RPC efficiency in RAT
-
Upload
regina-gilmore -
Category
Documents
-
view
24 -
download
0
description
Transcript of RPC efficiency in RAT
13 March 2007 G. Rakness (UCLA)1
RPC efficiency in RAT
Greg RaknessUniversity of California, Los Angeles
UCLA phone meeting13 March 2007
13 March 2007 G. Rakness (UCLA)2
Tracking through the numbers, making cuts…• MTCC phase II Run 4188: 2.5M triggers
• events with “something” in ME1 = 0.5M
• events with “something” in ME+1/3/30 = 53k
Raw chamber multiplicity…
Occupancy in ring ME+1/3…
N.B. “something” = ALCT, CLCT, LCT, RecHit, or segment…
13 March 2007 G. Rakness (UCLA)3
Tracking through the numbers, making cuts…
Occupancy in ring ME+2/2…
• events with exactly 2 chambers with “something” (including ME+1/3/30) = 26k
• events with something in ME+1/3/30 and ME+2/2/30 = 12.6k
• events with exactly one segment in both ME+1/3/30 and ME+2/2/30 = 10.5k
Segment multiplicity in ME+2/2/30…
13 March 2007 G. Rakness (UCLA)4
Illumination histograms for events with exactly 1 segment in ME+1/3/30 and ME+2/2/30
ME+1/3/30 ME+2/2/30
Things to note…
• edge of ME+1/3/30 overlaps with HV division in ME+2/2/30
• HV divisions overlap
• ME+1/3/30 “carves” out region in ME+2/2/30
Distributions of average RecHit positions:
13 March 2007 G. Rakness (UCLA)5
Interpolate position at RPCUse average value of RecHits to draw straight line between ME+1 and ME+2…
Y vs. X at Z = 712cm
Things to note:
• HV divisions in CSC project into RPC
• (large region where) CSC is active is 0.725 < < 0.75
13 March 2007 G. Rakness (UCLA)6
position with RPC bit in RATProject from ME+1 to ME+2, and require RPC data in RAT…
Y vs. X at Z = 712cm
Things to note:
• HV divisions appear to be different in RPC than in CSC…
• (large region where) RPC is active is 0.74 < < 0.75
13 March 2007 G. Rakness (UCLA)7
95
15 3100
15
32
64
A1 A2
B1 B2
C1 C2
Chamber Strip
LB
Inp
ut
Cha
nnel
A1 A2
B1 B2
C1 C2
Connector Boxstrip 0 strip 31
Recall: RPC Endcap Link Board Mapping
K. Bunkowski (Warsaw)
Configuration of LB in MTCC phase II was found to have a bug…
OR of 4 bits instead of 8
13 March 2007 G. Rakness (UCLA)8
RPC efficiency in RAT
= -1.28 = -1.17
= 0.75
= 0.725
= 0.75
= 0.74
CSC HV segment fiducial volume constraints:
1107/2068 = 54%
RPC HV segment fiducial volume constraints:
797/805 = 90%
…Efficiency depends on fiducial volume selected…
Significantly larger value within RPC HV segment
13 March 2007 G. Rakness (UCLA)9
Recall: RPC LB timing in TMB FIFOEstimates not conclusive…
Need to make measurement of relative latency between RPC LB and CSC pretrigger
Propose to:
1. Minimize programmable delay in RPC LB data path
2. Reduce time for RPC LB data decoding in TMB firmware
3. Use programmable delay in TMB to time in both sides of RPC LB data peak RPC data are late into TMB FIFO
ALCT*CLCT pretrigger arrives here
Time bin of RPC data (bx)
• RPC pad multiplicity 1