Routing Baru Bendungan

27
0 5 10 15 20 25 30 0 20 40 60 80 100 120 140 160 180 Inflow, I (m3/d)

description

rr

Transcript of Routing Baru Bendungan

Page 1: Routing Baru Bendungan

0 5 10 15 20 25 300

20

40

60

80

100

120

140

160

180

Inflow, I (m3/d)

Outflow,Q (m3/d)

Page 2: Routing Baru Bendungan

04/21/2023 / 10:39:54 document.xlsx / Routing Waduk

DATA UNTUK ROUTING WADUK

DATA LENGKUNG KAPASITAS DATA HIDROGRAF BANJIR DATA SPESIFIKASI SPILLWAY

(dihitung dari puncak mercu pelimpah)

ElevasiTampungan, S Waktu (t) Debit, QLebar spillway = 13.2 m

(m) Jam

119 0.000 0 0.02Koef. Debit, CD = 1.9

119.5 16.500 1 14.47120 18.400 2 95.69

120.5 21.000 3 160.98121 21.400 4 98.80

121.5 23.000 5 63.82122 25.000 6 41.93

122.5 26.740 7 27.43 0.3535534123 28.750 8 18.08 8.867119

123.5 30.500 9 12.31124 33.750 10 8.49

124.5 35.800 11 5.90125 37.074 12 4.11

125.5 38.800 13 2.87126 41.500 14 2.00

126.5 45.700 15 1.40127 47.500 16 0.98

127.5 48.913 17 0.6818 0.4819 0.3420 0.2421 0.1722 0.1223 0.0924 0.07

(m3) (m3/d)

Volume (MCM)

0 2 4 6 8 10 12 14 16 18

0

100

200

Inflow, I (m3/d)

Outflow,Q (m3/d)

Waktu (jam)

De

bit

(m

3/d

t)

Page 3: Routing Baru Bendungan

04/21/2023 / 10:39:54 document.xlsx / Routing Waduk

0 2 4 6 8 10 12 14 16 18

0

100

200

Inflow, I (m3/d)

Outflow,Q (m3/d)

Waktu (jam)

De

bit

(m

3/d

t)

Page 4: Routing Baru Bendungan

04/21/2023 / 10:39:54 document.xlsx / Routing Waduk

ROUTING WADUK

Elevasi mercu 119 KoefCD 1.9

Lebar mercu, B 13.2 m 1.0 jam

Elevasi H S QWaktu (t) Inflow, I H Outflow,Q

Jam (m)

(m) (m)0.0 0.020 0.23 0.020

119 0.0 0.000 0 0 0 0 1.0 14.470 7.245 7.50 2080 2088 7.52 0.23 2.729119.5 0.5 16.500 4583 9 4588 4579 2.0 95.690 55.080 7.52 2087 2143 7.71 0.23 2.833120 1.0 18.400 5111 25 5124 5099 3.0 160.980 128.335 7.71 2140 2268 8.16 0.25 3.085

120.5 1.5 21.000 5833 46 5856 5810 4.0 98.800 129.890 8.16 2265 2395 8.62 0.26 3.348121 2.0 21.400 5944 71 5980 5909 5.0 63.820 81.310 8.62 2392 2473 8.90 0.27 3.512

121.5 2.5 23.000 6389 99 6438 6339 6.0 41.930 52.875 8.90 2470 2523 9.08 0.28 3.618122 3.0 25.000 6944 130 7010 6879 7.0 27.430 34.680 9.08 2519 2554 9.19 0.28 3.685

122.5 3.5 26.740 7428 164 7510 7346 8.0 18.080 22.755 9.19 2550 2573 9.26 0.28 3.727123 4.0 28.750 7986 201 8086 7886 9.0 12.310 15.195 9.26 2569 2584 9.30 0.28 3.752

123.5 4.5 30.500 8472 239 8592 8353 10.0 8.490 10.400 9.30 2581 2591 9.32 0.28 3.766124 5.0 33.750 9375 280 9515 9235 11.0 5.900 7.195 9.32 2587 2594 9.34 0.28 3.774

124.5 5.5 35.800 9944 323 10106 9783 12.0 4.110 5.005 9.34 2591 2596 9.34 0.28 3.776125 6.0 37.074 10298 369 10483 10114 13.0 2.870 3.490 9.34 2592 2595 9.34 0.28 3.776

125.5 6.5 38.800 10778 416 10986 10570 14.0 2.000 2.435 9.34 2592 2594 9.33 0.28 3.773126 7.0 41.500 11528 464 11760 11296 15.0 1.400 1.700 9.33 2590 2592 9.33 0.28 3.768

126.5 7.5 45.700 12694 515 12952 12437 16.0 0.980 1.190 9.33 2588 2589 9.32 0.28 3.763127 8.0 47.500 13194 567 13478 12911 17.0 0.680 0.830 9.32 2586 2586 9.31 0.28 3.756

127.5 8.5 48.913 13587 622 13898 13276 18.0 0.480 0.580 9.31 2583 2583 9.30 0.28 3.74919.0 0.340 0.410 9.30 2580 2580 9.28 0.28 3.74220.0 0.240 0.290 9.28 2576 2576 9.27 0.28 3.73421.0 0.170 0.205 9.27 2573 2573 9.26 0.28 3.72722.0 0.120 0.145 9.26 2569 2569 9.25 0.28 3.71923.0 0.090 0.105 9.25 2566 2566 9.23 0.28 3.71124.0 0.070 0.080 9.23 2562 2562 9.22 0.28 3.703

Dt =

S/Dt(I1+I2)/2 S1 y1 j2 S2

(m3/d) (m3/d) (106 m3) (m3/d) (m3/d) (106 m3) (m3/d)

(106 m3) (m3/dt) (m3/dt) (m3/dt) (m3/dt) Ele

vasi

(m

)

Elevasi (m

)

Volume (MCM)

0 2 4 6 8 10 12 14 16 18

0

100

200

Inflow, I (m3/d)

Outflow,Q (m3/d)

Waktu (jam)

De

bit

(m

3/d

t)

2

Q

t

S

D 2

Q

t

S

D

Page 5: Routing Baru Bendungan

04/21/2023 / 10:39:54 document.xlsx / Routing Waduk

0 2 4 6 8 10 12 14 16 18

0

100

200

Inflow, I (m3/d)

Outflow,Q (m3/d)

Waktu (jam)

De

bit

(m

3/d

t)

Page 6: Routing Baru Bendungan

04/21/2023 / 10:39:54 document.xlsx / Routing Waduk prn

ROUTING WADUK

Elevasi mercu = 272.7 Koef.CD = 2.0Lebar mercu, B = 32.0 m 0.5 jam

Elevasi H S QWaktu (t) Inflow, I H Outflow,Q

Jam (m)

(m) (m)0.0 6 0.21 6

272.7 0.0 0 0 0 0 0 0.5 7 7 0.5434 299 305 0.5443 0.21 6272.9 0.2 0.5262 292 6 295 289 1.0 11 9 0.5443 299 308 0.5497 0.21 6273.1 0.4 1.0663 592 16 600 584 1.5 25 18 0.5497 302 320 0.5711 0.22 6273.3 0.6 1.6203 900 30 915 885 2.0 77 51 0.5711 314 365 0.6513 0.25 8273.5 0.8 2.1743 1208 46 1231 1185 2.5 182 130 0.6513 358 487 0.8703 0.33 12273.7 1.0 2.7283 1516 64 1548 1484 3.0 299 241 0.8703 477 718 1.2816 0.48 21273.9 1.2 3.2823 1824 84 1866 1781 3.5 420 360 1.2816 701 1061 1.8907 0.70 37

274.1 1.4 3.8437 2135 106 2188 2082 4.0 441 431 1.8907 1032 1462 2.5985 0.95 60274.3 1.6 4.4125 2451 130 2516 2387 4.5 432 437 2.5985 1414 1850 3.2770 1.20 84274.5 1.8 4.9813 2767 155 2845 2690 5.0 402 417 3.2770 1779 2196 3.8765 1.41 107274.7 2.0 5.5501 3083 181 3174 2993 5.5 362 382 3.8765 2100 2482 4.3709 1.59 128274.9 2.2 6.1189 3399 209 3504 3295 6.0 313 338 4.3709 2364 2702 4.7484 1.72 144275.1 2.4 6.7083 3727 238 3846 3608 6.5 261 287 4.7484 2566 2853 5.0056 1.81 156275.3 2.6 7.3183 4066 268 4200 3932 7.0 215 238 5.0056 2703 2941 5.1538 1.86 162

7.5 181 198 5.1538 2782 2980 5.2178 1.88 1658.0 155 168 5.2178 2816 2984 5.2225 1.88 1668.5 132 144 5.2225 2819 2962 5.1827 1.87 1649.0 114 123 5.1827 2797 2920 5.1093 1.85 1609.5 99 107 5.1093 2758 2865 5.0123 1.81 15610.0 87 93 5.0123 2707 2800 4.8990 1.77 15110.5 76 82 4.8990 2646 2728 4.7742 1.73 14511.0 68 72 4.7742 2580 2652 4.6423 1.68 13911.5 59 64 4.6423 2509 2573 4.5056 1.63 13412.0 51 55 4.5056 2436 2491 4.3642 1.58 12712.5 44 48 4.3642 2361 2408 4.2203 1.53 12113.0 38 41 4.2203 2284 2325 4.0755 1.48 11513.5 33 36 4.0755 2206 2242 3.9317 1.43 11014.0 28 31 3.9317 2129 2160 3.7894 1.38 10414.5 24 26 3.7894 2053 2079 3.6493 1.33 9815.0 20 22 3.6493 1978 2000 3.5121 1.28 9315.5 16 18 3.5121 1905 1923 3.3773 1.23 8816.0 13 15 3.3773 1832 1847 3.2455 1.19 8316.5 10 12 3.2455 1762 1773 3.1173 1.14 7817.0 7 9 3.1173 1693 1701 2.9923 1.10 73

Tabel 1. Tabel pendukung penelusuran banjir di waduk Tabel 2. Penghitungan penelusuran banjir melalui waduk/embung

Dt =

S/Dt(I1+I2)/2 S1 y1 j2 S2

(m3/d) (m3/d) (106 m3) (m3/d) (m3/d) (106 m3) (m3/d)

(106 m3) (m3/dt) (m3/dt) (m3/dt) (m3/dt) Ele

vasi

(m

)

Elevasi (m

)

Volume (MCM)

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 170

100

200

300

400

500

Inflow, I (m3/d)

Outflow,Q (m3/d)

Waktu (jam)

De

bit

(m

3/d

t)

2

Q

t

S

D 2

Q

t

S

D

Page 7: Routing Baru Bendungan

04/21/2023 / 10:39:55 document.xlsx / Routing Waduk prn

PROSEDUR PENGHITUNGAN PENELUSURAN BANJIR MELALUI WADUK

1.2.3. Dihitung besaran-besaran berikut, kemudian ditabelkan.

a.

b.

dengan notasi :

QCBH

c. dan

Hasil dari langkah (3) ini ditabelkan sebagaimana ditampilkan pada Tabel 1.

4. Dibuat Tabel 2 dengan penjelasan sebagai berikut ini :a. Inflow (I) adalah hidrograf banjir rencana yang diperoleh dari metode klasik atau metode sintetis (Nakayasu, Gama 1 dll)

Untuk langkah waktu (t) pertama.b. Untuk langkah pertama, Outflow (Q) = 0,00 atau nilai yang ditetapkan besarnya. Hal ini sesuai dengan asumsi bahwa elevasi muka air

sama dengan elevasi mercu spillway.c. Dihitung nilai H dengan menggunakan rumusan pada langkah (3).b. berdasarkan nilai debit (Q) yang sudah didapat pada langkah (4b).

d.

Untuk langkah waktu (t) kedua dan seterusnya.

e.

f.

g. pada Tabel 1 untuk nilai H yang sesuai.

h.

Pada penelusuran banjir melalui waduk/embung, dimensi dari pelimpah (spillway) sudah ditetapkan.Dibuat lengkung kapasitas waduk yang dimulai dari elevasi puncak mercu ambang pelimpah (spillway), bukan dari dasar bendungan/embung.Ditetapkan besarnya pias waktu (Dt) untuk perhitungan penelusuran banjir.

dengan S adalah volume tampungan waduk (m3) dan Dt adalah besarnya pias waktu (detik).

= debit yang melewati spillway (m3/dt),= koefisien debit di spillway,= lebar spillway (m),= kedalaman aliran diatas mercu spillway (m).

Kolom (I1 + I2)/2, kolom S1, kolom y1, kolom j2 dan kolom S2 dikosongkan

Dihitung nilai (I1 + I2)/2 dari debit inflow (I).

Berdasarkan nilai H pada Tabel 2 (langkah sebelumnya), dihitung S1 dengan menginterpolasi nilai S pada Tabel 1 untuk nilai H yang sesuai.

Berdasarkan nilai H yang sama, dihitung besarnya y1 dengan cara interpolasi nilai

Dihitung besarnya j2 dengan rumusan sebagai berikut :

tS

D

23

.. HBCQ

2

Q

t

S

Dy

2

Q

t

S

Dj

2

Q

t

S

D

221

12

II yj

Page 8: Routing Baru Bendungan

04/21/2023 / 10:39:55 document.xlsx / Routing Waduk prn

i.

Q adalah debit outflow pada langkah waktu sebelumnya

j.

k. Dihitung besarnya Q dengan menggunakan rumusan pada langkah (3).b. berdasarkan nilai H yang sudah didapat pada langkah (j).

l. Diulangi langkah (e) hingga (k) untuk langkah waktu selanjutnya, dengan menggunakan nilai H dan Q yang baru.

m. Dibuat grafik hidrograf Inflow (I) dan Outflownya (O).

Dihitung besarnya S2 dengan rumusan sebagai berikut :

Berdasarkan nilai S2 pada Tabel 2, dihitung besarnya H dengan cara interpolasi nilai H pada Tabel 1 untuk nilai S (Tabel 1) yang sama

dengan S2

tQII

SS D

221

12

Page 9: Routing Baru Bendungan

04/21/2023 / 10:39:55 document.xlsx / Routing Waduk prn

Untuk langkah pertama, Outflow (Q) = 0,00 atau nilai yang ditetapkan besarnya. Hal ini sesuai dengan asumsi bahwa elevasi muka air

Dihitung nilai H dengan menggunakan rumusan pada langkah (3).b. berdasarkan nilai debit (Q) yang sudah didapat pada langkah (4b).

), bukan dari dasar bendungan/embung.

dengan menginterpolasi nilai S pada Tabel 1 untuk nilai H yang sesuai.

Page 10: Routing Baru Bendungan

04/21/2023 / 10:39:55 document.xlsx / Routing Waduk prn

Dihitung besarnya Q dengan menggunakan rumusan pada langkah (3).b. berdasarkan nilai H yang sudah didapat pada langkah (j).

pada Tabel 2, dihitung besarnya H dengan cara interpolasi nilai H pada Tabel 1 untuk nilai S (Tabel 1) yang sama

Page 11: Routing Baru Bendungan

DATA LENGKUNG KAPASITAS Data Hidrograf Banjir ROUTING WADUK

(Diukur dari puncak pelimpah) Spesifikasi SpillwayLebar Spillway : 13,2 m

Elevasi Volume (S) Koefisien Debit © : 1,9 Elevasi mercu(m) (10^6 m3) Lebar mercu (B)

119 0.000 Waktu Debit (Q)Elevasi H

119.5 16.500 (t)

120 18.400 0 0.02 (m) (m)120.5 20.068 1 14.47 119 0.00

121 21.736 2 95.69 119.5 0.50121.5 23.404 3 160.98 120 1.00

122 25.072 4 98.80 120.5 1.50122.5 26.740 5 63.82 121 2.00

123 28.807 6 41.93 121.5 2.50123.5 30.874 7 27.43 122 3.00

124 32.940 8 18.08 122.5 3.50124.5 35.007 9 12.31 123 4.00

125 37.074 10 8.49 123.5 4.50125.5 39.442 11 5.90 124 5.00

126 41.810 12 4.11 124.5 5.50126.5 44.177 13 2.87 125 6.00

127 46.545 14 2.00 125.5 6.50127.5 48.913 15 1.40 126 7.00

16 0.98 126.5 7.5017 0.68 127 8.0018 0.48 127.5 8.5019 0.3420 0.2421 0.1722 0.1223 0.0924 0.07

(m3/dt)

0 5 10 15 20 25 30 35 40 45 50

050100150200250300350400450500

102.5

107.5

112.5

117.5

122.5

127.5

132.5

GRAFIK LENGKUNG KAPASITAS

Volume Tampungan (juta m³)

Ele

vasi (m

)

Luas Tampungan (Ha)280

17

Page 12: Routing Baru Bendungan

0 5 10 15 20 25 30 35 40 45 50

050100150200250300350400450500

102.5

107.5

112.5

117.5

122.5

127.5

132.5

GRAFIK LENGKUNG KAPASITAS

Volume Tampungan (juta m³)

Ele

vasi (m

)

Luas Tampungan (Ha)280

17

Page 13: Routing Baru Bendungan

ROUTING WADUK

119 m koef. © 1.913.2 m 1 Jam

S QWaktu (t) Inflow, I

Jam

0.000 0 0.000 0 0 0 0.0216.500 4583.333 7.537 4587.102 4579.565 1 14.47 7.245 0.28310618.400 5111.111 21.318 5121.77 5100.452 2 95.69 55.08020.068 5574.444 39.164 5594.026 5554.863 3 160.98 128.33521.736 6037.778 60.296 6067.926 6007.63 4 98.80 129.89023.404 6501.111 84.267 6543.245 6458.978 5 63.82 81.31025.072 6964.444 110.772 7019.83 6909.059 6 41.93 52.87526.740 7427.778 139.588 7497.572 7357.984 7 27.43 34.68028.807 8001.889 170.544 8087.161 7916.617 8 18.08 22.75530.874 8576 203.500 8677.75 8474.25 9 12.31 15.19532.940 9150.111 238.342 9269.282 9030.94 10 8.49 10.40035.007 9724.222 274.973 9861.709 9586.736 11 5.90 7.19537.074 10298.33 313.309 10454.99 10141.68 12 4.11 5.00539.442 10956.06 353.278 11132.69 10779.42 13 2.87 3.49041.810 11613.78 394.815 11811.19 11416.37 14 2.00 2.43544.177 12271.5 437.863 12490.43 12052.57 15 1.40 1.70046.545 12929.22 482.371 13170.41 12688.04 16 0.98 1.19048.913 13586.94 528.293 13851.09 13322.8 17 0.68 0.830

18 0.48 0.58019 0.34 0.41020 0.24 0.29021 0.17 0.20522 0.12 0.14523 0.09 0.10524 0.07 0.080

∆t

S/Dt(I1+I2)/2 S1

(m3/d) (m3/d) (106 m3)

(106 m3) (m3/dt) (m3/dt) (m3/dt) (m3/dt)

2

Q

t

S

D 2

Q

t

S

D

Page 14: Routing Baru Bendungan

H Outflow,Q

(m)

0.009 0.0278.57597 85.821 0.0260102831 0.858

y1 j2 S2

(m3/d) (m3/d) (106 m3) (m3/d)

Page 15: Routing Baru Bendungan

Tabel 3.2 Data Hidrograf Banjir

Tabel 3.1 Data Tampungan WadukKala ulang 100 Tahun

Elevasi Tampungan (S) Waktu

(m) V (Jam)119.0 15754600 48913000 0119.2 16382337 15754600 1119.4 17010074 33158400 2119.6 17637811 3119.8 18265549 4120.0 18893286 5120.2 19521023 6120.4 20148760 7120.6 20776497 8120.8 21404234 9121.0 22031971 10121.2 22659709 11121.4 23287446 12122.5 26740000 13

14151617181920

117.5 11830000 227 21120 18371000 296.3 22119 23

15754600 268.58 24

117.5119120

15.6

Tabel 3.5 Perhitungan Nilai He

Elevasi He BC

Q

(m) (m) (m) (m)

119 0 9.6 0.000 2.11 0.000119.5 0.5 9.6 0.354 2.11 7.162120 1 9.6 1.000 2.11 20.256

120.5 1.5 9.6 1.837 2.11 37.213121 2 9.6 2.828 2.11 57.293

121.5 2.5 9.6 3.953 2.11 80.069122 3 9.6 5.196 2.11 105.253

122.5 3.5 9.6 6.548 2.11 132.634123 4 9.6 8.000 2.11 162.048

(m3)

He3/2

(m3/dt)

Page 16: Routing Baru Bendungan

0.822214

0.7076399

Page 17: Routing Baru Bendungan

Tabel 3.2 Data Hidrograf BanjirKala ulang 100 Tahun

Tabel 3.4 Perhitungan Penelusuran Banjir Melalui Waduk dengan Bangunan Pelimpah

Debit, Q Waktu Inflow, I Ψ φ

(jam)

0.02 0 0.0215.87 1 15.87 7.94 15762295.52 4378.41 4370.46

104.95 2 104.95 60.41 15790888.67 4386.31 4325.90176.55 3 176.55 140.75 16008274.01 4446.41 4305.66103.36 4 103.36 139.96 16513298.50 4585.90 4445.9569.99 5 69.99 86.68 17008470.11 4722.27 4635.6045.98 6 45.98 57.99 17302087.58 4802.93 4744.9430.08 7 30.08 38.03 17485588.59 4853.42 4815.3919.83 8 19.83 24.96 17592630.68 4883.10 4858.1413.50 9 13.50 16.67 17649790.07 4899.28 4882.629.31 10 9.31 11.41 17675569.31 4905.50 4894.106.47 11 6.47 7.89 17681712.06 4907.47 4899.584.51 12 4.51 5.49 17675033.21 4906.18 4900.693.14 13 3.14 3.83 17659896.58 4902.78 4898.962.19 14 2.19 2.67 17639177.76 4898.06 4895.391.53 15 1.53 1.86 17614843.97 4892.52 4890.661.07 16 1.07 1.30 17588267.18 4886.53 4885.230.75 17 0.75 0.91 17560384.87 4880.33 4879.420.53 18 0.53 0.64 17531838.43 4874.09 4873.450.37 19 0.37 0.45 17503071.59 4871.29 4870.840.26 20 0.26 0.32 17474372.07 4850.26 4849.940.19 21 0.19 0.23 17445929.98 4842.55 4842.330.14 22 0.14 0.17 17417894.55 4835.28 4835.120.10 23 0.10 0.12 17390357.36 4828.40 4828.280.07 24 0.07 0.09 17363353.86 4821.89 4821.80

Tabel 3.3 Perhitungan Tinggi Muka Air-Storage-Debit (H-S-Q)

Elevasi H S Q Ψ

(m) (m)119.0 0 15754600 4376.278 0.000 4376.278119.2 0.2 16382337 4550.649 1.631 4549.833119.4 0.4 17010074 4725.021 4.614 4722.713119.6 0.6 17637811 4899.392 8.477 4895.153119.8 0.8 18265549 5073.763 13.051 5067.238120.0 1.0 18893286 5248.135 18.240 5239.015120.2 1.2 19521023 5422.506 23.977 5410.518

120.4 1.4 20148760 5596.878 30.215 5581.77

120.6 1.6 20776497 5771.249 36.915 5752.792

120.8 1.8 21404234 5945.621 44.049 5923.596

121.0 2.0 22031971 6119.992 51.591 6094.197

121.2 2.2 22659709 6294.363 59.519 6264.604

121.4 2.4 23287446 6468.735 67.817 6434.826

122.5 3.5 26740000 7427.778 119.434 7368.061

(I1+I2)/2 S1

(m3/d) (m3/dt) (m3/dt) (m3) (m3/dt) (m3/dt)

S/∆t

(m3) (m3/dt) (m3/dt) (m3/dt)

Page 18: Routing Baru Bendungan

0.022.1713.2

1.844992E-05

Page 19: Routing Baru Bendungan

Tabel 3.4 Perhitungan Penelusuran Banjir Melalui Waduk dengan Bangunan Pelimpah

H Outflow, Q

(m)

0.00 0.00215790888.67 0.01 0.02516008274.01 0.08 0.46516513298.50 0.24 2.40717008470.11 0.40 5.11517302087.58 0.49 7.01217485588.59 0.55 8.29617592630.68 0.59 9.07717649790.07 0.60 9.50417675569.31 0.61 9.69917681712.06 0.61 9.74517675033.21 0.61 9.69517659896.58 0.61 9.58017639177.76 0.60 9.42417614843.97 0.59 9.24217588267.18 0.58 9.04517560384.87 0.58 8.84017531838.43 0.57 8.63117503071.59 0.56 8.42217474372.07 0.55 8.21617445929.98 0.54 8.01317417894.55 0.53 7.81417390357.36 0.52 7.621 0.01156217363353.86 0.51 7.43317336900.93 0.50 7.250

Tabel 3.3 Perhitungan Tinggi Muka Air-Storage-Debit (H-S-Q)

φ

4376.278 -0.665 y^34551.4654727.328 2.563453E-074903.631 0.27073385080.2895257.2555434.495

5611.985 7.352455

5789.707 0,23^1,5

5967.645 2.7664274559

6145.787

6324.123

6502.644 0.03162

7487.495

1

S2

(m3) (m3/dt)

(m3/dt)

0 5 10 15 20 25 300

20

40

60

80

100

120

140

160

180

200

Grafik Penelusuran Banjir Melalui Waduk Pada Kala Ulang 200

Inflow, I (m3/dt)Outflow, Q (m3/dt)

Waktu (Jam)

Debi

t (m

³/dt

)

0 5 10 15 20 25 300

20

40

60

80

100

120

140

160

180

200

Grafik Penelusuran Banjir Melalui Waduk Pada Kala Ulang 1000

Inflow, I (m3/dt)Outflow, Q (m3/dt)

Waktu (Jam)

Debi

t (m

³/dt

)

Page 20: Routing Baru Bendungan

53.329 = 18.24

18.211920.342 0.028083

0 5 10 15 20 25 300

20

40

60

80

100

120

140

160

180

200

Grafik Penelusuran Banjir Melalui Waduk Pada Kala Ulang 200

Inflow, I (m3/dt)Outflow, Q (m3/dt)

Waktu (Jam)

Debi

t (m

³/dt

)

0 5 10 15 20 25 300

20

40

60

80

100

120

140

160

180

200

Grafik Penelusuran Banjir Melalui Waduk Pada Kala Ulang 1000

Inflow, I (m3/dt)Outflow, Q (m3/dt)

Waktu (Jam)

Debi

t (m

³/dt

)

Page 21: Routing Baru Bendungan

Tabel 3.6 Nilai Koefisien k dan nTabel 3.7 Hasil Perhitungan Kemiringan Mercu

TitikX Y

Kemiringank n

(m) (m)Permukaan Hilir 0 0.0 0.000

3:01 1.936 1.836 1 0.5 0.171

3:02 1.936 1.81 2 1.0 0.616

1:01 1.873 1.776 3 1.5 1.304Vertikal 2 1.85 4 2.0 2.221

5 2.5 3.3566 3.0 4.702

0.6155630.812265

0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.50.000

0.500

1.000

1.500

2.000

2.500

3.000

3.500

4.000

4.500

5.000

Column H

Page 22: Routing Baru Bendungan

Tabel 3.12 nilai X dan Y untuk tinggi air maksimum (h) = 3,457 m

X (m) -0.032 0 10 20 30 40 50 60 70Y 0.000 0.062 1.115 1.576 1.930 2.228 2.491 2.728 2.947

Tabel 3.11 Nilai X dan Y untuk Tinggi Air Maksimum (h) = 6,915 m

X (m) -0.134 0 10 20 30 40 50 60 70Y 0.000 0.268 2.331 3.285 4.019 4.638 5.184 5.677 6.131

81.966160.653157

75.35365 81.96616

Tabel 3.8 nilai X dan Y untuk tinggi air maksimum (h) = 17,289 mX (m) -1.095 0 10 20 30 40 50 60 67.193Y 0.000 2.189 6.969 9.610 11.668 13.413 14.956 16.355 17.291

Tabel 3.9 Nilai X dan Y untuk Tinggi Air Maksimum (h) = 13,769 mX (m) -0.637 0 10 20 30 40 50 60 70

Y 0.000 1.274 5.206 7.251 8.835 10.176 11.359 12.430 13.416

Tabel 3.10 Nilai X dan Y untuk Tinggi Air Maksimum (h) = 10,327 mX (m) -0.328 0 10 20 30 40 50 60 70

Y 0.000 0.656 3.681 5.164 6.308 7.274 8.126 8.897 9.606

-200204060801001200.000

2.000

4.000

6.000

8.000

10.000

12.000

14.000

16.000

18.000

20.000

Row 30Row 35Row 40Row 15Row 8

Page 23: Routing Baru Bendungan

-200204060801001200.000

2.000

4.000

6.000

8.000

10.000

12.000

14.000

16.000

18.000

20.000

Row 30Row 35Row 40Row 15Row 8

Page 24: Routing Baru Bendungan

Tabel 3.12 nilai X dan Y untuk tinggi air maksimum (h) = 3,457 m

80 90 96.2403.150 3.341 3.455

Tabel 3.11 Nilai X dan Y untuk Tinggi Air Maksimum (h) = 6,915 m

80 88.9796.554 6.911

Tabel 3.9 Nilai X dan Y untuk Tinggi Air Maksimum (h) = 13,769 m74.45513.832

Tabel 3.10 Nilai X dan Y untuk Tinggi Air Maksimum (h) = 10,327 m80 81.717

10.266 10.375

-200204060801001200.000

2.000

4.000

6.000

8.000

10.000

12.000

14.000

16.000

18.000

20.000

Row 30Row 35Row 40Row 15Row 8

Page 25: Routing Baru Bendungan

-200204060801001200.000

2.000

4.000

6.000

8.000

10.000

12.000

14.000

16.000

18.000

20.000

Row 30Row 35Row 40Row 15Row 8