RSPO CERTIFICATION ASSESSMENT
PUBLIC SUMMARY REPORT
Date of assessment
07 to 11.12.2009
PT. TUVNORD Indonesia
System Certification Management
Has assessed
PT. SAHABAT MEWAH dan MAKMUR
Palm Oil Mill and Supply Base for Compliance to RSPO Principles and Criteria for
Sustainable Palm Oil Production
Jangkang Mill and Supply Base CPO 65,518 t & PK 13,977 t
Report Prepared by
Hasnop Putra
Email: [email protected]
Revision 03
RSPO Certification Assessment – Public Summary Report for PT. Sahabat Mewah dan Makmur (SMM) Page 2
TABLE OF CONTENTS Page
Summary 3
Abbreviations Used 3
1. SCOPE OF THE CERTIFICATION ASSESSMENT 4
1.1. National Interpretation Used 4
1.2. Scope of Certification 4
1.3. Location 4
1.4. 1. Description of Supply Base 4
2. Company Background and Ownership History 5
1.5. Date of Planting and Replanting Cycles 5
1.6. Other Certification Held 5
1.7. Time Bound Plan for Other Certification Units 6
1.8. Area of Plantation 7
1.9. Approximate Tonnages Certified 7
1.10. Date Certification Issued and Scope Certificate 7
2. ASSESSMENT PROCESS 7
2.1. Certification Body 7
2.2. Assessment Methodology 8
2.3. Certification assessment checklist of principles and criteria 9
2.4. Review of documents 9
2.5. Onsite and Follow-up interviews 9
2.6. Resolution of Corrective action 10
2.7. Qualification of the lead assessor and assessment team 11
2.8. Outline of how stakeholders interviewed 12
2.9. List of stakeholders interviewed 13
2.10. Questions asked during interview of stakeholders 14
2.11. Date of next surveillance visit 14
3 ASSESSMENT FINDINGS 14
3.1 Summary of findings 14
3.2 Detailed Non-Conformity Report, Corrective Action taken and Auditor’s Conclusion 29
3.3Noteworthy positive components 30
3.3.1 Some Recommendations for Improvement to the Mill and Estates 32
3.4 Issues raised by stakeholders and findings of the assessment team 32
3.4.1 Attendance list of stakeholders meeting on February 12,2009 at Balok Estate 36
3.4.2 Attendance list of stakeholders meeting on February 25,2009 at Ladang Jaya Estate/ Jangkang Mill 37
3.4.3 Attendance list of stakeholders meeting on May 14 at Clubhouse PT. SMM 38
3.5 Certified organization’s acknowledgement of internal responsibility 39
3.6 Formal sign-off of assessment findings 39
Annex : A -Figure Maps of SMM Mill and Estates 40
Annex : B : Draft of RSPO Certificate 45
Annex C : Certification Assessment Plan 47
Certification Assessment – Public Summary Report for PT. Sahabat Mewah dan Makmur (SMM) Page 3
Summary
PT. TÜVNORD Indonesia (TNI) – Certification Body is a member of the German worldwide TÜV NORD
group. TNI has performed a comprehensive certification assessment of PT. Sahabat Mewah dan Makmur
(SMM) and concludes that PT. Sahabat Mewah dan Makmur (SMM) operations comply with the Indonesia
National Interpretation of the RSPO Principles and Criteria (RSPO INA-NIWG) version May 2008. TNI
therefore recommends PT. Sahabat Mewah dan Makmur (SMM) be approved as a producer of RSPO Certified
Sustainable Palm Oil.
Scope of the certification assessment is at Jangkang Mill producing products of 65,518 tonnes CPO/year* and
13,977 tonne PK/year*
*) Data source: January-December 2009
Abbreviations Used
AMDAL Analisis Mengenai Dampak Lingkungan (Environmental Impact Assessment Report)
Bapedalda Badan Pengendalian Dampak Lingkungan Daerah (Regional Environmental Impact Control Agency )
B3
BOD
Bahan Berbahaya dan Beracun (Toxic and Hazardous Materials)
Biological Oxygen Demand
CDM
COD
Clean Development Mechanism (Mekanisme Pembangunan Bersih )
Chemical Oxygen Demand
CPO Crude Palm Oil
CSR Corporate Social Responsibility
DAR Deutscher Akkreditierungs Rat (German Accreditation Body)
DeperindagRI Departemen Perindustrian dan Perdagangan (Department of Industry and Commerce of the Republic of
Indonesia)
EFB Empty Fruit Bunch
FFA Free Fatty Acid
FFB Fresh Fruit Bunch
GPS Global Positioning System
Ha
HCV
Hectare
High Conservation Value
HGU Hak Guna Usaha (Land Use Permit)
HSE Health Safety Environment (Kesehatan, Keselamatan dan Lingkungan)
IPM Integrated Pest Management
JAMSOSTEK Jaminan Sosial Tenaga Kerja (Labour Social Insurance)
KAN Komite Akreditasi Nasional (The Indonesian Accreditation Committee)
KLH
KUD
Kementrian Lingkungan Hidup (Ministry of Environment)
Koperasi Unit Desa (Village Cooperative Unit)
LCC Legume Cover Crop
LD50
LSM
Lethal Dosage (for50% of the tested population to be killed)
Lembaga Swadaya Masyarakat (NGO)
MSDS Material Safety Data Sheet
Permenaker RI
PIR
Peraturan Menteri Tenaga Kerja (Regulation of the Ministry of Labour of Republic of Indonesia)
Perkebunan Inti Rakyat (Peoples Core Estate)
PK Palm Kernel
PKO
PMA
Palm Kernel Oil
Penanaman Modal Asing (Foreign Investment)
POME Palm Oil Mill Effluent
PPE Personal Protective Equipment
RKL-RPL Rencana Kelola Lingkungan dan Rencana Pemantauan Lingkungan (Environmental Management Plan –
Environmental Monitoring Plan)
SMK3 Sistim Manajemen – Keselamatan dan Kesehatan Kerja (Management System of Occupational Safety and
Health)
SMM
SOP
SPSI
PT. Sahabat Mewah dan Makmur
Standard operating procedure
Serikat Pekerja Seluruh Indonesia (Indonesian Labour Union)
TNI PT. TÜV NORD Indonesia
UKL/UPL Upaya Kelola Lingkungan/Upaya Pemantauan Lingkungan (Environmental Management Efforts and
Environmental Monitoring Efforts)
UNFCCC United Nations Framework Convention on Climate Change
Certification Assessment – Public Summary Report for PT. Sahabat Mewah dan Makmur (SMM) Page 4
1. Scope of the certification assessment
1.1 National Interpretation
The standard requirements of the Indonesian National Interpretation of RSPO Principles and Criteria (RSPO
INA-NIWG) version May 2008 was used to assess the operation of the Palm Oil Mill and the supply base of
FFB.
1.2 Scope of certification
The scope of certification is the production from Jangking Mill and 5 (five) company owned plantations. The
Jangkang Mill produced a total of 65,518 tonnes CPO/year and 13,977 tonne PK/year. The supply of FFB
from smallholders for the period January – December 2009 was only 0.86% of the total production.
1.3 Location
SMM has 1 (one) mill and 5 (five) company-owned plantations.The smallholders, are located in Kabupaten
of East Belitung, and Province of Kepulauan Riau, Indonesia. The following is the location of the mill and 5
(five) plantations with their GPS identification. Locations by map are also shown on figure A – 1 & figure A
– 2. The GPS readings were taken in the estates and plantation office. The GPS source data is taken from Citra
Lansat 7 ETM+Band 542 Patch 122 Row 62 dated 06 August 2009, and Trimble GPS GARMIN type 12 CX.
Table 1: Mill GPS Location & Plantations GPS locations for Plantation/Estate Office (inside the
plantation/estate areas)
Code Units GPS Reference
Longitude (E) Latitude (S)
JKM Jangkang Mill 107° 52' 30.4" 02° 59' 55.2"
JKE Jangkang Estate 107° 52' 28,1" 02° 59' 45.0"
BLE BalokEstate 107° 54' 53.9" 03° 02' 00.8"
LJE Ladang Jaya
Estate 107° 53' 00.2" 02° 36' 43.3"
SBE Sari Bunga Estate 107° 52' 11.3" 02° 55' 16.0"
ARE Air Ruak Estate 107° 56' 03.8" 02° 59' 59.9"
1.4.1. Description of Supply Base
The FFB for the Jangkang Mill is sourced from the 5 (five) company-owned plantations and the smallholders.
The FFB from smallholders was 2,367.69 t (approximately 0.86%) of the total FFB processed by Jangkang
Mill during period January – December 2009. The FFB production from company owned estates and
outgrowers/smallholders is listed in Table 2.Table 2 shows the FFB capacity supplied from each estate
location.
Table 2: FFB production capacity (source: January – December 2009)
Estates and location FFB (t) In percentage
(%)
Jangkang Estate, Desa Jangkang 58,571.69 21.27%
Balok Estate, Desa Balok 59,904.81 21.76%
Ladang Jaya Estate, Desa Jangkang 45,052.65 16.36%
Sari Bunga Estate, Desa Nyuruk 38,451.47 13.96%
Air Ruak Estate, Desa Air Ruak 71,009.69 25.79%
Total Owned SMM Plantation 272,990.30 99.14%
Total Outgrower/Smallholders FFB Supplied 2,367.69 0.86%
Total FFB 275,357.99 100.00%
RSPO Certification Assessment – Public Summary Report for PT. Sahabat Mewah dan Makmur (SMM) Page 5
The smallholder scheme was developed as a condition for the approval of SMM’s project and as part of the
SMM managements high commitment and aspirations to contribute towards plantation technology and
education, as well as providing technical and plantation advice on breeding techniques, nursery, planting,
harvesting, economic viability and benefits from palm oil cultivation for smallholders.
The smallholder scheme originated from a government transmigration project (PIR Trans Scheme) at
Kabupaten of East Belitung, and Province of Kepulauan Riau, Indonesia. The oil palm smallholder scheme
was set up in the early 2003 with full support from SMM staff to train the smallholders to have a regular
source of income. SMM has explained and communicated the importance of RSPO certification assessment
and its implementation to a sample of smallholders..
The TNI audit team concluded that during audit the operations of smallholders met the standard requirements
of the Indonesian National Interpretation of RSPO Principles and Criteria and RSPO Certification
requirements. The SMM management has committed to develop and to fully support smallholders to be able
to operate their plantation in a sustainable manner, within the framework of RSPO Principles and Criteria.
However, the production from the smallholders scheme is not included within the scope of the RSPO
certificate.
Therefore, Principle and Criteria 7 of the RSPO National Interpretation of the Republic of Indonesia (RSPO
INA-NIWG) is not applicable.
1.4.2. Company Background and Ownership History
PT Sahabat Mewah dan Makmur (SMM) established in 1980, is owned by a consortium between a local
family business group represented by W.Mustika, and Mansour Holdings. In the year 2002 the status of the
company changed from Non Foreign Investment (Non Penanaman Modal Asing) into Foreign Investment
(PMA, Penanaman Modal Asing). Then in the year 2003, this company (SMM) was taken over by Austindo
Nusantara Jaya (Holdings) and Verdaine Limited.
The company(SMM) became fully owned by Austindo Group in the year of 2004 when shares of Verdaine
Limited were taken over by Eka Pendawa Sakti, one of Austindo Group’s subsidiary involved in the
plantation business. In the year of 2005, Eka Pendawa Sakti was renamed PT ANJ Agri and the current
shareholders of this company are PT Austindo Nusantara Jaya (holding) and PT ANJ Agri, while the name of
the company(SMM) remains the same.
1.5 Date of Planting and Replanting Cycles
In general, the oil palm trees should be replanted after 25 years. However, the period may be lesser or longer
based on reasonable and economical crop production and FFB price. The planting age profile of oil palm is
shown in the table 3.
Table 3: Age profile of planted palms in 5 areas
Estates Planting Year Plan for Replanting (year)
Jangkang Estate 1990 – 2005 2016 – 2031
Balok Estate 1990 – 2004 2016 – 2030
Ladang Jaya Eestate 1990 – 1998 2016 – 2024
Sari Bunga Estate 1991 – 2006 2017 – 2032
Air Ruak Estate 1992 – 2006 2018 – 2032
1.6 Other Certifications Held
SMM has committed to implement integrated management system of ISO 14001 and ISO 9001 to be
achieved in 2010;
RSPO Certification Assessment – Public Summary Report for PT. Sahabat Mewah dan Makmur (SMM) Page 6
Implementing SMK3 based on Permenaker No. 5 Tahun 2005 Certified by The Ministry of Labor of the
Republic of Indonesia;
Award for the best coach of women labor union is given by The Ministry of Labor of Republic of
Indonesia in 2004, 2005, and 2008;
Gold Awarded from the Ministry of Labor of Republic of Indonesia for Safety Excellence in 2008;
Zero accident awarded to the Company by the Ministry of Labor of Republic of Indonesia in 2007;
AANE Belitung Biogas Recovery from Palm Oil Mill Effluent (POME) Ponds and Biogas Flaring
Utilization, a Clean Development Mechanism project registered by UNFCCC in 2009.
Organizational Information/Contact Person
All information in respect to certification assessment of RSPO may be addressed to:
Contact Person : Mr. Ho Chew An
Position : General Manager (GM) Business and Development
Organization name : PT. Sahabat Mewah dan Makmur (PT. SMM)
Address : Wisma BII Lt. 7 Jl. Diponegoro No.18
Postal code, city : 20152 Medan, Sumatera Utara
Country : Indonesia
Telephone Nr : +62 61 4537480
Fax Nr : +62 61 4538366
Email : [email protected]
1.7 Time Bound Plan for Other Certification Units
The whole of SMM Oil Palm Plantations are currently located in Belitung Island. SMM has no other oil palm
plantation located out of Belitung Island. The total oil palm plantation addressed as shown on table 2.
However,the SMM management has committed to develop and to fully support smallholders to be able to
operate their plantation in a sustainable manner, within the framework of the standard requirements of the
Indonesian National Interpretation and RSPO Principles and Criteria, and commitment to sustainability,
social responsibility and community development.
The management of SMM manages 16,276.87 Ha of own plantation supplying Fresh Fruit Bunch (FFB) to
the Mill (Jangkang Mill) and also receives FFB from outgrowers/smallholders through 5 (five) cooperative
bodies or small scale entities. These smallholders are independent. They are not bound or obliged to sell to
SMM only. They are free and have the right to sell their FFB product to other Mills. The total FFB supplied
by independent small holders currently amounts to 2,367.69 t / year (0,86% from total processed FFB in
SMM Palm Oil Mill for the period January – December 2009).
SMM policy for Petani Sawit Mandiri (smallholders) is part of SMM Corporate Social Responsibility and
SMM commitment to local community development. These smallholders play an important role in
developing the local economy.
RSPO Certification Assessment – Public Summary Report for PT. Sahabat Mewah dan Makmur (SMM) Page 7
1.8 Area of Plantation
5 plantations are included in the certification assessment.
Table 4: Statistics on total oil palm planted and mature planting (Data source: Nov-Dec 2009)
Estates Location
Area Summary
Total
(Ha)
Planted
with Oil
Palm
(Ha)
Mature
(Ha)
Immature
(Ha)
Jangkang Estate Desa Jangkang 3,678.21 3,058.14 3,058.14 -
Balok Estate Desa Balok 3,157.20 2,894.94 2,894.94 -
Ladang Jaya
Eestate Desa Jangkang 2,157.88 2,117.91 2,117.91 -
Sari Bunga Estate Desa Nyuruk 2,397.50 2,167.61 2,167.61 -
Air Ruak Estate Desa Air Ruak 4,886.08 4,064.83 4,064.83 -
Total 16,276.87 14,303.43 14,303.43
1.9 Approximate Tonnages Certified
All FFB is processed by one mill and supplied from the company’s 5 (five) estates. The production from the
smallholders scheme is not included within the scope of the RSPO certification.(see para 1.4)
The approximate tonnage for the certification assessment is confirmed for 1 mill shown in table 5:
Table 5: Palm oil tonnage claimed for certification
The tonnage production is based on data for the period January 2009 to December 2009
1.10 Date Certification Issued and Scope Certificate
Scope of certificate covers the production from the 1 (one) palm oil mill and the 5 (five) plantations. The
issuing date of certificate will depend on approval of the Assessment Report by the RSPO secretariat. Draft of
the certificate is available on the annex.
2. ASSESSMENT PROCESS
2.1 Certification Body
PT. TÜV NORD Indonesia is a subsidiary of the German TÜV NORD Group. Our company is a market
leader in Indonesia for inspection, testing and certification services. Through more than 600 clients, we are
offering not just a high added value services but also a trust and confidence embedded on our issued
certificates / reports.
We are satisfying not only our direct customers but also the other stake holders like regulators, surrounding
society including NGOs through our competent auditors, inspectors and analysts.
Mill Location
Annual Outputs
CPO
tonne/year
PKO
tonne/year
PK
tonne/year
Jangkang Mill Desa
Jangkang 65.518 - 13.977
TOTAL 65.518 13.977
RSPO Certification Assessment – Public Summary Report for PT. Sahabat Mewah dan Makmur (SMM) Page 8
PT. TÜV NORD Indonesia, through its HQ in Germany, is a member of International Accreditation Forum
(IAF) and accredited by the DAR – German and locally by the Indonesian Accreditation Committee (KAN).
Services that are provided by the Strategic Business Unit Systems Certifications are: Food Safety
Management System ISO 22000, Information Security Management System ISO 27001, Social
Accountability SA 8000, Food Hygiene HACCP, Medical Device Directive MDD, ISO 13485, Occupational
Health and Safety OHSAS 18001, Product Certification: GS-Mark, CE-Mark, SNI Mark, Inspection for ISPS
Code, Clean Development Mechanism (CDM) Validation & Verification, British Retail Consortium, BRC
Issue 5.
The offices of PT. TÜV NORD Indonesia are
located as follows;
Head office
System Certification Management
Perkantoran Hijau Arkadia Tower F, 7th
Floor
Suite 706
Jl. Let. Jend. TB Simatupang Kav. 88
Jakarta 12520 – Indonesia
Tel : +6221 7883 7338
Fax : +6221 7883 7336
Branch office
Graha Pangeran 7-H1 Floor
Jl. Jend. A Yani 286 Surabaya 60234 – Indonesia
Tel : +6231 8292602
Fax : +6231 8292723
Laboratory Division
Jl. Jababeka XVII E Blok U No. 27B
Kawasan Industri Jababeka I
Cikarang Bekasi 17530 – Indonesia
President Director: Mr. Robert Napitupulu
Email: [email protected]
Website : www.tuev-nord.de
2.2 Assessment Methodology
The certification assessment of the sustainable management; PT. Sahabat Mewah dan Makmur was carried
out from December 07 to 11, 2009. The certification assessments consist of four phases:
A desk audit (document check) of the SMM management system documentation and supporting
documents with the use of a customised RSPO audit checklist according to RSPO manual, procedures
and palm oil mill and plantation working instructions;
Certification Body reviews the results of the consultation process (stakeholder meeting) prior to
certification assessment . The detailed method is given in point 2.8.
Back ground investigations (published dispute, public comment on preliminary announcement) and
followed by interviews with personnel of the organization RSPO management, employees and the
stakeholders (people surrounding, NGO representatives, land regulators, social watchers, labour union).
Verification of proposed corrective action continued by review of the assessment report by the internal
veto persons (board of directors of PT. TÜV NORD Indonesia)
The summary public report of certification assessment includes Corrective Action Requests, Corrective
Action Taken Plan, Verification of Corrective Action Taken, and Progress on implementation of Corrective
Action will be checked during the Surveillance Audit.
Request for Corrective Action to close Non Conformity outlined below
Major Non Conformity:
- mistakes have been made in the assumptions of SMM on the requirements of the RSPO Principles and
Criteria, which will directly influence the certification assessment results;
- the requirements of certain RSPO Principles and Criteria indicators have not been met or, in other words
there has been non-compliance of the requirements of the RSPO Principles and Criteria on major
indicators;
RSPO Certification Assessment – Public Summary Report for PT. Sahabat Mewah dan Makmur (SMM) Page 9
These give rise to considerable doubts as to the capability of the SMM management system to achieve
the desired results;
Minor Non Conformity:
Where information is insufficient, unclear or not transparent enough to establish whether a
requirement is met, or Non-compliance of requirements of the RSPO Principles and Criteria on
minor indicator has existed;
Potential for Improvement
- Conditions and factors prevalent in SMM management that would enable the organization to meet
the requirements of the relevant standards;
- Strengths, weaknesses, opportunities and threats of SMM
The final certification assessment started after the issuance of the proposed Corrective Action Taken Plan
of SMM management. The auditor has assessed the proposed Corrective Action Taken Plan and is satisfied
with the action taken to comply with the required standards. Based on the compliance this certification
assessment report is forwarded to RSPO for consideration.
2.3 Certification Assessment Checklist of Principles and Criteria
In order to ensure consideration of all relevant assessment of RSPO principles and criteria, a certification
assessment checklist was used.
The checklist shows in a transparent manner, the Principles and Criteria, and the means employed by SPO
management system and the results of the certification of the identified criteria. The certification assessment
checklist serves the following purposes:
- It organizes, details and clarifies the Principles and Criteria that a certification assessment is expected to
meet;
- It ensures a transparency in the certification process where principles and criteria have been applied
within the organization of SMM management.
The certification assessment checklist consists of National Interpretation of RSPO Principles and Criteria.
2.4 Review of documents
SMM documentation and supporting documents were submitted in September 2009 and the related SMM
management system had been reviewed in accordance with certification assessment checklist.
2.5 Onsite and Follow-up interviews
The audit team collected all information related to SMM management system to find evidence of conformity
of its implementation objectively on a random sampling audit basis.
Interview of the respective staffs, workers and some stakeholders in charge was carried out in a manner and
circumstances where the SMM management system was implemented within the organization.
The certification assessment was completed on the following dates, namely 07 to 11 December 2009.
RSPO Certification Assessment – Public Summary Report for PT. Sahabat Mewah dan Makmur (SMM) Page 10
The TÜV NORD Indonesia performed the on-site interviews with the organization of SMM management, and
palm oil mill operating personnel to confirm selected information and to resolve issues identified in the
document review and SMM management implementation.
The key points with respect to and concerned with the main topics of the interviews is summarised below
Interviewed Persons & Interview topics for Manager, Staff, Workers
General aspects of the certification and the certification boundary
Chemical stores; Water management; Details on reduction of paraquat usage
Approval documentation and status; Legal aspects related to SMM management
Management Policy and Quality, SM-K3 and Environmental Management System.
Involved personnel and responsibilities
Justification of RSPO principles and criteria
Monitoring and measurement of environmental performance for waste water treatment plant operation
Identification of environmental aspects and Environmental impacts
Flora, fauna, Ecology and biodiversity
Land and conversion planting; Replanting inspection and handling of chemical packaging wastes; Zero
burning
Socio economic impacts on local population; Sanitary and hygiene of employee’s housing complex
environment
License, operation & maintenance authority and responsibility
IPM (Integrated Pest Management)
The HCV’s identification
Mill operation including Inspection of receiving of FFB, Transportation of FFB, Road maintenance, and
Workshops for heavy truck, loader etc
Interviewed Persons & Interview topics for Stakeholders including NGO’s
Environmental protection within the estate(s) and mill(s) include using of pesticides, waste and effluent
management; Company approach to community development.
Environmental protection within the estate(s) and mill(s) include use of pesticides, waste and effluent
management; Provision of housing, sanitation, amenities and educational support.
Biodiversity conservation within the estate(s) and surroundings (where possibly impacted by the
estate/mill operations); Opportunities of earning fair wages, overtime and piece-rated work.
2.6 Resolution of Corrective action
In order to remedy any mistakes, problems or any other outstanding issues, which needed to be clarified for
positive conclusion, the required corrective actions were discussed. The management of SMM was required
to resolve or close out issues by providing the corresponding response to the Non Conformity Report and by
submission of the documentation of the SMM manual or procedures and working instructions as well as
supporting documents that have been implemented.
In this certification full report, the audit team has raised 1 non-conformity report and some improvements that
are required.
During the first day of the assessment process, the auditors raised some minor issues, that arose from a lack
of data which were not available on site at the time. However the issues had been settled before the close of
the meeting on the last day of audit.
The non conformity reports and required improvements, as output results of the certification process have
been documented completely in this certification assessment report.
RSPO Certification Assessment – Public Summary Report for PT. Sahabat Mewah dan Makmur (SMM) Page 11
2.7 Qualification of the lead assessor and assessment team
Lead Assessor : Hasnop Putra
A minimum of post high school (post secondary school) training in, and either agriculture/forestry,
environmental science or social science;
Mr. Hasnop Putra has S1 (Ir, Engineer) degree in Mechanical Engineering at University of Jayabaya in
1994-1997; A. Md (Ahli Madya) degree in Mechanical Engineering at Polytechnic of University of
Indonesia in 1988-1991; CDM training course – Essen, Germany in June 2008; Environmental Rules &
Regulations and Implementation by BAPEDAL in April 2000; Practical Course on Environmental
Management System, Environmental aspect and impact assessment, documentation establishment and
internal audit by Japan Audit and Certification (JACO) in December 1998; The Environmental
Management Law and the Environmental Policy by EX-CORPORATION - BAPEDAL in December
1997; The Big Challenge Biodiversity Course for Certification Body, June 2009 sponsored by RSPO,
IFC, RESCUE, Wild Asia; Green House Gas (Global Warming) Training - CDM & VCS project for
validation and verification at TÜVNORD Group, ESSEN- Germany 2008.
At least 5 years experience in area of work relevant with the audit (e.g., palm oil management;
agriculture, ecology; social science);
Well performed in the business of management system certification as Project Engineer, Assistant
Manager SBU 1.6 to PT. TÜV International Indonesia (TÜV Rheinland Group) from February 2001 to
May 2004; PT. TÜV SUD PSB Certification (Formerly PT. PSB Certification) from May 2004 to
November 2004; and PT. TÜV NORD Indonesia (TÜV NORD Group) from November 2004 up to now
incumbent as System Certification Manager.
Qualified personnel in auditing experiences since 2001 at all sectors of non palm oil and oil plantation
manufacturer and state-owned and private companies of oil palm plantation and palm oil mill as follows,
State-Owned Enterprises (Perkebunan Nusantara), Private Company Palm Oil and Palm Plantations;
Auditing product and process of crude palm oil to be dried oil at Wilmar Group;
Involved auditing SA 8000 standard for textile and garment industries, and shoes manufacturing as well
as toys manufacturing since 2007 up to now;
Involved in Green House Gas for CDM and VCD projects of validation at some companies in Indonesia
since 2008 – 2009.
Well performed as team leader of RSPO certification assessment for PT. London Sumatra Indonesia, Tbk
in 2008;
Training in the practical application of the RSPO criteria, and RSPO Certification System;
Training Lead Assessor / Internal Assessor Sustainable Palm Oil by Indonesia Palm Oil Board and KAN
(National Accreditation Committee) in March 2008 to April 2008;
Successful completion of an ISO 9000/19011 lead auditor course;
PE International - ISO 9000:2000 Series Auditor/ Lead Auditor Training Course - Certificate Number
LA 072 in June 2001;
PE International - ISO 14001:2004 IEMA Advanced EMS Auditor Training Course - Certificate No.
IQR/EMS4/00102, England and Wales in March 2001;
A supervised period of training in practical auditing against the RSPO Criteria or similar sustainability
standard, with a minimum of 15 days audit experience in last audit in different organizations;
Extensive experience in sustainable management system certification in the palm oil industry and oil
palm plantation industry by conducting in several oil palm and plantation companies with more than 30
days auditing the following State-Owned Enterprises (Perkebunan Nusantara); Sampoerna Agro Palm Oil
Mills and Palm Plantations, London Sumatra Indonesia Palm Oil Mills and Palm Plantation;
RSPO Certification Assessment – Public Summary Report for PT. Sahabat Mewah dan Makmur (SMM) Page 12
Assessor : Sudarmadji
He has a background in Electrical Engineering; and qualified in environmental auditing with sustainability
management system such as EMS. He has completed training as Lead Auditor ISO 14001, ISO 9001 and
CDM certification. He has completed training as Lead Assessor / Internal Assessor Sustainable Palm Oil by
Indonesia Palm Oil Board and KAN (National Accreditation Committee). He is an experienced auditor in
palm oil manufacturing based on ISO 14001, with a total of 15 days of audit. He has experience as Lead
Auditor in Occupational Health & Safety Management Systems. Was a member of the team involved in
RSPO certification assessment for PT. London Sumatra Indonesia, Tbk in 2008.
Technical Expert : DR. Hariyadi
He holds a Doctoral degree (S3) in Agriculture Environment from Bogor Agriculture Institute (IPB). He has
a strong background and experience in the socio – environment aspect of agriculture and he is also a lecturer
in Agriculture Studies and Socio – environment aspect studies. He has assisted in conducting socio –
environment impact assessment and was a researcher on Green Giant NPK fertilizer effects on immature oil
palm growth. He has extensive experience in the research of water and nutrient requirements, irrigation and
fertilizer application planning, seedling selection and Integrated Pest Management. He is also qualified in the
assessment of biodiversity and biodiversity science. He was involved as auditor training in oil palm
plantations and palm oil mills in EMS and the RSPO Principles and Criteria. He has completed training in
EMS course for ISO 14001:2004 and has experience in oil palm plantation waste management, disposal of
EFB and fertilizer packaging and environmental impact on employees’ housing complex. He was a member
of the team involved in RSPO certification assessment for PT. London Sumatra Indonesia, Tbk in 2008.
Ujang Sehabudin (Technical Expert)
He holds a BSc degree (S1)in Agronomy from Bogor Agriculture Institute (IPB) and has a strong background
and experienced in the socio – economic aspects. He is a researcher and member of Impact Study of Area
Development Program; Member of Indonesian Agribusiness and Agro industry Community. He has assisted
in conducting socio – economic assessment such as CSR assessment of oil palm company over the past 3
years. He has assisted in conducting audits of oil palm and plantation company against ISO 14001:2004
version and was involved as auditor training in oil palm and plantation company against the RSPO Principles
and Criteria. He has a good experience in design and identification of water resources project on farm area in
west of Java over past 2 years. . He was a member of the team involved in RSPO certification assessment for
PT. London Sumatra Indonesia, Tbk in 2008.
2.8 Outline of how stakeholders were interviewed
Stakeholder consultations began with notification of upcoming assessment through websites of RSPO,
SMM and TNI. Telephone calls, e-mails, facsimiles or letters were sent to applicable stakeholders.
Mechanisms for consultation with stakeholders was carried out regularly in accordance with external
communication procedure, which is integrated with SM-K3 procedures. Before proceeding with the
assessment, the audit team checked the complete proceedings of the stakeholder meeting conducted
previously to ensure all information of the meeting results could be followed up.
The stakeholders were invited to discuss critical issues regarding community development, including the
latest progress of plans for community development and the targets to be achieved. Some of the items on the
agenda for the stakeholders meeting were: to maintain infrastructure of churches, mosques, roads, irrigation
and drainage, kindergarten play yard and schools. In addition, to provide financial support, scholarships,
welfare, sanitary and improvement of hygiene of people living near employee’s housing complex, palm oil
mill and supply base. The discussion with stakeholders was well organized. The audit team visited some
RSPO Certification Assessment – Public Summary Report for PT. Sahabat Mewah dan Makmur (SMM) Page 13
stakeholders to interview and obtain positive and negative information or any issue in connection with the
operations of SMM palm oil mill and supply base. Stakeholder meeting proceedings were well recorded in a
proper manner to verify with the SMM management, and these interview results will be incorporated into the
assessment findings.
2.9 List of stakeholders contacted
Table 6: List of stakeholders
No Stakeholders contacted (consulted, attended the
stakeholder meeting or interviewed) Remarks
1 Kades Dendang, Belitung (Chief of
DendangVillage)
Head of Local Community
2 Kades Jangkang, Belitung (Chief of
JangkangVillage)
Head of Local Community
3 Kades Balok, Belitung (Chief of BalokVillage) Head of Local Community
4 Kades Nyuruk (Chief of BalokVillage) Head of Local Community
5 Kades Air Ruak (Chief of Air Ruak Village) Head of Local Community
6 Representative people of Dendang Village Local Community
7 Representative people of Jangkang Village Local Community
8 Representative people of Balok Village Local Community
9 Representative people of Nyuruk Village Local Community
10 Representative people of Air Ruak Village Local Community
11
3 Muspika : Camat Gantung, Belitung (Chief of
Kecamatan Gantung), Kapolsek Gantung, Danramil
Local Authority : District Head Officer,
District Police Officer and District
Military Officer
12 Head Master of local Elementary School Local Community
13 LSM Peduli Lingkungan Hidup, Belitung Local NGO
14 LSM Warna Indonesia Local NGO
15 Mechanical Contractor Contractor
16 FFB Transportation, Belitung Contractor
17 KUD Karya (FFB Supplier), Belitung. Cooperative
18 PUK SPSI KEP. Migas dan Umum, Belitung. Head of Worker Organization
19 PUK SPSI - PT. SMM, Belitung Worker Organization
20 3 women workers Gender representative
There is no indigenous people living around PT. SMM based on secondary data from demographic profile
and consultation with local community. The definition or criteria of indigenous people is as follows: Indigenous
Peoples can be identified, in particular geographical areas, by the presence, in varying degrees, of the
following characteristics: a) close attachment to ancestral territories and to the natural resources in these areas;
b) self-identification and identification by others as members of a distinct cultural group; c) an indigenous language,
often different from the national language; d) presence of customary social and political institutions; and e)
primarily subsistence-oriented production.
Source: World Bank (operational directive 4.20, 1991):
The definition of indigenous people in Bahasa is: masyarakat asli or masyarakat adat, as termed by the Ministry of
Social Affairs of the Republic of Indonesia, and none of those people living in this area are categorized as
indigenous people. The “dukun” (natural / traditional healer) represent local community but not considered as
indigenous people.
Some non-staff women workers has been interviewed confidentially considering gender representative and TNI has
committed not to disclose their identities to assure trustworthy response. The detailed minutes of stakeholder meeting
are presented in section 3.4.
RSPO Certification Assessment – Public Summary Report for PT. Sahabat Mewah dan Makmur (SMM) Page 14
2.10 Questions asked during interview of stakeholders
Did SMM Management provide information on the RSPO certification exercise including plans for
safety and health to the public and stakeholders?
Does the SMM management conduct meetings regularly regarding community development?
Does the SMM management have a proper system to inform people living around the mill and supply
base?
Does the SMM management respond well to the complaints in respect of RSPO implementation?
Is there a clear grievance and complaints procedure in the company?
Are there still any complaints regarding land acquired for palm plantation?
Is there any environment impact arising from the operations of SMM management?
Are there any conflicts not solved satisfactorily?
Is there a procedure for the settlement of conflicts which has been communicated to the local
community?
Does the SMM management invite stakeholders regularly for discussions on issues related to community
development?
Are the workers receiving wages in accordance with government regulations?
Is there a system for dissemination of information on emergencies to the local community living around
the palm oil mill and supply base?
The audit team used the above questions during interview of stakeholders to collect sufficient information
from stakeholders on issues relevant to the certification assessment. All responses and comments both
positive and negative from stakeholders were recorded by the audit team in the auditor’s hand written notes.
In addition, the audit team verified the information against relevant procedures and standard operating
procedures. The procedures relating to stakeholders communication is defined in Standard Operating
Procedures established in September 2009.
2.11 Date of next surveillance visit
The next surveillance visit audit is planned on 11 December 2010. Surveillance audit is conducted once a year
during a 5-year period.
3. ASSESSMENT FINDING
3.1 Summary of findings
Objective evidence was obtained separately for each of the indicators for the mill and the estates.
As mentioned in section 2.2, the objective evidence was obtained during the certification assessment. The information was comprehensively asked in accordance with the RSPO indicators for 1 (one) mill and each of the 5 (five) plantations, and outgrowers/smallholders. The results for each indicator from each of these operational areas have been aggregated to provide an assessment of overall conformance of the Company's operations with each Criterion. A statement is provided for each Indicator to support the findings of the assessment team.
The detailed description of Non-Conformity Report is given in section 3.2.
Nonconformities were raised against One (1) Minor Compliance Indicator and some opportunities for improvement.. Where a nonconformity/observation is assigned, reference is made at the end of the text of the Indicator to which it refers. Details of the Nonconformities are given in Section 3.2 (Pages 26 &27).
SMM has prepared a Corrective Active Plan and the date for its implementation which has been reviewed and accepted by PT. TUVNORD Indonesia. The effectiveness of the implementation of corrective action on next surveillance audit will be checked for minor nonconformity findings.
The audit team has issued this certification assessment in compliance with the implementation within the
criterion of the RSPO principles and criteria with 1 (one) minor non-conformity and some opportunities for
RSPO Certification Assessment – Public Summary Report for PT. Sahabat Mewah dan Makmur (SMM) Page 15
improvements. The major findings should be closed within 60 days. The assessment of SMM management
operations comprise 1 (one) palm oil mill and, 5 (five) oil palm plantations, smallholders, facilities and
infrastructure as well as supporting services. The audit team has conducted the assessment of PT. Sahabat
Mewah dan Makmur operations and concludes SMM complies with requirements of RSPO Principles and
Criteria, and National Interpretation of May 2008. Thus, PT. TUVNORD Indonesia recommends that PT.
Sahabat Mewah dan Makmur, be approved as a producer of RSPO Certified Sustainable Palm Oil.
The following is a summary of findings for the criteria listed in the RSPO Principles & Criteria:
Criterion 1.1
Oil palm growers and millers provide adequate information to other stakeholders on environmental,
social and legal issues relevant to RSPO Criteria, in appropriate languages and forms to allow for
effective participation in decision making.
SMM has established comprehensively a procedure for conducting sufficient communication with
stakeholders. The system requests all heads of mills and heads of plantations to communicate with local
communities and stakeholders as insufficient evidence is found. Copies of requests for information are held in
hard copy files at the General Affairs Department under the control of external relationships manager. The
review of records confirmed that General Affairs Department also stores copies of responses to requests for
information. All information requested by stakeholders is recorded in “Stakeholders Request Log Book”. The
log book is kept well in a suitable room. Retention time of records concerning local community and
stakeholders is for 5 (five) years. The assessor checked the files and confirmed that SMM has responded
appropriately to requests for information in accordance with external communication procedure.
Criterion 1.2
Management documents are publicly available, except where this is prevented by commercial
confidentiality or where disclosure of information would result in negative environmental or social
outcomes.
The management of SMM ensures documents are available upon request and in accordance with Government
regulations. Information on land titles and user rights documents are available to stakeholders. SMM has a
system to monitor and to measure environmental impact and social impact, which is documented in AMDAL
that was approved by local environmental agency of Belitung. RKL/RPL and UKL/UPL documentations and
also HGU are available to the public. All the estates have identified the total land use occupied by SMM and
is well informed and displayed on HGU boards made available at the entrance gate of each estate. The Health
and Safety Plan and Training Program provided to all workers and the local community who also receive a
medical program that is performed every month e.g.; medical checks free for both children living in
employee’s housing complex or children outside of employee’s housing complex. A report also is available
on staff and workers’ voluntary participation in a community service program involving projects such as
fogging, socialization of health and safety, and environmental procedure/or instruction and recent
construction of classrooms for an elementary school located at one of the estates. UPL Monitoring reports are
forwarded six‐monthly to Government. Inspection confirmed copies are available, e.g. most recent report
January–June 2009 and July – December 2009 is in progress. Retention time of records is determined by
SMM based on relative importance, and filed in List of Records.
RSPO Certification Assessment – Public Summary Report for PT. Sahabat Mewah dan Makmur (SMM) Page 16
Criterion 2.1
There is compliance with all applicable local, national and ratified international laws and regulations
SMM management keeps all applicable legislations and other regulations, which are registered in applicable
regulation list, in a manner that the SMM management complies with applicable regulation and which is in
accordance with general procedures of evaluation of legal compliance “PRS-SCL-001”. The Head of mills
and head of plantations have to apply themselves to applicable legal and other requirements including license
and permits based on their activities. The updating of regulations is the responsibility of HSE manager and
team, and monitored consistently.
The Assessor inspected and checked records of legal compliance achievement “DOC-CLS-003 of November
2009. Most of the applicable documents are in compliance with legal and regulation requirements. Otherwise,
remaining applicable legal requirements that are not compliant have been evaluated and still in progress to
meet the requirements not later than November 2010. The continuous improvement program has been
planned to fulfill all the legal requirements. The SMM management has committed to obtain an ISO 14001
certification in 2010 by establishing environment and SM-K3 policy since January 2009, and this is a part of
the commitment of SMM management to implement environmental management system. The HSE manager
is responsible for keeping Estates and Mills operations under national legislation and regulation up to date
with any changes. SMM has documented legal requirements and this includes a list of the legislation,
regulations and licenses, together with a description of the compliance requirements.
Criterion 2.2
The right to use the land can be demonstrated and is not legitimately contested by local communities
with demonstrable rights
Within the operation of SMM management, land use for palm oil is identified and marked by T-0 pillars on
boundaries. GPS coordinates can be seen on the photograph below
Figure 1: Identification of an occupied land by a pillar
The General Affairs Department and the Legal Department are responsible to resolve any conflict over land
acquired. Currently there is no land claimed by the people who live around the mill and plantations. The Mill
Manager and the Plantation Managers have ensured proper registration for the HGU certificate in the
acquired land register list.
RSPO Certification Assessment – Public Summary Report for PT. Sahabat Mewah dan Makmur (SMM) Page 17
Criterion 2.3
Use of land for oil palm does not diminish the legal rights or customary rights of other users, without
their free, prior and informed consent
As observed in the certification assessment of RSPO Principles and Criteria implementation within SMM
operation, there is no customary right of other users.
Criterion 3.1
There is an implemented management plan that aims to achieve long term economic and financial
viability
SMM has 3 years 2010 - 2012 of crop projection that includes key performance data for mill and estates and
has a long term program to attain economic and financial viability of the company. SMM has also a business
plan to increase FFB production capacity in accordance with long term projections. The long term program
includes the long term projected replanting program, long term crop projection, and long term financial
forecast.
The long term replanting program is a 20 year projection of the planted yielding hectare in SMM. The
yielding hectare will vary because palms will be replanted based on the economic lifespan of the palms.
Extremely tall palms and older palms of more than 25 years will be replanted due to difficulty in harvesting,
and the lower density of palms arising from natural death of old palms in the fields. The percentage of palms
replanted in any one year is maintained at below 5% to ensure minimal impact on crop production.
Replanting also has the benefit of better planting materials in terms of yield and general characteristics. SMM
has a replanting program commencing 2016, which will replace the oldest fieldplanted in 1991.
The long term crop projection anticipates higher crop production for the next 20 years. This is based on the
long term replanting program and the actual current and anticipated yields based on the potential of clones
planted.
The long term financial forecast is a 5 year financial projection to work out the anticipated profits taking into
consideration the latest yield estimates, projected CPO prices and projected budgeted operational costs.
Criterion 4.1
Operating Procedures are appropriately documented and consistently implemented and monitored
HSE department, RSPO SMM team and supported by respective departments have prepared and established
Standard Operating Procedures that incorporate best practices for all areas of the mill and plantation
operations. Most of the Standard Operation Procedures are integrated with SM-K3 management system. More
than 15 Standard Operating Procedures on mill operations have been established. The following procedures
are implemented within sustainable palm oil parameters:
a. SOP for Oil Palm (containing aspects from nursery, land preparation, planting, upkeep, harvesting,
waste management, HCV, emergency preparedness and response, and management of hazardous
waste of used agrochemicals).
b. SOP for Palm Oil Mill [containing stages of process, boiler operations, power generation, water
treatment, land application, electrical systems, quality (including monitoring of CPO parameters),
dispatch and laboratory inspection of incoming fresh fruit bunches.
c. Manual and SOP for Health & Safety (SM-K3).
RSPO Certification Assessment – Public Summary Report for PT. Sahabat Mewah dan Makmur (SMM) Page 18
Updated Standard Operating Procedures will be sent to the respective Section Heads of the Mill and
Plantations whenever there are changes or revisions to the SOP’s. The Standard Operating Procedures are
and consistently implemented to monitor FFA parameters and moisture of CPO during processing and before
delivery to end users. Monitoring Records of inspection are kept properly in a laboratory cabinet with proper
identification.
The performance of each mill work station is monitored on a shift basis and recorded daily on a
Production/Record Log sheet. General inspections are carried out monthly and reported to the General
Manager. Quality Inspection records of CPO processing from FFB reception until CPO dispatch were
inspected during the audit it was confirmed that log sheets at mill work stations were filled in accurately and
consistently.
The General Manager and Senior Manager carry out inspections of field conditions and practices. The
Technical Services Department in conjunction with the Estate Managers and HSE Department monitors the
operations and the implementation of Health and Safety initiatives monthly.
Criterion 4.2
Practices maintain soil fertility at, or where possible improve soil fertility, to a level that ensures
optimal and sustained yield
SMM has carried out and made an annual fertilizer application regime as recommended by credible -
internationally proven oil palm research experts from PT. Sarana Inti Pratama (SIP). Foliar samples are taken
from approximately 1% of the palms; samples are taken on each block of 30 Ha at Air Ruak Estate for
division 14, division 15, division 16, division 17 and division 18.The sample is taken from frond number 17
and sent to the laboratory (SIP) to analyze for minor and major nutrient status of elements N, P, K, Ca, Mg,
Zn and B. After due analysis, recommendations are made and SMM will fertilize the blocks as per
recommendations. The soil analysis test is carried out every 7 years.
The soil was analyzed and tested initially in 2003, and the next inspection will be in 2010 as recommended by
the SMM agronomist. The Soil Analysis for SMM is carried out again by an independent and proven oil palm
research institution i.e. PT PP London Sumatra Indonesia Tbk. The results of the soil analysis and the leaf
analysis will be considered to formulate fertilizer recommendations. The SMM agronomist visits annually to
check and to monitor palm growth and vigour, occurrences of pest attacks and diseases and any other
abnormalities.
SMM management monitors the yield performance of all blocks (30 Ha) in SMM using a method of the “red
black monitoring system.” Monthly reports are computed whereby the yields of all blocks are monitored
against the potential site yields of the same cultivar of palms of the same age. Action Plans are drawn up
and monitored monthly.SMM has in place many Best Practices to ensure fertility and sustained yields,
amongst them the planting of legume cover crops (LCC) such as Mucuna brachteata, Calopogonium
caeruleum and Pueraria javanica, and the planting of Nephrolepis in open areas to protect soil erosion
during abnormal rainfall conditions, as well as to add nutrients and to prevent growth of weeds.
Further best practices include; recycling empty fruit bunches and application of palm oil mill effluent to the
fields to optimize organic matter and to fertilize the soil; application of organic fertilizers in marginal areas;
production and application of household waste as compost; construction of contour silt pits in hilly areas to
prevent excessive erosion; construction of aeration drains in hard pan marginal areas; and planting of
Legumes to improve Nitrogen uptake.
RSPO Certification Assessment – Public Summary Report for PT. Sahabat Mewah dan Makmur (SMM) Page 19
Criterion 4.3
Practices minimise and control erosion and degradation of soils
The management of SMM has committed to make efforts to minimize and to control soil degradation at the
plantations.
The general topography of SMM plantations is flat to gently rolling. Approximately 5 % of the planted
hectarage in SMM is of hilly terrain of more than 25 degree slope.
The SMM Management applies certain techniques to reduce soil erosion, especially during land preparation
for replanting/conversion, such as planting LCC (legume cover crops e.g.,: Mucuna brachteata sp),
terracing/platforms, frond stacking, digging burrow pits and windrowing. Erosion monitoring plots were
constructed in some areas in order to get information on the erosion levels based on soil types, slope and
ground covers. This started from the planting or conversion area until the canopy of the palm oil leaves are
touching each other.
The repair of roads like grading, compacting and cambering are carried out to ensure there is no delay in
transporting FFB to the mill. Surface run off is reduced by having a systematic road upkeep and
maintenance program. Total length of road upkeep for all estates within SMM is around 38 Km. Roads are
cambered and graded periodically to ensure proper channeling of rain water.SMM has highly protected
wetlands within the whole areas of the estates. The audit team did not find any wetland within the whole
company owned estates. The strategy for fragile and problem soils such as sandy, low organic matter acid
sulphate soils, have been managed and well monitored as indicated on” the Red Black Explanation Summary”
at Air Ruak Estate.
The various methods implemented to prevent land erosion are as outlined below :
1. Control measures taken in hilly terrain are:
a. Construction of Continuous Silt Pits. These pits are constructed dissecting the water flow and thus
trapping surface run off (Photo 1).
b. Planting Platforms are constructed to lessen leaching losses and surface run off (Photo 2).
c. Fronds cut during pruning or harvesting are placed criss-cross against the slope to slow down or
break water runoff velocity (Photo 3).
d. Cover crops and natural greenery are encouraged and blanket spraying is prohibited in areas prone
to erosion (Photo 4).
Certification Assessment – Public Summary Report for PT. Sahabat Mewah dan Makmur (SMM) Page 20
Photo4 : Planting of Mucuna brachteata legume (cover Frond stacking
along the contour
Photo 3 : Frond stacking along the contour
Photo 2. Platform construction Photo.1 : Silt Pits
RSPO Certification Assessment – Public Summary Report for PT. Sahabat Mewah dan Makmur (SMM) Page 21
2. SMM has conserved hilly areas deemed too steep to plant: some of these areas are in Semalar and Bukit
Sari Bunga. These areas with their natural flora are another indication of SMM’ s concern for the
environment (Picture 5)
3. Vertiver and King grass are planted in culverts, bridges and areas prone to erosion as these grass acts to
bind the soil to prevent erosion (Picture.6,7)
Photo6 : Planting vertiver and kinggrass to prevent erosion
Photo5 : Bukit Semalar and Bukit Sari Bunga
Photo 7 : Planting bamboo to reduce erosion
RSPO Certification Assessment – Public Summary Report for PT. Sahabat Mewah dan Makmur (SMM) Page 22
A summary of erosion control methods implemented in each estate are presented as follows ;
Erosion Control methods Estates
JKE BLE LJE SBE ARE
Planting of Mucuna brachteata (ha) 5 5.3 61.15
Planting of Bamboo (plant) 127
Planting of Vetiver (meter) 1840 3565 40
Planting king grass (meter) 7190 3565
Making Silt pit (Ha) 1
Making Contour terracing (Ha) 6.52
Criterion 4.4
Practices maintain the quality and availability of surface and ground water
SMM management has facilitated provision of water in storage tanks that are provided to mill and estates and
employee’s housing. The water for industrial use is supplied from some of the rivers e.g.:Sungai Belas, and
Sungai Balok, and for household/domestic use is from other water sources located in HCV 4.
The SMM management policy is to maintain the water sources as HCV 4; protect the existing riparian strips
as stated in their procedure for riparian strips; a 50m wide buffer zone has been maintained along
Sungai Belas, the main river that runs through the estates. The SMM management policy also states that the
use of herbicide is prohibited along the buffer zone area. There are monitoring systems along riparian buffer
zones to protect the area from erosion and degradation of water quality.
However, this criterion is not effectively implemented to manage water resources. The daily data is missing to
monitor accurately water for daily consumption. Most of the water usage is for the purpose of cleaning dirty
areas in the mills and water consumption for the employees housing complex. Therefore, minor indicator as
nonconformity issued. See Non-Conformity Report T01.12/09.
Criterion 4.5
Pests, diseases, weeds and invasive introduced species are effectively managed using appropriate
Integrated Pest Management (IPM) techniques
SMM has identified and documented an Integrated Management System Program (2009) on “Conservation
Report and Activity”. The main pests attacking the oil palms in the plantations are leaf eating insects and rats
that eat the palm fruits. Plantation Manager assigned a pest engineer (from head office quality assurance,
SMM group) to monitor regularly the population of pests at each estate,e.g.: At Ladang Jaya estate, a method
known as early warning census has been initiated. The IPM techniques and natural control were noted on all
plantations inspected. Monitoring of the quantity of herbicides used is recorded in each of the plantations
and displayed by the plantation manager.
Uncontrolled usage of herbicide can severely endanger health of spray operators, and also damage the palm
fruits from LD 50 toxicity. The LD 50 criterion was observed for all plantation activities. Information
pertaining to monitoring the usage of chemicals based on LD 50 of per tonne of FFB was implemented to
indicate that a reduction in usage and the influence of the LD 50 are progressively implemented . Record of
monitoring using the affected LD 50 of per tonne FFB was inspected and shown (2009) in the “Monitoring of
Attacks by Pests Report No. 16/QA/XI/2009”.
SMM management also cultivates beneficial weeds to reduce the use of chemicals in controlling pests, such
as Turnera subulata (bunga pukul delapan)over 1600 Ha, Antigonon leptopus (air mata pengantin)planted
over 90 ha,and Cassia cobanersis over 30 Ha at Division 4 – Division 7. SSM had also been promoting the
RSPO Certification Assessment – Public Summary Report for PT. Sahabat Mewah dan Makmur (SMM) Page 23
barn owl (burung hantu) as one of its IPM practices to control the rat attacks. Recent census data at Ladang
Jaya estate, revealed the total number of barn owls (burung hantu) Tyto alba in the estate is approximately
52 (fifty two) couples.
Criterion 4.6
Agrochemicals are used in a way that does not endanger health or the environment. There is no
prophylactic use of pesticides, except in specific situations identified in national Best Practice
guidelines. Where agrochemicals are used that are categorised by the World Health Organization as
Types 1 A or 1 B, or are listed by the Stockholm or Rotterdam Conventions, growers are actively
seeking to identify alternatives and this is documented
SMM Management documents its policy on the wearing of PPE while using agro-chemicals, in SOP – Guide
to the Safe Use of Pesticides. The SOP lists the justification of chemicals use, the conditions and application
rates for individual chemicals ,information and requirements on storage safety precautions, solution
preparation and application, pesticide waste disposal, first aid and a list of pesticides allowed by the
regulations. The Auditor confirmed that agrochemicals used are in accordance with relevant SOP, applied by
trained personnel, stored in secured area and empty containers were disposed in B3 (hazardous and toxic
material) waste warehouse area before removal by a licensed contractor. All the records are well maintained.
There is regular medical checkup for workers who apply agrochemicals.
Criterion 4.7
An occupational health and safety plan is documented, effectively communicated and implemented
The SMM management has established a safety, health and environment policy and it is comprehensively
implemented. Explanation and communication of the policy is the responsibility of the safety engineer (SM-
P2K3). The policy is available at the mills and the plantations; and communicated to all subcontractors. A
safety engineer monitors and inspects all facilities in the mill operations relating to emergency conditions on
a daily basis. Records of mill operations and facilities are kept properly, identified and retrievable in the
safety engineer’s room. If there is an accident in the mill caused by the workers violating a working procedure
or other instructions, an investigation of the accident is conducted and the findings forwarded to the mill
manager for inclusion in the agenda of the Safety Meeting. The Auditor found the implementation of the
Occupational Health and Safety Plan as acceptable.
Criterion 4.8
All staff, workers, smallholders and contractors are appropriately trained
Mill managers and Plantation managers identify training needs for safety training program annually for
workers especially chemical sprayer operators. Some contractors are included in training programs in respect
of safety concerns conducted by safety engineers. The small holders have received training in emergency
procedures. Evaluation of training effectiveness is conducted regularly to ensure all staffs and workers are
updated with sufficient training. All training records were checked. during audit.
Criterion 5.1
Aspects of plantation and mill management, including replanting, that have environmental impacts are
identified, and plans to mitigate the negative impacts and promote the positive ones are made,
implemented and monitored, to demonstrate continuous improvement
Identification of aspects of plantation, mill management and replanting that have environmental impacts are
in place and monitoring of plans to mitigate environmental impacts were satisfactory. Assessment is also
carried out in environmental management efforts and environmental monitoring efforts (UKL/UPL).SMM
RSPO Certification Assessment – Public Summary Report for PT. Sahabat Mewah dan Makmur (SMM) Page 24
has documented environmental impact assessment as a part of environmental management system and is
committed to obtain an ISO 14001 certification in 2010. Six- monthly reports of UKL/UPL are submitted to
Bapedalda (local environmental controlling body). A documented procedure has been established to revise
environmental documentation if there is any change in company activities.
Criterion 5.2
The status of rare, threatened or endangered species and high conservation value habitats, if any, that
exist in the plantation or that could be affected by plantation or mill management, shall be identified
and their conservation taken into account in management plans and operations.
The SPO management has prepared and developed all information on HCV including for flora and fauna in
preparation for the certification. The flora and fauna are comprehensively identified in “Executive Summary
of High Conservation Value Report 2009”. The HCV areas are recognized with HCV 4.1, 4.2, and 6, with
most of HCV available in all the plantations. The HCV areas at the field level are well identified with
sufficient signboards.
Criterion 5.3
Waste is reduced, recycled, re-used and disposed of in an environmentally and socially responsible
manner
Suitable methods are established such as environmental aspects identification and environmental impacts
assessment to control all sources of significant environmental impact including management of wastes. The
wastes of used agrochemical jars are disposed in a chemical store permanent area which is kept away from
rain. Prior to being stored in the chemical permanent area, the wastes are crushed in a manner so as not to be
re-used. Some wastes have economical values for metal scraps generated from workshop waste. Most of
metal scraps were sold to recycling outlets. In addition, the EFB wastes are used as composting for several
plantations and it is well implemented. Discharge of liquid wastes to waste treatment plant for BOD, COD
and pH are regularly measured to ensure that the parameters are under control in accordance with waste water
regulations.
Criterion 5.4
Efficiency of energy use and use of renewable energy is maximized
SMM management applies the efficiency program for energy, which is known as the renewable energy
program. Boilers use fibre and palm kernel shell as fuel (environmentally friendly) to heat water in boilers to
generate high pressure steam. High pressure steam drives turbines connected to generators to produce
electricity. The electricity generated meets the electricity needs of the factory, employee housing, public
facilities, schools, places of worship, etc.This is SMM management’s commitment to reduce consumption of
fossil fuel.
Criterion 5.5
Use of fire for waste disposal and for preparing land for replanting is avoided except in specific
situations, as identified in the ASEAN guidelines or other regional best practices
The whole SMM management and staffs have high commitment to a zero burning policy. This zero burning
policy is fully supported by the managing director of the SMM management. The audit team has checked to
confirm zero burning policy on the whole of the SPO management is well implemented. The wastes that are
generated by mill and plantations activities are treated properly within the SPO management operation.
RSPO Certification Assessment – Public Summary Report for PT. Sahabat Mewah dan Makmur (SMM) Page 25
Criterion 5.6
Plans to reduce pollution and emissions, including greenhouse gases, are developed, implemented and
monitored
The prevention of pollution is a part of the SMM Management’s Policies on Health, Safety; and Environment.
Monitoring and measurement on emission parameters are planned and implemented in accordance with
emission regulations. On a 12 monthly basis, the emission from boilers and vehicles for transportation of FFB
are tested by an external independent laboratory. Results of emissions are reported to the Environment
Manager to ensure that necessary action is taken. The result of emission monitoring and management is also
reported to the local Environment Agency (Bapedalda) as part of RKL-RPL (Environment Management and
Monitoring) Semester Report.
Criterion 6.1
Aspects of plantation and mill management including replanting that have social impacts are identified
in a participatory way, and plans to mitigate the negative impacts and promote the positive ones are
made, implemented and monitored to demonstrate continuous improvement
SMM management has developed and has a method to monitor all information due to social aspects of people
who are living in the neighborhood and within the employee’s housing complex. All information related to
social aspects are identified and assessed using appropriate methods such as environmental aspects and
impacts assessment. Results of the assessment for social aspects is reported to the Environment Manager and
distributed to respective concerned parties such as environmental impact-controlling agency at least once a
year.
Criterion 6.2
There are open and transparent methods for communication and consultation between growers and/or
millers, local communities and other affected or interested parties
SMM has implemented an effective communication and consultation procedure between the growers, millers
and local communities. The SMM management has also drawn up an external communication procedure.
Consultation with stakeholders has been determined. List of stakeholders includes local community, NGO’s,
worker’s organizations, and the police. Some stakeholders have been contacted for the consultation. Adjacent
estate officers are responsible for communication with the respective parties on estate activities. The
Community Development Manager assumes responsibility for communication and consultations with
stakeholders and to ensure that community programs are run effectively.
Criterion 6.3
There is a mutually agreed and documented system for dealing with complaints and grievances, which
is implemented and accepted by all parties
SMM has established a complaints, grievance, and dispute procedure, which is integrated with the
communication procedure for SM-K3. This procedure has been communicated to all stakeholders at each mill
and plantation. The positive response from the stakeholders regarding this communication was inspected.
During the visit to the stakeholders, the audit team confirmed that there were no complaints, grievances and
disputes. One of SPO management system’s procedure has been established for customary rights of the land
(No 021/HR&GA/CP/06-09 regarding liberation of land).
RSPO Certification Assessment – Public Summary Report for PT. Sahabat Mewah dan Makmur (SMM) Page 26
Criterion 6.4
Any negotiations concerning compensation for loss of legal or customary rights are dealt with through
a documented system that enables indigenous people, local communities and other stakeholders to
express their views through their own representative institutions
Within the certification assessment, the audit team verified and inspected the whole information regarding
compensation. The evidence of compensation was found satisfactory and no legal action was raised. The
compensation procedures have been established and communicated to stakeholders.
Criterion 6.5
Pay and conditions for employees and for employees of contractors always meet at least legal or
industry minimum standards and are sufficient to provide decent living wages
List of pay and conditions of employees are described in detail according to level and rank of their position.
SMM management has committed to follow related legislation, which regulates working days, working time,
salary levels, regional minimum rate payments, and employees insurance. JAMSOSTEK.
HRD staff do inform the workers of salary adjustments whenever there are amendments to the regional
minimum rates.
Criterion 6.6
The employer respects the right of all personnel to form and join trade unions of their choice and to
bargain collectively. Where the right to freedom of association and collective bargaining are restricted
under law, the employer facilitates parallel means of independent and free association and bargaining
for all such personnel
SMM has entered into an agreement with workers and those in management level to establish labour unions
in accordance with national legislation, UU No. 13 2003. Memorandum of understanding that has been
approved by both parties, on time payment and safety for contract workers has been made with all contractors
who have projects with the SPO management.
Criterion 6.7
Children are not employed or exploited. Work by children is acceptable on family farms, under adult
supervision, and when not interfering with education programmes. Children are not exposed to
hazardous working conditions.
Records of personal data of employees like age of workers, status of employees, position and rank, location
of work, date of joining the mill and the plantations are maintained. It was confirmed that no worker under
the age of 16 years is employed. This is in compliance with the legislation of the Republic of Indonesia – UU
RI No. 13 Tahun 2003.
Criterion 6.8
Any form of discrimination based on race, caste, national origin, religion, disability, gender, sexual
orientation, union membership, political affiliation, or age, is prohibited.
SMM management has a policy on equal employment opportunities. Capable employees have opportunities
for career progression in the mill and the plantations. The Head of the General Affairs Department identifies
RSPO Certification Assessment – Public Summary Report for PT. Sahabat Mewah dan Makmur (SMM) Page 27
candidates for promotion and submits the names for selection by the General Manager. SMM is also
committed to providing job opportunities for the local community. Information on vacant positions is posted
in notice boards in the mill and estates. Information on job opportunities are also announced in the local
newspaper (Belitung Post).
Criterion 6.9
A policy to prevent sexual harassment and all other forms of violence against women and to protect
their reproductive rights is developed and applied
SMM has a policy on prevention of sexual harassment which is displayed at various locations of the estate
and mill offices. The policy also contains rules for enforcement and is part of the Company’s Social
Responsibility approved by General Manager dated 01.12.2009. The External Relationship Manager on
behalf of General Affairs Department has developed the rules and it has been explained and communicated to
all workers to ensure they understand the rule well.
Prevention and eradication of sexual harassment was well communicated to all workers, management levels
and stakeholders. Records of the meetings to communicate the policy is kept and retrievable in the
appropriate place. The Committee on Sexual Harassment has been established in accordance to the letter of
General Manager No. 001/SK/GM/06-2009 date 23.06.2009.
The letters Procedures No.SOP-EHS-001 are established to ensure there is no sexual harassment and all other
forms of violence against women. Interviews with female workers confirmed that they understood the Policy
well.
Criterion 6.10
Growers and mills deal fairly and transparently with smallholders and other local businesses.
SMM has made agreements between suppliers/subcontractors and smallholders/out growers. A contract has
been inspected between SMM and one of the smallholders e.g.,: Cooperative of Anugrah (Koperasi Anugrah)
for contract No. 017/SMM-SPK/PKS/VIII/2009.
There were transactions and purchase contracts with smallholders or local business private companies
regarding the sales and purchase of FFB. Other contracts do exist for FFB transportation and for the service
or maintenance and repairs of mill equipments. The pricing of FFB is regulated by Pemerintahan Propinsi
(Local Government Province) Kepulauan Bangka Belitung, Sekda No. 525/80/Ass II/2009 dates 15.10.2009.
Criterion 6.11
Growers and millers contribute to local sustainable development wherever appropriate
Contibutions to local development is based on community needs and the company’s budget. The SMM
management’s contributions to community development included infrastructures (buildings, rehabilitation of
schools, mosques, church, roads, and local community assembly halls, and kindergarten yard) which are
documented at Government and Community Relations Annual Reports and distributed to each estate and mill.
The SMM management conducts meetings regularly with local communities in response to requests and
provides assistance. The Health and Safety Department of The SMM management provides free medical
treatment at the clinics to local communities who seek treatment. The evidence of SMM’s tax contribution
for Local Development is recorded in a letter No. 47/DPK-BT/XII/2008. This record is kept at the General
Affairs Department, and will be retained for a period of 5 (five) years.
RSPO Certification Assessment – Public Summary Report for PT. Sahabat Mewah dan Makmur (SMM) Page 28
Criterion 7.1 to 7.7
N/A
This requirement is not applicable as there has been no new planting since November 2005.
Criterion 8.1
Growers and millers regularly monitor and review their activities and develop and implement action
plans that allow demonstrable continuous improvement in key operations.
SMM management has committed to continuous improvement through observing RSPO Principles and
Criteria. On the prevention of emission (release of carbon emission to environment generated from palm
plantation and methane capture by CDM program), the Environmental Impact Assessment was adopted to
ensure uncontrolled parameters were detected in emissions from vehicles and boilers. Reduced usage of
dangerous agrochemicals (paraquat) was inspected and they conformed to SMM Policy. The used
agrochemical jars or containers have been handled and stored in proper chemicals warehouse. Records of the
reducing consumption of paraquat (gramoxone) were inspected and the reduction is seen from the following
figures.
Year 2007 : (0.16 litre/Ha),
Year 2008 : (0.13 litre/Ha),
Year 2009 : (0.01029 liter/Ha).
RSPO Certification Assessment – Public Summary Report for PT. Sahabat Mewah dan Makmur (SMM) Page 29
3.2 Detailed Non-Conformity Report, Corrective Action Taken, and Auditors Conclusion
Non Conformity Report – T01.12/09
Date of issued 11.12.2009 NCR issued by : Hasnop Putra
Location Balok Estate Discussed with : Managers and staffs
RSPO – Criterion : 4.4
Practices maintain the quality and availability of surface and ground water.
Description of Finding:
Implementation of water management plan overall in the estates are not evident. There are no records
available on consumption of water, to ensure water management program is effective.
Classification Major Minor
Corrective Action Taken: Date of implementation: 31 January 2010
Establish Water Management Plan for all estates, which will include procedures to monitor water
quality and quantity;
A Water management Plan will be drawn up for all Estates which will monitor water usage and
quality;
Install water monitoring facility (flow meter) to ensure proper monitoring and recording;
Establish recording and periodic checks to quantity (m3/month), and water quality (lab test) based on
procedure (SOP-EHS-011) according with related regulation.
Auditee sign:
General Manager: Mr. Phillip Liu Senior Manager: Sukrisdianto
Auditor Comments:
Corrective action taken by the organization for the documentation submitted has been verified and
accepted.
Records monitoring of water per tonne of FFB and water management data have been submitted. The
effectiveness of the water management program and consumption of water per tonne of FFB will be
checked during the next surveillance audit. The verification of corrective action had been conducted in
TUVNORD Indonesia office
Auditor Comments and Conclusion
To check in next verification visit Appropriate action taken
Appropriate action not taken Corrective action in compliance with the
requirement
Date of verification:February 2010 Auditor(s) sign: Mr. Hasnop Putra
RSPO Certification Assessment – Public Summary Report for PT. Sahabat Mewah dan Makmur (SMM) Page 30
Table 7: Summary of findings by RSPO Criterion
Audit type Certification Assessment
Criterio
n
Audite
d Comply Major
Mino
r
No of
NC
1.1 Yes
1.2 Yes
2.1 Yes
2.2 Yes
2.3 Yes
3.1 Yes
4.1 Yes
4.2 Yes
4.3 Yes
4.4 No 1 1
4.5 Yes
4.6 Yes
4.7 Yes
4.8 Yes
5.1 Yes
5.2 Yes
5.3 Yes
5.4 Yes
Audit type Certification Assessment
Criterio
n
Audite
d Comply Major
Mino
r
No of
NC
5.5 Yes
5.6 Yes
6.1 Yes
6.2 Yes
6.3 Yes
6.4 Yes
6.5 Yes
6.6 Yes
6.7 Yes
6.8 Yes
6.9 Yes
6.10 Yes
6.11 Yes
7.0 N/A -
8.1 Yes
Total of
Nonconformities 1 1
3.3 Noteworthy positive components
SMM maintains a 100 M strip from the river as a reserve for conservation. The management of
SMM is highly committed to environmental regulations and have adopted a zero burning policy for
the prevention of fire in the plantations. Fire fighting facilities and equipment are provided for the fire
brigade team, and are always available together with water tank vehicles in response to any land
burning.
High Conservation Value identified and protected in all the estates. The RSPO management unit of
SMM has set a high priority on protection of all HCVs within the whole plantation and other locations
that have been identified,. Protection of the HCVs are clearly identified in Executive summary 2009
with identification and analysis of high conservation value (NKT), and the management and monitoring
for areas of value for high conservation (KBKT) as reference. The identification of HCV areas was
observed by an independent environmental group i.e. Focus Consulting Group (FCG) - Jakarta.
Organic wastes and land application: Empty fruit bunches were placed in palm plantations in such a
manner to enhance the organic matter and quality of the soil. Effluent from waste treatment plant is
discharged to the plantation as land applications; minimizing the use of chemicals. SMM is committed
to reducing use of chemicals and spraying of chemicals is vigilantly monitored;
The SMM’s IPM program has resulted in the reduction of chemicals use for pest control (rat control).
The Barn Owl (Tyto alba) population has been built up to a level where it now provides effective
control of rats. and reduction on the use of rodenticides.
RSPO Certification Assessment – Public Summary Report for PT. Sahabat Mewah dan Makmur (SMM) Page 31
Figure - 1: Pest control – The Barn Owl on the leaf of palm oil plantation
Estate managers allow every family to have vegetable gardens at the rear of their houses provided they
are kept neat and tidy. This is beneficial to the workers as it supplements family income and contributes
to family health.
The mill and the estates have documented safety guidelines and SOP’s as well as safety monitoring in
accordance with SM-K3 implementation. There is a Zero accident program in all areas of the estates and
mill. This commitment to zero accident has been communicated and explained to stakeholders.
The RSPO team of SMM management has set high priority on environment impact assessments and
provides sufficient training to increase awareness. The environment monitoring programs established
to monitor boiler emission, FFB transportation emission, and power generation by generator-set
operations help in developing sustainable management systems to meet with RSPO Principles and
Criteria.
The role of RSPO team of SMM management will be more effective when consideration is given by
SMM to Green House Gases (GHG) for CDM program. A CDM program is currently being prepared to
replace consumption of diesel fuel with biogas (methane capture) to run a generator to generate
electricity. There is also Biomass Gasification renewable energy initiative without CDM.
The management of SMM provides fresh water for employees’ housing complex. The water is sourced
from Sungai Lenggang (Lenggang River) and supplied to employees after purification. The facility was
installed for the employees as part of the company’s commitment to safety and health of employees and
the local community. Figure 3 below shows the water purifier installation.
Figure – 2: Water purifier installation and storage tank
Kindergarten yard is provided in all estates as playground for children who use it after school and
during holidays. The play yard for children is very clean and safe from emissions from vehicles, and
noise and dust pollution. Figure 4 below is the best kindergarten yard in Sari Bunga Estate.
RSPO Certification Assessment – Public Summary Report for PT. Sahabat Mewah dan Makmur (SMM) Page 32
Figure – 3: Kindergarten yard for children
3.3.1 Some Recommendations for Improvement to the Mill and Estates:
1. Polyclinics in the estates should clearly provide expiry dates on drugs. Some expired dugs have even
been found on the floor and should be disposed in accordance with the regulations.. The Maternity
Room (Ruang Kebidanan) should be clean and tidy. The condition of Blood Pressure Equipment
should be checked properly. The recommendation is to monitor these, including expiry date of drugs,
and to dispose of expired drugs to avoid usage. There should also be periodical checks on the condition
of all equipment.
2. Efficiency calculation of Genset 63KVA and 15 KVA should mention the average - load per month
(KVA) instead of just Lt/Hours. The data of average-load per month (KVA) must be monitored and
recorded.
3. The procedure, SOP-OPR-023 Rev.01 to be revised to record accurately the use of agrochemicals and
use/disposal of agrochemical containers.
4. Mapping of Integrated Pest Management (IPM) should indicate clearly areas of activities and should
include mapping of details of actual IPM projects in all estates.
5. Safety signs and posters should be available on all access roads to estates and the mill. Signs should also
be available to indicate areas where animal crossings occur to prevent accidents.
Speed limit signboards shall be erected at roadsides and speed breakers constructed in areas where
speeding occurs to prevent accidents.
6. The temporary hut for fuel, used oil, used small parts located in the middle of palm plantation, should
also provide for oil spill containment. SMM must erect proper secondary containment in all sheds
where generator sets (gen-sets) are housed.
7. The noise from generator sets operations in employees housing area has the potential of impairing the
hearing of residents in the housing areas. Information on noise levels of generator set operations is not
available. It is recommended to measure noise levels so that noise mufflers can be used to reduce
excessive noise levels.
8. Chimney smoke from exhausts of generator sets is ejected from a horizontal position. This is very
unsafe for children who may be playing around the gen-set houses, and may affect their breathing,
particularly in the future. The exhaust pipes of gen sets are to be repositioned to ensure that the exhaust
gasses are diverted upwards.
.
3.4 Issues raised by stakeholders and findings of the assessment team
The audit team did not receive any major issues and comments to be considered from the stakeholders
meeting on environmental impacts or social performance of the mill and the plantations operations. The
interview was used as a suitable method to obtain positive or negative comments from stakeholders. The
RSPO Certification Assessment – Public Summary Report for PT. Sahabat Mewah dan Makmur (SMM) Page 33
audit team had prepared some of the questions requiring feedback from stakeholders. The feedback refers to
section 2.10.
Figure – 4: Stakeholder meeting
The picture shows a stakeholders meeting to obtain positive or negative response in respect of RSPO
Certification Assessment for SMM. SMM has collected information comprehensively and documented the
minutes of stakeholders’ meeting that was carried out on May 14, 2009. The SMM management responded
to the feedback from the stakeholders. Most of the feedback from the meeting was positive in respect RSPO
certification and compliance of RSPO Principles and Criteria. The response of the stakeholders’ meeting is
shown below.
Camat Gantung (Local Community)
Camat requests SMM management to provide clear information of land acquired (HGU) for local
community.
Camat on behalf of local community Gantung requests SMM management to develop partnerships
between SMM management for smallholders of Gantung Village. We provide 50 Ha of free land to
be developed for palm oil plantation.
SMM Response
The management level of SMM is very concerned over the HGU information. The request will be
referred to the external relationship manager for early response.
SMM management provides training to smallholders on oil palm cultivation.
Chief of JangkangVillage
The spraying gang workers complained recently of breathing difficulties and coughing. It could
have occurred because of improper PPE use.
SMM Response
The SMM management is concerned with worker’s health and provides comprehensive medical
attention. The HSE officer will train and familiarize workers on the proper use of agrochemical
spray equipment and PPE. The training and familiarization is carried out regularly.
LSM Warna Indonesia (Environmnetal NGO)
The NGO did not raise any issues of concern to environmental and social impact. The company had proven
its commitment to empower the local community with education and partnerships to give them a better life.
RSPO Certification Assessment – Public Summary Report for PT. Sahabat Mewah dan Makmur (SMM) Page 34
FFB Transporter (Contractor)
The FFB Transport contractor has worked for more than12 years. They had not raised any negative issues to
PT. SMM.
Table 8 shows the result of an interview meeting with a stakeholder who is the Head of village Dendang – Local
community in Belitung.
Table 8: Feedback from one of stakeholders and SMM management comment
N
o Subjects Stakeholders’ feedback SMM management comments
1 Did SMM Management
provide information on
the RSPO certification
exercise including plans
for safety and health to
the public and
stakeholders?
Information and awareness about
RSPO are insufficiently understood by
stakeholders.
Conduct meetings regularly and
training properly. Provide
sufficient information about
RSPO Certification and safety
and health program to
stakeholder. Records of meeting
with stakeholder will be
followed by action plan and
monitoring of the achievement.
2 Does the SMM
management conduct
regular meetings
regarding community
development?
The meeting is carried out in such a
manner in order to obtain clear
information on the progress of
development of local community..
The meeting with stakeholders
will be carried out regularly and
effectively and will not be
restricted by time.
3 Does the SMM
management have a
proper system to inform
people living around the
mill and supply base?
Stakeholders were informed about the
system. The complaints and grievance
procedures were communicated to the
people.
No action needed to provide
evidence for correction,
corrective and even, preventive
actions as the community is
informed if there was a need for
revision.
4 Does the SMM
management respond
properly to the
complaints in respect of
RSPO implementation?
So far, we (stakeholders) have no
complaints regarding company’s
operations. Sometimes we need help
for our activities or we need donations
for repairing some facilities, or for
repairs to roads and other
infrastructures in our location.
Yes, any proposals to help
stakeholders is welcome.
5 Is there a clear
grievance and
complaints procedure in
the company?
Yes, we were very clear about this
concern. The company informed us
through some of stakeholders meeting
for grievance procedure clearly.
However, we have requests for some
help and financial support to renovate
school buildings and other
infrastructure
We communicated flow process
of grievance and complaints to
them.
The SMM management will
consider financial support for
renovation of school buildings
and infrastructure.
6 Is there still a complaint
regarding current land
acquired for palm
plantation?
The company acquired this plantation
from previous company. The whole
land acquired has HGU. This
information has been relayed to the
community through the external
relationship manager and lawyer.
We have no complaint on this issue.
None
RSPO Certification Assessment – Public Summary Report for PT. Sahabat Mewah dan Makmur (SMM) Page 35
7 Is there any
environment impact
arising from the
operations of SMM
management?
As long as the SMM management
maintains and consistently monitors
environmental impact, there has been
no impact on environment surrounding
stakeholders’ living areas. No water
quality changes noted and soil is not
contaminated, flora and fauna are still
found in their natural environment and
habitats.
We endeavor to maintain good
living conditions surrounding
stakeholders’ living area and
provide sufficient facilities. We
also monitor the prevention of
pollution, noise, odours, dust,
etc.
8 Is there any conflict
solved satisfactorily?
So far, we have not complained about
the company’s operations.
We have procedures in place in
the event of a complaint or
grievance.
9 Is there any procedure
for settling conflicts
which is communicated
with local community?
The company communicates the
procedures to the local community.
The SMM management has
communicated the conflict settlement
procedures to stakeholders.
We maintain an attendance list
of participants at the
familiarization meetings to
explain the procedures.
10 Does the SPO
management invite
stakeholders regularly
for the activities related
to community
development?
Yes. We are always invited by the
company to discuss general programs
for the local community in respect of
free medical services, donations for
some villages for road maintenance,
school renovation, preschool yard,
playing fields for children and public,
etc
The company will maintain this
effective communication
continuously with stakeholder.
12 Are the workers
receiving wages in
accordance with
government regulations?
No one below the age of 16 years is
employed at the company. The
company is very concerned about
workers welfare and has committed to
comply with labour regulation. So far,
there has been no major complaint
regarding salary issues from workers
including days of work, leave,
overtime, and remuneration.
As long as we work and live for
this business we shall comply
with labour regulations.
13 Is there a system on
emergency procedures
and has this been
communicated to the
local community living
around the mill and
supply base?
We have been trained in emergency
procedures, and how to use fire
equipment such as fire extinguishers,
other emergency-situation drills, and
evacuation.
HSE Department will
continuously train the local
community on emergency
procedures ,fire drills and
earthquake evacuation.
RSPO Certification Assessment – Public Summary Report for PT. Sahabat Mewah dan Makmur (SMM) Page 36
3.4.1. Attendance list of stakeholders meeting on February 12,2009 at Balok Estate
No Name Position
1 Hendry Tjen PT. SMM/ / ANJ
2 Hafendi PT. SMM/ ANJ
3 Suwarsono PT. SMM/ ANJ
4 Erlin OB Sinaga PT. SMM/ ANJ
5 Hotlan Sirait PT. SMM/ ANJ
6 Baringin Marpaung PT. SMM/ ANJ
7 Bahiman Traditional healer of Air Nangka Village (representative local
people) 8 Sarmina Secretary of Desa Balok
9 Ardiansyah Representative of local people
10 Zulkarnaen Head of Dusun Air Nangka
11 Haryanto Head of Dusun Dendang
12 Hardiyanto Head of Dusun Balok
RSPO Certification Assessment – Public Summary Report for PT. Sahabat Mewah dan Makmur (SMM) Page 37
3.4.2. Attendance list of stakeholders meeting on February 25,2009 at Ladang Jaya Estate/ Jangkang Mill
No Name Position
1 Hendry Tjen PT. SMM/ ANJ
2 Sukrisdianto PT. SMM/ ANJ
3 Jadial Silalahi PT. SMM/ ANJ
4 Heri Gunawan Lindu PT. SMM/ ANJ
5 Kariman PT. SMM/ ANJ
6 Antoperis Tarigan PT. SMM/ ANJ
7 Andi Siswoyo PT. SMM/ ANJ
8 Robin Simamora PT. SMM/ANJ
9 Budi Purianto PT. SMM/ ANJ
10 Tongku Aman Hasibuan PT. SMM/ ANJ
11 Dadi Supriadi PT. SMM/ ANJ
12 Suryadi Head of West Jangkang Village
13 Hairil Anwar Head of Dusun Tungkup
14 Tamri Traditional healer of Village Air Asam (representative of local people)
15 Marsili Head of East Jangkang Village
16 Misran Traditional healer of Tungkup Village representative of local people)
17 Basri Head of Dusun Air Asam
18 Edi Hermawan Head of Nyuruk Village
19 Kurnadi Head of Nyuruk Village
20 Sabron Head of Pelulusan Village
21 Yusniar Head of Dusun Bentaian
22 Zaidin Secretary of Desa Jangkang
RSPO Certification Assessment – Public Summary Report for PT. Sahabat Mewah dan Makmur (SMM) Page 38
3.4.3. Attendance list of stakeholders meeting on May 14 at Clubhouse PT. SMM
No Name Position
1 Ho Che An PT. SMM/ ANJ (General Manager PT.ANJ Agri)
2 Sukrisdianto PT. SMM/ ANJ (General Manager PT. SMM)
3 Andi Esfandiari PT. SMM/ ANJ (Vice President Director PT. ANJ Agri)
4 M.Wiedhayaka PT. SMM/ ANJ
5 Sukrisdianto PT. SMM/ ANJ (Senior Manager PT. SMM)
6 Hendry Tjen PT. SMM/ ANJ (External Relation)
7 Supri Hantoro PT. SMM/ ANJ (Estate Manager PT. SMM)
8 Suwarsono PT. SMM/ ANJ (Estate Manager PT. SMM)
9 Purnawan PT. SMM/ ANJ (Estate Manager PT.SMM)
10 Isransani PT. SMM/ ANJ(Estate Manager PT.SMM)
11 Rotman PT. SMM/ ANJ(HRO PT. SMM)
12 Kariman PT. SMM/ ANJ (Mill Manager PT. SMM))
13 M. Reza PT. SMM/ ANJ (Civil Manager PT. SMM)
14 Rebo Pansuyadi PT. SMM/ ANJ (Tata Usaha PT. SMM)
15 M. Subri PT. SMM/ ANJ (EHS Manager PT. SMM)
16 ZarnyAbd PT. SMM/ANJ(staff)
17 A.Jumady PT.SMM/ANJ(staff)
18 Triyanti (woman) PT. SMM/ ANJ (staff)
19 Jedial Silalahi PT. SMM/ ANJ (staff)
20 Efendi Pandiangan PT. SMM/ ANJ (staff)
21 Erwin PT. SMM/ ANJ (staff)
22 Joni Nopiansyah PT. SMM/ ANJ (staff)
23 GurdiF Secretary ofDesaNyuruk
24 Syamsurizal LSM Warna Indonesia
25 Glenn Nelwan LSM Kelompok Peduli Lingkungan Belitung
26 Edy Aryanto Head Master of SDN 14 Dendang (School)
27 Sanan Lesmana Head of SPSI (Labour Union)
28 Hirya Dharma Camat Gantung
29 Khairil Anwar Camat Dendang
30 Erwin Head ofDesaDendang
31 Sandri Head of Desa Renggiang
32 Rolia Head of Desa Balok
33 Sarmania (Woman) People of Desa Balok
34 Lusi (Woman) People of Desa Balok
35 Dony Setiawan StafofCamat Dendang
36 Azwan People of Dusun Air Nangka
37 Arif StafofCamat Gantung
38 Untung StafofCamat Gantung
39 Zulman Head of Desa Jangkang
40 Khoirudin Kapolsek (Head of District Police)
41 Marmono Staf of District Police
42 Junaidi Contractor
43 Edy Libarki Kabid Pengawas Lingkungan Hidup (Head of Local Environmental
Controlling Body)
44 Trijaka Priyono Kabid Pertanian dan Kehutanan Distanhut (Head of local Agricultural and
Forestry Body)
45 Nofindra S StafDistanhut East Timur (Staf of local Agricultural and Forestry Body)
46 Ellys S Representative TUV NORD
RSPO Certification Assessment – Public Summary Report for PT. Sahabat Mewah dan Makmur (SMM) Page 39
3.5 Certified organization’s acknowledgement of internal responsibility
Please sign on the certification assessment and confirm the acceptance of the assessment report contents including assessment findings. The company General Manager
and Senior Manager will sign for the certification assessment report. Complete signatures are shown in section 3.6.
3.6 Formal sign-off of assessment findings
Belitung
Signed for and on behalf of
PT. Sahabat Mewah dan Makmur
17.05.2010 General Manager Senior Manager & RSPO Coordinator
Phillip Liu Sukrisdianto
Jakarta
Signed for and on behalf of
PT. TÜV NORD Indonesia – System Certification Management
17.05.2010 - Lead Auditor : Hasnop Putra
40
Annex – A : Figure Maps of SMM Mill & Estates
Figure A-1: Map of SMM and location FFB supply to Mill
41
42
Figure A-2: Map of FFB supplying to the mill by company owned estates
43
44
RSPO Certification Assessment – Public Summary Report for PT. Sahabat Mewah dan Makmur (SMM) Page 45
Annex – B : Draft of RSPO Certificate
C E R T I F I C A T E
In accordance with TÜV NORD Indonesia procedures,a certificate is hereby given to
PT. SAHABAT MEWAH dan MAKMUR Head Office: Wisma BII, Lt.7 Jl. Diponegoro No. 18 Medan 20152 – Indonesia
Jangkang Palm Oil Mill Mill Location
GPS location
Longitude (E) Latitude (S)
Desa Jangkang , KecamatanDendang 33464,
Kabupaten Belitung Timur, Propinsi Bangka
Belitung - Indonesia
107° 52' 30.4" 02° 59' 55.2"
Applies a Sustainable Palm Oil Management System in line with 2008 National Interpretation of RSPO Principles and Criteria for Sustainable Palm Oil Production of Republic of Indonesia the following scope of certification
Production of Crude Palm Oil and Palm Kernel
CPO Tonnage Total Production 65,518 t
CPO Tonnage Claimed 65,518 t
Palm Kernel (PK) Tonnage Total Production 13,977 t
Palm Kernel (PK) Tonnage Claimed 13,977 t
Certificate Registration No: TNI –RSPO 005.2009 Audit Report No. SPO-ID09002 Issued date of Certificate : RSPO approval dateValid Certificate : -
President Director
This certification was carryout in accordance with the TÜV NORD Indonesia auditing and certification procedures and is subject to regular surveillance
audits.
PT. TÜV NORD Indonesia is a subsidiary of TÜV NORD CERT GmbH
46
Langemarckstrasse 20 D - 45141 Essen, Germany
-
Annex to Certif icate – RSPO (Supply Base)
Certificate Registration No: TNI-RSPO 005.2009
F o l l o w i n g s c ope o f c e r t i f i c a t i o n M i l l a n d S up p l y b as e c o ve r a re
Estate Location FFB
Production (tonnes)
GPS Location
Longitude (E) Latitude (S)
Jangkang (JKE)
Desa Jangkang, Kecamatan 33464
Dendang, Kabupaten Belitung
Timur, Propinsi Bangka Belitung -
Indonesia
58,571.69 107° 52' 28,1" 02° 59' 45.0"
Balok (BLE)
Desa Balok, Kecamatan Dendang,
Kabupaten Belitung Timur, Propinsi
Bangka Belitung - Indonesia
59,904.81 107° 54' 53.9" 03° 02' 00.8"
Ladang Jaya (LJE)
Desa Jangkang, Kecamatan
Dendang, Kab. Belitung Timur,
Propinsi Bangka Belitung -
Indonesia
45,052.65 107° 53' 00.2" 02° 36' 43.3"
Sari Bunga (SBE)
Desa Nyuruk, Kecamatan Dendang,
Kabupaten Belitung Timur, Propinsi
Bangka Belitung - Indonesia
38,451.47 107° 52' 11.3" 02° 55' 16.0"
Air Ruak (ARE)
Desa Simpang Tiga Kecamatan
Simpang Renggiang, Kabupaten
Belitung Timur, Propinsi Bangka
Belitung - Indonesia
71,009.69 107° 56' 03.8" 02° 59' 59.9"
47
Annex – C : Certification Assessment Plan
Client: PT. SAHABAT MEWAH DAN MAKMUR (PT.SMM)
Address: Wisma BII 7th Floor Jl. Diponegoro No.18 Medan20152 – Sumatera Utara
MR Name, Pos.: Mr. Ho Chew An, General Manager; Mr. J. Silalahi, RSPO Team
Number of Mills: 1 Number of estate(s): 5 Order No. - Business No. -
Mill(s), Location Estates, Locations
- Jangkang Mill, Kec Jangkang, Belitung Timur - Jangkang Estate, Desa Jangkang
- Balok Estate, Desa Balok
- Ladang Jaya Estate, Desa Ladang Jaya
- Sari Bunga Estate, Desa Sari Bunga
- Air Ruak Estate, Desa Air Ruak
Standard: RSPO P&C (Principles & Criteria) May 2008
Type of audit: Initial Assessment Audit date: 07 to 11.12.2009
Lead Auditor: Hasnop Putra (HAP) Trainee/ Expert: DR. Haryadi (HA) ; Ir. Ujang Sehabudin (US)
Auditor(s): Sudarmadji (SD) Audit days on-site: 5 days
Date /
Time1)
Site / Shift /
Organizational Unit
Auditor
(Abbrev.)
Interview-
partner 2)
Requirements
Day – 1: 07.12.2009 Office and Jangkang Mill
10:00-10:15 Opening meeting Introduction team and fine tune audit plan (if
necessary)
10:15 – 12:00 - Sites: Office and Mill HAP, HA SMM-RSPO
team
- General issues for RSPO certification
assessment
- The SPO documentations and records
- Environmental Policy
- Justification for RSPO principles and
criteria
- Principle – 1: 1.1, 1.2
- Principle - 2: 2.1
- Principle – 3: 3.1
12:00 – 13:30 Break
13:30 – 17:00 Mill Operations:
Jangkang Mill HAP, HA
SMM-RSPO
team
- Quality, SM-K3 and Environmental
Management System
- Involved personnel and responsibilities
- Chemical stores.
- Monitoring and measurement of
environmental performance of waste water
treatment plant.
- Mill operation including inspection of
incoming FFB, FFB transport, road
maintenance and workshops for heavy
trucks, loaders, etc
- Principle - 4 : 4.1, 4.4, 4.7, 4.8
- Principle – 5 : 5.4, 5.6
- Principle – 6 : 6.1, 6.2, 6.3, 6.5, 6.6, 6.8,
6.10, 6.11
- Principle – 8 : 8.1
Days – 1: 07.11.2009 Jangkang Estate
48
Date /
Time1)
Site / Shift /
Organizational Unit
Auditor
(Abbrev.)
Interview-
partner 2)
Requirements
09:00-12:00 Sites: Office and Estate SD, US SMM-RSPO
team
General issues for RSPO certification
assessment
The SPO documentations and records
Environmental Policy
Justification for RSPO principles and
criteria
Principle – 1: 1.1, 1.2
Principle - 2: 2.1
Principle – 3: 3.1
Legal aspects related to SPO management
Involved personnel and responsibilities
Socio economic impacts on the local
population
12:00 -13:30 Break
13:30 – 17:00 Estate operations: Jangkang
Estate SD, US
SMM-RSPO
team
Flora, fauna, ecology and biodiversity
Land and conversion planting
Decreased paraquat use
HCV identification
IPM (Integrated Pest Management)
Replanting and handling of chemical
packaging wastes
Zero burning
Principle - 4 : 4.1, 4.2, 4.3, 4.4, 4.5, 4.6,
4.7, 4.8
Principle – 5 : 5.1, 5.2, 5.5
Principle – 6 : 6.1, 6.2, 6.3, 6.4, 6.5, 6.6,
6.7, 6.8, 6.10, 6.11
Principle – 8 : 8.1
Days – 2: 08.12.2009 Sari Bunga Estate
09:00-12:00 Sites: Office and Estate SD, US SMM-RSPO
team
General issues for RSPO certification
assessment
The SPO documentations and records
Environmental Policy
Justification for RSPO principles and
criteria
Principle – 1: 1.1, 1.2
Principle - 2: 2.1
Principle – 3: 3.1
Legal aspects related to SPO management
Involved personnel and responsibilities
Socio economic impacts on the local
population
12:00 -13:00 Break
49
13:00 -17:30 Estate operations: Sari
Bunga Estate SD, US
SMM-RSPO
team
Flora, fauna, ecology and biodiversity
Land and conversion planting
Decreased paraquat use
HCV identification
IPM (Integrated Pest Management)
Replanting and handling of chemical
packaging wastes
Zero burning
Principle - 4 : 4.1, 4.2, 4.3, 4.4, 4.5, 4.6,
4.7, 4.8
Principle – 5 : 5.1, 5.2, 5.5
Principle – 6 : 6.1, 6.2, 6.3, 6.5, 6.6, 6.7,
6.8, 6.10, 6.11
Principle – 8 : 8.1
Days – 2: 08.12.2009 Air Ruak Estate
09:15-12:00 Sites: Office and Estate HAP, HA SMM-RSPO
team
General issues for RSPO certification
assessment
The SPO documentations and records
Environmental Policy
Justification for RSPO principles and
criteria
Principle – 1: 1.1, 1.2
Principle - 2: 2.1
Principle – 3: 3.1
Legal aspects related to SPO management
Involved personnel and responsibilities
Socio economic impacts on the local
population
12:00 -13:00 Break
13:00 -17:30 Estate operations: Air
Ruak Estate HAP, HA
SMM-RSPO
team
Flora, fauna, ecology and biodiversity
Land and conversion planting
Decreased paraquat use
HCV identification
IPM (Integrated Pest Management)
Replanting and handling of chemical
packaging wastes
Zero burning
Principle - 4 : 4.1, 4.2, 4.3, 4.4, 4.5, 4.6,
4.7, 4.8
Principle – 5 : 5.1, 5.2, 5.5
Principle – 6 : 6.1, 6.2, 6.3, 6.5, 6.6, 6.7,
6.8, 6.10, 6.11
Principle – 8 : 8.1
Days –3 : 09.12.2009 Balok Estate
09:00-09:15 Opening meeting HAP, HA SMM-RSPO
team
Introduction team and fine tune audit plan (if
necessary)
50
09:15-12:00 Sites: Office and Estate HAP, HA SMM-RSPO
team
General issues for RSPO certification
assessment
The SPO documentations and records
Environmental Policy
Justification for RSPO principles and
criteria
Principle – 1: 1.1, 1.2
Principle - 2: 2.1
Principle – 3: 3.1
Legal aspects related to SPO management
Involved personnel and responsibilities
Socio economic impacts on the local
population
12:00 -13:00 Break and pray
13:00 -17:30 Estate operations: Balok
Estate HAP, HA
SMM-RSPO
team
Flora, fauna, ecology and biodiversity
Land and conversion planting
Decreased paraquat use
HCV identification
IPM (Integrated Pest Management)
Replanting and handling of chemical
packaging wastes
Zero burning
Principle - 4 : 4.1, 4.2, 4.3, 4.4, 4.5, 4.6,
4.7, 4.8; Principle – 5 : 5.1, 5.2, 5.5
Principle – 6 : 6.1, 6.2, 6.3, 6.5, 6.6, 6.7,
6.8, 6.10, 6.11
Principle – 8 : 8.1
Days –3 : 09.12.2009 Ladang Jaya Estate
09:15-12:00 Sites: Office and Estate SD, US SMM-RSPO
team
- General issues for RSPO certification
assessment
- The SPO documentations and records
- Environmental Policy
- Justification for RSPO principles and
criteria
- Principle – 1: 1.1, 1.2; Principle - 2: 2.1
- Principle – 3: 3.1
- Legal aspects related to SPO management
- Involved personnel and responsibilities
- Socio economic impacts on the local
population
12:00 -13:00 Break and pray
13:00 -17:30 Estate operations: Jangkang
Estate SD, US
SMM-RSPO
team
- Flora, fauna, ecology and biodiversity
- Land and conversion planting
- Decreased paraquat use
- HCV identification
- IPM (Integrated Pest Management)
- Replanting and handling of chemical
packaging wastes
- Zero burning
- Principle - 4 : 4.1, 4.2, 4.3, 4.4, 4.5, 4.6,
4.7, 4.8; Principle – 5 : 5.1, 5.2, 5.5
- Principle – 6 : 6.1, 6.2, 6.3, 6.5, 6.6, 6.7,
6.8, 6.10, 6.11; Principle – 8 : 8.1
Days –4 : 10.12.2009
51
09:00-12:00 SMM operation SD, US, HAP,
HA
SMM-RSPO
team
- Consultation, Interviews stakeholders
(Indigoes people , NGO, Chief of village)
- Dormitory facilities
- Public facilities
12:00 -13:00 Break and pray
13:00 -17:30 SMM operation SD, US, HAP,
HA
SMM-RSPO
team
- School, Health program,
- Social Responsibility program
- Workshop, Clinic
Days – 5 : 11.12.2009
09:00 -10:30 Preparation audit report on
site
HAP, SD, and
team
10:30 – 11:30 Reporting and presentation
audit finding
HAP, SD, and
team
SMM-RSPO
team Closing Meeting
11:30 Travelling to airport
End of Initial assessment RSPO Certification