Rosario Castellanos Elementary School 2524 S Central Park Ave Chicago, IL 60623 This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility item by visual observation only; they do not test the operation of equipment or perform destructive testing of walls, ceilings or floors. Each facility item is ranked on a 7-point scale: rank 7 means the item is in new or in good condition and no work is required while rank 1 means the item has failed and has lead to an immediate life safety condition¹. The remaining ranks choices generally mean that the item requires regular maintenance (rank 5 or 6) or full replacement (rank 2, 3 or 4). For additional detail and definition on rank values as they relate to each assessed item, please visit the "CPS Guide to Biennial Facility Assessments" found on the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/About_CPS/Policies_and_guidelines/Pages/facilitystandards.aspx. Definitions for Quantity, Unit, Cost and Campus Total can be found at the end of this report. Facility Assessment Report Building Name Year Constructed Building Area (Sq Ft) Assessed Need Number of Floors Campus Summary Main 1912 60,348 $3,303,448 3 Addition 1938 23,768 $1,187,259 3 SITE $249,358 Campus Total $4,740,065 84,116 Building: Main Category: Building Exterior Item - Type Quantity Unit Rank Cost Location Group Comments Entrance Entrance Control - Audio and Video 1 strike doesn't work properly 5 EA 1 $1,567 Exterior Doors - Exterior Wood Door 1 6 EA 3 $1,442 Exterior Doors - Exterior Wood Door 2 6 EA 2 $961 Exterior Doors - Exterior Wood Door 3 6 EA 3 $1,442 Exterior Doors - Exterior Wood Door 4 6 EA 1 $481 Exterior Doors - Exterior Wood Door 5 boiler room - graffiti 5 EA 1 $1,341 Exterior Doors - Exterior Wood Door 6 basement 6 EA 1 $481 Exterior Doors - Exterior Wood Door 9 7 EA 2 $0 Exterior Doors - Side lite 1 6 EA 3 $940 Exterior Doors - Transom Lite 1 6 EA 3 $940 Exterior Doors - Transom Lite 2 6 EA 2 $627 Exterior Doors - Transom Lite 9 6 EA 2 $627 Exterior Stairs - Concrete 1 5 LF 45 $4,931 Exterior Stairs - Concrete 2 7 LF 15 $0 Exterior Stairs - Concrete 9 6 LF 15 $1,227 Stair Handrail - Steel_Stair Handrail 1 6 LF 20 $173 Stair Handrail - Steel_Stair Handrail 2 6 LF 8 $69 Stair Handrail - Steel_Stair Handrail 9 6 LF 8 $69 Page 1 of 30 CASTELLANOS Assessment Date: 8/26/14

Transcript of Rosario Castellanos Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2510D.pdf ·...

Page 1: Rosario Castellanos Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2510D.pdf · Rosario Castellanos Elementary School 2524 S Central Park Ave Chicago, IL 60623

Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623

This report contains the detailed findings of a facility assessment completed on the date noted in the document footer below. Assessors rate each facility item by visual observation only; they do not test the operation of equipment or perform destructive testing of walls, ceilings or floors. Each facility item is ranked on a 7-point scale: rank 7 means the item is in new or in good condition and no work is required while rank 1 means the item has failed and has lead to an immediate life safety condition¹. The remaining ranks choices generally mean that the item requires regular maintenance (rank 5 or 6) or full replacement (rank 2, 3 or 4). For additional detail and definition on rank values as they relate to each assessed item, please visit the "CPS Guide to Biennial Facility Assessments" found on the Facilities Standards webpage under CPS Policies and Guidelines at http://www.cps.edu/About_CPS/Policies_and_guidelines/Pages/facilitystandards.aspx. Definitions for Quantity, Unit, Cost and Campus Total can be found at the end of this report.

Facility Assessment Report

Building Name Year Constructed Building Area (Sq Ft) Assessed Need Number of Floors

Campus Summary

Main 1912 60,348 $3,303,4483

Addition 1938 23,768 $1,187,2593

SITE $249,358

Campus Total $4,740,06584,116

Building: Main

Category: Building Exterior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Entrance

Entrance Control - Audio and Video 1 strike doesn't work properly5EA1 $1,567

Exterior Doors - Exterior Wood Door 1 6EA3 $1,442

Exterior Doors - Exterior Wood Door 2 6EA2 $961

Exterior Doors - Exterior Wood Door 3 6EA3 $1,442

Exterior Doors - Exterior Wood Door 4 6EA1 $481

Exterior Doors - Exterior Wood Door 5 boiler room - graffiti5EA1 $1,341

Exterior Doors - Exterior Wood Door 6 basement6EA1 $481

Exterior Doors - Exterior Wood Door 9 7EA2 $0

Exterior Doors - Side lite 1 6EA3 $940

Exterior Doors - Transom Lite 1 6EA3 $940

Exterior Doors - Transom Lite 2 6EA2 $627

Exterior Doors - Transom Lite 9 6EA2 $627

Exterior Stairs - Concrete 1 5LF45 $4,931

Exterior Stairs - Concrete 2 7LF15 $0

Exterior Stairs - Concrete 9 6LF15 $1,227

Stair Handrail - Steel_Stair Handrail 1 6LF20 $173

Stair Handrail - Steel_Stair Handrail 2 6LF8 $69

Stair Handrail - Steel_Stair Handrail 9 6LF8 $69

Page 1 of 30CASTELLANOS Assessment Date: 8/26/14

Page 2: Rosario Castellanos Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2510D.pdf · Rosario Castellanos Elementary School 2524 S Central Park Ave Chicago, IL 60623

Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623

Building: Main

Category: Building Exterior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Foundation

Foundation - Masonry Entire Building seepage7LF20 $0

Foundation - Masonry Entire Building 7LF743 $0

Superstructure - Heavy Timber Entire Building 7SF55,872 $0

Superstructure - Steel with Clay Tile Arch Entire Building 7SF4,476 $0

Lighting

Exterior Lighting - Wall Mounted Entire Building 6EA4 $1,155

Roof System

Chimney - Metal Flue B / West metal tube chimney6LF66 $10,437

Coping - Metal A / Entire Building 7LF310 $0

Coping - Metal B / Entire Building 7LF197 $0

Coping - Terra Cotta A / Entire Building 6LF282 $9,057

Downspouts - Exterior Downspouts A / West 6LF264 $8,774

Downspouts - Exterior Downspouts B / West 6LF36 $1,196

Parapet - 16" - 30" Height A / Entire Building 6LF514 $20,536

Parapet - Parapet < 16" Height B / Entire Building 7LF436 $0

Parapet - Parapet > 30" A / South 6LF78 $4,986

Roof Structure - Heavy Timber A / Entire Building 7SF13,968 $0

Roof Structure - Steel with Clay Tile Arch B / Entire Building 7SF4,476 $0

Roof - Asphalt Gravel Ballast A / Entire Building 6SF13,698 $139,272

Roof - Asphalt Gravel Ballast B / Entire Building 6SF4,476 $45,509

Walls

Exterior Walls - Brick Entire Building 6SF31,853 $214,084

Exterior Walls - Brick Entire Building / West graffiti5SF100 $2,381

Exterior Walls - Stone-Cut Entire Building 6SF727 $4,886

Windows

Guard - Guards perforated Entire Building 6SF1,834 $23,420

Lintels - Brick Entire Building / Courtyard 6LF26 $0

Lintels - Steel Entire Building / West 6LF179 $5,196

Lintels - Stone Entire Building 6LF330 $0

Windows - Decorative Entire Building 6SF82 $612

Windows - Insulated Panel Entire Building 6SF318 $2,374

Windows - Louver Entire Building / Boiler Room 6SF32 $239

Windows - Sash Aluminum Double-pane Entire Building 6SF4,013 $29,955

Page 2 of 30CASTELLANOS Assessment Date: 8/26/14

Page 3: Rosario Castellanos Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2510D.pdf · Rosario Castellanos Elementary School 2524 S Central Park Ave Chicago, IL 60623

Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623

Building: Main

Category: Building Exterior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Building Exterior Subtotal: $541,387

Building: Main

Category: Electrical System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Emergency System

Automatic Transfer Switch Electrical Room 6EA1 $408

Emergency A/C Power - Corridors and Stairs Entire Building 6SF7,889 $2,369

Emergency A/C Power - Lunchrooms Entire Building / Basement 6SF3,069 $1,141

Emergency Battery Packs - Corridors and Stairs Entire Building 6EA29 $5,873

Emergency Battery Packs - Gym Entire Building / Basement 6EA4 $810

Emergency Battery Packs - Lunchrooms Entire Building / Basement 6EA1 $203

Emergency Battery Packs - Students Toilets Entire Building 6EA5 $1,013

Exit Signs - Corridors and Stairs Entire Building School do not have Generator or UPS installed

and exit signs are not provided with battery backup.

2EA39 $21,274

Exit Signs - Gym Entire Building / Basement School do not have Generator or UPS installed

and exit signs are not provided with battery backup.

2EA8 $4,626

Exit Signs - Lunchroom Entire Building / Basement School do not have Generator or UPS installed and exit signs are not provided with battery backup.

2EA2 $1,091

Security System - CCTV Entire Building Serves Main and Addition6SF84,116 $25,260

Security System - Intrusion Detection Entire Building Serves Main and Addition6SF84,116 $21,651

Main Service

Independent Electrical Service for emergency power Electrical Room Served the entire school6EA1 $2,921

Main Electrical Service - 1600 A 120/208/3PH Electrical Room Serves Main and Addition buildings6EA1 $5,641

PA System Entire Building Serves Main and Addition buildings6SF84,116 $27,666

Power Distribution

Lighting and Power Panels - 100 A Electrical Room / Basement Fuses4EA1 $4,849

Lighting and Power Panels - 100 A Electrical Room / Entire Building 6EA3 $897

Lighting and Power Panels - Above 100 A Electrical Room / Entire Building 6EA13 $6,461

Main Distribution Panels - 400 - 600 amp Electrical Room / Basement 6EA2 $1,055

Transformers - 277/480 - 120/208 Electrical Room / Basement 51 KVA6EA1 $1,265

Electrical System Subtotal: $136,474

Building: Main

Category: Safty System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Page 3 of 30CASTELLANOS Assessment Date: 8/26/14

Page 4: Rosario Castellanos Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2510D.pdf · Rosario Castellanos Elementary School 2524 S Central Park Ave Chicago, IL 60623

Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623

Building: Main

Category: Safty System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Fire Alarm

Fire Alarm Panel Basement / Mechanical Room Replacement of fire alarm panel has been

ordered. Served the entire school. Serves Main

and Addition buildings

4EA1 $49,477

Fire Alarm_System Basement / Entire Building Fire alarm system is in poor condition. No strobe

lights installed. Serves Main and Addition buildings

4SF84,116 $167,197

Fire Pump Controller Basement / Mechanical Room Controller is obsolete4EA1 $23,389

Pump Room Assembly

Fire Pump - 25-50 hp Basement / Mechanical Room Pump is in poor condition and excessive corrosion

present. Serves Main and Addition buildings

4EA1 $38,011

Sprinkler System

Sprinkler Heads Entire Building Heads are so old4SF60,348 $31,067

Sprinkler Piping Entire Building 6SF60,348 $11,219

Wet Sprinkler System Entire Building 6SF60,348 $15,534

Safty System Subtotal: $335,893

Building: Main

Category: Mechanical System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Air Handling Systems

Air Handling Unit- Built Up-Multi Zone-Double Delivery- Steam Coils - 30001 - 45000 cfm

Basement Motor is old.5EA1 $184,422

Air Intake Basement / East Façade 6EA2 $11,529

Auxiliaries - 30001 - 45000 cfm Basement 6EA1 $8,716

Return Duct Work - Masonry and Ducts- Missing or Existing Shaft Basement No return duct and fresh air intake is located on the ground east facade.

4LF100 $0

Zone Dampers Basement 5EA33 $63,147

Boiler Systems

Boiler Auxiliary- Scotch Marine- Steam Low Pressure Boiler - 151 - 200 HP

Boiler Room 6EA2 $5,091

Chemical Feed System Boiler Room 6EA1 $1,078

Combustion Dampers Boiler Room 6EA1 $409

Condensate Pump Boiler Room 6EA1 $2,021

Condensate Pump Boiler Room / Basement 6EA1 $2,021

Feed Water Pumps and Tank Boiler Room Tank is leaking and pumps are in poor condition4EA1 $92,964

Non Condensing- Fire Tube- Scotch Marine- Steam- Low Pressure Boiler - 151 - 200 HP

Boiler Room Serves Main and addition buildings6EA2 $5,091

Page 4 of 30CASTELLANOS Assessment Date: 8/26/14

Page 5: Rosario Castellanos Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2510D.pdf · Rosario Castellanos Elementary School 2524 S Central Park Ave Chicago, IL 60623

Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623

Building: Main

Category: Mechanical System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Boiler Systems

Piping - Steam Pipe- Steel Boiler Room Serves Main and addition buildings6LF300 $566

Steam Traps Boiler Room 6EA3 $792

Gas Booster

Gas Booster Basement 6EA2 $998

Heating Devices

Cabinet Heaters - With Steam Coil Basement 6EA3 $1,070

Radiators - Steam Entire Building 6EA5 $1,389

Unit Heater - Gas Boiler Room Unit heater is in poor condition4EA1 $3,234

Wall Heater - Electric Entire Building / 1st Floor Poor condition4EA1 $1,083

Wall Heater - Electric Entire Building / Basement Poor condition4EA1 $1,083

Wall Heater - Electric Entire Building 6EA4 $556

Mechanical Plumbing

Condensate-Steel or Galvanized Basement 6LF300 $23,033

Temperature Control

Pneumatic System Entire Building 5SF60,348 $207,977

Thermostats - Pneumatic Entire Building Not providing the right signal to the room4EA30 $22,117

Ventilation

Exhaust Fans- Indoor - 500 - 1500 CFM Lower Roof / Basement Vibrating and producing a louder noise4EA1 $4,245

Exhaust Fans- Roof Mounted - 500 - 1500 CFM Lower Roof 6EA2 $1,185

Mechanical System Subtotal: $645,815

Building: Main

Category: Plumbing System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Hot Water

Gas Heater - 150000 - 300000 BTU/HR Boiler Room Served the entire school6EA1 $310

Piping

Domestic Piping-Cold Water from Risers to Fixtures Entire Building Majority of the piping are galvanized4SF60,348 $43,149

Domestic Piping-Cold Water Horizontal Lines Entire Building Majority of the piping are galvanized4SF60,348 $87,161

Domestic Piping-Cold Water Risers Entire Building Majority of the piping are galvanized4SF60,348 $48,327

Domestic Piping-Hot Water from Risers to Fixtures Entire Building Majority of the piping are galvanized4SF60,348 $32,793

Domestic Piping-Hot Water Horizontal Lines Entire Building Majority of the piping are galvanized4SF60,348 $77,668

Domestic Piping-Hot Water Return Lines Entire Building Majority of the piping are galvanized4SF60,348 $51,779

Page 5 of 30CASTELLANOS Assessment Date: 8/26/14

Page 6: Rosario Castellanos Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2510D.pdf · Rosario Castellanos Elementary School 2524 S Central Park Ave Chicago, IL 60623

Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623

Building: Main

Category: Plumbing System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Piping

Domestic Piping-Hot Water Return Risers Entire Building Majority of the piping are galvanized4SF60,348 $29,341

Sanitary Piping Entire Building 6SF60,348 $55,230

Storm Piping Entire Building 6SF60,348 $52,642

Vent Piping Entire Building 6SF60,348 $40,560

Pumps

Pumps - Domestic Booster Pump-Simplex Boiler Room Serves the Main and addition buildings6EA1 $1,446

Pumps - Ejector-Duplex Boiler Room Pump is in poor condition4EA1 $15,749

Plumbing System Subtotal: $536,154

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #09-Basement (Regular Classroom)

Ceiling - Plaster/Drywall 5SF1,030 $9,441

Doors - Wood Doors inclu hw 6EA1 $301

Floor - Concrete 6SF1,030 $545

Lighting - Pendent/Surface 6EA19 $2,354

Marker Board 6LF8 $171

Walls - Masonry 5SF1,262 $52,155

Work Sink 6EA1 $379

Classroom #101 (Regular Classroom)

AC Units 6EA1 $496

Casework 5LF15 $3,136

Ceiling - Plaster/Drywall 6SF852 $2,948

Chalk Board obsolete material4LF24 $2,203

Doors - Transom Window 6SF9 $152

Doors - Wood Doors inclu hw 6EA1 $301

Floor - Tile/Sheet 6SF852 $853

Lighting - Pendent/Surface 7EA14 $0

Marker Board 6LF8 $171

Storage/ Closet 5SF172 $2,774

Walls - Plaster/Drywall 5SF1,345 $10,194

Classroom #102 (Regular Classroom)

AC Units 6EA1 $496

Page 6 of 30CASTELLANOS Assessment Date: 8/26/14

Page 7: Rosario Castellanos Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2510D.pdf · Rosario Castellanos Elementary School 2524 S Central Park Ave Chicago, IL 60623

Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #102 (Regular Classroom)

Ceiling - Plaster/Drywall 6SF865 $2,993

Chalk Board Partially covered, obsolete material4LF48 $4,407

Doors - Transom Window 6SF30 $508

Doors - Wood Doors inclu hw 6EA1 $301

Floor - Wood 6SF865 $6,098

Lighting - Pendent/Surface 7EA14 $0

Marker Board 6LF10 $214

Storage/ Closet 6SF172 $1,247

Walls - Plaster/Drywall 6SF1,336 $3,687

Classroom #103 (Regular Classroom)

AC Units 6EA1 $496

Ceiling - Plaster/Drywall 6SF851 $2,945

Chalk Board Partially covered, obsolete material4LF30 $2,754

Doors - Transom Window 6SF30 $508

Doors - Wood Doors inclu hw 6EA1 $301

Floor - Wood 6SF851 $5,999

Lighting - Pendent/Surface 7EA14 $0

Marker Board 6LF10 $214

Storage/ Closet 5SF172 $2,774

Walls - Plaster/Drywall 6SF1,323 $3,651

Classroom #105 (Regular Classroom)

AC Units 6EA1 $496

Ceiling - Plaster/Drywall 6SF903 $3,125

Chalk Board obsolete material4LF24 $2,203

Doors - Transom Window 6SF9 $152

Doors - Wood Doors inclu hw 6EA1 $301

Floor - Wood 6SF903 $6,366

Lighting - Pendent/Surface 6EA14 $1,735

Marker Board 6LF10 $214

Storage/ Closet 6SF172 $1,247

Walls - Plaster/Drywall 6SF1,369 $3,778

Classroom #106 (Regular Classroom)

AC Units 6EA1 $496

Ceiling - Plaster/Drywall 6SF865 $2,993

Chalk Board Partially covered, obsolete material4LF40 $3,672

Doors - Transom Window 6SF30 $508

Page 7 of 30CASTELLANOS Assessment Date: 8/26/14

Page 8: Rosario Castellanos Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2510D.pdf · Rosario Castellanos Elementary School 2524 S Central Park Ave Chicago, IL 60623

Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #106 (Regular Classroom)

Doors - Wood Doors inclu hw 6EA2 $602

Floor - Wood 6SF865 $6,098

Lighting - Pendent/Surface 6EA14 $1,735

Marker Board 6LF8 $171

Storage/ Closet 6SF172 $1,247

Walls - Plaster/Drywall 6SF1,336 $3,687

Classroom #107 (Regular Classroom)

AC Units 7EA1 $0

Ceiling - Plaster/Drywall 7SF853 $0

Chalk Board obsolete material4LF6 $551

Doors - Transom Window 6SF9 $152

Doors - Wood Doors inclu hw 6EA1 $301

Floor - Wood 6SF853 $6,014

Lighting - Pendent/Surface 6EA14 $1,735

Marker Board 6LF8 $171

Storage/ Closet 6SF172 $1,247

Walls - Plaster/Drywall 6SF1,382 $3,814

Classroom #109 (Regular Classroom)

AC Units 6EA1 $496

Ceiling - Plaster/Drywall 7SF849 $0

Chalk Board obsolete material4LF48 $4,407

Doors - Transom Window 6SF9 $152

Doors - Wood Doors inclu hw 6EA1 $301

Floor - Wood 6SF849 $5,985

Lighting - Pendent/Surface 6EA14 $1,735

Marker Board 6LF8 $171

Storage/ Closet 6SF172 $1,247

Walls - Plaster/Drywall 6SF1,322 $3,649

Classroom #201 (Regular Classroom)

AC Units 7EA1 $0

Casework 6LF8 $202

Ceiling - Plaster/Drywall 6SF869 $3,007

Chalk Board obsolete material4LF48 $4,407

Doors - Transom Window 6SF9 $152

Doors - Wood Doors inclu hw 6EA1 $301

Floor - Wood 5SF869 $12,713

Page 8 of 30CASTELLANOS Assessment Date: 8/26/14

Page 9: Rosario Castellanos Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2510D.pdf · Rosario Castellanos Elementary School 2524 S Central Park Ave Chicago, IL 60623

Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #201 (Regular Classroom)

Lighting - Pendent/Surface 6EA14 $1,735

Marker Board 6LF10 $214

Storage/ Closet 6SF172 $1,247

Walls - Plaster/Drywall 5SF1,360 $10,307

Classroom #202 (Regular Classroom)

AC Units 6EA1 $496

Ceiling - Plaster/Drywall 7SF873 $0

Chalk Board Partially covered, obsolete material4LF48 $4,407

Doors - Transom Window 6SF30 $508

Doors - Wood Doors inclu hw 6EA1 $301

Floor - Wood 6SF873 $6,155

Lighting - Pendent/Surface 7EA14 $0

Marker Board 6LF6 $129

Storage/ Closet 6SF166 $1,204

Walls - Plaster/Drywall 6SF1,343 $3,707

Classroom #203 (Regular Classroom)

AC Units 7EA1 $0

Casework 6LF8 $202

Ceiling - Plaster/Drywall 6SF864 $2,990

Chalk Board Partially covered, obsolete material4LF48 $4,407

Doors - Transom Window 6SF30 $508

Doors - Wood Doors inclu hw 6EA1 $301

Floor - Wood 5SF864 $12,639

Lighting - Pendent/Surface 6EA14 $1,735

Marker Board 6LF10 $214

Storage/ Closet 6SF172 $1,247

Walls - Plaster/Drywall 6SF1,340 $3,698

Classroom #204 (Regular Classroom)

AC Units 6EA1 $496

Casework 5LF8 $1,673

Ceiling - Plaster/Drywall 7SF693 $0

Chalk Board Partially covered, obsolete material 4LF30 $2,754

Doors - Transom Window 6SF9 $152

Doors - Wood Doors inclu hw 6EA2 $602

Floor - Wood 6SF693 $4,886

Lighting - Pendent/Surface 7EA10 $0

Page 9 of 30CASTELLANOS Assessment Date: 8/26/14

Page 10: Rosario Castellanos Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2510D.pdf · Rosario Castellanos Elementary School 2524 S Central Park Ave Chicago, IL 60623

Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #204 (Regular Classroom)

Marker Board 7LF6 $0

Walls - Plaster/Drywall 6SF1,265 $3,491

Classroom #205 (Computer Lab)

AC Units 6EA2 $991

Ceiling - Plaster/Drywall 6SF943 $3,263

Chalk Board obsolete material4LF24 $2,203

Doors - Wood Doors inclu hw 5EA1 $1,174

Floor - Tile/Sheet 7SF943 $0

Lighting - Pendent/Surface 7EA14 $0

Marker Board 6LF34 $728

Walls - Plaster/Drywall 6SF1,281 $3,535

Wireless System 7EA1 $0

Classroom #206 (Regular Classroom)

AC Units 6EA1 $496

Ceiling - Plaster/Drywall 6SF873 $3,021

Chalk Board Partially covered, obsolete material4LF50 $4,590

Doors - Transom Window 6SF30 $508

Doors - Wood Doors inclu hw 6EA1 $301

Floor - Wood 6SF873 $6,155

Lighting - Pendent/Surface 7EA14 $0

Marker Board 6LF18 $386

Storage/ Closet 6SF172 $1,247

Walls - Plaster/Drywall 6SF1,323 $3,651

Classroom #207 (Regular Classroom)

AC Units 6EA1 $496

Ceiling - Plaster/Drywall 6SF860 $2,976

Chalk Board Partially covered, obsolete material4LF48 $4,407

Doors - Transom Window 6SF30 $508

Doors - Wood Doors inclu hw 5EA1 $1,174

Floor - Wood 6SF860 $6,063

Lighting - Pendent/Surface 7EA14 $0

Marker Board 6LF15 $321

Storage/ Closet 5SF174 $2,807

Walls - Plaster/Drywall 6SF1,332 $3,676

Page 10 of 30CASTELLANOS Assessment Date: 8/26/14

Page 11: Rosario Castellanos Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2510D.pdf · Rosario Castellanos Elementary School 2524 S Central Park Ave Chicago, IL 60623

Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #209 (Regular Classroom)

AC Units 7EA1 $0

Casework 6LF8 $202

Ceiling - Plaster/Drywall 6SF873 $3,021

Chalk Board Partially covered, obsolete material4LF48 $4,407

Doors - Transom Window 6SF9 $152

Doors - Wood Doors inclu hw 6EA1 $301

Floor - Wood 5SF873 $12,771

Lighting - Pendent/Surface 7EA14 $0

Marker Board 6LF8 $171

Storage/ Closet 6SF171 $1,240

Walls - Plaster/Drywall 5SF1,341 $10,163

Classroom #301 (Regular Classroom)

AC Units 7EA1 $0

Ceiling - Plaster/Drywall 6SF889 $3,076

Chalk Board Partially covered, obsolete material4LF50 $4,590

Doors - Transom Window 6SF9 $152

Doors - Wood Doors inclu hw 6EA1 $301

Floor - Wood 6SF889 $6,267

Lighting - Pendent/Surface 6EA14 $1,735

Marker Board 6LF8 $171

Storage/ Closet 6SF172 $1,247

Walls - Plaster/Drywall 6SF1,378 $3,803

Classroom #302 (Regular Classroom)

AC Units 6EA1 $496

Casework 5LF8 $1,673

Ceiling - Plaster/Drywall 6SF887 $3,070

Chalk Board Partially covered, obsolete material4LF48 $4,407

Doors - Transom Window 6SF30 $508

Doors - Wood Doors inclu hw 6EA1 $301

Floor - Wood 6SF887 $6,253

Lighting - Pendent/Surface 7EA14 $0

Marker Board 6LF6 $129

Storage/ Closet 5SF172 $2,774

Walls - Plaster/Drywall 6SF1,376 $3,798

Classroom #303 (Art Room)

AC Units 7EA1 $0

Page 11 of 30CASTELLANOS Assessment Date: 8/26/14

Page 12: Rosario Castellanos Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2510D.pdf · Rosario Castellanos Elementary School 2524 S Central Park Ave Chicago, IL 60623

Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #303 (Art Room)

Casework 5LF91 $19,026

Ceiling - Plaster/Drywall 6SF873 $3,021

Doors - Transom Window 6SF30 $508

Doors - Wood Doors inclu hw 6EA1 $301

Floor - Tile/Sheet 6SF873 $874

Lighting - Pendent/Surface 6EA14 $1,735

Marker Board 6LF8 $171

Storage/ Closet 6SF172 $1,247

Walls - Plaster/Drywall 6SF1,342 $3,704

Work Sink 7EA1 $0

Classroom #304 (Regular Classroom)

AC Units 6EA1 $496

Ceiling - Plaster/Drywall 7SF971 $0

Chalk Board Partially covered, obsolete material4LF48 $4,407

Doors - Transom Window 6SF18 $305

Doors - Wood Doors inclu hw 6EA2 $602

Floor - Wood 6SF971 $6,845

Lighting - Pendent/Surface 7EA14 $0

Marker Board 6LF12 $257

Storage/ Closet 6SF200 $1,450

Walls - Plaster/Drywall 6SF1,409 $3,889

Classroom #305 (Computer Lab)

AC Units 7EA2 $0

Casework 6LF8 $202

Ceiling - Plaster/Drywall 7SF960 $0

Doors - Transom Window 6SF18 $305

Doors - Wood Doors inclu hw 6EA2 $602

Floor - Tile/Sheet 6SF960 $961

Lighting - Pendent/Surface 7EA14 $0

Marker Board 7LF22 $0

Storage/ Closet 6SF214 $1,552

Walls - Plaster/Drywall 6SF1,347 $3,718

Wireless System 7EA1 $0

Work Sink Broken sink, faucet broken4EA1 $8,619

Classroom #306 (Regular Classroom)

AC Units 6EA1 $496

Page 12 of 30CASTELLANOS Assessment Date: 8/26/14

Page 13: Rosario Castellanos Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2510D.pdf · Rosario Castellanos Elementary School 2524 S Central Park Ave Chicago, IL 60623

Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623

Building: Main

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #306 (Regular Classroom)

Ceiling - Plaster/Drywall 6SF887 $3,070

Chalk Board Partially covered, obsolete material4LF48 $4,407

Doors - Transom Window 6SF30 $508

Doors - Wood Doors inclu hw 6EA2 $602

Floor - Wood 6SF887 $6,253

Lighting - Pendent/Surface 7EA14 $0

Marker Board 6LF6 $129

Storage/ Closet 6SF172 $1,247

Walls - Plaster/Drywall 6SF1,336 $3,687

Classroom #307 (Regular Classroom)

AC Units Limited access6EA1 $496

Ceiling - Plaster/Drywall 6SF860 $2,976

Chalk Board obsolete material4LF16 $1,469

Doors - Transom Window 6SF30 $508

Doors - Wood Doors inclu hw 6EA1 $301

Floor - Wood Floor was being serviced at the time of assessment.

7SF1,034 $0

Lighting - Pendent/Surface 6EA14 $1,735

Storage/ Closet 6SF174 $1,262

Walls - Plaster/Drywall 6SF860 $2,374

Classroom #309 (Regular Classroom)

AC Units 7EA1 $0

Ceiling - Plaster/Drywall 6SF892 $3,087

Chalk Board obsolete material4LF24 $2,203

Doors - Transom Window 6SF9 $152

Doors - Wood Doors inclu hw 6EA1 $301

Floor - Wood 6SF892 $6,289

Lighting - Pendent/Surface 7EA14 $0

Marker Board 6LF8 $171

Storage/ Closet 6SF172 $1,247

Walls - Plaster/Drywall 6SF1,358 $3,748

Classrooms Subtotal: $539,676

Building: Main

Category: Rooms (Other Than Classrooms)

Page 13 of 30CASTELLANOS Assessment Date: 8/26/14

Page 14: Rosario Castellanos Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2510D.pdf · Rosario Castellanos Elementary School 2524 S Central Park Ave Chicago, IL 60623

Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Administrative Suites/Offices

Ceiling - Plaster/Drywall Basement office 5SF367 $3,364

Doors - Steel Doors incl hw Basement office 6EA1 $301

Floor - Wood Basement office 5SF367 $5,369

Lighting - Pendent/Surface Basement office 6EA3 $372

Walls - Concrete Block Basement office 6SF363 $1,064

Walls - Masonry Basement office 6SF363 $1,142

Ceiling - Plaster/Drywall Custodian basement lounge 5SF198 $1,815

Doors - Wood Doors inclu hw Custodian basement lounge 6EA1 $301

Floor - Concrete Custodian basement lounge 6SF198 $105

Lighting - Pendent/Surface Custodian basement lounge 5EA1 $183

Walls - Masonry Custodian basement lounge 5SF541 $22,358

Ceiling - Plaster/Drywall Engineer's office 5SF264 $2,420

Doors - Wood Doors inclu hw Engineer's office 6EA1 $301

Floor - Wood Engineer's office 5SF264 $3,862

Lighting - Pendent/Surface Engineer's office 6EA3 $372

Walls - Masonry Engineer's office 5SF561 $23,184

AC Unit Main office 7EA1 $0

Ceiling - Plaster/Drywall Main office 6SF298 $1,031

Doors - Transom Window Main office 6SF50 $847

Doors - Wood Doors inclu hw Main office 6EA1 $301

Floor - Tile/Sheet Main office 6SF298 $298

Lighting - Pendent/Surface Main office 7EA4 $0

Storage/ Closet Main office 6SF97 $703

Walls - Plaster/Drywall Main office 6SF528 $1,457

AC Unit Principal's office 6EA1 $496

Ceiling - Plaster/Drywall Principal's office 6SF260 $900

Doors - Wood Doors inclu hw Principal's office 6EA1 $301

Floor - Tile/Sheet Principal's office 6SF260 $260

Lighting - Pendent/Surface Principal's office 6EA3 $372

Walls - Plaster/Drywall Principal's office 6SF535 $1,477

Kitchen

Ceiling - Plaster/Drywall Basement 6SF777 $2,689

Doors - Wood Doors inclu hw Basement 6EA2 $602

Floor - Tile/Sheet Basement 6SF777 $778

Lighting - Pendent/Surface Basement 7EA11 $0

Walls - Plaster/Drywall Basement 6SF1,059 $2,923

Lunch & Multipurpose Room

Ceiling - Lay-in Basement 6SF340 $1,021

Ceiling - Plaster/Drywall Basement 6SF1,007 $3,485

Page 14 of 30CASTELLANOS Assessment Date: 8/26/14

Page 15: Rosario Castellanos Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2510D.pdf · Rosario Castellanos Elementary School 2524 S Central Park Ave Chicago, IL 60623

Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Lunch & Multipurpose Room

Doors - Steel Doors incl hw Basement 6EA4 $1,204

Doors - Wood Doors inclu hw Basement 6EA2 $602

Floor - Tile/Sheet Basement 6SF1,347 $1,348

Lighting - Lay-in Basement 7EA5 $0

Lighting - Pendent/Surface Basement 6EA11 $1,363

Serving Line Basement 7LF18 $0

Walls - Masonry Basement 6SF1,380 $4,341

Ceiling - Lay-in South basement lunchroom 7SF340 $0

Ceiling - Plaster/Drywall South basement lunchroom 6SF1,027 $3,554

Doors - Steel Doors incl hw South basement lunchroom 6EA4 $1,204

Doors - Wood Doors inclu hw South basement lunchroom 6EA4 $1,204

Floor - Tile/Sheet South basement lunchroom 6SF1,367 $1,368

Lighting - Lay-in South basement lunchroom 7EA4 $0

Lighting - Pendent/Surface South basement lunchroom 6EA17 $2,106

Serving Line South basement lunchroom 7LF18 $0

Walls - Masonry South basement lunchroom 6SF1,410 $4,436

Ceiling - Plaster/Drywall Teachers lounge 7SF335 $0

Doors - Wood Doors inclu hw Teachers lounge 6EA1 $301

Floor - Tile/Sheet Teachers lounge 6SF335 $335

Lighting - Pendent/Surface Teachers lounge 6EA4 $496

Walls - Plaster/Drywall Teachers lounge 6SF902 $2,489

MDF_IDF

AC Unit 2nd Floor 6EA1 $496

Doors - Steel Doors incl hw 2nd Floor 6EA1 $301

Finishes 2nd Floor 6SF172 $1,227

Mechanical/ Service Rooms

Janitor's Closet 1st Floor 1st floor North5SF10 $161

Janitor's Closet 1st Floor 1st South5SF10 $161

Storage Room 1st Floor 6SF60 $430

Janitor's Closet 2nd Floor 2nd floor South6SF10 $72

Janitor's Closet 2nd Floor 2nd floor North6SF10 $72

Janitor's Closet 3rd Floor 3rd North6SF10 $72

Janitor's Closet 3rd Floor 3rd South6SF10 $72

Boiler Room Basement 5SF1,195 $19,276

Mechanical/ Service Rooms Basement 5SF1,235 $19,921

Mechanical/ Service Rooms Basement 5SF235 $3,791

Page 15 of 30CASTELLANOS Assessment Date: 8/26/14

Page 16: Rosario Castellanos Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2510D.pdf · Rosario Castellanos Elementary School 2524 S Central Park Ave Chicago, IL 60623

Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Mechanical/ Service Rooms

Mechanical/ Service Rooms Basement 6SF460 $3,296

Storage Room Basement Storage 15SF445 $7,178

Storage Room Basement Storage 35SF171 $2,758

Storage Room Basement Storage 25SF363 $5,855

Storage Room Basement 5SF216 $3,484

Restroom

Accessories Basement Mirror, soap dispenser, toilet paper dispenser6SF478 $4,409

Ceiling - Plaster/Drywall Basement 6SF478 $1,654

Doors - Wood Doors inclu hw Basement 7EA2 $0

Floor Drain Basement 6EA1 $1,059

Floor - Tile Ceramic/ Porcelain Basement 6SF478 $1,012

Hand Dryer Basement 6EA1 $230

Lavatory Basement 7EA2 $0

Lighting - Pendent/Surface Basement 5EA5 $913

Partitions Basement Door missing4EA1 $1,986

Partitions Basement 6EA9 $2,672

Walls - Structural Glazed Tile Basement 6SF919 $2,891

Water Closet Basement 6EA10 $3,360

Accessories Basement toilet paper dispenser6SF610 $5,626

Ceiling - Plaster/Drywall Basement 6SF610 $2,111

Floor Drain Basement 6EA1 $1,059

Floor - Tile Ceramic/ Porcelain Basement 6SF610 $1,291

Hand Dryer Basement 7EA1 $0

Lavatory Basement 6EA4 $1,278

Lighting - Pendent/Surface Basement 5EA6 $1,095

Partitions Basement 6EA6 $1,782

Urinals Basement 6EA14 $4,704

Walls - Structural Glazed Tile Basement 6SF1,044 $3,284

Water Closet Basement 6EA6 $2,016

Accessories Engineer's toilet mirror, toilet paper holder6SF31 $286

Ceiling - Plaster/Drywall Engineer's toilet 5SF31 $284

Doors - Wood Doors inclu hw Engineer's toilet 6EA1 $301

Floor - Wood Engineer's toilet 5SF31 $453

Lavatory Engineer's toilet 5EA1 $1,590

Lighting - Pendent/Surface Engineer's toilet 6EA1 $124

Walls - Masonry Engineer's toilet 5SF98 $4,050

Walls - Plaster/Drywall Engineer's toilet 5SF98 $743

Page 16 of 30CASTELLANOS Assessment Date: 8/26/14

Page 17: Rosario Castellanos Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2510D.pdf · Rosario Castellanos Elementary School 2524 S Central Park Ave Chicago, IL 60623

Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623

Building: Main

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Restroom

Water Closet Engineer's toilet 6EA1 $336

Accessories Main office unisex Mirror,soap and paper towel dispenser6SF75 $692

Ceiling - Plaster/Drywall Main office unisex 5SF75 $687

Doors - Wood Doors inclu hw Main office unisex 6EA1 $301

Floor - Tile Ceramic/ Porcelain Main office unisex 6SF75 $159

Lavatory Main office unisex 6EA1 $320

Lighting - Pendent/Surface Main office unisex 6EA1 $124

Partitions Main office unisex 5EA1 $751

Walls - Plaster/Drywall Main office unisex 6SF279 $770

Water Closet Main office unisex 6EA1 $336

Accessories Teachers Lounge soap dispenser, toilet paper holder5SF86 $1,702

Ceiling - Plaster/Drywall Teachers Lounge 6SF86 $298

Doors - Wood Doors inclu hw Teachers Lounge 5EA1 $1,174

Floor - Tile Ceramic/ Porcelain Teachers Lounge 6SF86 $182

Lavatory Teachers Lounge 6EA1 $320

Lighting - Pendent/Surface Teachers Lounge 6EA1 $124

Partitions Teachers Lounge 6EA2 $594

Walls - Plaster/Drywall Teachers Lounge 6SF450 $1,242

Water Closet Teachers Lounge 6EA2 $672

Rooms (Other Than Classrooms) Subtotal: $244,472

Building: Main

Category: Building Interior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Corridor

Ceiling - Plaster/Drywall 1st Floor 6SF2,282 $14,130

Doors - Steel Doors incl hw 1st Floor 6EA9 $2,709

Doors - Wood Doors include hw 1st Floor 6EA14 $4,214

Drinking Fountains - Single Fountain 1st Floor 6EA4 $1,103

Floor - Tile/Sheet 1st Floor deteriorated, worn, cracking4SF2,282 $22,060

Lighting - Pendent/Surface 1st Floor 6EA24 $2,973

Walls - Plaster/Drywall 1st Floor 6SF3,494 $15,489

Ceiling - Plaster/Drywall 2nd Floor 6SF2,777 $17,195

Drinking Fountains - Single Fountain 2nd Floor 6EA4 $1,103

Floor - Concrete Epoxy/ Painted 2nd Floor 6SF2,777 $1,350

Lighting - Pendent/Surface 2nd Floor 6EA24 $2,973

Page 17 of 30CASTELLANOS Assessment Date: 8/26/14

Page 18: Rosario Castellanos Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2510D.pdf · Rosario Castellanos Elementary School 2524 S Central Park Ave Chicago, IL 60623

Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623

Building: Main

Category: Building Interior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Corridor

Student Lockers - Two Tiers 2nd Floor 6EA72 $3,342

Walls - Plaster/Drywall 2nd Floor 6SF3,870 $17,156

Walls - Tile Ceramic/ Porcelain 2nd Floor 6SF60 $189

Ceiling - Plaster/Drywall 3rd floor 6SF2,377 $14,718

Doors - Steel Doors incl hw 3rd floor 7EA2 $0

Drinking Fountains - Single Fountain 3rd floor 6EA4 $1,103

Floor - Concrete Epoxy/ Painted 3rd floor 6SF2,377 $1,156

Lighting - Pendent/Surface 3rd floor 6EA24 $2,973

Student Lockers - Two Tiers 3rd floor 6EA80 $3,713

Walls - Plaster/Drywall 3rd floor 6SF3,870 $17,156

Walls - Tile Ceramic/ Porcelain 3rd floor 6SF60 $189

Ceiling - Plaster/Drywall Basemant north west 6SF204 $1,263

Doors - Wood Doors include hw Basemant north west 6EA2 $602

Floor - Concrete Epoxy/ Painted Basemant north west 5SF204 $350

Lighting - Pendent/Surface Basemant north west 6EA2 $248

Stairs - Concrete Stairs Basemant north west 6LF50 $415

Walls - Structural Glazed Tile Basemant north west 6SF1,044 $3,284

Ceiling - Plaster/Drywall Basement south west corridor 5SF204 $2,570

Doors - Wood Doors include hw Basement south west corridor 6EA2 $602

Floor - Concrete Epoxy/ Painted Basement south west corridor 6SF204 $99

Lighting - Pendent/Surface Basement south west corridor 6EA2 $248

Stairs - Concrete Stairs Basement south west corridor 6LF50 $415

Walls - Structural Glazed Tile Basement south west corridor 6SF509 $1,601

Ceiling - Plaster/Drywall Basement 6SF432 $2,675

Doors - Steel Doors incl hw Basement 6EA2 $602

Floor - Concrete Basement 6SF432 $229

Lighting - Pendent/Surface Basement 6EA10 $1,239

Walls - Concrete Block Basement 6SF750 $2,199

Walls - Masonry Basement 6SF750 $2,360

Safety

Camera Viewing Station 6EA1 $683

Security Cameras 6EA10 $1,940

Stairs

Ceiling - Plaster/Drywall Main Entrance 6SF702 $5,140

Floor - Concrete Epoxy/ Painted Main Entrance 6SF370 $180

Floor - Tile Ceramic/ Porcelain Main Entrance 6SF135 $905

Page 18 of 30CASTELLANOS Assessment Date: 8/26/14

Page 19: Rosario Castellanos Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2510D.pdf · Rosario Castellanos Elementary School 2524 S Central Park Ave Chicago, IL 60623

Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623

Building: Main

Category: Building Interior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Stairs

Handrails Main Entrance 6LF116 $1,005

Lighting - Pendent/Surface Main Entrance 6EA11 $1,363

Lighting - Wall Mounted Main Entrance 6EA2 $248

Stairs - Concrete Main Entrance 6LF360 $2,986

Walls - Plaster/Drywall Main Entrance 6SF1,350 $3,726

Ceiling - Plaster/Drywall North 6SF656 $4,803

Floor - Concrete Epoxy/ Painted North 5SF880 $4,014

Floor - Tile Ceramic/ Porcelain North 6SF73 $490

Handrails North 6LF182 $1,577

Lighting - Pendent/Surface North 6EA10 $1,239

Stairs - Concrete North 5LF480 $47,561

Walls - Plaster/Drywall North 6SF3,373 $9,309

Walls - Tile Ceramic/ Porcelain North 6SF160 $503

Ceiling - Plaster/Drywall South 6SF656 $4,803

Floor - Concrete Epoxy/ Painted South 5SF880 $4,014

Floor - Tile Ceramic/ Porcelain South 5SF73 $1,166

Handrails South 6LF182 $1,577

Lighting - Pendent/Surface South 5EA2 $365

Lighting - Pendent/Surface South 6EA8 $991

Stairs - Concrete South 5LF456 $45,183

Walls - Plaster/Drywall South 6SF3,373 $9,309

Walls - Structural Glazed Tile South 6SF160 $503

Building Interior Subtotal: $323,577

Total Building Cost $3,303,448

Building: Addition

Category: Building Exterior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Entrance

Exterior Doors - Exterior Wood Door 8 6EA2 $961

Exterior Doors - Transom Lite 8 6EA2 $627

Exterior Stairs - Concrete 8 6LF15 $1,227

Stair Handrail - Steel_Stair Handrail 8 6LF8 $69

Page 19 of 30CASTELLANOS Assessment Date: 8/26/14

Page 20: Rosario Castellanos Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2510D.pdf · Rosario Castellanos Elementary School 2524 S Central Park Ave Chicago, IL 60623

Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623

Building: Addition

Category: Building Exterior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Foundation

Foundation - Masonry Entire Building 7LF390 $0

Superstructure - Steel with Clay Tile Arch Entire Building 7SF23,768 $0

Lighting

Exterior Lighting - Parapet or Roof Mounted Main Roof 6EA2 $1,073

Roof System

Coping - Stone C / Entire Building 6LF222 $7,130

Coping - Stone D / Entire Building 6LF146 $4,689

Coping - Stone E / Entire Building 6LF22 $707

Downspouts - Exterior Downspouts E / Entire Building 6LF16 $532

Downspouts - Interior Downspouts C / Entire Building 6LF58 $1,928

Downspouts - Interior Downspouts D / Entire Building 6LF43 $1,429

Parapet - 16" - 30" Height D / Entire Building 6LF146 $5,833

Parapet - Parapet < 16" Height C / Entire Building 6LF222 $4,730

Parapet - Parapet < 16" Height E / Entire Building 6LF22 $469

Roof Structure - Steel with Clay Tile Arch C / Entire Building 7SF4,455 $0

Roof Structure - Steel with Clay Tile Arch D / Entire Building 7SF2,646 $0

Roof Structure - Steel with Clay Tile Arch E / Entire Building 7SF656 $0

Roof - Asphalt Gravel Ballast C / Entire Building 6SF4,455 $45,295

Roof - Asphalt Gravel Ballast D / Entire Building 6SF2,646 $26,903

Roof - Asphalt Gravel Ballast E / Entire Building 6SF656 $6,670

Walls

Exterior Walls - Brick Entire Building 6SF12,618 $84,806

Exterior Walls - Stone-Cut Entire Building 6SF876 $5,888

Windows

Guard - Guards perforated Entire Building 6SF477 $6,091

Lintels - Steel Entire Building 6LF231 $6,706

Lintels - Stone Entire Building / East 6LF12 $0

Windows - Decorative Entire Building / East fixed6SF24 $179

Windows - Insulated Panel Entire Building 6SF114 $851

Windows - Sash Aluminum Double-pane Entire Building 6SF2,211 $16,504

Building Exterior Subtotal: $231,295

Building: Addition

Category: Electrical System

Page 20 of 30CASTELLANOS Assessment Date: 8/26/14

Page 21: Rosario Castellanos Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2510D.pdf · Rosario Castellanos Elementary School 2524 S Central Park Ave Chicago, IL 60623

Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623

Category: Electrical System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Emergency System

Emergency A/C Power - Corridors and Stairs Entire Building 6SF6,363 $1,911

Emergency A/C Power - Gym Entire Building / Basement 6SF2,400 $892

Emergency Battery Packs - Corridors and Stairs Entire Building 6EA10 $2,025

Exit Signs - Corridors and Stairs Entire Building / Electrical Room School do not have Generator or UPS installed and exit signs are not provided with battery backup.

2EA9 $4,909

Power Distribution

Lighting and Power Panels - 100 A Entire Building / Basement 6EA2 $598

Lighting and Power Panels - Above 100 A Entire Building 6EA5 $2,485

Electrical System Subtotal: $12,821

Building: Addition

Category: Safty System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Sprinkler System

Sprinkler Heads Entire Building Heads are so old4SF23,768 $12,236

Sprinkler Piping Entire Building 6SF23,768 $4,418

Wet Sprinkler System Entire Building 6SF23,768 $6,118

Safty System Subtotal: $22,772

Building: Addition

Category: Mechanical System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Air Handling Systems

Air Handling Unit- Built Up-Multi Zone- Steam Coils - 15001 - 25000 Basement Motor isold5EA1 $66,438

Air Intake Basement / Lower Roof 6EA1 $5,765

Auxiliaries - 15001 - 25000 cfm Basement 6EA1 $5,788

Return Duct Work - Indoor- Vertical Shaft and Ducts Basement 5LF100 $96,198

Zone Dampers Basement 5EA15 $28,703

Heating Devices

Radiators - Steam Entire Building 6EA3 $833

Wall Heater - Electric 2nd Floor Poor condition4EA1 $1,083

Mechanical Plumbing

Condensate-Steel or Galvanized Basement 6LF100 $7,678

Temperature Control

Pneumatic System Entire Building Large number of dampers are not working properly4SF23,768 $123,717

Page 21 of 30CASTELLANOS Assessment Date: 8/26/14

Page 22: Rosario Castellanos Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2510D.pdf · Rosario Castellanos Elementary School 2524 S Central Park Ave Chicago, IL 60623

Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623

Building: Addition

Category: Mechanical System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Temperature Control

Thermostats - Pneumatic Entire Building Not providing the right signal to the room4EA15 $11,059

Ventilation

Exhaust Fans- Roof Mounted - 500 - 1500 CFM Lower Roof 6EA1 $592

Mechanical System Subtotal: $347,853

Building: Addition

Category: Plumbing System

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Piping

Domestic Piping-Cold Water from Risers to Fixtures Entire Building Majority of the piping are galvanized4SF23,768 $16,994

Domestic Piping-Cold Water Horizontal Lines Entire Building Majority of the piping are galvanized4SF23,768 $34,328

Domestic Piping-Cold Water Risers Entire Building Majority of the piping are galvanized4SF23,768 $19,033

Domestic Piping-Hot Water from Risers to Fixtures Entire Building Majority of the piping are galvanized4SF23,768 $12,916

Domestic Piping-Hot Water Horizontal Lines Entire Building Majority of the piping are galvanized4SF23,768 $30,589

Domestic Piping-Hot Water Return Lines Entire Building Majority of the piping are galvanized4SF23,768 $20,393

Domestic Piping-Hot Water Return Risers Entire Building Majority of the piping are galvanized4SF23,768 $11,556

Sanitary Piping Entire Building 6SF23,768 $21,752

Storm Piping Entire Building 6SF23,768 $20,733

Vent Piping Entire Building 6SF23,768 $15,974

Plumbing System Subtotal: $204,269

Building: Addition

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #211 (Store Room)

AC Units 2nd Floor 6EA1 $496

Ceiling - Lay-in 2nd Floor 6SF560 $1,682

Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301

Floor - Tile/Sheet 2nd Floor 6SF560 $561

Lighting - Lay-in 2nd Floor 7EA6 $0

Marker Board 2nd Floor 7LF10 $0

Walls - Plaster/Drywall 2nd Floor 6SF776 $2,142

Page 22 of 30CASTELLANOS Assessment Date: 8/26/14

Page 23: Rosario Castellanos Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2510D.pdf · Rosario Castellanos Elementary School 2524 S Central Park Ave Chicago, IL 60623

Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623

Building: Addition

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #212 (Computer Lab)

AC Units 2nd Floor 7EA1 $0

Casework 2nd Floor 6LF44 $1,111

Ceiling - Lay-in 2nd Floor 6SF885 $2,658

Doors - Transom Window 2nd Floor 6SF9 $152

Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301

Floor - Tile/Sheet 2nd Floor 6SF885 $886

Lighting - Lay-in 2nd Floor 6EA12 $1,428

Storage/ Closet 2nd Floor 6SF76 $551

Walls - Plaster/Drywall 2nd Floor 6SF986 $2,721

Wireless System 2nd Floor 6EA1 $372

Classroom #213 (Science Classroom)

AC Units 7EA1 $0

Casework 6LF80 $2,020

Ceiling - Lay-in 6SF1,140 $3,423

Doors - Transom Window 6SF18 $305

Doors - Wood Doors inclu hw 6EA1 $301

Floor - Tile/Sheet 6SF1,140 $1,141

Lighting - Lay-in 7EA12 $0

Marker Board 6LF10 $214

Walls - Plaster/Drywall 6SF1,118 $3,086

Work Sink 6EA2 $758

Classroom #310 (Regular Classroom)

AC Units 7EA1 $0

Casework 5LF7 $1,464

Ceiling - Lay-in 6SF837 $2,514

Chalk Board obsolete material4LF48 $4,407

Doors - Wood Doors inclu hw 6EA1 $301

Floor - Wood 6SF837 $5,901

Lighting - Lay-in 7EA12 $0

Walls - Plaster/Drywall 6SF966 $2,666

Classroom #312 (Regular Classroom)

AC Units 7EA1 $0

Casework 6LF8 $202

Ceiling - Lay-in 7SF837 $0

Chalk Board obsolete material4LF48 $4,407

Doors - Transom Window 6SF9 $152

Page 23 of 30CASTELLANOS Assessment Date: 8/26/14

Page 24: Rosario Castellanos Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2510D.pdf · Rosario Castellanos Elementary School 2524 S Central Park Ave Chicago, IL 60623

Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623

Building: Addition

Category: Classrooms

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Classroom #312 (Regular Classroom)

Doors - Wood Doors inclu hw 6EA1 $301

Floor - Wood 6SF837 $5,901

Lighting - Lay-in 6EA12 $1,428

Walls - Plaster/Drywall 6SF1,053 $2,906

Classrooms Subtotal: $59,157

Building: Addition

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Administrative Suites/Offices

AC Unit 209 6EA1 $496

Ceiling - Plaster/Drywall 209 5SF213 $1,952

Doors - Transom Window 209 6SF9 $152

Doors - Wood Doors inclu hw 209 6EA1 $301

Floor - Wood 209 6SF213 $1,502

Lighting - Pendent/Surface 209 6EA3 $372

Walls - Plaster/Drywall 209 6SF521 $1,438

Work SInk 209 6EA1 $508

Ceiling - Lay-in 210A 6SF165 $495

Doors - Wood Doors inclu hw 210A 6EA1 $301

Floor - Tile/Sheet 210A 6SF165 $165

Lighting - Lay-in 210A 7EA3 $0

Storage/ Closet 210A 6SF12 $87

Walls - Plaster/Drywall 210A 6SF450 $1,242

Ceiling - Lay-in 210B 6SF166 $498

Doors - Wood Doors inclu hw 210B 6EA1 $301

Floor - Tile/Sheet 210B 6SF166 $166

Lighting - Lay-in 210B 6EA3 $357

Walls - Plaster/Drywall 210B 6SF418 $1,154

Ceiling - Lay-in Computer lab office 6SF275 $826

Doors - Wood Doors inclu hw Computer lab office 6EA1 $301

Floor - Tile/Sheet Computer lab office 6SF275 $275

Lighting - Lay-in Computer lab office 6EA3 $357

Walls - Plaster/Drywall Computer lab office 6SF581 $1,604

Ceiling - Plaster/Drywall Gym Office 6SF767 $2,654

Doors - Wood Doors inclu hw Gym Office 6EA2 $602

Page 24 of 30CASTELLANOS Assessment Date: 8/26/14

Page 25: Rosario Castellanos Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2510D.pdf · Rosario Castellanos Elementary School 2524 S Central Park Ave Chicago, IL 60623

Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623

Building: Addition

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Administrative Suites/Offices

Floor - Tile/Sheet Gym Office 6SF767 $768

Lighting - Pendent/Surface Gym Office 6EA15 $1,858

Walls - Masonry Gym Office 6SF1,120 $3,524

Gymnasia

Ceiling - Plaster/Drywall Basement 6SF2,400 $13,248

Doors - Wood Doors inclu hw Basement 6EA6 $1,806

Floor - Concrete Basement 6SF252 $133

Floor - Wood Basement 6SF2,400 $16,920

Lighting - Pendent/Surface Basement 6EA14 $1,735

Scoreboards Basement 6EA1 $2,244

Sound System Basement 6EA1 $41,654

Stage Basement 6SF345 $1,993

Stage Curtain Basement 6EA3 $0

Stage Lighting System Basement 6EA1 $12,369

Walls - Structural Glazed Tile Basement 6SF3,264 $10,269

Library

Casework 110 6LF46 $1,162

Ceiling - Lay-in 110 6SF1,400 $4,204

Doors - Wood Doors inclu hw 110 6EA2 $602

Floor - Tile/Sheet 110 6SF1,400 $1,401

Lighting - Lay-in 110 6EA23 $2,736

Walls - Plaster/Drywall 110 6SF1,231 $3,397

Mechanical/ Service Rooms

Storage Room 2nd Floor 6SF375 $2,687

Mechanical/ Service Rooms Basement 6SF1,000 $7,164

Restroom

Accessories 1st Floor - Girls toilet paper dispenser, mirror, soap dispenser,

paper towel dispenser

6SF278 $2,564

Ceiling - Plaster/Drywall 1st Floor - Girls 6SF278 $962

Doors - Wood Doors inclu hw 1st Floor - Girls 6EA2 $602

Floor Drain 1st Floor - Girls 6EA1 $1,059

Floor - Tile Ceramic/ Porcelain 1st Floor - Girls 6SF278 $588

Hand Dryer 1st Floor - Girls 7EA1 $0

Lavatory 1st Floor - Girls 7EA2 $0

Lighting - Pendent/Surface 1st Floor - Girls 6EA3 $372

Page 25 of 30CASTELLANOS Assessment Date: 8/26/14

Page 26: Rosario Castellanos Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2510D.pdf · Rosario Castellanos Elementary School 2524 S Central Park Ave Chicago, IL 60623

Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623

Building: Addition

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Restroom

Partitions 1st Floor - Girls 6EA5 $1,485

Walls - Structural Glazed Tile 1st Floor - Girls 6SF646 $2,032

Water Closet 1st Floor - Girls 6EA5 $1,680

Accessories 1st Floor Staff- Library Restroom mirror, soap dispenser, toilet paper dispenser7SF54 $0

Ceiling - Lay-in 1st Floor Staff- Library Restroom 6SF54 $162

Doors - Wood Doors inclu hw 1st Floor Staff- Library Restroom 6EA1 $301

Floor - Tile/Sheet 1st Floor Staff- Library Restroom 6SF54 $54

Lavatory 1st Floor Staff- Library Restroom 6EA1 $320

Lighting - Lay-in 1st Floor Staff- Library Restroom 6EA1 $119

Walls - Plaster/Drywall 1st Floor Staff- Library Restroom 6SF191 $527

Water Closet 1st Floor Staff- Library Restroom 6EA1 $336

Accessories 2nd Floor mirror, soap dispenser, toilet paper dispenser6SF268 $2,472

Accessories 2nd Floor toilet paper holder6SF68 $627

Ceiling - Plaster/Drywall 2nd Floor 6SF268 $927

Ceiling - Plaster/Drywall 2nd Floor 6SF68 $235

Doors - Wood Doors inclu hw 2nd Floor 6EA1 $301

Doors - Wood Doors inclu hw 2nd Floor 6EA2 $602

Floor Drain 2nd Floor 6EA1 $1,059

Floor - Tile Ceramic/ Porcelain 2nd Floor 5SF268 $4,281

Floor - Tile Ceramic/ Porcelain 2nd Floor 6SF68 $144

Hand Dryer 2nd Floor 7EA1 $0

Lavatory 2nd Floor 6EA1 $320

Lavatory 2nd Floor 6EA2 $639

Lighting - Pendent/Surface 2nd Floor 6EA1 $124

Lighting - Pendent/Surface 2nd Floor 6EA3 $372

Partitions 2nd Floor 6EA2 $594

Partitions 2nd Floor 6EA2 $594

Urinals 2nd Floor 6EA5 $1,680

Walls - Plaster/Drywall 2nd Floor 6SF214 $591

Walls - Plaster/Drywall 2nd Floor 6SF308 $850

Walls - Structural Glazed Tile 2nd Floor 6SF643 $2,023

Water Closet 2nd Floor 6EA2 $672

Water Closet 2nd Floor 6EA2 $672

Accessories 3rd Floor mirror, soap dispenser, toilet paper dispenser6SF264 $2,435

Ceiling - Plaster/Drywall 3rd Floor 6SF264 $914

Doors - Wood Doors inclu hw 3rd Floor 6EA2 $602

Floor Drain 3rd Floor 6EA1 $1,059

Page 26 of 30CASTELLANOS Assessment Date: 8/26/14

Page 27: Rosario Castellanos Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2510D.pdf · Rosario Castellanos Elementary School 2524 S Central Park Ave Chicago, IL 60623

Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623

Building: Addition

Category: Rooms (Other Than Classrooms)

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Restroom

Floor - Tile/Sheet 3rd Floor 6SF264 $264

Hand Dryer 3rd Floor 7EA1 $0

Lavatory 3rd Floor 7EA2 $0

Lighting - Pendent/Surface 3rd Floor 7EA3 $0

Partitions 3rd Floor 6EA5 $1,485

Walls - Plaster/Drywall 3rd Floor 6SF201 $555

Walls - Structural Glazed Tile 3rd Floor 6SF602 $1,894

Water Closet 3rd Floor 6EA5 $1,680

Rooms (Other Than Classrooms) Subtotal: $193,808

Building: Addition

Category: Building Interior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Corridor

Ceiling - Plaster/Drywall 1st Floor 6SF1,344 $8,322

Doors - Wood Doors include hw 1st Floor 6EA4 $1,204

Floor - Tile/Sheet 1st Floor 6SF1,344 $730

Lighting - Pendent/Surface 1st Floor 6EA14 $1,735

Walls - Plaster/Drywall 1st Floor 6SF2,438 $10,808

Ceiling - Plaster/Drywall 2nd Floor 6SF1,344 $8,322

Doors - Steel Doors incl hw 2nd Floor 6EA2 $602

Floor - Tile/Sheet 2nd Floor 5SF1,344 $6,035

Lighting - Pendent/Surface 2nd Floor 6EA14 $1,735

Walls - Plaster/Drywall 2nd Floor 6SF2,438 $10,808

Ceiling - Plaster/Drywall 3rd Floor 7SF1,344 $0

Doors - Steel Doors incl hw 3rd Floor 6EA2 $602

Floor - Tile/Sheet 3rd Floor 6SF1,344 $730

Lighting - Pendent/Surface 3rd Floor 6EA13 $1,611

Student Lockers - Two Tiers 3rd Floor 6EA48 $2,228

Walls - Plaster/Drywall 3rd Floor 6SF1,916 $8,494

Ceiling - Plaster/Drywall Basement 6SF1,246 $7,715

Doors - Steel Doors incl hw Basement 6EA2 $602

Drinking Fountains - Single Fountain Basement 7EA2 $0

Floor - Concrete Basement 6SF1,246 $659

Lighting - Pendent/Surface Basement 7EA13 $0

Walls - Plaster/Drywall Basement 6SF1,891 $8,383

Page 27 of 30CASTELLANOS Assessment Date: 8/26/14

Page 28: Rosario Castellanos Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2510D.pdf · Rosario Castellanos Elementary School 2524 S Central Park Ave Chicago, IL 60623

Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623

Building: Addition

Category: Building Interior

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Corridor

Walls - Tile Ceramic/ Porcelain Basement 6SF30 $94

Stairs

Ceiling - Plaster/Drywall North 5SF839 $12,334

Floor - Concrete North 6SF70 $37

Floor - Terrazzo North 6SF422 $3,542

Floor - Tile Ceramic/ Porcelain North 6SF71 $476

Handrails North 6LF192 $1,664

Lighting - Pendent/Surface North 6EA13 $1,611

Stairs - Concrete North 6LF60 $498

Stairs - Terrazzo North 6LF462 $4,288

Walls - Plaster/Drywall North 6SF3,412 $9,417

Building Interior Subtotal: $115,283

Total Building Cost $1,187,259

SITE

Category: Site

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Civil/Drainage

Civil/ Drainage - Catch Basin Entire Site North and West parking lot, flooding during heavy

downpours

4EA2 $8,239

Civil/ Drainage - Site Manhole Entire Site 6EA5 $7,464

Fencing

Fencing - Chain Link Entire Site / West 6LF50 $939

Fencing - Old Standard Ornamental Entire Site 6LF690 $35,719

Landscape

Landscape - Hardscape- Concrete Entire Site 6SF800 $4,130

Landscape - Hardscape- Concrete Entire Site / North North area and Courtyards - cracks5SF150 $1,645

Parkway trees Entire Site / North 7EA5 $0

Planting Beds/ Area Entire Site 6SF420 $691

Parking Lot

Surface - Asphalt South / North 6SF11,132 $31,042

Surface - Asphalt South under construction4SF18,316 $144,579

Page 28 of 30CASTELLANOS Assessment Date: 8/26/14

Page 29: Rosario Castellanos Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2510D.pdf · Rosario Castellanos Elementary School 2524 S Central Park Ave Chicago, IL 60623

Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623

SITE

Category: Site

Item - Type Quantity Unit Rank Cost LocationGroup Comments

Sidewalks

Sidewalks - Perimeter Sidewalks Entire Site cracks, heaved - East ,North5SF200 $1,910

Sidewalks - Perimeter Sidewalks Entire Site 6SF6,124 $12,173

Signage

Flag Pole - Building Mounted Flag Pole Entire Site / East 6EA1 $828

Marquee - Free Standing Back Lighted Entire Site / East 6EA1 $0

Site Subtotal: $249,358

Total Site Cost $249,358

Campus Total ² ³

² As stated above, Total Assessed Campus Need does not include the addition of features not already in a particular facility, such as programmatic improvements, school-wide ADA compliance, air conditioning, space

reconfiguration or construction to alleviate overcrowding; these items are treated as separate capital needs. The Total Assessed Campus Need includes current deficiencies and is based on current unit cost estimates;

it does not reflect a complete project cost.

³ The overall condition of different items can change after an assessment date due to many variables, including newly occurring deficiencies, renovation or repairs and cost changes. These dollar figures in this report are

estimates only and are based solely on the data that was collected as of the assessment date in the footer below.

¹ It is very rare for assessors to find a feature in this condition. If assessors do, they are required to report it immediately to CPS, and CPS addresses it immediately. Thus, no features will be ranked “1” in this report; by the time the report is compiled, they have been resolved.

$4,740,065

Definitions

● Quantity

● Unit

means a basic estimate for each item needing some level of repair or replacement. Cost does not include all expenses that would be necessary to complete a repair or replacement project. This is because,

depending on the item and on the overall scope of a construction project, repair/replacement projects can include additional costs such as destructive testing, environmental needs, discovered conditions, and

additional work triggered by building codes.

means, for each item, the total number (or amount) of that item that exists and was evaluated.

means the generally accepted standard unit of measure for each item. Some items, like doors, are measured individually and use the unit of measurement “EA” for “each.” Other items, like

chimneys, are measured in terms of linear feet (“LF”). Still other items, like flooring, are generally measured in square feet (“SF”).

● Cost

● For the same reason, the Total Campus Need listed at the end of this report reflects only a portion of what it would actually cost to repair/replace all of the listed features.

● Campus Total also does not reflect features that do not yet exist at a particular facility, such as: programmatic improvements, school-wide ADA compliance, air conditioning, space reconfiguration, or construction to

alleviate overcrowding; these are viewed as separate capital needs.

Page 29 of 30CASTELLANOS Assessment Date: 8/26/14

Page 30: Rosario Castellanos Elementary Schoolschoolreports.cps.edu/Assessment_PDF_Detail_2015/2510D.pdf · Rosario Castellanos Elementary School 2524 S Central Park Ave Chicago, IL 60623

Rosario Castellanos Elementary School2524 S Central Park Ave Chicago, IL 60623

Classroom Summary

Smart-

Board

Power

Strip

Window

Stop

Operable

Window

Area

Glazed

Window

Area

Noise

Level

Elect.

Outlets

Data

Outlets

Voice

Outlets

Area (SF)Floor Plan

Room

Number

Room

Number

Intended UsageCurrent Usage Room

Location

Main

NNN40861728101,045303303Regular ClassroomArt Room

NYN408617272340943205205Regular ClassroomComputer Lab

YYN4086172863601,174305305Regular ClassroomComputer Lab

NYN500018201,0300909-BasementRegular ClassroomRegular Classroom

NYN408617214711,024101101KindergartenRegular Classroom

NYN40861726211,037102102Regular ClassroomRegular Classroom

NYN408617214211,023103103Regular ClassroomRegular Classroom

NYN408617221411,075105105Regular ClassroomRegular Classroom

NYN40861726211,037106106Regular ClassroomRegular Classroom

NNN407615212211,025107107Regular ClassroomRegular Classroom

NNN409719412211,021109109Regular ClassroomRegular Classroom

NYN40861728001,041201201Regular ClassroomRegular Classroom

NYN40861728211,039202202Regular ClassroomRegular Classroom

NYN40861728001,036203203Regular ClassroomRegular Classroom

NNN4050100800693204204Regular ClassroomRegular Classroom

NNN40861728101,045206206Regular ClassroomRegular Classroom

YYN40861729101,034207207Regular ClassroomRegular Classroom

YYN40971946101,044209209Regular ClassroomRegular Classroom

NNN40861728101,061301301Regular ClassroomRegular Classroom

NYN40861728101,059302302Regular ClassroomRegular Classroom

NYN40861728101,171304304Regular ClassroomRegular Classroom

NYN40861728101,059306306Regular ClassroomRegular Classroom

YYN40721448001,034307307Regular ClassroomRegular Classroom

NNN40971948101,064309309Regular ClassroomRegular Classroom

Addition

YNN40722312470961210212Regular ClassroomComputer Lab 2nd Floor

NNN4085170810837310310Regular ClassroomRegular Classroom

NYN40851708810837312312Regular ClassroomRegular Classroom

NYN406319420001,140211/213213Regular ClassroomScience Classroom

NNN407314634110560211/213211Regular ClassroomStore Room 2nd Floor

Page 30 of 30CASTELLANOS Assessment Date: 8/26/14