ROYAL GOVERNMENT OF BHUTAN ICP BUMPAGANG · PDF fileicp bumpagang project chukha bhutan...
-
Upload
nguyenkhue -
Category
Documents
-
view
235 -
download
7
Transcript of ROYAL GOVERNMENT OF BHUTAN ICP BUMPAGANG · PDF fileicp bumpagang project chukha bhutan...
ROYAL GOVERNMENT OF BHUTANICP BUMPAGANG PROJECT
CHUKHA BHUTAN
ARCHITECTURAL DRAWINGS&
WATER SUPPLY & SEWERAGE SYSTEM
TW 1855+1.5
1855+1
1855
1855 1855
STORM WATER LINE
VOLLEYBALL COURT
PAVED PARKING
PAVED PARKING
PAVED PARKING
PAVED PARKING
GATE
ASPHALTED ROAD
IMMG QUARTER
POLICE QUARTERPOLICE QUARTER
1855
1855
UP
BE
DR
OO
M 1
BE
DR
OO
M 2
KIT
CH
EN
LIV
IN
G R
OO
M
TO
ILE
T
D1
D1
D1
D1
D D
D2 D2
D2 D2
W W
W W
RW
RW RW
RW
DW DW
V1 V1
V V
UP
BE
DR
OO
M 1
BE
DR
OO
M 2
KIT
CH
EN
LIV
IN
G R
OO
M
TO
ILE
T
D1
D1
D1
D1
D D
D2 D2
D2 D2
W W
W W
RW
RW RW
RW
DW DW
V1 V1
V V
bedroom
living room
kitchen
powder room
closet
wash basin
shower
D D
D2 D2
D2D2
D D
W
W
W
WW
W
WW
WW1 W1
V1
V1
V1
V1
V1
V1
V1
V1
W
OFFICER QUARTER
W
1855
1855
1855
1855
TW 1855+3
TW 1855+4
TW 1855+4
TW 1855+3
TW 1855+3
TW 1855+2
TW 1855+.5
RW1
ROYAL GOVERNMENT OF BHUTANMINISTRY OF WORKS AND HUMAN SETTLEMENT
DEPARTMENT OF ENGINEERING SERVICESENGINEERING SERVICES DIVISION
ARCHITECTURE SECTIONP.O.BOX-129THIMPHU
DATEREV. DESIGNED & DRAWN BY: CHECKED BY: APPROVED BY:
Chief Engineer, ESD
DRAWING NO:
Tshering Norbu, Sr. Architect Executive Architect, ESD
NOTES:1. Drawings are not to be scaled of and measurements shown in drawings are to be
followed.2. Designer's responsibility shall remain limited to safe and sound structural design
by this drawings and shall not be remain responsible for:3. Safety of the construction worker/any personnel at works site during construction.4. Correctness/safety of any temporary structure, scaffolding, shuttering, centering
erected at site and any injury to any personnel arising out of any accident.
ARCH-01
DATE:
PROJECT:
SCALE:
HOUSING COMPLEX FOR INTEGRATED CHECK POINT, BUMPAGANG5. Any Accident occurring due to construction elements not designed by
us.6. Accident occurring due to premature de shuttering, faulty/sunstandard
construction material or workmanship/faulty construction procedure.7. All structural concrete should be weigh batched, machine mixed &
mechanically vibrated.8. Any discrepancy in the drawings should be brought to the notice of
designer before construction.
20/07/2017
1:400
PROPOSED STRUCTURE: DRAWING TITLE:SITE PLAN
3x40 X 60 M.S RECTANGULARHOLLOW SECTION
80mm THK. PCC SILL
3x40 X 60 M.S RECTANGULARHOLLOW SECTION
3mm THK. MS PLATE HORZINGWELDED TO THE MS FRAME
PLASTER PEM & DUNG
RCC BOH
PLASTER ZANGSHING
15 mm THK.CEMENT PLASTER (1:4)
250 MM THK. EXTERNALBRICK WALL
6mm CLEAR GLASS
3MM M.S PLATE TSEGAY
A A'
PLASTER ZANGSHING
RCC BOH
PLASTER PEM & DUNG
3mm THK. MS PLATE HORZINGWELDED TO THE MS FRAME
3x40 X 60 M.S RECTANGULARHOLLOW SECTION VERTICAL
FRAME
3x40 X 60 M.S RECTANGULARHOLLOW SECTION BOTTOM
FRAME
ROYAL GOVERNMENT OF BHUTANMINISTRY OF WORKS AND HUMAN SETTLEMENT
DEPARTMENT OF ENGINEERING SERVICESENGINEERING SERVICES DIVISION
ARCHITECTURE SECTIONP.O.BOX-129THIMPHU
DATEREV. DESIGNED & DRAWN BY: CHECKED BY: APPROVED BY:
Chief Engineer, ESD
DRAWING NO:
Tshering Norbu, Sr. Architect Executive Architect, ESD
NOTES:1. Drawings are not to be scaled of and measureme1:20 shown in drawings are to be
followed.2. Designer's responsibility shall remain limited to safe and sound structural design
by this drawings and shall not be remain responsible for:3. Safety of the construction worker/any personnel at works site during construction.4. Correctness/safety of any temporary structure, scaffolding, shuttering, centering
erected at site and any injury to any personnel arising out of any accident.
ARCH/W-09
DATE:
PROJECT:
SCALE:
HOUSING COMPLEX FOR INTEGRATED CHECK POINT, BUMPAGANG5. Any Accident occurring due to construction eleme1:20 not designed
by us.6. Accident occurring due to premature de shuttering, faulty/sunstandard
construction material or workmanship/faulty construction procedure.7. All structural concrete should be weigh batched, machine mixed &
mechanically vibrated.8. Any discrepancy in the drawings should be brought to the notice of
designer before construction.
20/07/2017
1:20
PROPOSED STRUCTURE: DRAWING TITLE:OFFICER'S QUARTER WINDOW V1 DETAILS
3x40 X 60 M.S RECTANGULARHOLLOW SECTION
80mm THK. PCC SILL
3x40 X 60 M.S RECTANGULARHOLLOW SECTION
3mm THK. MS PLATE HORZINGWELDED TO THE MS FRAME
PLASTER PEM & DUNG
RCC BOH
PLASTER ZANGSHING
15 mm THK.CEMENT PLASTER (1:4)
250 MM THK. EXTERNALBRICK WALL
3MM M.S PLATE TSEGAY
PLASTER ZANGSHING
RCC BOH
PLASTER PEM & DUNG
3mm THK. MS PLATE HORZINGWELDED TO THE MS FRAME
A A'
ROYAL GOVERNMENT OF BHUTANMINISTRY OF WORKS AND HUMAN SETTLEMENT
DEPARTMENT OF ENGINEERING SERVICESENGINEERING SERVICES DIVISION
ARCHITECTURE SECTIONP.O.BOX-129THIMPHU
DATEREV. DESIGNED & DRAWN BY: CHECKED BY: APPROVED BY:
Chief Engineer, ESD
DRAWING NO:
Tshering Norbu, Sr. Architect Executive Architect, ESD
NOTES:1. Drawings are not to be scaled of and measureme1:20 shown in drawings are to be
followed.2. Designer's responsibility shall remain limited to safe and sound structural design
by this drawings and shall not be remain responsible for:3. Safety of the construction worker/any personnel at works site during construction.4. Correctness/safety of any temporary structure, scaffolding, shuttering, centering
erected at site and any injury to any personnel arising out of any accident.
ARCH/W-10
DATE:
PROJECT:
SCALE:
HOUSING COMPLEX FOR INTEGRATED CHECK POINT, BUMPAGANG5. Any Accident occurring due to construction eleme1:20 not designed
by us.6. Accident occurring due to premature de shuttering, faulty/sunstandard
construction material or workmanship/faulty construction procedure.7. All structural concrete should be weigh batched, machine mixed &
mechanically vibrated.8. Any discrepancy in the drawings should be brought to the notice of
designer before construction.
20/07/2017
1:20
PROPOSED STRUCTURE: DRAWING TITLE:OFFICER'S QUARTER WINDOW V DETAILS
6mm CLEAR GLASS
PLASTER ZANGSHING
RCC BOH
PLASTER PEM & DUNG
3x40 X 60 M.S RECTANGULARHOLLOW SECTION
3x40 X 60 M.S RECTANGULARHOLLOW SECTION VERTICAL
FRAME
PLASTER PEM & DUNG
RCC BOH
PLASTER ZANGSHING
A'A
ROYAL GOVERNMENT OF BHUTANMINISTRY OF WORKS AND HUMAN SETTLEMENT
DEPARTMENT OF ENGINEERING SERVICESENGINEERING SERVICES DIVISION
ARCHITECTURE SECTIONP.O.BOX-129THIMPHU
DATEREV. DESIGNED & DRAWN BY: CHECKED BY: APPROVED BY:
Chief Engineer, ESD
DRAWING NO:
Tshering Norbu, Sr. Architect Executive Architect, ESD
NOTES:1. Drawings are not to be scaled of and measureme1:20 shown in drawings are to be
followed.2. Designer's responsibility shall remain limited to safe and sound structural design
by this drawings and shall not be remain responsible for:3. Safety of the construction worker/any personnel at works site during construction.4. Correctness/safety of any temporary structure, scaffolding, shuttering, centering
erected at site and any injury to any personnel arising out of any accident.
ARCH/W-08
DATE:
PROJECT:
SCALE:
HOUSING COMPLEX FOR INTEGRATED CHECK POINT, BUMPAGANG5. Any Accident occurring due to construction eleme1:20 not designed
by us.6. Accident occurring due to premature de shuttering, faulty/sunstandard
construction material or workmanship/faulty construction procedure.7. All structural concrete should be weigh batched, machine mixed &
mechanically vibrated.8. Any discrepancy in the drawings should be brought to the notice of
designer before construction.
20/07/2017
1:20
PROPOSED STRUCTURE: DRAWING TITLE:OFFICER'S QUARTER WINDOW DW DETAILS
3x40 X 60 M.S RECTANGULARHOLLOW SECTION BOTTOM
FRAME
3x40 X 60 M.S RECTANGULARHOLLOW SECTION VERTICAL
FRAME
3mm THK. MS PLATE HORZINGWELDED TO THE MS FRAME
PLASTER PEM & DUNG
RCC BOH
PLASTER ZANGSHING
A'A
3MM M.S PLATE TSEGAY
6mm CLEAR GLASS
250 MM THK. EXTERNALBRICK WALL
15 mm THK.CEMENT PLASTER (1:4)
PLASTER ZANGSHING
RCC BOH
PLASTER PEM & DUNG
3mm THK. MS PLATE HORZINGWELDED TO THE MS FRAME
3x40 X 60 M.S RECTANGULARHOLLOW SECTION
80mm THK. PCC SILL
3x40 X 60 M.S RECTANGULARHOLLOW SECTION
ROYAL GOVERNMENT OF BHUTANMINISTRY OF WORKS AND HUMAN SETTLEMENT
DEPARTMENT OF ENGINEERING SERVICESENGINEERING SERVICES DIVISION
ARCHITECTURE SECTIONP.O.BOX-129THIMPHU
DATEREV. DESIGNED & DRAWN BY: CHECKED BY: APPROVED BY:
Chief Engineer, ESD
DRAWING NO:
Tshering Norbu, Sr. Architect Executive Architect, ESD
NOTES:1. Drawings are not to be scaled of and measureme1:20 shown in drawings are to be
followed.2. Designer's responsibility shall remain limited to safe and sound structural design
by this drawings and shall not be remain responsible for:3. Safety of the construction worker/any personnel at works site during construction.4. Correctness/safety of any temporary structure, scaffolding, shuttering, centering
erected at site and any injury to any personnel arising out of any accident.
ARCH/W-07
DATE:
PROJECT:
SCALE:
HOUSING COMPLEX FOR INTEGRATED CHECK POINT, BUMPAGANG5. Any Accident occurring due to construction eleme1:20 not designed
by us.6. Accident occurring due to premature de shuttering, faulty/sunstandard
construction material or workmanship/faulty construction procedure.7. All structural concrete should be weigh batched, machine mixed &
mechanically vibrated.8. Any discrepancy in the drawings should be brought to the notice of
designer before construction.
20/07/2017
1:20
PROPOSED STRUCTURE: DRAWING TITLE:OFFICER'S QUARTER WINDOW W2 DETAILS
A'A
3MM M.S PLATE TSEGAY
6mm CLEAR GLASS
250 MM THK. EXTERNALBRICK WALL
15 mm THK.CEMENT PLASTER (1:4)
PLASTER ZANGSHING
RCC BOH
PLASTER PEM & DUNG
3mm THK. MS PLATE HORZINGWELDED TO THE MS FRAME
3x40 X 60 M.S RECTANGULARHOLLOW SECTION
80mm THK. PCC SILL
3x40 X 60 M.S RECTANGULARHOLLOW SECTION
3x40 X 60 M.S RECTANGULARHOLLOW SECTION VERTICAL
FRAME
3mm THK. MS PLATE HORZINGWELDED TO THE MS FRAME
PLASTER PEM & DUNG
RCC BOH
PLASTER ZANGSHING
ROYAL GOVERNMENT OF BHUTANMINISTRY OF WORKS AND HUMAN SETTLEMENT
DEPARTMENT OF ENGINEERING SERVICESENGINEERING SERVICES DIVISION
ARCHITECTURE SECTIONP.O.BOX-129THIMPHU
DATEREV. DESIGNED & DRAWN BY: CHECKED BY: APPROVED BY:
Chief Engineer, ESD
DRAWING NO:
Tshering Norbu, Sr. Architect Executive Architect, ESD
NOTES:1. Drawings are not to be scaled of and measureme1:20 shown in drawings are to be
followed.2. Designer's responsibility shall remain limited to safe and sound structural design
by this drawings and shall not be remain responsible for:3. Safety of the construction worker/any personnel at works site during construction.4. Correctness/safety of any temporary structure, scaffolding, shuttering, centering
erected at site and any injury to any personnel arising out of any accident.
ARCH/W-06
DATE:
PROJECT:
SCALE:
HOUSING COMPLEX FOR INTEGRATED CHECK POINT, BUMPAGANG5. Any Accident occurring due to construction eleme1:20 not designed
by us.6. Accident occurring due to premature de shuttering, faulty/sunstandard
construction material or workmanship/faulty construction procedure.7. All structural concrete should be weigh batched, machine mixed &
mechanically vibrated.8. Any discrepancy in the drawings should be brought to the notice of
designer before construction.
20/07/2017
1:20
PROPOSED STRUCTURE: DRAWING TITLE:OFFICER'S QUARTER WINDOW W1 DETAILS
3x40 X 60 M.S RECTANGULARHOLLOW SECTION BOTTOM
FRAME
3x40 X 60 M.S RECTANGULARHOLLOW SECTION VERTICAL
FRAME
3mm THK. MS PLATE HORZINGWELDED TO THE MS FRAME
PLASTER PEM & DUNG
RCC BOH
PLASTER ZANGSHING
A'A
3MM M.S PLATE TSEGAY
6mm CLEAR GLASS
250 MM THK. EXTERNALBRICK WALL
15 mm THK.CEMENT PLASTER (1:4)
PLASTER ZANGSHING
RCC BOH
PLASTER PEM & DUNG
3mm THK. MS PLATE HORZINGWELDED TO THE MS FRAME
3x40 X 60 M.S RECTANGULARHOLLOW SECTION
80mm THK. PCC SILL
3x40 X 60 M.S RECTANGULARHOLLOW SECTION
ROYAL GOVERNMENT OF BHUTANMINISTRY OF WORKS AND HUMAN SETTLEMENT
DEPARTMENT OF ENGINEERING SERVICESENGINEERING SERVICES DIVISION
ARCHITECTURE SECTIONP.O.BOX-129THIMPHU
DATEREV. DESIGNED & DRAWN BY: CHECKED BY: APPROVED BY:
Chief Engineer, ESD
DRAWING NO:
Tshering Norbu, Sr. Architect Executive Architect, ESD
NOTES:1. Drawings are not to be scaled of and measureme1:20 shown in drawings are to be
followed.2. Designer's responsibility shall remain limited to safe and sound structural design
by this drawings and shall not be remain responsible for:3. Safety of the construction worker/any personnel at works site during construction.4. Correctness/safety of any temporary structure, scaffolding, shuttering, centering
erected at site and any injury to any personnel arising out of any accident.
ARCH/W-05
DATE:
PROJECT:
SCALE:
HOUSING COMPLEX FOR INTEGRATED CHECK POINT, BUMPAGANG5. Any Accident occurring due to construction eleme1:20 not designed
by us.6. Accident occurring due to premature de shuttering, faulty/sunstandard
construction material or workmanship/faulty construction procedure.7. All structural concrete should be weigh batched, machine mixed &
mechanically vibrated.8. Any discrepancy in the drawings should be brought to the notice of
designer before construction.
20/07/2017
1:20
PROPOSED STRUCTURE: DRAWING TITLE:OFFICER'S QUARTER WINDOW W DETAILS
3x40 X 60 M.S RECTANGULARHOLLOW SECTION BOTTOM
FRAME
3x40 X 60 M.S RECTANGULARHOLLOW SECTION VERTICAL
FRAME
3mm THK. MS PLATE HORZINGWELDED TO THE MS FRAME
A'A
3MM M.S PLATE TSEGAY
6mm CLEAR GLASS
250 MM THK. EXTERNALBRICK WALL
15 mm THK.CEMENT PLASTER (1:4)
3mm THK. MS PLATE HORZINGWELDED TO THE MS FRAME
3x40 X 60 M.S RECTANGULARHOLLOW SECTION
ROYAL GOVERNMENT OF BHUTANMINISTRY OF WORKS AND HUMAN SETTLEMENT
DEPARTMENT OF ENGINEERING SERVICESENGINEERING SERVICES DIVISION
ARCHITECTURE SECTIONP.O.BOX-129THIMPHU
DATEREV. DESIGNED & DRAWN BY: CHECKED BY: APPROVED BY:
Chief Engineer, ESD
DRAWING NO:
Tshering Norbu, Sr. Architect Executive Architect, ESD
NOTES:1. Drawings are not to be scaled of and measureme1:20 shown in drawings are to be
followed.2. Designer's responsibility shall remain limited to safe and sound structural design
by this drawings and shall not be remain responsible for:3. Safety of the construction worker/any personnel at works site during construction.4. Correctness/safety of any temporary structure, scaffolding, shuttering, centering
erected at site and any injury to any personnel arising out of any accident.
ARCH/W-04
DATE:
PROJECT:
SCALE:
HOUSING COMPLEX FOR INTEGRATED CHECK POINT, BUMPAGANG5. Any Accident occurring due to construction eleme1:20 not designed
by us.6. Accident occurring due to premature de shuttering, faulty/sunstandard
construction material or workmanship/faulty construction procedure.7. All structural concrete should be weigh batched, machine mixed &
mechanically vibrated.8. Any discrepancy in the drawings should be brought to the notice of
designer before construction.
20/07/2017
1:20
PROPOSED STRUCTURE: DRAWING TITLE:OFFICER'S QUARTER WINDOW RW2 DETAILS
A'A
3x40 X 60 M.S RECTANGULARHOLLOW SECTION VERTICAL
FRAME
3mm THK. MS PLATE HORZINGWELDED TO THE MS FRAME
PLASTER PEM & DUNG
3MM M.S PLATE TSEGAY
6mm CLEAR GLASS
250 MM THK. EXTERNALBRICK WALL
15 mm THK.CEMENT PLASTER (1:4)
3mm THK. MS PLATE HORZINGWELDED TO THE MS FRAME
3x40 X 60 M.S RECTANGULARHOLLOW SECTION
ROYAL GOVERNMENT OF BHUTANMINISTRY OF WORKS AND HUMAN SETTLEMENT
DEPARTMENT OF ENGINEERING SERVICESENGINEERING SERVICES DIVISION
ARCHITECTURE SECTIONP.O.BOX-129THIMPHU
DATEREV. DESIGNED & DRAWN BY: CHECKED BY: APPROVED BY:
Chief Engineer, ESD
DRAWING NO:
Tshering Norbu, Sr. Architect Executive Architect, ESD
NOTES:1. Drawings are not to be scaled of and measureme1:20 shown in drawings are to be
followed.2. Designer's responsibility shall remain limited to safe and sound structural design
by this drawings and shall not be remain responsible for:3. Safety of the construction worker/any personnel at works site during construction.4. Correctness/safety of any temporary structure, scaffolding, shuttering, centering
erected at site and any injury to any personnel arising out of any accident.
ARCH/W-03
DATE:
PROJECT:
SCALE:
HOUSING COMPLEX FOR INTEGRATED CHECK POINT, BUMPAGANG5. Any Accident occurring due to construction eleme1:20 not designed
by us.6. Accident occurring due to premature de shuttering, faulty/sunstandard
construction material or workmanship/faulty construction procedure.7. All structural concrete should be weigh batched, machine mixed &
mechanically vibrated.8. Any discrepancy in the drawings should be brought to the notice of
designer before construction.
20/07/2017
1:20
PROPOSED STRUCTURE: DRAWING TITLE:OFFICER'S QUARTER WINDOW RW1 DETAILS
3x40 X 60 M.S RECTANGULARHOLLOW SECTION BOTTOM
FRAME
3x40 X 60 M.S RECTANGULARHOLLOW SECTION VERTICAL
FRAME
3mm THK. MS PLATE HORZINGWELDED TO THE MS FRAME
A'A
3MM M.S PLATE TSEGAY
6mm CLEAR GLASS
250 MM THK. EXTERNALBRICK WALL
15 mm THK.CEMENT PLASTER (1:4)
3mm THK. MS PLATE HORZINGWELDED TO THE MS FRAME
3x40 X 60 M.S RECTANGULARHOLLOW SECTION
ROYAL GOVERNMENT OF BHUTANMINISTRY OF WORKS AND HUMAN SETTLEMENT
DEPARTMENT OF ENGINEERING SERVICESENGINEERING SERVICES DIVISION
ARCHITECTURE SECTIONP.O.BOX-129THIMPHU
DATEREV. DESIGNED & DRAWN BY: CHECKED BY: APPROVED BY:
Chief Engineer, ESD
DRAWING NO:
Tshering Norbu, Sr. Architect Executive Architect, ESD
NOTES:1. Drawings are not to be scaled of and measureme1:20 shown in drawings are to be
followed.2. Designer's responsibility shall remain limited to safe and sound structural design
by this drawings and shall not be remain responsible for:3. Safety of the construction worker/any personnel at works site during construction.4. Correctness/safety of any temporary structure, scaffolding, shuttering, centering
erected at site and any injury to any personnel arising out of any accident.
ARCH/W-02
DATE:
PROJECT:
SCALE:
HOUSING COMPLEX FOR INTEGRATED CHECK POINT, BUMPAGANG5. Any Accident occurring due to construction eleme1:20 not designed
by us.6. Accident occurring due to premature de shuttering, faulty/sunstandard
construction material or workmanship/faulty construction procedure.7. All structural concrete should be weigh batched, machine mixed &
mechanically vibrated.8. Any discrepancy in the drawings should be brought to the notice of
designer before construction.
20/07/2017
1:20
PROPOSED STRUCTURE: DRAWING TITLE:OFFICER'S QUARTER WINDOW RW DETAILS
08
44
18
TOTAL
OFFICER
00
06
04
IMMIG.
04
10
06
POLICE=2X
02=04021002500DW
14=2845016502500W
02.
ALUMINUM WINDOWS
WINDOW SCHEDULE
REMARKS
04=0875017352500RW01.
NO.CILL
HEIGHTWIDTHDIMENSIONS(MM)
ITEMSL NO.
10020004=08100011001100V
04.
28041604=08100011001100V1
05.
07.
02000200=0045016502500W1
02000200=0075017352500RW1
08.
09.
03. 02020000=0075017352100RW2
06. 04020200=0045016502100W2
ALUMINUM WINDOWS
ALUMINUM WINDOWS
ALUMINUM WINDOWS
ALUMINUM WINDOWS
ALUMINUM WINDOWS
ALUMINUM WINDOWS
ALUMINUM WINDOWS
ALUMINUM WINDOWS
02020000=00002375600L109. PVC LOUVRES
ROYAL GOVERNMENT OF BHUTANMINISTRY OF WORKS AND HUMAN SETTLEMENT
DEPARTMENT OF ENGINEERING SERVICESENGINEERING SERVICES DIVISION
ARCHITECTURE SECTIONP.O.BOX-129THIMPHU
DATEREV. DESIGNED & DRAWN BY: CHECKED BY: APPROVED BY:
Chief Engineer, ESD
DRAWING NO:
Tshering Norbu, Sr. Architect Executive Architect, ESD
NOTES:1. Drawings are not to be scaled of and measureme1:20 shown in drawings are to be
followed.2. Designer's responsibility shall remain limited to safe and sound structural design
by this drawings and shall not be remain responsible for:3. Safety of the construction worker/any personnel at works site during construction.4. Correctness/safety of any temporary structure, scaffolding, shuttering, centering
erected at site and any injury to any personnel arising out of any accident.
ARCH/W-01
DATE:
PROJECT:
SCALE:
HOUSING COMPLEX FOR INTEGRATED CHECK POINT, BUMPAGANG5. Any Accident occurring due to construction eleme1:20 not designed
by us.6. Accident occurring due to premature de shuttering, faulty/sunstandard
construction material or workmanship/faulty construction procedure.7. All structural concrete should be weigh batched, machine mixed &
mechanically vibrated.8. Any discrepancy in the drawings should be brought to the notice of
designer before construction.
20/07/2017
NTS
PROPOSED STRUCTURE: DRAWING TITLE:OFFICER'S QUARTER WINDOW SCHEDULES
ROYAL GOVERNMENT OF BHUTANICP BUMPAGANG PROJECT
CHUKHA BHUTAN
ARCHITECTURAL DRAWINGS
WINDOW DETAILS
FFL
75x100 Wooden Door Frame
40x100 Shutter Frame
30 MM Thk. Wooden Panel
SECTION BB' (D3)
INSIDEOUTSIDE
40x100 Lock Rail
40x120 Bottom Rail
30 MM Thk. Wooden Panel
75x100 Timber Frame
40x100 Timber Shutter Frame
30mm Thk Wooden Panel
ELEVATION (D3)
SECTION AA' (D3)
RCC Lintel
OUTSIDE
INSIDE
D3
ROYAL GOVERNMENT OF BHUTANMINISTRY OF WORKS AND HUMAN SETTLEMENT
DEPARTMENT OF ENGINEERING SERVICESENGINEERING SERVICES DIVISION
ARCHITECTURE SECTIONP.O.BOX-129THIMPHU
DATEREV. DESIGNED & DRAWN BY: CHECKED BY: APPROVED BY:
Chief Engineer, ESD
DRAWING NO:
Tshering Norbu, Sr. Architect Executive Architect, ESD
NOTES:1. Drawings are not to be scaled of and measurements shown in drawings are to be
followed.2. Designer's responsibility shall remain limited to safe and sound structural design
by this drawings and shall not be remain responsible for:3. Safety of the construction worker/any personnel at works site during construction.4. Correctness/safety of any temporary structure, scaffolding, shuttering, centering
erected at site and any injury to any personnel arising out of any accident.
ARCH/D-05
DATE:
PROJECT:
SCALE:
HOUSING COMPLEX FOR INTEGRATED CHECK POINT, BUMPAGANG5. Any Accident occurring due to construction elements not designed by
us.6. Accident occurring due to premature de shuttering, faulty/sunstandard
construction material or workmanship/faulty construction procedure.7. All structural concrete should be weigh batched, machine mixed &
mechanically vibrated.8. Any discrepancy in the drawings should be brought to the notice of
designer before construction.
20/07/2017
1:20
PROPOSED STRUCTURE: DRAWING TITLE:DOOR D3 DETAILS
FFL
75x100 Wooden Door Frame
40x100 Shutter Frame
30 MM Thk. Wooden Panel
SECTION BB' (D2)
INSIDEOUTSIDE
40x100 Lock Rail
40x120 Bottom Rail
30 MM Thk. Wooden Panel
75x100 Timber Frame
40x100 Timber Shutter Frame
30mm Thk Wooden Panel
ELEVATION (D2)
SECTION AA' (D2)
RCC Lintel
OUTSIDE
INSIDE
D2
ROYAL GOVERNMENT OF BHUTANMINISTRY OF WORKS AND HUMAN SETTLEMENT
DEPARTMENT OF ENGINEERING SERVICESENGINEERING SERVICES DIVISION
ARCHITECTURE SECTIONP.O.BOX-129THIMPHU
DATEREV. DESIGNED & DRAWN BY: CHECKED BY: APPROVED BY:
Chief Engineer, ESD
DRAWING NO:
Tshering Norbu, Sr. Architect Executive Architect, ESD
NOTES:1. Drawings are not to be scaled of and measurements shown in drawings are to be
followed.2. Designer's responsibility shall remain limited to safe and sound structural design
by this drawings and shall not be remain responsible for:3. Safety of the construction worker/any personnel at works site during construction.4. Correctness/safety of any temporary structure, scaffolding, shuttering, centering
erected at site and any injury to any personnel arising out of any accident.
ARCH/D-04
DATE:
PROJECT:
SCALE:
HOUSING COMPLEX FOR INTEGRATED CHECK POINT, BUMPAGANG5. Any Accident occurring due to construction elements not designed by
us.6. Accident occurring due to premature de shuttering, faulty/sunstandard
construction material or workmanship/faulty construction procedure.7. All structural concrete should be weigh batched, machine mixed &
mechanically vibrated.8. Any discrepancy in the drawings should be brought to the notice of
designer before construction.
20/07/2017
1:20
PROPOSED STRUCTURE: DRAWING TITLE:DOOR D2 DETAILS
FFL
75x100 Wooden Door Frame
40x100 Shutter Frame
30 MM Thk. Wooden Panel
SECTION BB' (D1)
INSIDEOUTSIDE
40x100 Lock Rail
40x120 Bottom Rail
30 MM Thk. Wooden Panel
75x100 Timber Frame
40x100 Timber Shutter Frame
30mm Thk Wooden Panel
ELEVATION (D1)
SECTION AA' (D1)
RCC Lintel
OUTSIDE
INSIDE
D1
ROYAL GOVERNMENT OF BHUTANMINISTRY OF WORKS AND HUMAN SETTLEMENT
DEPARTMENT OF ENGINEERING SERVICESENGINEERING SERVICES DIVISION
ARCHITECTURE SECTIONP.O.BOX-129THIMPHU
DATEREV. DESIGNED & DRAWN BY: CHECKED BY: APPROVED BY:
Chief Engineer, ESD
DRAWING NO:
Tshering Norbu, Sr. Architect Executive Architect, ESD
NOTES:1. Drawings are not to be scaled of and measurements shown in drawings are to be
followed.2. Designer's responsibility shall remain limited to safe and sound structural design
by this drawings and shall not be remain responsible for:3. Safety of the construction worker/any personnel at works site during construction.4. Correctness/safety of any temporary structure, scaffolding, shuttering, centering
erected at site and any injury to any personnel arising out of any accident.
ARCH/D-03
DATE:
PROJECT:
SCALE:
HOUSING COMPLEX FOR INTEGRATED CHECK POINT, BUMPAGANG5. Any Accident occurring due to construction elements not designed by
us.6. Accident occurring due to premature de shuttering, faulty/sunstandard
construction material or workmanship/faulty construction procedure.7. All structural concrete should be weigh batched, machine mixed &
mechanically vibrated.8. Any discrepancy in the drawings should be brought to the notice of
designer before construction.
20/07/2017
1:20
PROPOSED STRUCTURE: DRAWING TITLE:DOOR D1 DETAILS
FFL
75x100 Wooden Door Frame
40x100 Shutter Frame
30 MM Thk. Wooden Panel
SECTION BB' (D1)
INSIDEOUTSIDE
40x100 Lock Rail
40x120 Bottom Rail
30 MM Thk. Wooden Panel
75x100 Timber Frame
40x100 Timber Shutter Frame
30mm Thk Wooden Panel
ELEVATION (D1)
SECTION AA' (D1)
RCC Lintel
OUTSIDE
INSIDE
D
ROYAL GOVERNMENT OF BHUTANMINISTRY OF WORKS AND HUMAN SETTLEMENT
DEPARTMENT OF ENGINEERING SERVICESENGINEERING SERVICES DIVISION
ARCHITECTURE SECTIONP.O.BOX-129THIMPHU
DATEREV. DESIGNED & DRAWN BY: CHECKED BY: APPROVED BY:
Chief Engineer, ESD
DRAWING NO:
Tshering Norbu, Sr. Architect Executive Architect, ESD
NOTES:1. Drawings are not to be scaled of and measurements shown in drawings are to be
followed.2. Designer's responsibility shall remain limited to safe and sound structural design
by this drawings and shall not be remain responsible for:3. Safety of the construction worker/any personnel at works site during construction.4. Correctness/safety of any temporary structure, scaffolding, shuttering, centering
erected at site and any injury to any personnel arising out of any accident.
ARCH/D-02
DATE:
PROJECT:
SCALE:
HOUSING COMPLEX FOR INTEGRATED CHECK POINT, BUMPAGANG5. Any Accident occurring due to construction elements not designed by
us.6. Accident occurring due to premature de shuttering, faulty/sunstandard
construction material or workmanship/faulty construction procedure.7. All structural concrete should be weigh batched, machine mixed &
mechanically vibrated.8. Any discrepancy in the drawings should be brought to the notice of
designer before construction.
20/07/2017
1:20
PROPOSED STRUCTURE: DRAWING TITLE:DOOR D DETAILS
SL NO. ITEM
DIMENSIONS(MM)
WIDTH HEIGHT
CILL NO.
01.
02.
D 1000 2100 0 04=08
REMARKS
DOOR SCHEDULE
PANELLED DOOR
PANELLED DOOR
03.
D1 900 2100 0 08=16
PANELLED DOORD2 800 2100 0 08=16
POLICE=2X
08
00
08
IMMIG.
02
06
06
OFFICER
TOTAL
18
22
30
04.PANELLED DOOR
D3 750 2100 0 00=00 00 02 02
ROYAL GOVERNMENT OF BHUTANMINISTRY OF WORKS AND HUMAN SETTLEMENT
DEPARTMENT OF ENGINEERING SERVICESENGINEERING SERVICES DIVISION
ARCHITECTURE SECTIONP.O.BOX-129THIMPHU
DATEREV. DESIGNED & DRAWN BY: CHECKED BY: APPROVED BY:
Chief Engineer, ESD
DRAWING NO:
Tshering Norbu, Sr. Architect Executive Architect, ESD
NOTES:1. Drawings are not to be scaled of and measurements shown in drawings are to be
followed.2. Designer's responsibility shall remain limited to safe and sound structural design
by this drawings and shall not be remain responsible for:3. Safety of the construction worker/any personnel at works site during construction.4. Correctness/safety of any temporary structure, scaffolding, shuttering, centering
erected at site and any injury to any personnel arising out of any accident.
ARCH/D-01
DATE:
PROJECT:
SCALE:
HOUSING COMPLEX FOR INTEGRATED CHECK POINT, BUMPAGANG5. Any Accident occurring due to construction elements not designed by
us.6. Accident occurring due to premature de shuttering, faulty/sunstandard
construction material or workmanship/faulty construction procedure.7. All structural concrete should be weigh batched, machine mixed &
mechanically vibrated.8. Any discrepancy in the drawings should be brought to the notice of
designer before construction.
20/07/2017
NTS
PROPOSED STRUCTURE: DRAWING TITLE:DOOR SCHEDULES
ROYAL GOVERNMENT OF BHUTANICP BUMPAGANG PROJECT
CHUKHA BHUTAN
ARCHITECTURAL DRAWINGS
DOOR DETAILS
PLINTH PROTECTION DETAILS
scale 1:10
MS DRAIN COVER PLAN
scale 1:10
GROUND LVL
ROYAL GOVERNMENT OF BHUTANMINISTRY OF WORKS AND HUMAN SETTLEMENT
DEPARTMENT OF ENGINEERING SERVICESENGINEERING SERVICES DIVISION
ARCHITECTURE SECTIONP.O.BOX-129THIMPHU
DATEREV. DESIGNED & DRAWN BY: CHECKED BY: APPROVED BY:
Chief Engineer, ESD
DRAWING NO:
Tshering Norbu, Sr. Architect Executive Architect, ESD
NOTES:1. Drawings are not to be scaled of and measurements shown in drawings are to be
followed.2. Designer's responsibility shall remain limited to safe and sound structural design
by this drawings and shall not be remain responsible for:3. Safety of the construction worker/any personnel at works site during construction.4. Correctness/safety of any temporary structure, scaffolding, shuttering, centering
erected at site and any injury to any personnel arising out of any accident.
ARCH/MS-02
DATE:
PROJECT:
SCALE:
HOUSING COMPLEX FOR INTEGRATED CHECK POINT, BUMPAGANG5. Any Accident occurring due to construction elements not designed by
us.6. Accident occurring due to premature de shuttering, faulty/sunstandard
construction material or workmanship/faulty construction procedure.7. All structural concrete should be weigh batched, machine mixed &
mechanically vibrated.8. Any discrepancy in the drawings should be brought to the notice of
designer before construction.
20/07/2017
1:20
PROPOSED STRUCTURE: DRAWING TITLE:MISCELLANEOUS DETAILS-PLINTH PROTECTION & RAILINGS
CEILING DETAILS
scale 1:20
TIMBER FLOORING SECTION
scale 1:20
TILES FLOORING SECTION
scale 1:20
TIMBER & TILES FLOORING JUNCTION SECTION
scale 1:20
ROYAL GOVERNMENT OF BHUTANMINISTRY OF WORKS AND HUMAN SETTLEMENT
DEPARTMENT OF ENGINEERING SERVICESENGINEERING SERVICES DIVISION
ARCHITECTURE SECTIONP.O.BOX-129THIMPHU
DATEREV. DESIGNED & DRAWN BY: CHECKED BY: APPROVED BY:
Chief Engineer, ESD
DRAWING NO:
Tshering Norbu, Sr. Architect Executive Architect, ESD
NOTES:1. Drawings are not to be scaled of and measurements shown in drawings are to be
followed.2. Designer's responsibility shall remain limited to safe and sound structural design
by this drawings and shall not be remain responsible for:3. Safety of the construction worker/any personnel at works site during construction.4. Correctness/safety of any temporary structure, scaffolding, shuttering, centering
erected at site and any injury to any personnel arising out of any accident.
ARCH/MS-01
DATE:
PROJECT:
SCALE:
HOUSING COMPLEX FOR INTEGRATED CHECK POINT, BUMPAGANG5. Any Accident occurring due to construction elements not designed by
us.6. Accident occurring due to premature de shuttering, faulty/sunstandard
construction material or workmanship/faulty construction procedure.7. All structural concrete should be weigh batched, machine mixed &
mechanically vibrated.8. Any discrepancy in the drawings should be brought to the notice of
designer before construction.
20/07/2017
1:20
PROPOSED STRUCTURE: DRAWING TITLE:MISCELLANEOUS DETAILS - FLOOR & CEILING DETAILS
ROYAL GOVERNMENT OF BHUTANICP BUMPAGANG PROJECT
CHUKHA BHUTAN
ARCHITECTURAL DRAWINGS
MISCELLANEOUS DETAILS(FLOOR, CEILING, PLINTH PROTECTION & RAILING DETAILS)