ROOF GARDEN CONCEPT PLAN - edqdad.dsdip.qld.gov.au

23
1 : 250 0 5 10 15 20 25m 9 JUBILEE HOTEL / LANDSCAPE CONCEPT 01 02 03 08 05 06 07 1. Feature paved entry area (to match lobby) 2. Raised planters (+600mm wall height with mounding to achieve approx 1000mm depth for trees) 3. Main gathering/event space, positioned for city views to the SW. Open paved area for flexibility of use, with shade cover over. 4. Bar for informal seating as general use, serving bar for event use with circulation space behind. 5. Kitchen bar with BBQ. 6. Circulation space behind kitchen bar for catering equipment & preparation or events. 7. Bar & stool to the edge of the roof for open views. 8. Shade structures over event/ gathering space. Informal seating & table setting may be utilised in general use mode for shaded seating. 9. Linear seat & tables setting integrated with planter walls for small informal gatherings or outdoor meeting/work station. 10. Feature spreading shade trees - larger specimens selected where planter width is greatest. 11. Screen trees to buffer roof plant equipment area. 12. Dense bank of planting to western edge. ROOF GARDEN CONCEPT PLAN 03 04 09 09 10 11 11 12 10 02 01 10 NOTE: ROOF GARDEN CONCEPT INDICATIVE ONLY. FINAL DESIGN TO BE RESOLVED IN CONJUNCTION WITH THE TENANT. SITE BOUNDARY PROPOSED CANOPY JUBILEE HOTEL LEVEL 01 CONSTANCE ST SYMES ST BREWERS ST ST PAULS TERRACE LIFT LIFT WC WC PLANT PLANT PLANT PLANT Subject to Compliance Assessment AMENDED IN RED By: Date: Tom Barker 12 February 2018

Transcript of ROOF GARDEN CONCEPT PLAN - edqdad.dsdip.qld.gov.au

Page 1: ROOF GARDEN CONCEPT PLAN - edqdad.dsdip.qld.gov.au

1:2500 5 10 15 20 25m

9JUBILEE HOTEL / LANDSCAPE CONCEPT

01

02

03

08

05

06

07

1. Feature paved entry area (to match

lobby)

2. Raised planters (+600mm wall height

with mounding to achieve approx

1000mm depth for trees)

3. Main gathering/event space,

positioned for city views to the SW.

Open paved area for flexibility of

use, with shade cover over.

4. Bar for informal seating as general

use, serving bar for event use with

circulation space behind.

5. Kitchen bar with BBQ.

6. Circulation space behind kitchen bar

for catering equipment & preparation

or events.

7. Bar & stool to the edge of the roof for

open views.

8. Shade structures over event/

gathering space. Informal seating

& table setting may be utilised in

general use mode for shaded seating.

9. Linear seat & tables setting

integrated with planter walls for

small informal gatherings or outdoor

meeting/work station.

10. Feature spreading shade trees -

larger specimens selected where

planter width is greatest.

11. Screen trees to buffer roof plant

equipment area.

12. Dense bank of planting to western

edge.

ROOF GARDEN CONCEPT PLAN

0304

09

09

10

11

11

12

10

02

01

10

NOTE: ROOF GARDEN CONCEPT INDICATIVE ONLY. FINAL DESIGN TO BE RESOLVED IN CONJUNCTION WITH THE TENANT.

SITE BOUNDARY

PROPOSED CANOPY

JUBILEE HOTEL

LEVEL 01

CO

NST

AN

CE

ST

SYM

ES S

T

BREWERS ST

ST PAULS TERRACE

LIFT

LIFT

WC

WC

PLANT

PLANT

PLANT

PLANT

Subject to Compliance Assessment

AMENDED IN REDBy: Date:

Tom Barker12 February 2018

Page 2: ROOF GARDEN CONCEPT PLAN - edqdad.dsdip.qld.gov.au

The Jubilee Hotel470 St Pauls Terrace,Fortitude Valley

Landscape Concept

THE JUBILEE HOTEL REFURBISHMENT Stage 2 Development application amenDment 26.02.2021

39paRt 2: DRaWingS

josephe
Jubilee
Page 3: ROOF GARDEN CONCEPT PLAN - edqdad.dsdip.qld.gov.au

Document Issue Purpose Date Approved

20146 LC-01 A Draft 05/02/21 AG20146 LC-01 B For Information 15/02/21 AG20146 LC-01 C For Information 19/02/21 AG

For: JGL Properties + Tony Burnett Hotels

Wild Studio wildstudio.com.au

13/46 Douglas StreetMilton Qld 4064PO Box 287 Paddington Qld 4064

ABN: 38 638 202 123

© 2020 Wild Studio Australia Pty Ltd

Contents

1 Context2 Nature-Based Behaviour3 Biophyllia4 Design Response5 Planting Strategy6 Maintenance

THE JUBILEE HOTEL REFURBISHMENT Stage 2 Development application amenDment 26.02.2021

40paRt 2: DRaWingS

Page 4: ROOF GARDEN CONCEPT PLAN - edqdad.dsdip.qld.gov.au

WILDSTUDIO.COM.AU I THE JUBILEE HOTEL 20146 LC-01 [C] I 2021-02-19 I PAGE 3

1.0 Context

“Fortitude Valley is a contradiction in itself – raw, yet sophisticated. It is where elegance and style meet grungy and offbeat, and heritage-listed properties proudly stand among contemporary buildings. From the cranking of a coffee grinder to the final closing doors of nightclubs – Fortitude Valley is the suburb that never sleeps.

The Valley, as it is affectionately known, was Australia’s first dedicated entertainment district and continues to be a hive of activity. Live music pumps and international DJs are drawn to the clubs and chic bars. From local acts at the tiniest dive bar, through to big names at The Fortitude Music Hall –Brisbane’s live music scene was born, raised and continues to thrive on these streets.”

1. Aerial 2. Jubilee Hotel3. St Pauls Terrace

1

2 3

THE JUBILEE HOTEL REFURBISHMENT Stage 2 Development application amenDment 26.02.2021

41paRt 2: DRaWingS

Page 5: ROOF GARDEN CONCEPT PLAN - edqdad.dsdip.qld.gov.au

WILDSTUDIO.COM.AU I THE JUBILEE HOTEL 20146 LC-01 [C] I 2021-02-19 I PAGE 4

2.0 Nature-Based Behaviour

Plants generate happiness. Designing a space with a carefully considered planting strategy can have a positive impact on people’s mood and behaviour. Incorporating this into a public venue which serves alcohol is a great way to encourage positive social behaviours and generates a vibrant atmosphere.“Research shows that people who spend extended lengths of time around plants tend to have better relationships with others. This is due to measurable increases in feelings of compassion; another effect of exposure to ornamental plants.”

THE JUBILEE HOTEL REFURBISHMENT Stage 2 Development application amenDment 26.02.2021

42paRt 2: DRaWingS

Page 6: ROOF GARDEN CONCEPT PLAN - edqdad.dsdip.qld.gov.au

WILDSTUDIO.COM.AU I THE JUBILEE HOTEL 20146 LC-01 [C] I 2021-02-19 I PAGE 5

3.0 Biophyllia

Exploring Biophilia in the public realm

“Biophilia hypothesis, idea that humans possess an innate tendency to seek connections with nature and other forms of life.”

The movement towards nature-based urban environments is growing awareness of the health and wellness benefits from contact with nature, a concept known as biophilia. Exposure to nature has been shown to lower levels of cortisol, the human stress hormone, as well as stimulate creativity. Employers competing for the best workers are using outdoor amenities to show they care about their staff’s well-being.”

Water is believed to induce nurturing energies, it pulls out negativity and balances emotions resulting with a calm and focused state. It provokes creative thoughts and new ideas whilst also aiding restoration of health.

THE JUBILEE HOTEL REFURBISHMENT Stage 2 Development application amenDment 26.02.2021

43paRt 2: DRaWingS

Page 7: ROOF GARDEN CONCEPT PLAN - edqdad.dsdip.qld.gov.au

4.0 Design Response

Concept Plan1:250@A3

1 Celebration of heritage wall2 Cascadingbarplanting+figtreeforest3 Street planters + climbers (Hops garden)4 Water garden5 Low planters6 Courtyard feature tree (Fiddle Leaf Fig)

B D

09

10

11

EX. FLOOR HATCH & STAIRS TO KEG ROOM

PRIVATE DINING CELLAR

BAR

PUBLIC BAR

TERRACE

OFFICE

GAMING

GAMING

WC WC

2A30.01

1A30.00

EXISTING BAR & FINISHES TO BE RETAINED

EXISTING FLOOR TO PUBLIC BAR TO BE RETAINED

NEW CARPET TO GAMING ROOM & OFFICES

NEW SLIDING GLASS DOORS

EXISTING STAIRS UP

NEW WC'S

RESTORE EXISTING WINDOW

NEW GLASS DOOR

DOSA

LIFT

NEW WINDOW TO EXISTING OPENING

A20.02

1

A20.01 1

A20.00

1

WASHUP

DRY STORE COLD ROOM FREEZER

WASTE CHUTE

KITCHEN

SERVERY

BREWERY

BOOTH SEATING

BEER GARDEN

BAR

NEW CURTAIN TO GAMING ROOM

TV SCREEN

SITE BOUNDARY

SITE

BOU

NDAR

Y

SITE

BOU

NDAR

Y

SITE BOUNDARY

SITE BOUNDARY

INFILL EXISTING OPENING

ST01AST01B

ST01C

TM01

ST01B

CP01

CP02

CP02

TM01

ST01B

ST01C

MALE

ST01C

FEMALEST01CPWD

ST02

(e)

EP01

EP01

EP01

EP01 EP01 EP01

REINSTATE DOORS

REINSTATE DOORS

STAGE 01

EXISTING WATER TANK BELOW SHOWN DASHED (INDICATIVE)

COFFEE

STORE

RAIL

SECURE LINE

QUICK SERVICE

01A71.00

2A30.00

2A30.00

01A71.15

01A71.20

1A30.02

1DA99.03

1DA99.03

ANGLED GLAZING WALL

FLOOR OVER

1A30.01

1A30.01

PENDANT LIGHTS OVER

1A54.00

3A54.00

5A54.00

FHR

DP

SIPHONIC DOWNPIPES CONCEALED IN STRUCTURE

PORTAL FRAME & GUILLOTINE DOOR

WATER FEATURES REFER HYDRAULIC ENGINEERS DRAWINGS

FOOT

PATH

BREWERS STREET

CONS

TANC

E S

TREE

T

ST PAULS TERRACE

FOOTPATH

FOOTPATH

FOOT

PATH

EXISTING LANDSCAPING

DP

FT01

BOOTH SEATING REFER DETAILS

FHR

07

08

06

05

04

03

C

01

02

A

2A30.02

3A30.02

NEW DOORS TO GAMING ROOM

MATERIALS LEGENDSCD01 – Tiled claddingCF01 – Off form concreteCF02 – Broom finish concreteCP01 - Feature carpet insert to private dining roomCP02 - Gaming room carpetCP03 - Level 01 carpetEP01 - Epoxy flooringFT01 - Frameless clear glassLV01 - Glass LouvresMA01 - White half brick - patteredMRS - Black Metal Roof SheetingST01A – Stone Tiles (to match existing Jubilee Place Plaza floor)ST01B - Stone tiles to match ST01A, smaller formatST01C- Stone tiles to match ST01B, smaller formatST02 – Thresholds TF01 - Timber Floor

0

Rev Description Date By

Drawing No.

Project No.

Revision

Drawn by

Date

Checked by

ScaleSheet Name

© BLIGHT RAYNER ARCHITECTURE PTY LTD ACN 614335956Use figured dimensions only. Do not scale. Check all dimensions on site prior to fabrication or setout.These designs, drawings and specifications are copyright and must not be used, kept or copied by any means without permission.

6.33.81.3

Client Project Name

Project Address@A3 1 : 250

15.02.21

8

15/0

2/20

21 6

:20:

19 P

M@A1 1 : 12519039

A10.00 JZ

JB

GROUND FLOOR

470 St Pauls Terrace, Fortitude Valley QLD 4006

JUBILEE HOTELLevel 2, 88 Creek Street, Brisbane Qld 4000 Ph.39056500 [email protected]

1 Preliminary Issue 10.03.20 JZ2 ISSUE FOR REVIEW 19.03.203 ISSUE FOR REVIEW 23.03.20 JZ4 ISSUE FOR REVIEW 24.05.20 JZ5 ISSUE FOR INFORMATION 19.06.20 JZ6 100%SD ISSUE 16.09.20 JZ7 ISSUE FOR INFORMATION 28.01.21 JZ8 ISSUE FOR PRICING 15.02.21 JZ

1

2

2

3

3

4

5

6

THE JUBILEE HOTEL REFURBISHMENT Stage 2 Development application amenDment 26.02.2021

44paRt 2: DRaWingS

Page 8: ROOF GARDEN CONCEPT PLAN - edqdad.dsdip.qld.gov.au

WILDSTUDIO.COM.AU I THE JUBILEE HOTEL 20146 LC-01 [C] I 2021-02-19 I PAGE 8

Jubilee Beer Garden

through to courtyard

Bar

Kitchen

Brewery

1 Beer garden entry + bar - feature paving2 Cascading plants over bar3 Street planters + climbers (Hops)4 Water garden5 Low planters6 Stool seating7 Bench seats8 Booth seating (8-10 people)9 Booth seating (6-8 people)10 Booth seating (4-6 people)11 Lift12 Restrooms13 Planting threshold14 Booth planters15 Feature tree

1

1

1

2

2

3

4

4

5

5

8

8

8

8

89

9

9

7

76

6

6

6

11

10

10

13

10

14

10

15

15

12

Plan - Upper Ground1:100@A3Joins page 09

Foot

path

Prop

erty

Bou

ndar

y

+11.450

+11.450

+10.340

+10.340

+10.340

02

03

THE JUBILEE HOTEL REFURBISHMENT Stage 2 Development application amenDment 26.02.2021

45paRt 2: DRaWingS

Page 9: ROOF GARDEN CONCEPT PLAN - edqdad.dsdip.qld.gov.au

WILDSTUDIO.COM.AU I THE JUBILEE HOTEL 20146 LC-01 [C] I 2021-02-19 I PAGE 10

Plan - Level 011:100@A3

1 Fig tree forest2 Cascading plants over bar3 Water garden below4 Balcony stool seating5 Booth seating below6 Function area7 Terrace

1

2

2

2

3

3

4

6 7

+15.760

+15.760

Jubilee Beer Garden below

Con

stan

ce S

treet

foot

path

bel

ow

5

5

5

THE JUBILEE HOTEL REFURBISHMENT Stage 2 Development application amenDment 26.02.2021

46paRt 2: DRaWingS

Page 10: ROOF GARDEN CONCEPT PLAN - edqdad.dsdip.qld.gov.au

WILDSTUDIO.COM.AU I THE JUBILEE HOTEL 20146 LC-01 [C] I 2021-02-19 I PAGE 12

Section 021:100@A3

1 Feature lift shaft2 Booth seating and water garden behind3 Jubilee beer garden main floor4 Cascading plants over bar5 Feature tree behind6 Cascading planters behind

FFL 10.340

1

2

3

45

6

3

THE JUBILEE HOTEL REFURBISHMENT Stage 2 Development application amenDment 26.02.2021

47paRt 2: DRaWingS

Page 11: ROOF GARDEN CONCEPT PLAN - edqdad.dsdip.qld.gov.au

WILDSTUDIO.COM.AU I THE JUBILEE HOTEL 20146 LC-01 [C] I 2021-02-19 I PAGE 13

Section 031:100@A3

1 Feature wall / main TV screen2 Level 01 function room behind3 Seating niches / planters4 Main floor / low planting behind5 Cascading plants over bar6 Feature tree7 Stool seating8 Booth seating (4-6 people)9 Booth seating (8-10 people)10 Street planters (deep planting) (Humulus lupulus) or

similar - 300mm pots @ 1m centres11 Water garden12 Fig tree forest (Ficus lyrata)13 Bar14 Constance Street footpath15 Existing street light16 Cellar behind

Con

stan

ce S

treet

1

3

4

5 6

7

8 910 14 15

16

11

12

13

Prop

erty

Bou

ndar

y

FFL 10.340

FFL 11.450

FFL 10.400

2

THE JUBILEE HOTEL REFURBISHMENT Stage 2 Development application amenDment 26.02.2021

48paRt 2: DRaWingS

Page 12: ROOF GARDEN CONCEPT PLAN - edqdad.dsdip.qld.gov.au

WILDSTUDIO.COM.AU I THE JUBILEE HOTEL 20146 LC-01 [C] I 2021-02-19 I PAGE 14

Section 041:100@A3

1 Brewery (by architect)2 Street planters (deep planting) (Humulus lupulus) or

similar - 300mm pots @ 1m centres3 Footpath4 Street planting (Liriope evergreen giant) (Dietes grandiflora)(Lomatiasilafolia)5 Street tree (Harpullia hillii)Pr

oper

ty B

ound

ary

1

2

3

4

5

Brew

ers

Stre

et

FFL 10.340FFL9.900

THE JUBILEE HOTEL REFURBISHMENT Stage 2 Development application amenDment 26.02.2021

49paRt 2: DRaWingS

Page 13: ROOF GARDEN CONCEPT PLAN - edqdad.dsdip.qld.gov.au

WILDSTUDIO.COM.AU I THE JUBILEE HOTEL 20146 LC-01 [C] I 2021-02-19 I PAGE 15

Entry - Beer Garden + Bar

THE JUBILEE HOTEL REFURBISHMENT Stage 2 Development application amenDment 26.02.2021

50paRt 2: DRaWingS

Page 14: ROOF GARDEN CONCEPT PLAN - edqdad.dsdip.qld.gov.au

WILDSTUDIO.COM.AU I THE JUBILEE HOTEL 20146 LC-01 [C] I 2021-02-19 I PAGE 16

Water Garden

THE JUBILEE HOTEL REFURBISHMENT Stage 2 Development application amenDment 26.02.2021

51paRt 2: DRaWingS

Page 15: ROOF GARDEN CONCEPT PLAN - edqdad.dsdip.qld.gov.au

WILDSTUDIO.COM.AU I THE JUBILEE HOTEL 20146 LC-01 [C] I 2021-02-19 I PAGE 17

Water Garden - Evening

THE JUBILEE HOTEL REFURBISHMENT Stage 2 Development application amenDment 26.02.2021

52paRt 2: DRaWingS

Page 16: ROOF GARDEN CONCEPT PLAN - edqdad.dsdip.qld.gov.au

WILDSTUDIO.COM.AU I THE JUBILEE HOTEL 20146 LC-01 [C] I 2021-02-19 I PAGE 18

Water Garden

THE JUBILEE HOTEL REFURBISHMENT Stage 2 Development application amenDment 26.02.2021

53paRt 2: DRaWingS

Page 17: ROOF GARDEN CONCEPT PLAN - edqdad.dsdip.qld.gov.au

WILDSTUDIO.COM.AU I THE JUBILEE HOTEL 20146 LC-01 [C] I 2021-02-19 I PAGE 19

Bar + Fig Tree Forest

THE JUBILEE HOTEL REFURBISHMENT Stage 2 Development application amenDment 26.02.2021

54paRt 2: DRaWingS

Page 18: ROOF GARDEN CONCEPT PLAN - edqdad.dsdip.qld.gov.au

WILDSTUDIO.COM.AU I THE JUBILEE HOTEL 20146 LC-01 [C] I 2021-02-19 I PAGE 21

Constance Street Hops Garden

THE JUBILEE HOTEL REFURBISHMENT Stage 2 Development application amenDment 26.02.2021

55paRt 2: DRaWingS

Page 19: ROOF GARDEN CONCEPT PLAN - edqdad.dsdip.qld.gov.au

WILDSTUDIO.COM.AU I THE JUBILEE HOTEL 20146 LC-01 [C] I 2021-02-19 I PAGE 22

5.0 Planting Strategy

Trees and PalmsFicus lyrata Fiddle Leaf Fig

Shrubs and AccentsAlocasia brisbanensis CunjevoiDietesgrandiflora Wild IrisColocasia gigantea Giant Elephant EarColocasia ‘Black Beauty’ Black Beauty Elephant Ears

Liriope Evergreen Giant Evergreen GiantMacrozamia lucida Burrawang PalmPhyllanthusmultiflorus Waterfall Plant

Groundcovers, Ferns + Climbers

Blechnum cartilagineum Gristle FernHumulus lupulus Common hop

Epipremnum pinnatum Native monstera

Microsorum punctatum Strapleaf FernAsplenium nidus Bird’s Nest FernPteris umbrosa Jungle BrackenBlechnum indicum Swamp Water Fern

Nephrolepis exaltata Sword FernHildewintera Colademononis Soft Monkey TailCyathea cooperi Tree Fern

1

3

8

7

6

2

5

4

1 7 8

5 6

2 3

4

The plant palette is dominated by calm and cool species which create breathable semi-indoor spaces and drive a sub-tropical, authentic character of the proposed landscape.

The canopy comprises sculptural species such as the Fiddle Leaf Fig, while structures and trellises are softened by climbers such as the Native Monstera.

A reference to the process of brewing craft beer is given by the Com-mon Hops to the exterior of the building.

THE JUBILEE HOTEL REFURBISHMENT Stage 2 Development application amenDment 26.02.2021

56paRt 2: DRaWingS

Page 20: ROOF GARDEN CONCEPT PLAN - edqdad.dsdip.qld.gov.au

WILDSTUDIO.COM.AU I THE JUBILEE HOTEL 20146 LC-01 [C] I 2021-02-19 I PAGE 23

6.0 Maintenance

Maintenance issues are considered an integral part of the landscape design and a sustainable maintenance regime is implemented and re-evaluated over time. It is imperative the landscape thrives after installation with minimal maintenance and on-going cost to owners.

The following are some of the initiatives adopted to help ensure the long-term sustainability of the landscape:

• Choosing plant species which are suitable to the location and differing microclimates on site with long life expectancy and minimal pruning, watering and fertilising requirements.

• Designing all ground level planters to be accessible from pathways and paved areas and any balcony planters, where not accessible from the adjacent balcony, to be accessed using rooftop abseiling or safety lines provided.

• Requiring plant suppliers have an industry accreditation and third-party assessed QA system.

• Certifying that all trees comply with the NATSPEC Guide – Specifying Trees: A Guide to Assessment of Tree Quality (2003) to avoid any long-term structural issues.

• Using a quality, tested and certified, soil blend that complies with Soils for Landscape Development guidelines and AS4419, constructed with a duel-horizon to minimise slumping, maximise plant survival rates, and minimise maintenance.

• Ensuring all planters are adequately drained and drainage is connected to the stormwater system.

• Installing of a fully-automatic, multi-station, reticulated irrigation system to all landscape and recreation areas including podium planters.

• Using a minimum of 75mm of organic mulch to reduce weed growth and water loss in garden areas.

• Providing hose cocks in all outdoor areas (communal and private) to enable additional plant watering and surface washdown when necessary.

• Submitting a Planting Maintenance Program by the Landscape Contractor at the completion of construction.

• Incorporating a minimum 12 week establishment and maintenance period by the Landscape Contractor and a 52 week defects period for advanced tree stock.

• Ensuring a training program is carried out by the Landscape Contractor at handover to ensure that maintenance staff can operate irrigation the system and maintain the landscape.

THE JUBILEE HOTEL REFURBISHMENT Stage 2 Development application amenDment 26.02.2021

57paRt 2: DRaWingS

Page 21: ROOF GARDEN CONCEPT PLAN - edqdad.dsdip.qld.gov.au

1 Existing street tree - Kauri Pine2 New street tree - Kauri Pine3 Stone paving - Juperana granite4 Low planting5 Hops garden6 Water garden7 Plaza seating + planters8 Courtyard9 Bar10 Existing street light11 BCC footpath - honed concrete12 BCC footpath - asphalt13 BCC seat14 BCC waste bin15 New street tree in tree grate (Tulipwood)16 Existing street trees and understory planting made good17 Alternate paving as part of public art strategy

1 1 2 2

3

4

5

5

6

7

10

111314

15

17

17

17

15

15

1616

16

12

11

11

10

10

8

9

7

3

2 2 2

St Pauls Terrace

Brewers Street

Sym

es S

treet

Jubilee Hotel Plaza

Beer Garden

Jubilee Place

Neighbouring Property

Brewery

C

onst

ance

Stre

et

Property Boundary

Property Boundary

Prop

erty

Bou

ndar

y

Property Boundary

Prop

erty

Bou

ndar

y

Prop

erty

Bou

ndar

y

Legend

Landscape Concept Plan Ground Level + Streetscape1:250@A3

WILDSTUDIO.COM.AU I JUBILEE PLACE 20105 RFI [B] I 2021-04-20 I

01

josephe
Callout
Minimum 500mm wide in-ground planting (internal width)
josephe
Callout
Minimum 2.8m internal diameter planter. Minimum 1,200mm soil / media depth to support tree.
josephe
Callout
Minimum 4m internal diameter planter. Minimum 1,200mm soil / media depth to support tree.
josephe
Rectangle
josephe
Jubilee
mcgillk
New Stamp
Page 22: ROOF GARDEN CONCEPT PLAN - edqdad.dsdip.qld.gov.au

Planter Sections - Upper Ground1:100@A3

WILDSTUDIO.COM.AU I JUBILEE PLACE 20105 RFI [B] I 2021-04-20 I

UPPER GROUND

10100

LEVEL 01

16100

BB

5

LD-01

1

LD-01

JUBILEE HOTEL

MOUNDED PL1

PL2

S2W1

S2W1

2 00

900

300

300

5 00

UPPER GROUND

10100

LEVEL 01

16100

44

PRO

PER

TY B

OU

ND

ARY

MOUNDED PL15

LD-01

MOUNDED PL15

LD-01

ST P

AUL'

S TE

RR

ACE

S2

W1

S2

W1

E

LEVEL 01

16100

44

BENCH SEAT BY ARCHITECT

5

LD-01 MOUNDED PL1

PRO

PER

TY B

OU

ND

ARY

5

LD-01 PL1

E

LEVEL 03

25250

44

5

LD-01 MOUNDED PL1PR

OPE

RTY

BO

UN

DAR

Y

LEVEL 03

25250

11

5

LD-01 MOUNDED PL1

Project No.

13/46 Douglas Street, Milton Qld 4064PO Box 287, Paddington Qld [email protected]

wildstudio.com.au

©2020 Wild Studio Australia Pty Ltd

Client Drawing Issue Scale

@A3E 1 : 100

JUBILEE PLACE470 ST PAULS TERRACE, FORTITUDE VALLEY QLD 4006

Credit Suisse 20105 LS01

SECTIONS

1 : 100

SECTION 11

1 : 100

SECTION 22

1 : 100

SECTION 33

1 : 100

SECTION 44

1 : 100

SECTION 550 0.5 1 2 3 5m

LEGENDB1 STREET BINBK BOTTOM OF KERBPA1 HONED CONCRETE PAVEMENTPA2 ASPHALTPA3 STONE PAVEMENT - REFER ARCHITECT'S DRAWINGSPA4 STONE PAVEMENT - REFER ARCHITECT'S DRAWINGSPL1 PLANTING AREA TYPE 1PL2 PLANTING AREA TYPE 2S1 BCC STREET BENCHS2 PRECAST CONCRETE SEATTP TACTILE PAVINGTR1 VERTICAL STEEL WIRE MESHTR2 OVERHEAD STEEL WIRE MESHTG1 TREE GRATE 1200 x 1600mmTG2 TREE GRATE 1200 x 1200mmTK TOP OF KERB

TREE

0.000 EX EXISTING SURFACE LEVEL0.000 FINISHED SURFACE LEVELPD PLANTER DRAINW1 INSITU CONCRETE WALL

Issue Date Purpose Drawn ApprovedA 04/12/2020 PRELIMINARY AG OMB 29/01/2021 PRELIMINARY AG OMC 1/02/2021 PRELIMINARY AG OMD 02/03/2021 FOR INFORMATION AG OME 06/04/2021 FOR INFORMATION AG OM

NOT FOR CONSTRUCTION

UPPER GROUND

10100

LEVEL 01

16100

BB

5

LD-01

1

LD-01

JUBILEE HOTEL

MOUNDED PL1

PL2

S2W1

S2W1

2 00

900

300

300

5 00

UPPER GROUND

10100

LEVEL 01

16100

44

PRO

PER

TY B

OU

ND

ARY

MOUNDED PL15

LD-01

MOUNDED PL15

LD-01

ST P

AUL'

S TE

RR

ACE

S2

W1

S2

W1

E

LEVEL 01

16100

44

BENCH SEAT BY ARCHITECT

5

LD-01 MOUNDED PL1

PRO

PER

TY B

OU

ND

ARY

5

LD-01 PL1

E

LEVEL 03

25250

44

5

LD-01 MOUNDED PL1PR

OPE

RTY

BO

UN

DAR

Y

LEVEL 03

25250

11

5

LD-01 MOUNDED PL1

Project No.

13/46 Douglas Street, Milton Qld 4064PO Box 287, Paddington Qld [email protected]

wildstudio.com.au

©2020 Wild Studio Australia Pty Ltd

Client Drawing Issue Scale

@A3E 1 : 100

JUBILEE PLACE470 ST PAULS TERRACE, FORTITUDE VALLEY QLD 4006

Credit Suisse 20105 LS01

SECTIONS

1 : 100

SECTION 11

1 : 100

SECTION 22

1 : 100

SECTION 33

1 : 100

SECTION 44

1 : 100

SECTION 550 0.5 1 2 3 5m

LEGENDB1 STREET BINBK BOTTOM OF KERBPA1 HONED CONCRETE PAVEMENTPA2 ASPHALTPA3 STONE PAVEMENT - REFER ARCHITECT'S DRAWINGSPA4 STONE PAVEMENT - REFER ARCHITECT'S DRAWINGSPL1 PLANTING AREA TYPE 1PL2 PLANTING AREA TYPE 2S1 BCC STREET BENCHS2 PRECAST CONCRETE SEATTP TACTILE PAVINGTR1 VERTICAL STEEL WIRE MESHTR2 OVERHEAD STEEL WIRE MESHTG1 TREE GRATE 1200 x 1600mmTG2 TREE GRATE 1200 x 1200mmTK TOP OF KERB

TREE

0.000 EX EXISTING SURFACE LEVEL0.000 FINISHED SURFACE LEVELPD PLANTER DRAINW1 INSITU CONCRETE WALL

Issue Date Purpose Drawn ApprovedA 04/12/2020 PRELIMINARY AG OMB 29/01/2021 PRELIMINARY AG OMC 1/02/2021 PRELIMINARY AG OMD 02/03/2021 FOR INFORMATION AG OME 06/04/2021 FOR INFORMATION AG OM

NOT FOR CONSTRUCTION

josephe
Callout
In-ground planting (minimum 500mm internal width)
josephe
Rectangle
josephe
Cross-Out
josephe
Callout
PL2
josephe
Callout
Horizon B - height varies
josephe
Callout
Horizon A - 300mm maximum
josephe
Callout
Minimum 1,200mm soil / media depth to support tree. Maximum ground cover of planting to be below 150mm to maintain sight lines to art work.
josephe
Callout
PL1
josephe
Cross-Out
josephe
Jubilee
mcgillk
New Stamp
Page 23: ROOF GARDEN CONCEPT PLAN - edqdad.dsdip.qld.gov.au

Soil Specification

WILDSTUDIO.COM.AU I JUBILEE PLACE 20105 RFI [B] I 2021-04-20 I

(on podium)

(on ground)

josephe
Cross-Out
josephe
Cross-Out
josephe
Line
josephe
Line
josephe
Callout
E1
josephe
Callout
E2
josephe
Jubilee
mcgillk
New Stamp