Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623
This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility item by visual observation only; they do not test the operation of equipment or perform destructive testing of walls, ceilings or floors. Each facility item is ranked on a 7-point scale: rank 7 means the item is in new or in good condition and no work is required while rank 1 means the item has failed and has lead to an immediate life safety condition¹. The remaining ranks choices generally mean that the item requires regular maintenance (rank 5 or 6) or full replacement (rank 2, 3 or 4). For additional detail and definition on rank values as they relate to each assessed item, please visit the "CPS Guide to Biennial Facility Assessments" found on the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/About_CPS/Policies_and_guidelines/Pages/facilitystandards.aspx. Definitions for Quantity, Unit, Cost and Campus Total can be found at the end of this report.
Facility Assessment Report
Building Name Year Constructed Building Area (Sq Ft) Assessed Need Number of Floors
Campus Summary
Main 1912 60,348 $3,303,4483
Addition 1938 23,768 $1,187,2593
SITE $249,358
Campus Total $4,740,06584,116
Building: Main
Category: Building Exterior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Entrance
Entrance Control - Audio and Video 1 strike doesn't work properly5EA1 $1,567
Exterior Doors - Exterior Wood Door 1 6EA3 $1,442
Exterior Doors - Exterior Wood Door 2 6EA2 $961
Exterior Doors - Exterior Wood Door 3 6EA3 $1,442
Exterior Doors - Exterior Wood Door 4 6EA1 $481
Exterior Doors - Exterior Wood Door 5 boiler room - graffiti5EA1 $1,341
Exterior Doors - Exterior Wood Door 6 basement6EA1 $481
Exterior Doors - Exterior Wood Door 9 7EA2 $0
Exterior Doors - Side lite 1 6EA3 $940
Exterior Doors - Transom Lite 1 6EA3 $940
Exterior Doors - Transom Lite 2 6EA2 $627
Exterior Doors - Transom Lite 9 6EA2 $627
Exterior Stairs - Concrete 1 5LF45 $4,931
Exterior Stairs - Concrete 2 7LF15 $0
Exterior Stairs - Concrete 9 6LF15 $1,227
Stair Handrail - Steel_Stair Handrail 1 6LF20 $173
Stair Handrail - Steel_Stair Handrail 2 6LF8 $69
Stair Handrail - Steel_Stair Handrail 9 6LF8 $69
Page 1 of 30CASTELLANOS Assessment Date: 8/26/14
Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623
Building: Main
Category: Building Exterior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Foundation
Foundation - Masonry Entire Building seepage7LF20 $0
Foundation - Masonry Entire Building 7LF743 $0
Superstructure - Heavy Timber Entire Building 7SF55,872 $0
Superstructure - Steel with Clay Tile Arch Entire Building 7SF4,476 $0
Lighting
Exterior Lighting - Wall Mounted Entire Building 6EA4 $1,155
Roof System
Chimney - Metal Flue B / West metal tube chimney6LF66 $10,437
Coping - Metal A / Entire Building 7LF310 $0
Coping - Metal B / Entire Building 7LF197 $0
Coping - Terra Cotta A / Entire Building 6LF282 $9,057
Downspouts - Exterior Downspouts A / West 6LF264 $8,774
Downspouts - Exterior Downspouts B / West 6LF36 $1,196
Parapet - 16" - 30" Height A / Entire Building 6LF514 $20,536
Parapet - Parapet < 16" Height B / Entire Building 7LF436 $0
Parapet - Parapet > 30" A / South 6LF78 $4,986
Roof Structure - Heavy Timber A / Entire Building 7SF13,968 $0
Roof Structure - Steel with Clay Tile Arch B / Entire Building 7SF4,476 $0
Roof - Asphalt Gravel Ballast A / Entire Building 6SF13,698 $139,272
Roof - Asphalt Gravel Ballast B / Entire Building 6SF4,476 $45,509
Walls
Exterior Walls - Brick Entire Building 6SF31,853 $214,084
Exterior Walls - Brick Entire Building / West graffiti5SF100 $2,381
Exterior Walls - Stone-Cut Entire Building 6SF727 $4,886
Windows
Guard - Guards perforated Entire Building 6SF1,834 $23,420
Lintels - Brick Entire Building / Courtyard 6LF26 $0
Lintels - Steel Entire Building / West 6LF179 $5,196
Lintels - Stone Entire Building 6LF330 $0
Windows - Decorative Entire Building 6SF82 $612
Windows - Insulated Panel Entire Building 6SF318 $2,374
Windows - Louver Entire Building / Boiler Room 6SF32 $239
Windows - Sash Aluminum Double-pane Entire Building 6SF4,013 $29,955
Page 2 of 30CASTELLANOS Assessment Date: 8/26/14
Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623
Building: Main
Category: Building Exterior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Building Exterior Subtotal: $541,387
Building: Main
Category: Electrical System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Emergency System
Automatic Transfer Switch Electrical Room 6EA1 $408
Emergency A/C Power - Corridors and Stairs Entire Building 6SF7,889 $2,369
Emergency A/C Power - Lunchrooms Entire Building / Basement 6SF3,069 $1,141
Emergency Battery Packs - Corridors and Stairs Entire Building 6EA29 $5,873
Emergency Battery Packs - Gym Entire Building / Basement 6EA4 $810
Emergency Battery Packs - Lunchrooms Entire Building / Basement 6EA1 $203
Emergency Battery Packs - Students Toilets Entire Building 6EA5 $1,013
Exit Signs - Corridors and Stairs Entire Building School do not have Generator or UPS installed
and exit signs are not provided with battery backup.
2EA39 $21,274
Exit Signs - Gym Entire Building / Basement School do not have Generator or UPS installed
and exit signs are not provided with battery backup.
2EA8 $4,626
Exit Signs - Lunchroom Entire Building / Basement School do not have Generator or UPS installed and exit signs are not provided with battery backup.
2EA2 $1,091
Security System - CCTV Entire Building Serves Main and Addition6SF84,116 $25,260
Security System - Intrusion Detection Entire Building Serves Main and Addition6SF84,116 $21,651
Main Service
Independent Electrical Service for emergency power Electrical Room Served the entire school6EA1 $2,921
Main Electrical Service - 1600 A 120/208/3PH Electrical Room Serves Main and Addition buildings6EA1 $5,641
PA System Entire Building Serves Main and Addition buildings6SF84,116 $27,666
Power Distribution
Lighting and Power Panels - 100 A Electrical Room / Basement Fuses4EA1 $4,849
Lighting and Power Panels - 100 A Electrical Room / Entire Building 6EA3 $897
Lighting and Power Panels - Above 100 A Electrical Room / Entire Building 6EA13 $6,461
Main Distribution Panels - 400 - 600 amp Electrical Room / Basement 6EA2 $1,055
Transformers - 277/480 - 120/208 Electrical Room / Basement 51 KVA6EA1 $1,265
Electrical System Subtotal: $136,474
Building: Main
Category: Safty System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Page 3 of 30CASTELLANOS Assessment Date: 8/26/14
Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623
Building: Main
Category: Safty System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Fire Alarm
Fire Alarm Panel Basement / Mechanical Room Replacement of fire alarm panel has been
ordered. Served the entire school. Serves Main
and Addition buildings
4EA1 $49,477
Fire Alarm_System Basement / Entire Building Fire alarm system is in poor condition. No strobe
lights installed. Serves Main and Addition buildings
4SF84,116 $167,197
Fire Pump Controller Basement / Mechanical Room Controller is obsolete4EA1 $23,389
Pump Room Assembly
Fire Pump - 25-50 hp Basement / Mechanical Room Pump is in poor condition and excessive corrosion
present. Serves Main and Addition buildings
4EA1 $38,011
Sprinkler System
Sprinkler Heads Entire Building Heads are so old4SF60,348 $31,067
Sprinkler Piping Entire Building 6SF60,348 $11,219
Wet Sprinkler System Entire Building 6SF60,348 $15,534
Safty System Subtotal: $335,893
Building: Main
Category: Mechanical System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Air Handling Systems
Air Handling Unit- Built Up-Multi Zone-Double Delivery- Steam Coils - 30001 - 45000 cfm
Basement Motor is old.5EA1 $184,422
Air Intake Basement / East Façade 6EA2 $11,529
Auxiliaries - 30001 - 45000 cfm Basement 6EA1 $8,716
Return Duct Work - Masonry and Ducts- Missing or Existing Shaft Basement No return duct and fresh air intake is located on the ground east facade.
4LF100 $0
Zone Dampers Basement 5EA33 $63,147
Boiler Systems
Boiler Auxiliary- Scotch Marine- Steam Low Pressure Boiler - 151 - 200 HP
Boiler Room 6EA2 $5,091
Chemical Feed System Boiler Room 6EA1 $1,078
Combustion Dampers Boiler Room 6EA1 $409
Condensate Pump Boiler Room 6EA1 $2,021
Condensate Pump Boiler Room / Basement 6EA1 $2,021
Feed Water Pumps and Tank Boiler Room Tank is leaking and pumps are in poor condition4EA1 $92,964
Non Condensing- Fire Tube- Scotch Marine- Steam- Low Pressure Boiler - 151 - 200 HP
Boiler Room Serves Main and addition buildings6EA2 $5,091
Page 4 of 30CASTELLANOS Assessment Date: 8/26/14
Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623
Building: Main
Category: Mechanical System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Boiler Systems
Piping - Steam Pipe- Steel Boiler Room Serves Main and addition buildings6LF300 $566
Steam Traps Boiler Room 6EA3 $792
Gas Booster
Gas Booster Basement 6EA2 $998
Heating Devices
Cabinet Heaters - With Steam Coil Basement 6EA3 $1,070
Radiators - Steam Entire Building 6EA5 $1,389
Unit Heater - Gas Boiler Room Unit heater is in poor condition4EA1 $3,234
Wall Heater - Electric Entire Building / 1st Floor Poor condition4EA1 $1,083
Wall Heater - Electric Entire Building / Basement Poor condition4EA1 $1,083
Wall Heater - Electric Entire Building 6EA4 $556
Mechanical Plumbing
Condensate-Steel or Galvanized Basement 6LF300 $23,033
Temperature Control
Pneumatic System Entire Building 5SF60,348 $207,977
Thermostats - Pneumatic Entire Building Not providing the right signal to the room4EA30 $22,117
Ventilation
Exhaust Fans- Indoor - 500 - 1500 CFM Lower Roof / Basement Vibrating and producing a louder noise4EA1 $4,245
Exhaust Fans- Roof Mounted - 500 - 1500 CFM Lower Roof 6EA2 $1,185
Mechanical System Subtotal: $645,815
Building: Main
Category: Plumbing System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Hot Water
Gas Heater - 150000 - 300000 BTU/HR Boiler Room Served the entire school6EA1 $310
Piping
Domestic Piping-Cold Water from Risers to Fixtures Entire Building Majority of the piping are galvanized4SF60,348 $43,149
Domestic Piping-Cold Water Horizontal Lines Entire Building Majority of the piping are galvanized4SF60,348 $87,161
Domestic Piping-Cold Water Risers Entire Building Majority of the piping are galvanized4SF60,348 $48,327
Domestic Piping-Hot Water from Risers to Fixtures Entire Building Majority of the piping are galvanized4SF60,348 $32,793
Domestic Piping-Hot Water Horizontal Lines Entire Building Majority of the piping are galvanized4SF60,348 $77,668
Domestic Piping-Hot Water Return Lines Entire Building Majority of the piping are galvanized4SF60,348 $51,779
Page 5 of 30CASTELLANOS Assessment Date: 8/26/14
Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623
Building: Main
Category: Plumbing System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Piping
Domestic Piping-Hot Water Return Risers Entire Building Majority of the piping are galvanized4SF60,348 $29,341
Sanitary Piping Entire Building 6SF60,348 $55,230
Storm Piping Entire Building 6SF60,348 $52,642
Vent Piping Entire Building 6SF60,348 $40,560
Pumps
Pumps - Domestic Booster Pump-Simplex Boiler Room Serves the Main and addition buildings6EA1 $1,446
Pumps - Ejector-Duplex Boiler Room Pump is in poor condition4EA1 $15,749
Plumbing System Subtotal: $536,154
Building: Main
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #09-Basement (Regular Classroom)
Ceiling - Plaster/Drywall 5SF1,030 $9,441
Doors - Wood Doors inclu hw 6EA1 $301
Floor - Concrete 6SF1,030 $545
Lighting - Pendent/Surface 6EA19 $2,354
Marker Board 6LF8 $171
Walls - Masonry 5SF1,262 $52,155
Work Sink 6EA1 $379
Classroom #101 (Regular Classroom)
AC Units 6EA1 $496
Casework 5LF15 $3,136
Ceiling - Plaster/Drywall 6SF852 $2,948
Chalk Board obsolete material4LF24 $2,203
Doors - Transom Window 6SF9 $152
Doors - Wood Doors inclu hw 6EA1 $301
Floor - Tile/Sheet 6SF852 $853
Lighting - Pendent/Surface 7EA14 $0
Marker Board 6LF8 $171
Storage/ Closet 5SF172 $2,774
Walls - Plaster/Drywall 5SF1,345 $10,194
Classroom #102 (Regular Classroom)
AC Units 6EA1 $496
Page 6 of 30CASTELLANOS Assessment Date: 8/26/14
Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623
Building: Main
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #102 (Regular Classroom)
Ceiling - Plaster/Drywall 6SF865 $2,993
Chalk Board Partially covered, obsolete material4LF48 $4,407
Doors - Transom Window 6SF30 $508
Doors - Wood Doors inclu hw 6EA1 $301
Floor - Wood 6SF865 $6,098
Lighting - Pendent/Surface 7EA14 $0
Marker Board 6LF10 $214
Storage/ Closet 6SF172 $1,247
Walls - Plaster/Drywall 6SF1,336 $3,687
Classroom #103 (Regular Classroom)
AC Units 6EA1 $496
Ceiling - Plaster/Drywall 6SF851 $2,945
Chalk Board Partially covered, obsolete material4LF30 $2,754
Doors - Transom Window 6SF30 $508
Doors - Wood Doors inclu hw 6EA1 $301
Floor - Wood 6SF851 $5,999
Lighting - Pendent/Surface 7EA14 $0
Marker Board 6LF10 $214
Storage/ Closet 5SF172 $2,774
Walls - Plaster/Drywall 6SF1,323 $3,651
Classroom #105 (Regular Classroom)
AC Units 6EA1 $496
Ceiling - Plaster/Drywall 6SF903 $3,125
Chalk Board obsolete material4LF24 $2,203
Doors - Transom Window 6SF9 $152
Doors - Wood Doors inclu hw 6EA1 $301
Floor - Wood 6SF903 $6,366
Lighting - Pendent/Surface 6EA14 $1,735
Marker Board 6LF10 $214
Storage/ Closet 6SF172 $1,247
Walls - Plaster/Drywall 6SF1,369 $3,778
Classroom #106 (Regular Classroom)
AC Units 6EA1 $496
Ceiling - Plaster/Drywall 6SF865 $2,993
Chalk Board Partially covered, obsolete material4LF40 $3,672
Doors - Transom Window 6SF30 $508
Page 7 of 30CASTELLANOS Assessment Date: 8/26/14
Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623
Building: Main
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #106 (Regular Classroom)
Doors - Wood Doors inclu hw 6EA2 $602
Floor - Wood 6SF865 $6,098
Lighting - Pendent/Surface 6EA14 $1,735
Marker Board 6LF8 $171
Storage/ Closet 6SF172 $1,247
Walls - Plaster/Drywall 6SF1,336 $3,687
Classroom #107 (Regular Classroom)
AC Units 7EA1 $0
Ceiling - Plaster/Drywall 7SF853 $0
Chalk Board obsolete material4LF6 $551
Doors - Transom Window 6SF9 $152
Doors - Wood Doors inclu hw 6EA1 $301
Floor - Wood 6SF853 $6,014
Lighting - Pendent/Surface 6EA14 $1,735
Marker Board 6LF8 $171
Storage/ Closet 6SF172 $1,247
Walls - Plaster/Drywall 6SF1,382 $3,814
Classroom #109 (Regular Classroom)
AC Units 6EA1 $496
Ceiling - Plaster/Drywall 7SF849 $0
Chalk Board obsolete material4LF48 $4,407
Doors - Transom Window 6SF9 $152
Doors - Wood Doors inclu hw 6EA1 $301
Floor - Wood 6SF849 $5,985
Lighting - Pendent/Surface 6EA14 $1,735
Marker Board 6LF8 $171
Storage/ Closet 6SF172 $1,247
Walls - Plaster/Drywall 6SF1,322 $3,649
Classroom #201 (Regular Classroom)
AC Units 7EA1 $0
Casework 6LF8 $202
Ceiling - Plaster/Drywall 6SF869 $3,007
Chalk Board obsolete material4LF48 $4,407
Doors - Transom Window 6SF9 $152
Doors - Wood Doors inclu hw 6EA1 $301
Floor - Wood 5SF869 $12,713
Page 8 of 30CASTELLANOS Assessment Date: 8/26/14
Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623
Building: Main
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #201 (Regular Classroom)
Lighting - Pendent/Surface 6EA14 $1,735
Marker Board 6LF10 $214
Storage/ Closet 6SF172 $1,247
Walls - Plaster/Drywall 5SF1,360 $10,307
Classroom #202 (Regular Classroom)
AC Units 6EA1 $496
Ceiling - Plaster/Drywall 7SF873 $0
Chalk Board Partially covered, obsolete material4LF48 $4,407
Doors - Transom Window 6SF30 $508
Doors - Wood Doors inclu hw 6EA1 $301
Floor - Wood 6SF873 $6,155
Lighting - Pendent/Surface 7EA14 $0
Marker Board 6LF6 $129
Storage/ Closet 6SF166 $1,204
Walls - Plaster/Drywall 6SF1,343 $3,707
Classroom #203 (Regular Classroom)
AC Units 7EA1 $0
Casework 6LF8 $202
Ceiling - Plaster/Drywall 6SF864 $2,990
Chalk Board Partially covered, obsolete material4LF48 $4,407
Doors - Transom Window 6SF30 $508
Doors - Wood Doors inclu hw 6EA1 $301
Floor - Wood 5SF864 $12,639
Lighting - Pendent/Surface 6EA14 $1,735
Marker Board 6LF10 $214
Storage/ Closet 6SF172 $1,247
Walls - Plaster/Drywall 6SF1,340 $3,698
Classroom #204 (Regular Classroom)
AC Units 6EA1 $496
Casework 5LF8 $1,673
Ceiling - Plaster/Drywall 7SF693 $0
Chalk Board Partially covered, obsolete material 4LF30 $2,754
Doors - Transom Window 6SF9 $152
Doors - Wood Doors inclu hw 6EA2 $602
Floor - Wood 6SF693 $4,886
Lighting - Pendent/Surface 7EA10 $0
Page 9 of 30CASTELLANOS Assessment Date: 8/26/14
Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623
Building: Main
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #204 (Regular Classroom)
Marker Board 7LF6 $0
Walls - Plaster/Drywall 6SF1,265 $3,491
Classroom #205 (Computer Lab)
AC Units 6EA2 $991
Ceiling - Plaster/Drywall 6SF943 $3,263
Chalk Board obsolete material4LF24 $2,203
Doors - Wood Doors inclu hw 5EA1 $1,174
Floor - Tile/Sheet 7SF943 $0
Lighting - Pendent/Surface 7EA14 $0
Marker Board 6LF34 $728
Walls - Plaster/Drywall 6SF1,281 $3,535
Wireless System 7EA1 $0
Classroom #206 (Regular Classroom)
AC Units 6EA1 $496
Ceiling - Plaster/Drywall 6SF873 $3,021
Chalk Board Partially covered, obsolete material4LF50 $4,590
Doors - Transom Window 6SF30 $508
Doors - Wood Doors inclu hw 6EA1 $301
Floor - Wood 6SF873 $6,155
Lighting - Pendent/Surface 7EA14 $0
Marker Board 6LF18 $386
Storage/ Closet 6SF172 $1,247
Walls - Plaster/Drywall 6SF1,323 $3,651
Classroom #207 (Regular Classroom)
AC Units 6EA1 $496
Ceiling - Plaster/Drywall 6SF860 $2,976
Chalk Board Partially covered, obsolete material4LF48 $4,407
Doors - Transom Window 6SF30 $508
Doors - Wood Doors inclu hw 5EA1 $1,174
Floor - Wood 6SF860 $6,063
Lighting - Pendent/Surface 7EA14 $0
Marker Board 6LF15 $321
Storage/ Closet 5SF174 $2,807
Walls - Plaster/Drywall 6SF1,332 $3,676
Page 10 of 30CASTELLANOS Assessment Date: 8/26/14
Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623
Building: Main
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #209 (Regular Classroom)
AC Units 7EA1 $0
Casework 6LF8 $202
Ceiling - Plaster/Drywall 6SF873 $3,021
Chalk Board Partially covered, obsolete material4LF48 $4,407
Doors - Transom Window 6SF9 $152
Doors - Wood Doors inclu hw 6EA1 $301
Floor - Wood 5SF873 $12,771
Lighting - Pendent/Surface 7EA14 $0
Marker Board 6LF8 $171
Storage/ Closet 6SF171 $1,240
Walls - Plaster/Drywall 5SF1,341 $10,163
Classroom #301 (Regular Classroom)
AC Units 7EA1 $0
Ceiling - Plaster/Drywall 6SF889 $3,076
Chalk Board Partially covered, obsolete material4LF50 $4,590
Doors - Transom Window 6SF9 $152
Doors - Wood Doors inclu hw 6EA1 $301
Floor - Wood 6SF889 $6,267
Lighting - Pendent/Surface 6EA14 $1,735
Marker Board 6LF8 $171
Storage/ Closet 6SF172 $1,247
Walls - Plaster/Drywall 6SF1,378 $3,803
Classroom #302 (Regular Classroom)
AC Units 6EA1 $496
Casework 5LF8 $1,673
Ceiling - Plaster/Drywall 6SF887 $3,070
Chalk Board Partially covered, obsolete material4LF48 $4,407
Doors - Transom Window 6SF30 $508
Doors - Wood Doors inclu hw 6EA1 $301
Floor - Wood 6SF887 $6,253
Lighting - Pendent/Surface 7EA14 $0
Marker Board 6LF6 $129
Storage/ Closet 5SF172 $2,774
Walls - Plaster/Drywall 6SF1,376 $3,798
Classroom #303 (Art Room)
AC Units 7EA1 $0
Page 11 of 30CASTELLANOS Assessment Date: 8/26/14
Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623
Building: Main
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #303 (Art Room)
Casework 5LF91 $19,026
Ceiling - Plaster/Drywall 6SF873 $3,021
Doors - Transom Window 6SF30 $508
Doors - Wood Doors inclu hw 6EA1 $301
Floor - Tile/Sheet 6SF873 $874
Lighting - Pendent/Surface 6EA14 $1,735
Marker Board 6LF8 $171
Storage/ Closet 6SF172 $1,247
Walls - Plaster/Drywall 6SF1,342 $3,704
Work Sink 7EA1 $0
Classroom #304 (Regular Classroom)
AC Units 6EA1 $496
Ceiling - Plaster/Drywall 7SF971 $0
Chalk Board Partially covered, obsolete material4LF48 $4,407
Doors - Transom Window 6SF18 $305
Doors - Wood Doors inclu hw 6EA2 $602
Floor - Wood 6SF971 $6,845
Lighting - Pendent/Surface 7EA14 $0
Marker Board 6LF12 $257
Storage/ Closet 6SF200 $1,450
Walls - Plaster/Drywall 6SF1,409 $3,889
Classroom #305 (Computer Lab)
AC Units 7EA2 $0
Casework 6LF8 $202
Ceiling - Plaster/Drywall 7SF960 $0
Doors - Transom Window 6SF18 $305
Doors - Wood Doors inclu hw 6EA2 $602
Floor - Tile/Sheet 6SF960 $961
Lighting - Pendent/Surface 7EA14 $0
Marker Board 7LF22 $0
Storage/ Closet 6SF214 $1,552
Walls - Plaster/Drywall 6SF1,347 $3,718
Wireless System 7EA1 $0
Work Sink Broken sink, faucet broken4EA1 $8,619
Classroom #306 (Regular Classroom)
AC Units 6EA1 $496
Page 12 of 30CASTELLANOS Assessment Date: 8/26/14
Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623
Building: Main
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #306 (Regular Classroom)
Ceiling - Plaster/Drywall 6SF887 $3,070
Chalk Board Partially covered, obsolete material4LF48 $4,407
Doors - Transom Window 6SF30 $508
Doors - Wood Doors inclu hw 6EA2 $602
Floor - Wood 6SF887 $6,253
Lighting - Pendent/Surface 7EA14 $0
Marker Board 6LF6 $129
Storage/ Closet 6SF172 $1,247
Walls - Plaster/Drywall 6SF1,336 $3,687
Classroom #307 (Regular Classroom)
AC Units Limited access6EA1 $496
Ceiling - Plaster/Drywall 6SF860 $2,976
Chalk Board obsolete material4LF16 $1,469
Doors - Transom Window 6SF30 $508
Doors - Wood Doors inclu hw 6EA1 $301
Floor - Wood Floor was being serviced at the time of assessment.
7SF1,034 $0
Lighting - Pendent/Surface 6EA14 $1,735
Storage/ Closet 6SF174 $1,262
Walls - Plaster/Drywall 6SF860 $2,374
Classroom #309 (Regular Classroom)
AC Units 7EA1 $0
Ceiling - Plaster/Drywall 6SF892 $3,087
Chalk Board obsolete material4LF24 $2,203
Doors - Transom Window 6SF9 $152
Doors - Wood Doors inclu hw 6EA1 $301
Floor - Wood 6SF892 $6,289
Lighting - Pendent/Surface 7EA14 $0
Marker Board 6LF8 $171
Storage/ Closet 6SF172 $1,247
Walls - Plaster/Drywall 6SF1,358 $3,748
Classrooms Subtotal: $539,676
Building: Main
Category: Rooms (Other Than Classrooms)
Page 13 of 30CASTELLANOS Assessment Date: 8/26/14
Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Administrative Suites/Offices
Ceiling - Plaster/Drywall Basement office 5SF367 $3,364
Doors - Steel Doors incl hw Basement office 6EA1 $301
Floor - Wood Basement office 5SF367 $5,369
Lighting - Pendent/Surface Basement office 6EA3 $372
Walls - Concrete Block Basement office 6SF363 $1,064
Walls - Masonry Basement office 6SF363 $1,142
Ceiling - Plaster/Drywall Custodian basement lounge 5SF198 $1,815
Doors - Wood Doors inclu hw Custodian basement lounge 6EA1 $301
Floor - Concrete Custodian basement lounge 6SF198 $105
Lighting - Pendent/Surface Custodian basement lounge 5EA1 $183
Walls - Masonry Custodian basement lounge 5SF541 $22,358
Ceiling - Plaster/Drywall Engineer's office 5SF264 $2,420
Doors - Wood Doors inclu hw Engineer's office 6EA1 $301
Floor - Wood Engineer's office 5SF264 $3,862
Lighting - Pendent/Surface Engineer's office 6EA3 $372
Walls - Masonry Engineer's office 5SF561 $23,184
AC Unit Main office 7EA1 $0
Ceiling - Plaster/Drywall Main office 6SF298 $1,031
Doors - Transom Window Main office 6SF50 $847
Doors - Wood Doors inclu hw Main office 6EA1 $301
Floor - Tile/Sheet Main office 6SF298 $298
Lighting - Pendent/Surface Main office 7EA4 $0
Storage/ Closet Main office 6SF97 $703
Walls - Plaster/Drywall Main office 6SF528 $1,457
AC Unit Principal's office 6EA1 $496
Ceiling - Plaster/Drywall Principal's office 6SF260 $900
Doors - Wood Doors inclu hw Principal's office 6EA1 $301
Floor - Tile/Sheet Principal's office 6SF260 $260
Lighting - Pendent/Surface Principal's office 6EA3 $372
Walls - Plaster/Drywall Principal's office 6SF535 $1,477
Kitchen
Ceiling - Plaster/Drywall Basement 6SF777 $2,689
Doors - Wood Doors inclu hw Basement 6EA2 $602
Floor - Tile/Sheet Basement 6SF777 $778
Lighting - Pendent/Surface Basement 7EA11 $0
Walls - Plaster/Drywall Basement 6SF1,059 $2,923
Lunch & Multipurpose Room
Ceiling - Lay-in Basement 6SF340 $1,021
Ceiling - Plaster/Drywall Basement 6SF1,007 $3,485
Page 14 of 30CASTELLANOS Assessment Date: 8/26/14
Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623
Building: Main
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Lunch & Multipurpose Room
Doors - Steel Doors incl hw Basement 6EA4 $1,204
Doors - Wood Doors inclu hw Basement 6EA2 $602
Floor - Tile/Sheet Basement 6SF1,347 $1,348
Lighting - Lay-in Basement 7EA5 $0
Lighting - Pendent/Surface Basement 6EA11 $1,363
Serving Line Basement 7LF18 $0
Walls - Masonry Basement 6SF1,380 $4,341
Ceiling - Lay-in South basement lunchroom 7SF340 $0
Ceiling - Plaster/Drywall South basement lunchroom 6SF1,027 $3,554
Doors - Steel Doors incl hw South basement lunchroom 6EA4 $1,204
Doors - Wood Doors inclu hw South basement lunchroom 6EA4 $1,204
Floor - Tile/Sheet South basement lunchroom 6SF1,367 $1,368
Lighting - Lay-in South basement lunchroom 7EA4 $0
Lighting - Pendent/Surface South basement lunchroom 6EA17 $2,106
Serving Line South basement lunchroom 7LF18 $0
Walls - Masonry South basement lunchroom 6SF1,410 $4,436
Ceiling - Plaster/Drywall Teachers lounge 7SF335 $0
Doors - Wood Doors inclu hw Teachers lounge 6EA1 $301
Floor - Tile/Sheet Teachers lounge 6SF335 $335
Lighting - Pendent/Surface Teachers lounge 6EA4 $496
Walls - Plaster/Drywall Teachers lounge 6SF902 $2,489
MDF_IDF
AC Unit 2nd Floor 6EA1 $496
Doors - Steel Doors incl hw 2nd Floor 6EA1 $301
Finishes 2nd Floor 6SF172 $1,227
Mechanical/ Service Rooms
Janitor's Closet 1st Floor 1st floor North5SF10 $161
Janitor's Closet 1st Floor 1st South5SF10 $161
Storage Room 1st Floor 6SF60 $430
Janitor's Closet 2nd Floor 2nd floor South6SF10 $72
Janitor's Closet 2nd Floor 2nd floor North6SF10 $72
Janitor's Closet 3rd Floor 3rd North6SF10 $72
Janitor's Closet 3rd Floor 3rd South6SF10 $72
Boiler Room Basement 5SF1,195 $19,276
Mechanical/ Service Rooms Basement 5SF1,235 $19,921
Mechanical/ Service Rooms Basement 5SF235 $3,791
Page 15 of 30CASTELLANOS Assessment Date: 8/26/14
Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623
Building: Main
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Mechanical/ Service Rooms
Mechanical/ Service Rooms Basement 6SF460 $3,296
Storage Room Basement Storage 15SF445 $7,178
Storage Room Basement Storage 35SF171 $2,758
Storage Room Basement Storage 25SF363 $5,855
Storage Room Basement 5SF216 $3,484
Restroom
Accessories Basement Mirror, soap dispenser, toilet paper dispenser6SF478 $4,409
Ceiling - Plaster/Drywall Basement 6SF478 $1,654
Doors - Wood Doors inclu hw Basement 7EA2 $0
Floor Drain Basement 6EA1 $1,059
Floor - Tile Ceramic/ Porcelain Basement 6SF478 $1,012
Hand Dryer Basement 6EA1 $230
Lavatory Basement 7EA2 $0
Lighting - Pendent/Surface Basement 5EA5 $913
Partitions Basement Door missing4EA1 $1,986
Partitions Basement 6EA9 $2,672
Walls - Structural Glazed Tile Basement 6SF919 $2,891
Water Closet Basement 6EA10 $3,360
Accessories Basement toilet paper dispenser6SF610 $5,626
Ceiling - Plaster/Drywall Basement 6SF610 $2,111
Floor Drain Basement 6EA1 $1,059
Floor - Tile Ceramic/ Porcelain Basement 6SF610 $1,291
Hand Dryer Basement 7EA1 $0
Lavatory Basement 6EA4 $1,278
Lighting - Pendent/Surface Basement 5EA6 $1,095
Partitions Basement 6EA6 $1,782
Urinals Basement 6EA14 $4,704
Walls - Structural Glazed Tile Basement 6SF1,044 $3,284
Water Closet Basement 6EA6 $2,016
Accessories Engineer's toilet mirror, toilet paper holder6SF31 $286
Ceiling - Plaster/Drywall Engineer's toilet 5SF31 $284
Doors - Wood Doors inclu hw Engineer's toilet 6EA1 $301
Floor - Wood Engineer's toilet 5SF31 $453
Lavatory Engineer's toilet 5EA1 $1,590
Lighting - Pendent/Surface Engineer's toilet 6EA1 $124
Walls - Masonry Engineer's toilet 5SF98 $4,050
Walls - Plaster/Drywall Engineer's toilet 5SF98 $743
Page 16 of 30CASTELLANOS Assessment Date: 8/26/14
Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623
Building: Main
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Restroom
Water Closet Engineer's toilet 6EA1 $336
Accessories Main office unisex Mirror,soap and paper towel dispenser6SF75 $692
Ceiling - Plaster/Drywall Main office unisex 5SF75 $687
Doors - Wood Doors inclu hw Main office unisex 6EA1 $301
Floor - Tile Ceramic/ Porcelain Main office unisex 6SF75 $159
Lavatory Main office unisex 6EA1 $320
Lighting - Pendent/Surface Main office unisex 6EA1 $124
Partitions Main office unisex 5EA1 $751
Walls - Plaster/Drywall Main office unisex 6SF279 $770
Water Closet Main office unisex 6EA1 $336
Accessories Teachers Lounge soap dispenser, toilet paper holder5SF86 $1,702
Ceiling - Plaster/Drywall Teachers Lounge 6SF86 $298
Doors - Wood Doors inclu hw Teachers Lounge 5EA1 $1,174
Floor - Tile Ceramic/ Porcelain Teachers Lounge 6SF86 $182
Lavatory Teachers Lounge 6EA1 $320
Lighting - Pendent/Surface Teachers Lounge 6EA1 $124
Partitions Teachers Lounge 6EA2 $594
Walls - Plaster/Drywall Teachers Lounge 6SF450 $1,242
Water Closet Teachers Lounge 6EA2 $672
Rooms (Other Than Classrooms) Subtotal: $244,472
Building: Main
Category: Building Interior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Corridor
Ceiling - Plaster/Drywall 1st Floor 6SF2,282 $14,130
Doors - Steel Doors incl hw 1st Floor 6EA9 $2,709
Doors - Wood Doors include hw 1st Floor 6EA14 $4,214
Drinking Fountains - Single Fountain 1st Floor 6EA4 $1,103
Floor - Tile/Sheet 1st Floor deteriorated, worn, cracking4SF2,282 $22,060
Lighting - Pendent/Surface 1st Floor 6EA24 $2,973
Walls - Plaster/Drywall 1st Floor 6SF3,494 $15,489
Ceiling - Plaster/Drywall 2nd Floor 6SF2,777 $17,195
Drinking Fountains - Single Fountain 2nd Floor 6EA4 $1,103
Floor - Concrete Epoxy/ Painted 2nd Floor 6SF2,777 $1,350
Lighting - Pendent/Surface 2nd Floor 6EA24 $2,973
Page 17 of 30CASTELLANOS Assessment Date: 8/26/14
Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623
Building: Main
Category: Building Interior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Corridor
Student Lockers - Two Tiers 2nd Floor 6EA72 $3,342
Walls - Plaster/Drywall 2nd Floor 6SF3,870 $17,156
Walls - Tile Ceramic/ Porcelain 2nd Floor 6SF60 $189
Ceiling - Plaster/Drywall 3rd floor 6SF2,377 $14,718
Doors - Steel Doors incl hw 3rd floor 7EA2 $0
Drinking Fountains - Single Fountain 3rd floor 6EA4 $1,103
Floor - Concrete Epoxy/ Painted 3rd floor 6SF2,377 $1,156
Lighting - Pendent/Surface 3rd floor 6EA24 $2,973
Student Lockers - Two Tiers 3rd floor 6EA80 $3,713
Walls - Plaster/Drywall 3rd floor 6SF3,870 $17,156
Walls - Tile Ceramic/ Porcelain 3rd floor 6SF60 $189
Ceiling - Plaster/Drywall Basemant north west 6SF204 $1,263
Doors - Wood Doors include hw Basemant north west 6EA2 $602
Floor - Concrete Epoxy/ Painted Basemant north west 5SF204 $350
Lighting - Pendent/Surface Basemant north west 6EA2 $248
Stairs - Concrete Stairs Basemant north west 6LF50 $415
Walls - Structural Glazed Tile Basemant north west 6SF1,044 $3,284
Ceiling - Plaster/Drywall Basement south west corridor 5SF204 $2,570
Doors - Wood Doors include hw Basement south west corridor 6EA2 $602
Floor - Concrete Epoxy/ Painted Basement south west corridor 6SF204 $99
Lighting - Pendent/Surface Basement south west corridor 6EA2 $248
Stairs - Concrete Stairs Basement south west corridor 6LF50 $415
Walls - Structural Glazed Tile Basement south west corridor 6SF509 $1,601
Ceiling - Plaster/Drywall Basement 6SF432 $2,675
Doors - Steel Doors incl hw Basement 6EA2 $602
Floor - Concrete Basement 6SF432 $229
Lighting - Pendent/Surface Basement 6EA10 $1,239
Walls - Concrete Block Basement 6SF750 $2,199
Walls - Masonry Basement 6SF750 $2,360
Safety
Camera Viewing Station 6EA1 $683
Security Cameras 6EA10 $1,940
Stairs
Ceiling - Plaster/Drywall Main Entrance 6SF702 $5,140
Floor - Concrete Epoxy/ Painted Main Entrance 6SF370 $180
Floor - Tile Ceramic/ Porcelain Main Entrance 6SF135 $905
Page 18 of 30CASTELLANOS Assessment Date: 8/26/14
Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623
Building: Main
Category: Building Interior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Stairs
Handrails Main Entrance 6LF116 $1,005
Lighting - Pendent/Surface Main Entrance 6EA11 $1,363
Lighting - Wall Mounted Main Entrance 6EA2 $248
Stairs - Concrete Main Entrance 6LF360 $2,986
Walls - Plaster/Drywall Main Entrance 6SF1,350 $3,726
Ceiling - Plaster/Drywall North 6SF656 $4,803
Floor - Concrete Epoxy/ Painted North 5SF880 $4,014
Floor - Tile Ceramic/ Porcelain North 6SF73 $490
Handrails North 6LF182 $1,577
Lighting - Pendent/Surface North 6EA10 $1,239
Stairs - Concrete North 5LF480 $47,561
Walls - Plaster/Drywall North 6SF3,373 $9,309
Walls - Tile Ceramic/ Porcelain North 6SF160 $503
Ceiling - Plaster/Drywall South 6SF656 $4,803
Floor - Concrete Epoxy/ Painted South 5SF880 $4,014
Floor - Tile Ceramic/ Porcelain South 5SF73 $1,166
Handrails South 6LF182 $1,577
Lighting - Pendent/Surface South 5EA2 $365
Lighting - Pendent/Surface South 6EA8 $991
Stairs - Concrete South 5LF456 $45,183
Walls - Plaster/Drywall South 6SF3,373 $9,309
Walls - Structural Glazed Tile South 6SF160 $503
Building Interior Subtotal: $323,577
Total Building Cost $3,303,448
Building: Addition
Category: Building Exterior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Entrance
Exterior Doors - Exterior Wood Door 8 6EA2 $961
Exterior Doors - Transom Lite 8 6EA2 $627
Exterior Stairs - Concrete 8 6LF15 $1,227
Stair Handrail - Steel_Stair Handrail 8 6LF8 $69
Page 19 of 30CASTELLANOS Assessment Date: 8/26/14
Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623
Building: Addition
Category: Building Exterior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Foundation
Foundation - Masonry Entire Building 7LF390 $0
Superstructure - Steel with Clay Tile Arch Entire Building 7SF23,768 $0
Lighting
Exterior Lighting - Parapet or Roof Mounted Main Roof 6EA2 $1,073
Roof System
Coping - Stone C / Entire Building 6LF222 $7,130
Coping - Stone D / Entire Building 6LF146 $4,689
Coping - Stone E / Entire Building 6LF22 $707
Downspouts - Exterior Downspouts E / Entire Building 6LF16 $532
Downspouts - Interior Downspouts C / Entire Building 6LF58 $1,928
Downspouts - Interior Downspouts D / Entire Building 6LF43 $1,429
Parapet - 16" - 30" Height D / Entire Building 6LF146 $5,833
Parapet - Parapet < 16" Height C / Entire Building 6LF222 $4,730
Parapet - Parapet < 16" Height E / Entire Building 6LF22 $469
Roof Structure - Steel with Clay Tile Arch C / Entire Building 7SF4,455 $0
Roof Structure - Steel with Clay Tile Arch D / Entire Building 7SF2,646 $0
Roof Structure - Steel with Clay Tile Arch E / Entire Building 7SF656 $0
Roof - Asphalt Gravel Ballast C / Entire Building 6SF4,455 $45,295
Roof - Asphalt Gravel Ballast D / Entire Building 6SF2,646 $26,903
Roof - Asphalt Gravel Ballast E / Entire Building 6SF656 $6,670
Walls
Exterior Walls - Brick Entire Building 6SF12,618 $84,806
Exterior Walls - Stone-Cut Entire Building 6SF876 $5,888
Windows
Guard - Guards perforated Entire Building 6SF477 $6,091
Lintels - Steel Entire Building 6LF231 $6,706
Lintels - Stone Entire Building / East 6LF12 $0
Windows - Decorative Entire Building / East fixed6SF24 $179
Windows - Insulated Panel Entire Building 6SF114 $851
Windows - Sash Aluminum Double-pane Entire Building 6SF2,211 $16,504
Building Exterior Subtotal: $231,295
Building: Addition
Category: Electrical System
Page 20 of 30CASTELLANOS Assessment Date: 8/26/14
Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623
Category: Electrical System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Emergency System
Emergency A/C Power - Corridors and Stairs Entire Building 6SF6,363 $1,911
Emergency A/C Power - Gym Entire Building / Basement 6SF2,400 $892
Emergency Battery Packs - Corridors and Stairs Entire Building 6EA10 $2,025
Exit Signs - Corridors and Stairs Entire Building / Electrical Room School do not have Generator or UPS installed and exit signs are not provided with battery backup.
2EA9 $4,909
Power Distribution
Lighting and Power Panels - 100 A Entire Building / Basement 6EA2 $598
Lighting and Power Panels - Above 100 A Entire Building 6EA5 $2,485
Electrical System Subtotal: $12,821
Building: Addition
Category: Safty System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Sprinkler System
Sprinkler Heads Entire Building Heads are so old4SF23,768 $12,236
Sprinkler Piping Entire Building 6SF23,768 $4,418
Wet Sprinkler System Entire Building 6SF23,768 $6,118
Safty System Subtotal: $22,772
Building: Addition
Category: Mechanical System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Air Handling Systems
Air Handling Unit- Built Up-Multi Zone- Steam Coils - 15001 - 25000 Basement Motor isold5EA1 $66,438
Air Intake Basement / Lower Roof 6EA1 $5,765
Auxiliaries - 15001 - 25000 cfm Basement 6EA1 $5,788
Return Duct Work - Indoor- Vertical Shaft and Ducts Basement 5LF100 $96,198
Zone Dampers Basement 5EA15 $28,703
Heating Devices
Radiators - Steam Entire Building 6EA3 $833
Wall Heater - Electric 2nd Floor Poor condition4EA1 $1,083
Mechanical Plumbing
Condensate-Steel or Galvanized Basement 6LF100 $7,678
Temperature Control
Pneumatic System Entire Building Large number of dampers are not working properly4SF23,768 $123,717
Page 21 of 30CASTELLANOS Assessment Date: 8/26/14
Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623
Building: Addition
Category: Mechanical System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Temperature Control
Thermostats - Pneumatic Entire Building Not providing the right signal to the room4EA15 $11,059
Ventilation
Exhaust Fans- Roof Mounted - 500 - 1500 CFM Lower Roof 6EA1 $592
Mechanical System Subtotal: $347,853
Building: Addition
Category: Plumbing System
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Piping
Domestic Piping-Cold Water from Risers to Fixtures Entire Building Majority of the piping are galvanized4SF23,768 $16,994
Domestic Piping-Cold Water Horizontal Lines Entire Building Majority of the piping are galvanized4SF23,768 $34,328
Domestic Piping-Cold Water Risers Entire Building Majority of the piping are galvanized4SF23,768 $19,033
Domestic Piping-Hot Water from Risers to Fixtures Entire Building Majority of the piping are galvanized4SF23,768 $12,916
Domestic Piping-Hot Water Horizontal Lines Entire Building Majority of the piping are galvanized4SF23,768 $30,589
Domestic Piping-Hot Water Return Lines Entire Building Majority of the piping are galvanized4SF23,768 $20,393
Domestic Piping-Hot Water Return Risers Entire Building Majority of the piping are galvanized4SF23,768 $11,556
Sanitary Piping Entire Building 6SF23,768 $21,752
Storm Piping Entire Building 6SF23,768 $20,733
Vent Piping Entire Building 6SF23,768 $15,974
Plumbing System Subtotal: $204,269
Building: Addition
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #211 (Store Room)
AC Units 2nd Floor 6EA1 $496
Ceiling - Lay-in 2nd Floor 6SF560 $1,682
Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301
Floor - Tile/Sheet 2nd Floor 6SF560 $561
Lighting - Lay-in 2nd Floor 7EA6 $0
Marker Board 2nd Floor 7LF10 $0
Walls - Plaster/Drywall 2nd Floor 6SF776 $2,142
Page 22 of 30CASTELLANOS Assessment Date: 8/26/14
Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623
Building: Addition
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #212 (Computer Lab)
AC Units 2nd Floor 7EA1 $0
Casework 2nd Floor 6LF44 $1,111
Ceiling - Lay-in 2nd Floor 6SF885 $2,658
Doors - Transom Window 2nd Floor 6SF9 $152
Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301
Floor - Tile/Sheet 2nd Floor 6SF885 $886
Lighting - Lay-in 2nd Floor 6EA12 $1,428
Storage/ Closet 2nd Floor 6SF76 $551
Walls - Plaster/Drywall 2nd Floor 6SF986 $2,721
Wireless System 2nd Floor 6EA1 $372
Classroom #213 (Science Classroom)
AC Units 7EA1 $0
Casework 6LF80 $2,020
Ceiling - Lay-in 6SF1,140 $3,423
Doors - Transom Window 6SF18 $305
Doors - Wood Doors inclu hw 6EA1 $301
Floor - Tile/Sheet 6SF1,140 $1,141
Lighting - Lay-in 7EA12 $0
Marker Board 6LF10 $214
Walls - Plaster/Drywall 6SF1,118 $3,086
Work Sink 6EA2 $758
Classroom #310 (Regular Classroom)
AC Units 7EA1 $0
Casework 5LF7 $1,464
Ceiling - Lay-in 6SF837 $2,514
Chalk Board obsolete material4LF48 $4,407
Doors - Wood Doors inclu hw 6EA1 $301
Floor - Wood 6SF837 $5,901
Lighting - Lay-in 7EA12 $0
Walls - Plaster/Drywall 6SF966 $2,666
Classroom #312 (Regular Classroom)
AC Units 7EA1 $0
Casework 6LF8 $202
Ceiling - Lay-in 7SF837 $0
Chalk Board obsolete material4LF48 $4,407
Doors - Transom Window 6SF9 $152
Page 23 of 30CASTELLANOS Assessment Date: 8/26/14
Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623
Building: Addition
Category: Classrooms
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Classroom #312 (Regular Classroom)
Doors - Wood Doors inclu hw 6EA1 $301
Floor - Wood 6SF837 $5,901
Lighting - Lay-in 6EA12 $1,428
Walls - Plaster/Drywall 6SF1,053 $2,906
Classrooms Subtotal: $59,157
Building: Addition
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Administrative Suites/Offices
AC Unit 209 6EA1 $496
Ceiling - Plaster/Drywall 209 5SF213 $1,952
Doors - Transom Window 209 6SF9 $152
Doors - Wood Doors inclu hw 209 6EA1 $301
Floor - Wood 209 6SF213 $1,502
Lighting - Pendent/Surface 209 6EA3 $372
Walls - Plaster/Drywall 209 6SF521 $1,438
Work SInk 209 6EA1 $508
Ceiling - Lay-in 210A 6SF165 $495
Doors - Wood Doors inclu hw 210A 6EA1 $301
Floor - Tile/Sheet 210A 6SF165 $165
Lighting - Lay-in 210A 7EA3 $0
Storage/ Closet 210A 6SF12 $87
Walls - Plaster/Drywall 210A 6SF450 $1,242
Ceiling - Lay-in 210B 6SF166 $498
Doors - Wood Doors inclu hw 210B 6EA1 $301
Floor - Tile/Sheet 210B 6SF166 $166
Lighting - Lay-in 210B 6EA3 $357
Walls - Plaster/Drywall 210B 6SF418 $1,154
Ceiling - Lay-in Computer lab office 6SF275 $826
Doors - Wood Doors inclu hw Computer lab office 6EA1 $301
Floor - Tile/Sheet Computer lab office 6SF275 $275
Lighting - Lay-in Computer lab office 6EA3 $357
Walls - Plaster/Drywall Computer lab office 6SF581 $1,604
Ceiling - Plaster/Drywall Gym Office 6SF767 $2,654
Doors - Wood Doors inclu hw Gym Office 6EA2 $602
Page 24 of 30CASTELLANOS Assessment Date: 8/26/14
Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623
Building: Addition
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Administrative Suites/Offices
Floor - Tile/Sheet Gym Office 6SF767 $768
Lighting - Pendent/Surface Gym Office 6EA15 $1,858
Walls - Masonry Gym Office 6SF1,120 $3,524
Gymnasia
Ceiling - Plaster/Drywall Basement 6SF2,400 $13,248
Doors - Wood Doors inclu hw Basement 6EA6 $1,806
Floor - Concrete Basement 6SF252 $133
Floor - Wood Basement 6SF2,400 $16,920
Lighting - Pendent/Surface Basement 6EA14 $1,735
Scoreboards Basement 6EA1 $2,244
Sound System Basement 6EA1 $41,654
Stage Basement 6SF345 $1,993
Stage Curtain Basement 6EA3 $0
Stage Lighting System Basement 6EA1 $12,369
Walls - Structural Glazed Tile Basement 6SF3,264 $10,269
Library
Casework 110 6LF46 $1,162
Ceiling - Lay-in 110 6SF1,400 $4,204
Doors - Wood Doors inclu hw 110 6EA2 $602
Floor - Tile/Sheet 110 6SF1,400 $1,401
Lighting - Lay-in 110 6EA23 $2,736
Walls - Plaster/Drywall 110 6SF1,231 $3,397
Mechanical/ Service Rooms
Storage Room 2nd Floor 6SF375 $2,687
Mechanical/ Service Rooms Basement 6SF1,000 $7,164
Restroom
Accessories 1st Floor - Girls toilet paper dispenser, mirror, soap dispenser,
paper towel dispenser
6SF278 $2,564
Ceiling - Plaster/Drywall 1st Floor - Girls 6SF278 $962
Doors - Wood Doors inclu hw 1st Floor - Girls 6EA2 $602
Floor Drain 1st Floor - Girls 6EA1 $1,059
Floor - Tile Ceramic/ Porcelain 1st Floor - Girls 6SF278 $588
Hand Dryer 1st Floor - Girls 7EA1 $0
Lavatory 1st Floor - Girls 7EA2 $0
Lighting - Pendent/Surface 1st Floor - Girls 6EA3 $372
Page 25 of 30CASTELLANOS Assessment Date: 8/26/14
Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623
Building: Addition
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Restroom
Partitions 1st Floor - Girls 6EA5 $1,485
Walls - Structural Glazed Tile 1st Floor - Girls 6SF646 $2,032
Water Closet 1st Floor - Girls 6EA5 $1,680
Accessories 1st Floor Staff- Library Restroom mirror, soap dispenser, toilet paper dispenser7SF54 $0
Ceiling - Lay-in 1st Floor Staff- Library Restroom 6SF54 $162
Doors - Wood Doors inclu hw 1st Floor Staff- Library Restroom 6EA1 $301
Floor - Tile/Sheet 1st Floor Staff- Library Restroom 6SF54 $54
Lavatory 1st Floor Staff- Library Restroom 6EA1 $320
Lighting - Lay-in 1st Floor Staff- Library Restroom 6EA1 $119
Walls - Plaster/Drywall 1st Floor Staff- Library Restroom 6SF191 $527
Water Closet 1st Floor Staff- Library Restroom 6EA1 $336
Accessories 2nd Floor mirror, soap dispenser, toilet paper dispenser6SF268 $2,472
Accessories 2nd Floor toilet paper holder6SF68 $627
Ceiling - Plaster/Drywall 2nd Floor 6SF268 $927
Ceiling - Plaster/Drywall 2nd Floor 6SF68 $235
Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301
Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602
Floor Drain 2nd Floor 6EA1 $1,059
Floor - Tile Ceramic/ Porcelain 2nd Floor 5SF268 $4,281
Floor - Tile Ceramic/ Porcelain 2nd Floor 6SF68 $144
Hand Dryer 2nd Floor 7EA1 $0
Lavatory 2nd Floor 6EA1 $320
Lavatory 2nd Floor 6EA2 $639
Lighting - Pendent/Surface 2nd Floor 6EA1 $124
Lighting - Pendent/Surface 2nd Floor 6EA3 $372
Partitions 2nd Floor 6EA2 $594
Partitions 2nd Floor 6EA2 $594
Urinals 2nd Floor 6EA5 $1,680
Walls - Plaster/Drywall 2nd Floor 6SF214 $591
Walls - Plaster/Drywall 2nd Floor 6SF308 $850
Walls - Structural Glazed Tile 2nd Floor 6SF643 $2,023
Water Closet 2nd Floor 6EA2 $672
Water Closet 2nd Floor 6EA2 $672
Accessories 3rd Floor mirror, soap dispenser, toilet paper dispenser6SF264 $2,435
Ceiling - Plaster/Drywall 3rd Floor 6SF264 $914
Doors - Wood Doors inclu hw 3rd Floor 6EA2 $602
Floor Drain 3rd Floor 6EA1 $1,059
Page 26 of 30CASTELLANOS Assessment Date: 8/26/14
Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623
Building: Addition
Category: Rooms (Other Than Classrooms)
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Restroom
Floor - Tile/Sheet 3rd Floor 6SF264 $264
Hand Dryer 3rd Floor 7EA1 $0
Lavatory 3rd Floor 7EA2 $0
Lighting - Pendent/Surface 3rd Floor 7EA3 $0
Partitions 3rd Floor 6EA5 $1,485
Walls - Plaster/Drywall 3rd Floor 6SF201 $555
Walls - Structural Glazed Tile 3rd Floor 6SF602 $1,894
Water Closet 3rd Floor 6EA5 $1,680
Rooms (Other Than Classrooms) Subtotal: $193,808
Building: Addition
Category: Building Interior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Corridor
Ceiling - Plaster/Drywall 1st Floor 6SF1,344 $8,322
Doors - Wood Doors include hw 1st Floor 6EA4 $1,204
Floor - Tile/Sheet 1st Floor 6SF1,344 $730
Lighting - Pendent/Surface 1st Floor 6EA14 $1,735
Walls - Plaster/Drywall 1st Floor 6SF2,438 $10,808
Ceiling - Plaster/Drywall 2nd Floor 6SF1,344 $8,322
Doors - Steel Doors incl hw 2nd Floor 6EA2 $602
Floor - Tile/Sheet 2nd Floor 5SF1,344 $6,035
Lighting - Pendent/Surface 2nd Floor 6EA14 $1,735
Walls - Plaster/Drywall 2nd Floor 6SF2,438 $10,808
Ceiling - Plaster/Drywall 3rd Floor 7SF1,344 $0
Doors - Steel Doors incl hw 3rd Floor 6EA2 $602
Floor - Tile/Sheet 3rd Floor 6SF1,344 $730
Lighting - Pendent/Surface 3rd Floor 6EA13 $1,611
Student Lockers - Two Tiers 3rd Floor 6EA48 $2,228
Walls - Plaster/Drywall 3rd Floor 6SF1,916 $8,494
Ceiling - Plaster/Drywall Basement 6SF1,246 $7,715
Doors - Steel Doors incl hw Basement 6EA2 $602
Drinking Fountains - Single Fountain Basement 7EA2 $0
Floor - Concrete Basement 6SF1,246 $659
Lighting - Pendent/Surface Basement 7EA13 $0
Walls - Plaster/Drywall Basement 6SF1,891 $8,383
Page 27 of 30CASTELLANOS Assessment Date: 8/26/14
Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623
Building: Addition
Category: Building Interior
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Corridor
Walls - Tile Ceramic/ Porcelain Basement 6SF30 $94
Stairs
Ceiling - Plaster/Drywall North 5SF839 $12,334
Floor - Concrete North 6SF70 $37
Floor - Terrazzo North 6SF422 $3,542
Floor - Tile Ceramic/ Porcelain North 6SF71 $476
Handrails North 6LF192 $1,664
Lighting - Pendent/Surface North 6EA13 $1,611
Stairs - Concrete North 6LF60 $498
Stairs - Terrazzo North 6LF462 $4,288
Walls - Plaster/Drywall North 6SF3,412 $9,417
Building Interior Subtotal: $115,283
Total Building Cost $1,187,259
SITE
Category: Site
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Civil/Drainage
Civil/ Drainage - Catch Basin Entire Site North and West parking lot, flooding during heavy
downpours
4EA2 $8,239
Civil/ Drainage - Site Manhole Entire Site 6EA5 $7,464
Fencing
Fencing - Chain Link Entire Site / West 6LF50 $939
Fencing - Old Standard Ornamental Entire Site 6LF690 $35,719
Landscape
Landscape - Hardscape- Concrete Entire Site 6SF800 $4,130
Landscape - Hardscape- Concrete Entire Site / North North area and Courtyards - cracks5SF150 $1,645
Parkway trees Entire Site / North 7EA5 $0
Planting Beds/ Area Entire Site 6SF420 $691
Parking Lot
Surface - Asphalt South / North 6SF11,132 $31,042
Surface - Asphalt South under construction4SF18,316 $144,579
Page 28 of 30CASTELLANOS Assessment Date: 8/26/14
Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623
SITE
Category: Site
Item - Type Quantity Unit Rank Cost LocationGroup Comments
Sidewalks
Sidewalks - Perimeter Sidewalks Entire Site cracks, heaved - East ,North5SF200 $1,910
Sidewalks - Perimeter Sidewalks Entire Site 6SF6,124 $12,173
Signage
Flag Pole - Building Mounted Flag Pole Entire Site / East 6EA1 $828
Marquee - Free Standing Back Lighted Entire Site / East 6EA1 $0
Site Subtotal: $249,358
Total Site Cost $249,358
Campus Total ² ³
² As stated above, Total Assessed Campus Need does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space
reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Total Assessed Campus Need includes current deficiencies and is based on current unit cost estimates;
it does not reflect a complete project cost.
³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are
estimates only and are based solely on the data that was collected as of the assessment date in the footer below.
¹ It is very rare for assessors to find a feature in this condition. If assessors do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked “1” in this report; by the time the report is compiled, they have been resolved.
$4,740,065
Definitions
● Quantity
● Unit
means a basic estimate for each item needing some level of repair or replacement. Cost does not include all expenses that would be necessary to complete a repair or replacement project. This is because,
depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and
additional work triggered by building codes.
means, for each item, the total number (or amount) of that item that exists and was evaluated.
means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement “EA” for “each.” Other items, like
chimneys, are measured in terms of linear feet (“LF”). Still other items, like flooring, are generally measured in square feet (“SF”).
● Cost
● For the same reason, the Total Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features.
● Campus Total also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to
alleviate overcrowding; these are viewed as separate capital needs.
Page 29 of 30CASTELLANOS Assessment Date: 8/26/14
Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623
Classroom Summary
Smart-
Board
Power
Strip
Window
Stop
Operable
Window
Area
Glazed
Window
Area
Noise
Level
Elect.
Outlets
Data
Outlets
Voice
Outlets
Area (SF)Floor Plan
Room
Number
Room
Number
Intended UsageCurrent Usage Room
Location
Main
NNN40861728101,045303303Regular ClassroomArt Room
NYN408617272340943205205Regular ClassroomComputer Lab
YYN4086172863601,174305305Regular ClassroomComputer Lab
NYN500018201,0300909-BasementRegular ClassroomRegular Classroom
NYN408617214711,024101101KindergartenRegular Classroom
NYN40861726211,037102102Regular ClassroomRegular Classroom
NYN408617214211,023103103Regular ClassroomRegular Classroom
NYN408617221411,075105105Regular ClassroomRegular Classroom
NYN40861726211,037106106Regular ClassroomRegular Classroom
NNN407615212211,025107107Regular ClassroomRegular Classroom
NNN409719412211,021109109Regular ClassroomRegular Classroom
NYN40861728001,041201201Regular ClassroomRegular Classroom
NYN40861728211,039202202Regular ClassroomRegular Classroom
NYN40861728001,036203203Regular ClassroomRegular Classroom
NNN4050100800693204204Regular ClassroomRegular Classroom
NNN40861728101,045206206Regular ClassroomRegular Classroom
YYN40861729101,034207207Regular ClassroomRegular Classroom
YYN40971946101,044209209Regular ClassroomRegular Classroom
NNN40861728101,061301301Regular ClassroomRegular Classroom
NYN40861728101,059302302Regular ClassroomRegular Classroom
NYN40861728101,171304304Regular ClassroomRegular Classroom
NYN40861728101,059306306Regular ClassroomRegular Classroom
YYN40721448001,034307307Regular ClassroomRegular Classroom
NNN40971948101,064309309Regular ClassroomRegular Classroom
Addition
YNN40722312470961210212Regular ClassroomComputer Lab 2nd Floor
NNN4085170810837310310Regular ClassroomRegular Classroom
NYN40851708810837312312Regular ClassroomRegular Classroom
NYN406319420001,140211/213213Regular ClassroomScience Classroom
NNN407314634110560211/213211Regular ClassroomStore Room 2nd Floor
Page 30 of 30CASTELLANOS Assessment Date: 8/26/14