the project. • Writer states that whatever solution is derived for Hydraulic it must be centered around

Rt 29 Solutions Hydraulic Planning Advisory Panel

May 25, 2017