RRS Project Photos 10-23-16
-
Upload
ryan-r-smith-eit -
Category
Documents
-
view
10 -
download
0
Transcript of RRS Project Photos 10-23-16
![Page 1: RRS Project Photos 10-23-16](https://reader036.fdocuments.us/reader036/viewer/2022062412/58a286471a28ab891a8b6fc9/html5/thumbnails/1.jpg)
Project Number Project Number and Name YEAR location Work Type Project Description
7842 7842-ANDREWS AFB-AMBULATORY CARE 2015 MD Pile Driving, Shoring, Tiebacks, RakersWorked for Manhattan Construction (used rakers as heel blocks) - installed
piles and lagging and rakers
7852 7852-SWATARA BRIDGE 2014-2015-2016 Middletown, PA Micropiles
Ongoing installation of micropiles (178 approximately remaining to do),
approximately 35 feet deep, challenging drilling through existing concrete
abutments
7873 7873-YORK HOSP EARTH RETN UNDERPIN 2015 York, PA Shoring, TiebacksExpansion for the hospital, shoring to facilitate the building of emergency
department and helipad overhead
7890 7890-JHU 33RD ST PAUL 2015 Baltimore, MD Shoring, Tiebacks, Tiedowns, RakersArmada hoffler was the GC, Mixed use building, we utilized the daily utility
ticket on this project sucessfully
7891 7891 - JHU Pedestrian Bridge 2016 Baltimore, MD Micropiles Installation of 76 micropiles for a pedestrian bridge at JHU
7894 7894-MERRIWEATHER POST PAVILION 2015 Columbia, MD Shoring Cantilever shoring
7897 7897-VILLAGE AT ORCHARD-EARTH RET 2015 Winchester, VA Shoring, Raker Raker and shoring for addition to the charles village retirement community
7898 7898-JHU CHARLES VILLAGE 2015 Baltimore, MD TiedownsPart of Armada hoffler project, 3 tiedowns were installed (100 Kips capacity)
drilled 40 feet into rock (per engineer they would not ease up on this, we tried)
7901 7901-ARLINGTON NATL CEMETARY 2015 Arlington, VA Shoring, TiebacksTiebacks for columbarium - addition to the cemetery. Tiered wall system, 2
walls were built and piling crew drove all piling
7903 7903-SR 180 (129) 2015-2016 Williamsport, PA Soil NailsSoil nails through gabion baskets for hawbaker construction. Challenging
project, nails were 23 feet drilled into fill and clay soils
7904 7904-BRETHREN VILLAGE SHORT TERM 2015 Lancaster, PA UnderpinningUnderpinning design and management for WCI (norm adams and Jeremiah) -
matt beihl project manager. We designed and oversaw the construction
7909 7909 - VA 688 Martins Construction 2016 Markham, VA Shoring, TiebacksPhased shoring for Martins construction. Tiebacks, shoring and attachment to
abutments
PROJECT Project Manager – Ryan Smith
![Page 2: RRS Project Photos 10-23-16](https://reader036.fdocuments.us/reader036/viewer/2022062412/58a286471a28ab891a8b6fc9/html5/thumbnails/2.jpg)
7842 – Andrews Airforce Base (2015 Andrews AFB, MD)Project Manager – Ryan Smith
Pile Driving, Rakers, Tiebacks, H-Pile Heel Blocks, Timber Lagging
![Page 3: RRS Project Photos 10-23-16](https://reader036.fdocuments.us/reader036/viewer/2022062412/58a286471a28ab891a8b6fc9/html5/thumbnails/3.jpg)
7852 – Swatara Creek Bridge (2014-2016 Middletown, PA) Project Manager – Ryan Smith
Micropiles (#14 Bar) – Mostly battered working for Turnpike
![Page 4: RRS Project Photos 10-23-16](https://reader036.fdocuments.us/reader036/viewer/2022062412/58a286471a28ab891a8b6fc9/html5/thumbnails/4.jpg)
7873 – York Hospital (2015 York, PA)Project Manager – Ryan Smith
Cantilever Shoring, Tiebacks, Bracing
![Page 5: RRS Project Photos 10-23-16](https://reader036.fdocuments.us/reader036/viewer/2022062412/58a286471a28ab891a8b6fc9/html5/thumbnails/5.jpg)
7890 – JHU 33rd & St. Paul Street (2015 Baltimore, MD) Project Manager – Ryan Smith
Tiebacks, Cantilever Shoring, Rakers, Wales, Heel Blocks
![Page 6: RRS Project Photos 10-23-16](https://reader036.fdocuments.us/reader036/viewer/2022062412/58a286471a28ab891a8b6fc9/html5/thumbnails/6.jpg)
7894 – Merriweather Post Pavilion (2015 Columbia, MD)Project Manager – Ryan Smith
Cantilever Shoring, Tiebacks, Bracing – Worked for Whiting Turner
![Page 7: RRS Project Photos 10-23-16](https://reader036.fdocuments.us/reader036/viewer/2022062412/58a286471a28ab891a8b6fc9/html5/thumbnails/7.jpg)
7898 – JHU Charles Village (2015 Baltimore, MD)Project Manager – Ryan Smith
(3) Permanent Tiedowns –
Worked for Atlantic Caisson
for the work 40 feet deep
completely in compotent Rock
![Page 8: RRS Project Photos 10-23-16](https://reader036.fdocuments.us/reader036/viewer/2022062412/58a286471a28ab891a8b6fc9/html5/thumbnails/8.jpg)
7901 – Arlington National Cemetery (2015-2016 Arlington, VA)Project Manager – Ryan Smith
Pile Driving (Team did great!), Tiebacks in Potomac clay, tiered wall
System in soft soils for new columbarium
![Page 9: RRS Project Photos 10-23-16](https://reader036.fdocuments.us/reader036/viewer/2022062412/58a286471a28ab891a8b6fc9/html5/thumbnails/9.jpg)
7903 – SR180 Soil Nails 2015-2016 Williamsport, PAProject Manager – Ryan Smith
Very challenging job – 90% complete
Soil Nailing being installed through existing
Gabion Baskets (Bob Horst – Superintendant)
![Page 10: RRS Project Photos 10-23-16](https://reader036.fdocuments.us/reader036/viewer/2022062412/58a286471a28ab891a8b6fc9/html5/thumbnails/10.jpg)
Bob and crew enjoying Sticky Bunns during morning safety
Review onsite
Soil nail headed shear studs
With 10”x10” bearing plates
7903 – SR180 Soil Nails 2015-2016 Williamsport, PAProject Manager – Ryan Smith
![Page 11: RRS Project Photos 10-23-16](https://reader036.fdocuments.us/reader036/viewer/2022062412/58a286471a28ab891a8b6fc9/html5/thumbnails/11.jpg)
7909 – VA 688 Martins Construction (2016 Markham VA)Project Manager – Ryan Smith
Phased Shoring of 2 Bridge culvert replacements for
Martins Construction in Markham VA