ARC SURVEYING & MAPPING, INC. PROFESSIONAL SURVEYING SOLUTIONS SINCE 1986 www.arcsurveyors.com 5567 Commander Dr., Ste 101 5202 San Juan Ave 4160 Minton Road Arlington, TN 38002 Jacksonville, FL 32210 Melbourne, FL 32904 (901) 867-5333 (904) 384-8377 (321) 728-8688 Milton Wilson Boulevard Extension Arlington, Tennessee Arc Surveying and Mapping performed the initial route survey and mapping project across the properties of the proposed Milton Wilson Boulevard alignment. The new section of the Boulevard was to connect to previously constructed ends of the roadway. The length of the remaining section was approximately 2 miles and consisted of a 150 foot wide corridor plus overlap where needed. Arc Surveying and Memphis performed a horizontal traverse network utilizing GPS for original control and Total Stations for the actual control network throughout the project. In addition, a level loop was performed to achieve the highest accuracy in the vertical control. Total Stations were utilized to perform the topographical survey and locate all boundary information throughout the project. Arc was responsible for the full topographic survey and mapping, boundary surveys of all tracts concerned, and the preparation of Right Of Way plats for the procurement of the required land and easements. One of our usual team members and the Arlington Town Engineer, Powers Hill Design took our survey and performed the Civil Engineering required to prepare construction documents, permitting, and specifications to move the project to bid.

Transcript of Route Survey Arlington, Tennessee

Page 1: Route Survey  Arlington, Tennessee

ARC SURVEYING & MAPPING, INC. PROFESSIONAL SURVEYING SOLUTIONS SINCE 1986 www.arcsurveyors.com

5567 Commander Dr., Ste 101 5202 San Juan Ave 4160 Minton Road Arlington, TN 38002 Jacksonville, FL 32210 Melbourne, FL 32904 (901) 867-5333 (904) 384-8377 (321) 728-8688

Milton Wilson Boulevard Extension Arlington, Tennessee

Arc Surveying and Mapping performed the initial route survey and mapping project across the properties of the proposed Milton Wilson Boulevard alignment. The new section of the Boulevard was to connect to previously constructed ends of the roadway. The length of the remaining section was approximately 2 miles and consisted of a 150 foot wide corridor plus overlap where needed.

Arc Surveying and Memphis performed a horizontal traverse network utilizing GPS for original control and Total Stations for the actual control network throughout the project. In addition, a level loop was performed to achieve the highest accuracy in the vertical control. Total Stations were utilized to perform the topographical survey and locate all boundary information throughout the project. Arc was responsible for the full topographic survey and mapping, boundary surveys of all tracts concerned, and the preparation of Right Of Way plats for the procurement of the required land and easements. One of our usual team members and the Arlington Town Engineer, Powers Hill Design took our survey and performed the Civil Engineering required to prepare construction documents, permitting, and specifications to move the project to bid.