GENERAL NOTES
All building work to be in accordance with National Building Regulations SANS 10400, SANS 204 as well as by-laws and requirements of Local Authority.All levels, heights and dimensions to be verified on site.Errors, discrepancies or omissions from these drawings must be reported to designer immediately.These drawings are not to be scaled and figured dimensions must be utilised.FOUNDATIONSAll vegetable matter to be removed from within perimeter of building.Foundations taken down to depth in accordance with appointed Engineer's design.Concrete to be 10 MPa. Minimum depth 600mm. Size determined by Engineer.All soil compaction to Engineer's specification.Consolidated fill to be treated with ant poison.WALLSAs per Part K of SANS 10400.Walls in accordance with Schedule 1 Table 2 and freestanding walls Schedule 1 Table 5 of NBR.Brickforce minimum every 6th course.No DPC to freestanding walls.Weepholes and expansion joints as necessary to freestanding walls.RC lintels over all openings.Painting and preparation to comply with manufacturer's specifications.DAMP PROOFINGDPC to be a minimum of 150mm above ground level.DPM to be a minimum of 0.250mm thick.DPM to be on compacted fill.DPC to be provided to all window cills.STRUCTURERC structure to be in accordance with appointed Structural Engineer's details.Monolithic components to be constructed in accordance with SABS 0100 or SABS 0145.CHIMNEYS & FIREPLACEChimneys and fireplace in accordance with Part V of NBR.DRAINAGEAll drainage works to be in accordance with Municipality drainage requirements.100mm diameter UPVC sewer pipe drain with a minimum fall of 1:60.100mm diameter OVP at head of drain.All drainage chased into walls to allow access to bends.Lintels to be built over drainage passing through walls and drainage to be encased in concrete sleeve where it passes under building. Foundations to be reinforced where passing over WP.IE's to be provided at maximum 24 metres centre to centre.Gullies to have a minimum of 150mm upstand all around.No bends or junctions under building.1 metre concrete or brick apron around building where gutters are not provided.Provide rodding eyes at head of drain, to all changes of direction and at a maximum of 25m intervals.Provide inspection eyes at all junctions of drain. Inspection eyes to have marked covers at ground level.WP to bath, shower and sinks to be minimum 40mm diameter. WP to WHB and bidets to be minimum of 32mm diameter.All waste pipes to have 65mm reseal traps or vented traps to waste fittings 3m or longer.All showers to have brass traps.450X450mm FC access panel to all drainage ducts.All soil fittings with vertical discharge greater than 1220mm to have anti syphon vent pipes.All piping from basins chased into brickwork to be inspected and approved by Council before covering up.ROOFRoof trusses manufactured in accordance with Part L Roofs of SANS 10400 or designed by Engineer in accordance with SANS 10160: Loading Code and SANS 10163: The Structural Use of Timber.Roof construction to conform to Part 1 Schedule 1 Table 1 of NBR with approved underlay.GS strap as anchorage to all roof trusses and wall plates.GS flashing as necessary.All waterproofing to manufacturer's specification.STAIRCASES & BALUSTRADESAs per Part M of SANS 10400 and to comply to SABS requirements.Staircases to have treads minimum 250mm and risers maximum 200mm.Balustrades minimum 1000mm height and openings max 100mm.TIMBERAll timber in accordance with SANS 0163.ALUMINIUM DOORS & WINDOWSIn accordance with AAAMSA and SABS rules and requlations.GEYSERGeyser to SABS 0254All exposed hot water piping to be insulated with min R-value of 1.0GLAZINGAs per Part N of SANS 10400 and to comply to SABS requirements.6.5mm PVC laminated safety glass to be used from 0 to +900mm affl.POOL SAFETYPool Safety in accordance with SABS 1390 and Section 4 of NBR, including self closing and locking gate.TILINGAluminium trim to all tile edging.PAVINGPaving apron of 1m wide to perimeter of building where gutters are not specified .
HOUSEWORK
03.04385
DU
Elect Plan, H&C Water Layout and SANSNotes
CELL: 082 457 2785
19 TUSCANY GROVECAMPBELL ROAD, CRAIGAVONGAUTENG
PO B
OX
2324
FOU
RWAY
S, S
AND
TON
2055
LESLIE & LINDA BOSMA
ERF 8639 EASTFORD DOWNS,KNYSNA
diet
er@
hous
ewor
k.jo
burg
HOT WATER SUPPLY
GENERALIn order to comply with functional regulations XA2 Contained in Part XA of the NBR the following guidance is provided: Accordance with Table 2 and 5 of SANS 10252-1:2004.Requirements for water installation in buildings shall be in accordance with SANS 10252-1 and SANS 10254.All hot water service pipes shall be clad with insulation with a min R value in accordance with Table 1.Thermal insulation if any shall be installed in accordance with manufactures instructions.
THERMAL INSULATIONPipes, fittings and components shall when necessary be protected against freezing. The insulation provided shall be appropriate to the min. temperature that can be expected in that geographical area.All exposed pipes to and from the hot water cylinders and central heating system shall be insulated with pipe insulation material with a thermal resistance in accordance with table 10. R value of 1.00 for 15mm pipes.Insulation shall be protected against the effects of weather and sunlight, and be able to withstand the temp. within the piping and achieve the min. total r value given in table 10:Table 10Internal Dia of pipe >80 .......... Min R value< 80 ........................................ 1.00>80 ......................................... 1.5Hot water vessels and tanks shall be insulated with material that achieves a min r value of 2.0. Note: to achieve this value, insulation in addition to the manufacturer’s installed insulation might be required.Insulation on vessels, tanks and piping containing cooling water shall be protected by a vapour barrier on the outside of the insulation.The piping insulation requirements do not apply to space heating water piping located within the space being heated. Where the piping is to provide the heating to that space or encased within a concrete floor slab or in masonry, such piping shall comply with this Part of SANS.Piping to be insulated includes all flow and return cold water supply piping within 1m of the connection for the heating or cooling system and pressure relief piping within 1m of the connection to the heating or cooking system. Where possible the length of pipe runs shall be minimised.After thermal insulation material has been installed, the ingress of moisture into such material shall be prevented. Note that roughness increases the effective surface area of insulation material and consequently, heat losses and moisture increase the thermal conductivity of the material.
HOT WATER SYSTEMS CALCULATIONCalculated as per SANS 10252-1:2004 (hot water system to be endorsed by specialist):
Type of accommodation: Dwelling / House
Daily capacity in litres: 55 - 110 l/day
Number of people per day: 4
Assumed daily water consumption in litres: 440 l/day
Assumed daily hot water consumption in litres: 220 l/day
Assumed annual hot water consumption in litres:80 300 litres Based on daily design occupancy
50% of daily hot water in litres: 110 l/dayProvided by means other than electrical resistance heating
Insulation Requirements
Internal Dia of hot water service pipes: <80
Min R-value 1.0 as per SANS 204
Min R-value for hot water tanks 2.0 Insulation may be required
Hot Water Calculation as per SANS 10252 - 1
Estimated daily demand for hot water: 110 l/day
Capacity: 250 l storage tank
All hot water pipes must be installed with thermal insulation of minimum R-value 1.0
Conclusion: The design complies with the requirements of SANS 10400 -XA-2011 and SANS 10252-1:2004 for hot water calculations
ELECTRICAL NOTES
ELECTRICAL Electrical layout to be checked on site by specialist before any work is put to handAll electrical components and installations to comply with relevant NBR and SANS.All plugs to be @ 350mm (centre line) from FFL unless specified otherwise.All light switches to be @ 1200mm (centre line) from FFL unless specified otherwise.Alarm system by specialist. Design and layout to approval of client.Sound system by specialist. Design and layout to approval of client.All fixtures, fittings and appliances must also be approved by client prior to installation and application.SERVICESAll internal conduits for fibre optics, security or TV to be min Ø 25mm (unless specified larger), fitted with a draw wire, installed with slow bends and with a single / dedicated conduit per point. (No "daisy chaining" or looping of conduits is allowed).2 x Ø25mm conduits to be provided to main TV point from DSTV aerial. (This is where the decoders will be situated / installed).All DSTV conduits to be chased or routed through ceiling voids to pts indicated.Should the TV be mounted at a high level at the main TV point, a Ø32mm conduit must be provided from the low TV point to the higher level point in order to accommodate the HDMI cable.Ensure that electrical plug points are provided at all TV, telephone (for digital phones) and data points.All electrical cabling and data / TV cabling to be installed in separate conduits with min 300mm distance between conduits and should cross at 90° angles where necessary.All internal cabling to be installed by approved and accredited installers.Telkom line to be trenched from boundary to tel points where indicated.
DOOR & WINDOW NOTES
All doors and windows to be in accordance with National Building Regulations SANS 10400, SANS 204 as well as all by-laws and requirements of the Local Authority.All external doors open outward except for main entrance doorsTIMBERAll timber in accordance with SANS 0163.ALUMINIUM DOORS & WINDOWSIn accordance with AAAMSA and SABS rules and requlations.GLAZINGAs per Part N of SANS 10400 and to comply to SABS requirements.GLAZING6.5mm PVC laminated safety glass to be used from 0 to +900mm affl.All external doors open outward except for main entrance doors.All external doors exposed to weather must include a bottom rail to frame.
40mm
thk I
soBo
ard rig
id ins
ulatio
n boa
rd 60
0mm
width
with I
soPin
e finis
h /ed
ge be
velle
dfin
ish fix
ed ab
ove t
russe
s as c
eiling
. Pain
t with
acryl
ic PV
A (No
solve
nt ba
sed p
aint) C
ol: TB
C.
Exist
ing gy
psum
ceilin
g to r
emain
.
@11
50
SH
DST
V@1150
@1150
@11
50
@11
50
I (STOVE ISOLATOR)@1850
@1850
@18
50
@18
50
@18
50
@32
00
WI-F
I
2WD
DD 2W
2W
2W
2W
DB
2WD
@1150
DD
DST
VW
I-FI
G
@18
50
Weath
erproo
f wall
mou
nted d
ecora
tive e
xterna
l light
fitting
selec
ted by
clien
t. Ligh
t mus
t not
be vi
sible
to ne
ighbo
uring
resid
ents.
Exist
ing ho
t wate
r stor
age i
n ceil
ing vo
id. El
ectric
ian to
chec
k gey
ser c
ompli
es w
ith SA
BS02
54 an
d to e
nsure
isola
tor sw
itch a
nd su
itable
powe
r sup
ply.
Connectcircuit to firstfloor 2-way
switch
Plug point forgarage doormotor flushwith ceilingsoffit. Makeprovision in
concrete slab.
40mm
thk I
soBo
ard rig
id ins
ulatio
n boa
rd 60
0mm
width
with I
soPin
e finis
h /ed
ge be
velle
dfin
ish fix
ed ab
ove t
russe
s as c
eiling
. Pain
t with
acryl
ic PV
A (No
solve
nt ba
sed p
aint) C
ol: TB
C.
@11
50
WI-F
I
SH
G
2W
EXTERNAL SATDISH POINTUNDER EAVES
New
hot w
ater s
torag
e hea
ter (in
ceilin
g void
abov
e bath
) for fl
at pa
nel s
olar c
ollec
tors
moun
ted on
roof.
Gey
ser to
comp
ly to
SABS
0254
. Elec
trician
to en
sure
isolat
or sw
itch a
ndsu
itable
powe
r sup
ply. O
verflo
w pip
e to l
ead o
utside
. All e
xpos
ed ho
t wate
r pipi
ng to
beins
ulated
with
min
R-va
lue of
1.0.
Instal
lation
by ce
rtified
plum
ber to
follo
w ma
nufac
turer'
ssp
ec.
Connectcircuit to
ground floor2-way switch
Exter
nal 8
l gas
wate
r hea
ter un
it enc
losed
in fa
brica
ted w
eathe
rproo
f and
venti
lated
struc
ture a
nd fix
ed to
wall
. No e
lectric
al po
int re
quire
d. All
ducti
ng an
d pipe
s to b
e buil
t into
struc
ture.
All ex
pose
d hot
water
pipin
g to b
e ins
ulated
with
min
R-va
lue of
1.0
Exist
ing ho
t wate
r stor
age i
n ceil
ing vo
id. El
ectric
ian to
chec
k gey
ser c
ompli
es w
ith SA
BS02
54 an
d to e
nsure
isola
tor sw
itch a
nd su
itable
powe
r sup
ply.
G
Basin
WM
Cold watersupply frommunicipal
connection
DW
Sink
WC
Gas
wat
er h
eate
r
Tap
Tap
Tap
Basi
n
WC
Shwr
Cold watersupply tofirst floor
WC
Basin
Shwr
New
hot w
ater s
torag
e hea
ter (in
ceilin
g void
abov
e bath
) for fl
at pa
nel s
olar c
ollec
tors
moun
ted on
roof.
Gey
ser to
comp
ly to
SABS
0254
. Elec
trician
to en
sure
isolat
or sw
itch a
ndsu
itable
powe
r sup
ply.
Hot w
ater ri
ng m
ain (re
turn l
ine). Ø
22 in
sulat
ed (m
in R-
value
of 1.
0) co
pper
pipe r
ing m
ainco
nnec
ted to
solar
pane
ls on
roof
slab a
nd ho
t wate
r stor
age (
geys
er) in
ceilin
g void
.Co
nnec
ted as
per S
ANS 1
0400
-XA:2
011.
GBasi
n
WC Bath
Shw
r
Cold watersupply fromground floor
Hot waterreturn
15A Waterproof single plug point @ 350 AFFL unlessindicated otherwise.
15A Dedicated single plug point @ 350 AFFL unlessindicated otherwise. [Typically for fridge / freezer orcomputer].
3W LED Low Voltage outdoor garden lights withintegrated transformer.
15A Double plug point @ 350 AFFL unless indicatedotherwise.
15A Waterproof double plug point @ 350 AFFL unlessindicated otherwise.
Isolator switch @ 1200 AFFL unless indicated otherwise[for oven, hob, spa bath, etc].
Geyser point.
3W LED Low Voltage Downlights on track. Positiontransformer where shown [when the transformer isnot integrated into fitting or track].
Heated towel rail electrical point [Isolator].
Telephone point @ 350 AFFL unless indicated otherwise.
2 Tube 1200 fluorescent lamp box fitting.
Internet dedicated point @ 350 AFFL unless indicatedotherwise.
Intercom dedicated point @ 1200 AFFL unless indicatedotherwise.
TV aerial point @ 350 AFFL unless indicated otherwise.Cable to be ducted to aerial and dish position shown.
LED strip lights fitted as continuous bulkheadlighting. 5W/lin.m. Transformer to be hidden.
Speaker point in ceiling unless indicated otherwise.
2” X 4” Drawbox for Audio Controls @ 350 AFFL.
AC wall unit “Artcool” 500 W X 400 H X 100 D. Requiresdrainage into existing WP or to outside wall [to approvalof designer] as well as power.
AC grilles mounted into ceiling or walls as indicated.
CFL 5W GU10 recessed downlight lamp fitting (warmwhite). (Use dimmable lamps where required).
Keypad for Security.
Thermostat / switch for underfloor heating @ 1200 AFFLunless indicated otherwise.
230V dedicated power point.
Passive eye / Sensor for Security.
Switch in a 2 way circuit as shown @ 1200 AFFL unlessindicated otherwise.
Switch @ 1200 AFFL unless indicated otherwise.
230V power point for stock recessed foot light @350 AFFL unless indicated otherwise. 11W CFLlamp. Waterproof where used externally.
230V power point for decorative pendant light fitting.15W CFL lamp.
15A Single plug point @ 350 AFFL unless indicatedotherwise.
Switch with dimmer @ 1200 AFFL unless indicatedotherwise.
3W LED Low Voltage shockproof and waterproofuplighter recessed into floor. Integrated transformer.
ELECTRICAL
3W LED Low Voltage Downlights on cables linked totransformer in position indicated.
230V power point for stock bulkhead wall mountedlight fitting @ 1800 AFFL unless indicated otherwise.15W CFL lamp. Waterproof where used externally.
SEC
AC
AUDIO
TV
COM
I
T
H
G
W
D
W
W
G
TH
2W
D
SERVICES LEGEND
230V power point for stock bulkhead wall mountedlight fitting @ 1800 AFFL unless indicated otherwise.15W CFL lamp. Waterproof where used externally.
11W CFL Downlight
CFL 5W GU10 spotlight lamp fitting (warm white).
*Roof assembly to achieve a min R-Valueof 3.7 as per SANS 204:2011. Roof
structure to comply with part 'L' of SANS10400
40mm
thk I
soBo
ard rig
id ins
ulatio
n boa
rd 60
0mm
width
with I
soPin
e/edg
e bev
elled
finish
laid h
orizo
ntally
and s
ecure
d as s
pecifi
ed to
top o
f trus
ses.
Paint
ceilin
g soffi
t with
wate
rba
sed a
crylic
where
Isop
ine ex
pose
d to v
iew.
SABS
appro
ved t
russe
s and
spac
ing to
comp
ly wit
h part
'H' o
f SAN
S 104
00 an
d as
deter
mine
d by E
ngine
er. Pi
tch 17
.5º.
Water
proof
sisala
tion m
embra
ne as
unde
rlay.
Coro
/ Briti
Cord
ova T
errac
otta r
oof ti
les. F
ix on
75X3
8 tim
ber b
atten
s @ ce
ntres
to su
it and
acco
rding
to til
e man
ufactu
rer's
spec
.
200x
25mm
(or c
loses
t to fit
) timb
er fas
cia bo
ard - d
ouble
s as t
ilting fi
llet.
75x3
8 tim
ber p
urlins
@ ce
ntres
to su
it and
acco
rding
to ro
of tile
and i
nsula
tion b
oard
manu
factur
er's s
pec.
Timbe
r wall
plate
.
40mm
thk I
sothe
rm th
ermal
blank
et ins
ulatio
n.
38x3
8 tim
ber c
ounte
r batt
ens t
o sec
ure Is
opine
pane
ls. Fi
xed d
irectl
y ove
r rafte
rs.
ROOF ASSEMBLY CALCULATION
PITCH 17.5º /CATHEDRAL CEILING / CEMENT TILES
Climate Zone Total required Resistivity (m2K/W) Direction
4 3.7 Up
Outdoor air film (7m/s). (Ref: Table F.3) 0.03
Cement Roof Tile. (Ref: Table F.3) 0.02Sisalation Sheet (Reflective Foil / Emissivity: 0,2 outer - 0,05 inner/ In non-ventilated roof space). (Ref: 4.3.6 Roof Assemblies Table 9)
0.75
Roof air space (non-reflective). (Ref: Table F.3) 0.18
75mm Aerolite Mineral Wool Insulation 1.88
40mm rigid EPS board Insulation 0.82
Indoor air film (still air). (Ref: Table F.3) 0.11
Total R-value is a combination of roof assembly and insulation 3.79
Conclusion: The design complies with the minimum requirements of SANS 10400-XA-2011 & SANS 204
EXTERNAL WALL CALCULATIONParameters Conclusion: The design complies with
the minimum requirements of SANS 10400 -XA-2011
Min Thermal Resistivity R = 0.22Climatic Zone 4
(λ) Thermal Conductivity (w/m²k) (l)Thickness (mm) Resistivity(m2K/W)
External Plaster - 0 0.00Brickwork 0.70 220 0.31Internal Plaster - 15 0.00TOTAL 235 0.31
PL03 Ground Reflected Ceiling and Electrical 1:100 PL04 First Reflected Ceiling and Elect 1:100
PL05 Ground Hot & Cold Water Layout 1:100 PL06 First Hot & Cold Water Layout 1:100
W-10 Truss Roof Detail 1:10
As Indicated
EASTFORD DOWNS GUIDELINESIt is noted that these plans have been prepared in
accordance with the Building & LandscapingGuidelines for Eastford Downs.
All building activity is bound to comply to the samerules as defined in the indicated document and all
contractors and sub-contractors must ensure that theyare familiar with the conditions described within theBuilding Code of Conduct before commencing work.
B
2017.09.05
J. TRUDASACAP REGISTRATION: T0321
LIGHTING ENERGY CONSUMPTION SCHEDULEDESCRIPTION QUANTITY TOTAL WATTS
CFL 5W GU10 recessed downlight lamp fitting (warm white). (Use dimmable lamps where required). 33 off 165 W
Pendant light compact fluorescent energy saving lamp 15W 10 off 150 W
Wall Mounted Light compact fluorescent energy saving lamp 15W 8 off 120 W
TOTAL435 W/1000
0.435 kW
Allowed: 5.0 kWh/m².a
Area of Structure: 376.04 m²
5.0 kWh/m².a X 376.04 m² = 1 880 kWh.a
Assume the lights are turned on between 17:30-21:00 each day:
That is the following number of hours per day: 3.5 hrs/day
52 weeks X 7 days X 3.5 hrs/day = 1 274 hrs/annum
0.435 kW X 1 274 hrs/annum = 554 kWh.a (<1655kWh.a)
Therefore structure complies with Part ‘O’ of SANS 10400