Roosevelt High School Moderniza on Concept DesignOctober 2013
![Page 2: Roosevelt High School Concept Design (S.I.T. Meeting Oct. 16th, 2013)](https://reader031.fdocuments.us/reader031/viewer/2022020217/548c7faab47959640d8b456a/html5/thumbnails/2.jpg)
Roosevelt High School Moderniza on Concept DesignOctober 2013
ScheduleDesign Submissions• Concept Design October 16, 2013• Schematic Design December 20, 2013• Early Release Packages December 20, 2013• Design Development/GMP March 3, 2014• Construction Documents June 2014
Construction Milestones• Abatment November 1, 2013 - December 31, 2013• Demolition January 1, 2014 - March 15, 2014• Substantial Completion July 15, 2015• School starts August 2015
Student Involvement• Bi-weekly meetings Starting in November 2013 with design/build team
SCHEDULE
![Page 3: Roosevelt High School Concept Design (S.I.T. Meeting Oct. 16th, 2013)](https://reader031.fdocuments.us/reader031/viewer/2022020217/548c7faab47959640d8b456a/html5/thumbnails/3.jpg)
Roosevelt High School Moderniza on Concept DesignOctober 2013
NEIGHBORHOOD CONTEXT
10 min w
alk
Petworth Metro
![Page 4: Roosevelt High School Concept Design (S.I.T. Meeting Oct. 16th, 2013)](https://reader031.fdocuments.us/reader031/viewer/2022020217/548c7faab47959640d8b456a/html5/thumbnails/4.jpg)
Roosevelt High School Moderniza on Concept DesignOctober 2013
GREATER CAMPUS
MacFarland (RHS swing space)
Sharpe Health
Roosevelt
Petworth Library
Greater Campus
![Page 5: Roosevelt High School Concept Design (S.I.T. Meeting Oct. 16th, 2013)](https://reader031.fdocuments.us/reader031/viewer/2022020217/548c7faab47959640d8b456a/html5/thumbnails/5.jpg)
Roosevelt High School Moderniza on Concept DesignOctober 2013
CONSTRUCTION PHASES
Construc on Phases
1932
1976
![Page 6: Roosevelt High School Concept Design (S.I.T. Meeting Oct. 16th, 2013)](https://reader031.fdocuments.us/reader031/viewer/2022020217/548c7faab47959640d8b456a/html5/thumbnails/6.jpg)
Roosevelt High School Moderniza on Concept DesignOctober 2013
ISSUES AND OPPORTUNITIES
Arrival/Iden ty• School Students Teachers Parents
• STAY Students Teachers
• Community Gym Pool Health Clinic Auditorium
Access/Security• School Students Teachers Parents
• STAY Students Teachers
• Community Gym Pool Health Clinic Auditorium
Issues and Opportuni es
![Page 7: Roosevelt High School Concept Design (S.I.T. Meeting Oct. 16th, 2013)](https://reader031.fdocuments.us/reader031/viewer/2022020217/548c7faab47959640d8b456a/html5/thumbnails/7.jpg)
Roosevelt High School Moderniza on Concept DesignOctober 2013
CAMPUS PLAN
Campus Plan
“The Heart”“The Outdoor Classroom”“The Pavilion”Georgia Ave
Iowa Ave
13th
Str
eet N
W
Allison Street NW
Upshur Street
“The Terrace”
“The Waterworks”
“The School Garden”
“The Gallery”
![Page 8: Roosevelt High School Concept Design (S.I.T. Meeting Oct. 16th, 2013)](https://reader031.fdocuments.us/reader031/viewer/2022020217/548c7faab47959640d8b456a/html5/thumbnails/8.jpg)
Roosevelt High School Moderniza on Concept DesignOctober 2013
“THE TERRACE”
• Visibility• Iden ty• Access
“The Terrace”
![Page 9: Roosevelt High School Concept Design (S.I.T. Meeting Oct. 16th, 2013)](https://reader031.fdocuments.us/reader031/viewer/2022020217/548c7faab47959640d8b456a/html5/thumbnails/9.jpg)
Roosevelt High School Moderniza on Concept DesignOctober 2013
“THE TERRACE”
![Page 10: Roosevelt High School Concept Design (S.I.T. Meeting Oct. 16th, 2013)](https://reader031.fdocuments.us/reader031/viewer/2022020217/548c7faab47959640d8b456a/html5/thumbnails/10.jpg)
Roosevelt High School Moderniza on Concept DesignOctober 2013
“THE PAVILION”
“The Pavilion”
• Community entrance• STAY entrance• Iden ty
![Page 11: Roosevelt High School Concept Design (S.I.T. Meeting Oct. 16th, 2013)](https://reader031.fdocuments.us/reader031/viewer/2022020217/548c7faab47959640d8b456a/html5/thumbnails/11.jpg)
Roosevelt High School Moderniza on Concept DesignOctober 2013
“THE OUTDOOR CLASSROOM” AND “THE PAVILION”
“The Outdoor Classroom” and “The Pavilion”
![Page 12: Roosevelt High School Concept Design (S.I.T. Meeting Oct. 16th, 2013)](https://reader031.fdocuments.us/reader031/viewer/2022020217/548c7faab47959640d8b456a/html5/thumbnails/12.jpg)
Roosevelt High School Moderniza on Concept DesignOctober 2013
“THE OUTDOOR CLASSROOM”
“The Outdoor Classroom”
![Page 13: Roosevelt High School Concept Design (S.I.T. Meeting Oct. 16th, 2013)](https://reader031.fdocuments.us/reader031/viewer/2022020217/548c7faab47959640d8b456a/html5/thumbnails/13.jpg)
Roosevelt High School Moderniza on Concept DesignOctober 2013
ACADEMICSADMINATHLETICS/PHYSICAL EDUCATIONMEDIA CENTERVISUAL & PERFORMING ARTSAUDITORIUM & SUPPORTHEALTH CLINICFAMILY SUPPORTFOOD SERVICESSTAYCTE
10’ 20’ 30’ 50’0’
FIRST FLOOR
BUILDING ORGANIZATION
ARTS AUDITORIUM ACADEMICS
RHS ENTRY
STAY/COMMUNITY ENTRY
ATHLETICS
![Page 14: Roosevelt High School Concept Design (S.I.T. Meeting Oct. 16th, 2013)](https://reader031.fdocuments.us/reader031/viewer/2022020217/548c7faab47959640d8b456a/html5/thumbnails/14.jpg)
Roosevelt High School Moderniza on Concept DesignOctober 2013
OVERALL PLAN LOWER LEVEL
ACADEMICSADMINATHLETICS/PHYSICAL EDUCATIONMEDIA CENTERVISUAL & PERFORMING ARTSAUDITORIUM & SUPPORTHEALTH CLINICFAMILY SUPPORTFOOD SERVICESSTAYCTEMECHANICAL/SUPPORTCIRCULATION
10’ 20’ 30’ 40’0’
“The Heart”
![Page 15: Roosevelt High School Concept Design (S.I.T. Meeting Oct. 16th, 2013)](https://reader031.fdocuments.us/reader031/viewer/2022020217/548c7faab47959640d8b456a/html5/thumbnails/15.jpg)
Roosevelt High School Moderniza on Concept DesignOctober 2013
“THE HEART”
“The Heart”
Cafeteria
CulinaryArts
Career Center
13th Street
“The Terrace”
“The Steps”
MediaCenter
“O u td o o r Classroom”
“The Heart”
C o s m e -tology
![Page 16: Roosevelt High School Concept Design (S.I.T. Meeting Oct. 16th, 2013)](https://reader031.fdocuments.us/reader031/viewer/2022020217/548c7faab47959640d8b456a/html5/thumbnails/16.jpg)
Roosevelt High School Moderniza on Concept DesignOctober 2013
“THE HEART”
gathering
learningcommunity building
sharing“The Heart”
![Page 17: Roosevelt High School Concept Design (S.I.T. Meeting Oct. 16th, 2013)](https://reader031.fdocuments.us/reader031/viewer/2022020217/548c7faab47959640d8b456a/html5/thumbnails/17.jpg)
Roosevelt High School Moderniza on Concept DesignOctober 2013
“The Heart”
“THE HEART”
old + new
![Page 18: Roosevelt High School Concept Design (S.I.T. Meeting Oct. 16th, 2013)](https://reader031.fdocuments.us/reader031/viewer/2022020217/548c7faab47959640d8b456a/html5/thumbnails/18.jpg)
Roosevelt High School Moderniza on Concept DesignOctober 2013
“The Heart”
“THE HEART”
![Page 19: Roosevelt High School Concept Design (S.I.T. Meeting Oct. 16th, 2013)](https://reader031.fdocuments.us/reader031/viewer/2022020217/548c7faab47959640d8b456a/html5/thumbnails/19.jpg)
Roosevelt High School Moderniza on Concept DesignOctober 2013
OVERALL PLAN LOWER LEVEL
ACADEMICSADMINATHLETICS/PHYSICAL EDUCATIONMEDIA CENTERVISUAL & PERFORMING ARTSAUDITORIUM & SUPPORTHEALTH CLINICFAMILY SUPPORTFOOD SERVICESSTAYCTEMECHANICAL/SUPPORTCIRCULATION
10’ 20’ 30’ 40’0’
Media Center
![Page 20: Roosevelt High School Concept Design (S.I.T. Meeting Oct. 16th, 2013)](https://reader031.fdocuments.us/reader031/viewer/2022020217/548c7faab47959640d8b456a/html5/thumbnails/20.jpg)
Roosevelt High School Moderniza on Concept DesignOctober 2013
MEDIA CENTER
Media Center
![Page 21: Roosevelt High School Concept Design (S.I.T. Meeting Oct. 16th, 2013)](https://reader031.fdocuments.us/reader031/viewer/2022020217/548c7faab47959640d8b456a/html5/thumbnails/21.jpg)
Roosevelt High School Moderniza on Concept DesignOctober 2013
OVERALL PLAN LOWER LEVEL
“The Waterworks”
![Page 22: Roosevelt High School Concept Design (S.I.T. Meeting Oct. 16th, 2013)](https://reader031.fdocuments.us/reader031/viewer/2022020217/548c7faab47959640d8b456a/html5/thumbnails/22.jpg)
Roosevelt High School Moderniza on Concept DesignOctober 2013
“The Waterworks”
“THE WATERWORKS”
![Page 23: Roosevelt High School Concept Design (S.I.T. Meeting Oct. 16th, 2013)](https://reader031.fdocuments.us/reader031/viewer/2022020217/548c7faab47959640d8b456a/html5/thumbnails/23.jpg)
Roosevelt High School Moderniza on Concept DesignOctober 2013
OVERALL PLAN FIRST FLOOR
ACADEMICSADMINATHLETICS/PHYSICAL EDUCATIONMEDIA CENTERVISUAL & PERFORMING ARTSAUDITORIUM & SUPPORTHEALTH CLINICFAMILY SUPPORTFOOD SERVICESSTAYCTEMECHANICAL/SUPPORTCIRCULATION
10’ 20’ 30’ 50’0’
FIRST FLOOR
“The Gallery”
![Page 24: Roosevelt High School Concept Design (S.I.T. Meeting Oct. 16th, 2013)](https://reader031.fdocuments.us/reader031/viewer/2022020217/548c7faab47959640d8b456a/html5/thumbnails/24.jpg)
Roosevelt High School Moderniza on Concept DesignOctober 2013
“THE GALLERY”
“The Gallery”
3D/2D Studio
Instrumental
Choral
Mul -purpose Studio
![Page 25: Roosevelt High School Concept Design (S.I.T. Meeting Oct. 16th, 2013)](https://reader031.fdocuments.us/reader031/viewer/2022020217/548c7faab47959640d8b456a/html5/thumbnails/25.jpg)
Roosevelt High School Moderniza on Concept DesignOctober 2013
OVERALL PLAN FIRST FLOOR
ACADEMICSADMINATHLETICS/PHYSICAL EDUCATIONMEDIA CENTERVISUAL & PERFORMING ARTSAUDITORIUM & SUPPORTHEALTH CLINICFAMILY SUPPORTFOOD SERVICESSTAYCTEMECHANICAL/SUPPORTCIRCULATION
10’ 20’ 30’ 50’0’
FIRST FLOOR
“The Pavilion”
![Page 26: Roosevelt High School Concept Design (S.I.T. Meeting Oct. 16th, 2013)](https://reader031.fdocuments.us/reader031/viewer/2022020217/548c7faab47959640d8b456a/html5/thumbnails/26.jpg)
Roosevelt High School Moderniza on Concept DesignOctober 2013
“The Pavilion”
“THE PAVILION”
STAY
GYM
POOL
![Page 27: Roosevelt High School Concept Design (S.I.T. Meeting Oct. 16th, 2013)](https://reader031.fdocuments.us/reader031/viewer/2022020217/548c7faab47959640d8b456a/html5/thumbnails/27.jpg)
Roosevelt High School Moderniza on Concept DesignOctober 2013
OVERALL PLAN FIRST FLOOR
ACADEMICSADMINATHLETICS/PHYSICAL EDUCATIONMEDIA CENTERVISUAL & PERFORMING ARTSAUDITORIUM & SUPPORTHEALTH CLINICFAMILY SUPPORTFOOD SERVICESSTAYCTEMECHANICAL/SUPPORTCIRCULATION
10’ 20’ 30’ 50’0’
FIRST FLOOR
“The School Garden”
![Page 28: Roosevelt High School Concept Design (S.I.T. Meeting Oct. 16th, 2013)](https://reader031.fdocuments.us/reader031/viewer/2022020217/548c7faab47959640d8b456a/html5/thumbnails/28.jpg)
Roosevelt High School Moderniza on Concept DesignOctober 2013
“The School Garden”
“THE SCHOOL GARDEN”
![Page 29: Roosevelt High School Concept Design (S.I.T. Meeting Oct. 16th, 2013)](https://reader031.fdocuments.us/reader031/viewer/2022020217/548c7faab47959640d8b456a/html5/thumbnails/29.jpg)
Roosevelt High School Moderniza on Concept DesignOctober 2013
ACADEMICSADMINATHLETICS/PHYSICAL EDUCATIONMEDIA CENTERVISUAL & PERFORMING ARTSAUDITORIUM & SUPPORTHEALTH CLINICFAMILY SUPPORTFOOD SERVICESSTAYCTEMECHANICAL/SUPPORTCIRCULATION
10’ 20’ 30’ 50’0’
FIRST FLOOR
OVERALL PLAN FIRST FLOOR
Gym
![Page 30: Roosevelt High School Concept Design (S.I.T. Meeting Oct. 16th, 2013)](https://reader031.fdocuments.us/reader031/viewer/2022020217/548c7faab47959640d8b456a/html5/thumbnails/30.jpg)
Roosevelt High School Moderniza on Concept DesignOctober 2013
GYM SECTION
Gym Sec on
Proposed bleacher capacity: +/- 1,000
![Page 31: Roosevelt High School Concept Design (S.I.T. Meeting Oct. 16th, 2013)](https://reader031.fdocuments.us/reader031/viewer/2022020217/548c7faab47959640d8b456a/html5/thumbnails/31.jpg)
Roosevelt High School Moderniza on Concept DesignOctober 2013
GROUND FLOOR FIRST FLOOR
SHARED SPACES
• RHS Administration• STAY Administration• Family Support Center
• Cafeteria• Culinary Arts• Media Center
• Career Center• STAY Classrooms
![Page 32: Roosevelt High School Concept Design (S.I.T. Meeting Oct. 16th, 2013)](https://reader031.fdocuments.us/reader031/viewer/2022020217/548c7faab47959640d8b456a/html5/thumbnails/32.jpg)
Roosevelt High School Moderniza on Concept DesignOctober 2013
FIRST FLOOR SECOND FLOOR THIRD FLOOR
ACADEMY ORGANIZATION
• 10th Grade Academy• RISE Academy• Autism Academy
• 9th Grade Academy• ESL Academy (9th +10th)
• 11th Grade Academy• 12th Grade Academy• Elite Academy
![Page 33: Roosevelt High School Concept Design (S.I.T. Meeting Oct. 16th, 2013)](https://reader031.fdocuments.us/reader031/viewer/2022020217/548c7faab47959640d8b456a/html5/thumbnails/33.jpg)
Roosevelt High School Moderniza on Concept DesignOctober 2013
ACADEMY IDENTITY
ACADEMY IDENTITY
![Page 34: Roosevelt High School Concept Design (S.I.T. Meeting Oct. 16th, 2013)](https://reader031.fdocuments.us/reader031/viewer/2022020217/548c7faab47959640d8b456a/html5/thumbnails/34.jpg)
Roosevelt High School Moderniza on Concept DesignOctober 2013
ACADEMY ADMINISTRATION
ACADEMY ADMINISTRATION
• Staff Office or Workroom• Stairs and Restroom
![Page 35: Roosevelt High School Concept Design (S.I.T. Meeting Oct. 16th, 2013)](https://reader031.fdocuments.us/reader031/viewer/2022020217/548c7faab47959640d8b456a/html5/thumbnails/35.jpg)
Roosevelt High School Moderniza on Concept DesignOctober 2013
Front Entrance Preliminary Landscape Planting Concept:
Preliminary Plant Palette:
Trees / Shrubs
Stabilize embankment / Foundation Planting ExampleProvide emphasis to front entrance
LANDSCAPE
Landscape
![Page 36: Roosevelt High School Concept Design (S.I.T. Meeting Oct. 16th, 2013)](https://reader031.fdocuments.us/reader031/viewer/2022020217/548c7faab47959640d8b456a/html5/thumbnails/36.jpg)
Roosevelt High School Moderniza on Concept DesignOctober 2013
DROP OFF
Proposed Drop-off Along 13th Street
Visitor parking(22 spaces)
Bus Loop
AuditoriumArts Wing
Accessible Path
![Page 37: Roosevelt High School Concept Design (S.I.T. Meeting Oct. 16th, 2013)](https://reader031.fdocuments.us/reader031/viewer/2022020217/548c7faab47959640d8b456a/html5/thumbnails/37.jpg)
Roosevelt High School Moderniza on Concept DesignOctober 2013
LEED for Schools 2009 Pts.
80 13 6 11 Total Proposed Project Score 110
19 2 3 0 24
Y M+ M- NY SSp1 Construction Activity Pollution Prevention 0Y SSp2 Environmental Site Assessment 01 SS1 Site Selection 14 SS2 Dev. Density & Community Connectivity 41 SS3 Brownfield Redevelopment 14 SS4.1 Alt. Transportation - Public Transport 41 SS4.2 Alt. Transportation - Bicycle Storage 12 SS4.3 Alt. Transportation - LEV Vehicles 2
2 SS4.4 Alt. Transportation - Parking Capacity 21 SS5 1 Site Development Protect or Restore Habitat 1
Sustainable SitesCertified 40 to 49 points Silver 50 to 59 points Gold 60 to 79 points Pla
1 SS5.1 Site Development - Protect or Restore Habitat 11 SS5.2 Site Development - Maximize Open Space 1
1 SS6.1 Stormwater Design - Quantity Control 11 SS6.2 Stormwater Design - Quality Control 11 SS7.1 Heat Island Effect - Non-Roof 1
1 SS7.2 Heat Island Effect - Roof 11 SS8 Light Pollution Reduction 1
1 SS9 Site Master Plan 11 SS10 Joint Use of Facilities 110 0 0 1 11
Y M+ M- NY WEp1 Water Use Reduction 04 WE1 Water Efficient Landscaping 4
2 WE2 Innovative Wastewater Technologies 24 WE3 Water Use Reduction, 30%, 35%, 40% 4
1 WE4 Process Water Use Reduction, 20% 120 8 1 4 33
Y M+ M- NY EAp1 Fundamental Commissioning 0Y EAp2 Min. Energy Performance (ASHRAE 90.1 - 2007) 0Y EAp3 Fundamental Refrigerant Management 010 5 1 3 EA1 Optimize Energy Performance 19
5 2 EA2 On-Site Renewable Energy 7
2 EA3 Enhanced Commissioning 2
Water Efficiency
Energy & Atmosphere
2 EA3 Enhanced Commissioning 21 EA4 Enhanced Refrigerant Management 1
1 1 EA5 Measurement & Verification 2
2 EA6 Green Power, 35% for 2 years 2
, y8 1 0 4 13
Y M+ M- NY MRp1 Storage & Collection of Recyclables 01 1 MR1.1 Bldg. Reuse - Exist. Walls/ Floors/ Roof 75/95% 2
1 MR1.2 Bldg. Reuse - Interior Non-Struc. Elements,50% 12 MR2 Construction Waste Management, 50/ 75% 2
2 MR3 Materials Reuse 5% 22 MR4 Recycled Content 10%, 20% 22 MR5 Regional Materials 10%, 20% 2
1 MR6 Rapidly Renewable Materials 2.5% 11 MR7 Certified Wood 114 1 2 2 19
Y M+ M- NY IEQp1 Minimum IAQ Performance 0Y IEQp2 Environmental Tobacco Smoke (ETS) Control 0Y IEQp3 Minimum Acoustical Performance 01 IEQ1 Outdoor Air Delivery Monitoring 1
1 IEQ2 Increased Ventilation 11 IEQ3.1 Const. IAQ Management Plan - During Const. 11 IEQ3.2 Const. IAQ Management Plan - Pre Occupancy 1
IEQ4 Low-Emitting Materials (Choose for upto 4 points) 41 IEQ4.1 Adhesives and Sealants 11 IEQ4.2 Paints & Coatings 11 IEQ4.3 Flooring Systems 1Y IEQ4.4 Composite Wood & Agrifiber 1
Indoor Environmental Quality
Materials & Resources
1 IEQ4.5 Furniture & Furnishings 1Y IEQ4.6 Ceiling and Wall Systems 11 IEQ5 Indoor Chemical & Pollutant Source Control 11 IEQ6.1 Controllability of Systems - Lighting 11 IEQ6.2 Controllability of Systems - Thermal Comfort 11 IEQ7.1 Thermal Comfort - Design 11 IEQ7.2 Thermal Comfort - Verification 11 1 1 IEQ8.1 Daylight 75/90% classrm/ 75% reg. occupied 3
1 IEQ8.2 Views 90% 11 IEQ9 Enhanced Acoustical Performance 1
1 IEQ10 Mold Prevention 16 0 0 0 6
Y M+ M- N1 ID1.1 Innovation in Design: Education/ Outreach 11 ID1.2 Innovation in Design: Green Cleaning 11 ID1.3 Pilot Credit SSpc82: Local Food Production 11 ID1.4 Exemplary Performance: Green Power - 70% 1
Backup Innovation in Design: SSc4.1 0Backup Innovation in Design: Low Mercury Lighting 0Backup Exemplary Performance: MRc2 95%
1 ID2 LEED™ Accredited Professional 11 ID3 The School as a Teaching Tool 1
Innovation in Design
g3 1 0 0 4
Y M+ M- N Up to 4 points awarded in this categoryM- RP1.1 Regional Priority: SSc5.1 1
1 RP1.2 Regional Priority: SSc6.1 11 RP1.3 Regional Priority: WEc2 1
M+ RP1.4 Regional Priority: EAc1 (40%/36%) 11 RP1.5 Regional Priority: EAc2 (1%) 11 RP1.6 Regional Priority: MRc1.1 (75%) 1
Regional Priority
1 RP1.6 Regional Priority: MRc1.1 (75%) 1
LEED SCORECARD
LEED Scorecard
![Page 38: Roosevelt High School Concept Design (S.I.T. Meeting Oct. 16th, 2013)](https://reader031.fdocuments.us/reader031/viewer/2022020217/548c7faab47959640d8b456a/html5/thumbnails/38.jpg)
Roosevelt High School Moderniza on Concept DesignOctober 2013
• Restora on + Maintain profi les - Rou ne maintenance - $$$$ - Poor thermal performance without added storm• New Wood Windows + Match profi les - Rou ne maintenance - $$$ - Moderate thermal performance• Metal Clad Wood Windows +/- Tradi onal appearance + Be er thermal performance + Less maintenance + $$• Metal Windows +/- Tradi onal appearance + Be er thermal performance + Least maintenance + $$
WINDOWS
Windows
![Page 39: Roosevelt High School Concept Design (S.I.T. Meeting Oct. 16th, 2013)](https://reader031.fdocuments.us/reader031/viewer/2022020217/548c7faab47959640d8b456a/html5/thumbnails/39.jpg)
Roosevelt High School Moderniza on Concept DesignOctober 2013
CUPOLA RESTORATION
Cupola Restora on
1932Cupola
2013Cupola
Glass Fiber Reinforced Concrete “Jacket”
2015Cupola
+ =
![Page 40: Roosevelt High School Concept Design (S.I.T. Meeting Oct. 16th, 2013)](https://reader031.fdocuments.us/reader031/viewer/2022020217/548c7faab47959640d8b456a/html5/thumbnails/40.jpg)
Roosevelt High School Moderniza on Concept DesignOctober 2013