ROMANIAN WIND ENERGY DEVELOPER
BETA WIND PROJECT GENERAL INFORMATION
+I Wind Project PresentationI. Wind Project PresentationIndex
1. General Presentation – IMA Partners
2 B t Wi d P j t P j t T 2. Beta Wind Project – Project Teaser
3. Beta Wind Project – General Description
4. Beta Wind Project – Cluster Basic Information
5. Beta Wind Project – Wind Information
6. Beta Wind Project – Construction Key Elements
7. Beta Wind Project – Project Licensing Status
8. IMA Partners Contact List
+1 General Presentation1. General PresentationIMA Partners
IMA Partners is a 100% Romanian Share Capital.
The activities of Wind Energy Development has started in 2006 with the The activities of Wind Energy Development has started in 2006 with the Casimcea Project.
The Main role of IMA Partners is to carry out the Project Development until the Ready-to-build stage as Project ManagersReady-to-build stage, as Project Managers.
IMA Partners has developed a strong competence in dealing in a professional manner with the Authorities in the Wind Park development stages (Local Councils ANRE Transelectrica etc)Councils, ANRE, Transelectrica, etc).
IMA Partners has created “in house” the needed competences to manage the development of Wind Projects, such as Alpha Wind 150MW; CAS Regenerabile Project 50MW; Beta Wind 232MW; Moldova Project 224MW and an additional Project 50MW; Beta Wind 232MW; Moldova Project 224MW and an additional capacity in Dobrogea of 100MW.
IMA Partners was able to put together a strong group of suppliers and designers, to help the successful development of the Wind Parks. designers, to help the successful development of the Wind Parks.
+1 General Presentation 1. General Presentation Project Teaser- Dobrogea
Dobrogea is one of the most windy place in Romania…
…It can reach average wind speeds of 8 m/s at 100m.
Under Development Projects
Project Region Installed Capacity
CAS Regenerabile Tulcea 50MW
Alpha Wind Tulcea 150MW
Beta Wind Tulcea 232MW
Moldavia Iasi 224MW
IMA Partner is developing wind power projects inRomania since 2005 and has already TCP for 600MW inDobrogea Area…
Moldavia Iasi 224MW……and recently got a new ATR for an additional
capacity of 100MW.
+2 BETA Wind Project 2. BETA Wind Project Project Teaser
BETA WIND PROJECT OVERVIEWThe Beta Wind Project has secured
The Beta Project has a total Capacity of 323MW and it’s is divided in several Clusters, located near two villages in the Dobrogea Region, Casimcea and Topolog;
enough plots for all turbines.
The Project
Project was divided in more than 6 Sub-Projects (Clusters);
Clusters from 7 to 32 Wind Turbines;
NO objections on the Environmental Approval Process;
Construction ready to start in 2010;
Operational Summary
jlocation is one of the Best in Dobrogea Region…
BETA WIND DEVELOPMENT PLAN
y ;
First Operation expected for 4thQ 2011.
Project life: 25 years
Average Winds > 7 2m/s @HH
All Main Development actions are ongoing:
• Wind Turbine and Main equipment under analysis; • 400kV Substation Tender to be finalized in November
Average Winds > 7,2m/s @HH
Capacity factor Around 30%
2010 • Electrical design (cables, 110 Substations) partially
finalized; • Preliminary design for 30kV Park Cabling and 110kV
Cable connection ready; Cable connection ready; • Balance of Plant Projects ongoing;• Connection Contract signed.
+3 BETA Wind Project3. BETA Wind ProjectBeta Project – General Description
General Description Location Description:
• Altitude: 170m - 250mAltitude: 170m 250m• Surface area: 700 ha (Total Beta Project)• Orography: Small hills and high flats with a North-South orientation• Land Use: Agriculture Lands• Accessibility: National Road and other accesses• Surrounding Landscape: Pasture and low height crops.g p g p
Key Topics:
• Beta Wind has superficies rights with private companies (no Public Lands);• The site is a composed by high level terraces, with moderate slopes;p y g p• Most of the lands are used for continuous agriculture;• Houses and Villages are more than 500m from the Clusters.
North East South
+4 BETA Wind Project4. BETA Wind ProjectBeta North 1 Cluster
Project Basic InfoAll the licensing procedures are advancing at a good pace...
Permitting Procedure
Ongoing
N. of WEC’s 21
Wind Speeds 7 2 @80mWind Speeds ~ 7,2 @80m
Capacity Factor ~30%
RTB Expected 2nd Q 2011
…we expect to reach the Ready-to-Build stage for the entire Beta Wind P j t d i 2011
MILESTONES
Development Construction Operation
Project during 2011.
ProjectWF Construction
LicenseInterconnection Lines Construction License
Start of Civil Works
Start ofErection
FirstOperation
Beta North 1 1st Q 2011 (E) 1st Q 2011 (E) 2011 (E) 3rd Q 2011 (E) 1st Q 2012 (E)Beta North 1 1st Q 2011 (E) 1st Q 2011 (E) 2011 (E) 3 d Q – 2011 (E) 1st Q – 2012 (E)
+4 BETA Wind Project4. BETA Wind ProjectBeta North 2 Cluster
Project Basic InfoAll the licensing procedures are advancing at a good pace...
Permitting Procedure
Ongoing
N. of WEC’s 34
Wind Speeds 7 2 @80mWind Speeds ~7,2 @80m
Capacity Factor ~30%
RTB Expected 2nd Q 2011
…we expect to reach the Ready-to-Build stage for the entire Beta Wind P j t d i 2011
MILESTONES
Development Construction Operation
Project during 2011.
ProjectWF Construction
LicenseInterconnection Lines Construction License
Start of Civil Works
Start ofErection
FirstOperation
Beta North 2 1st Q 2011 (E) 1st Q 2011 (E) 2011 (E) 3rd Q 2011 (E) 1st Q 2012 (E)Beta North 2 1st Q 2011 (E) 1st Q 2011 (E) 2011 (E) 3 d Q – 2011 (E) 1st Q – 2012 (E)
+4 BETA Wind Project4. BETA Wind ProjectBeta North 3 Cluster
Project Basic InfoAll the licensing procedures are advancing at a good pace...
Permitting Procedure
Ongoing
N. of WEC’s 7
Wind Speeds 7 2 @80mWind Speeds ~7,2 @80m
Capacity Factor ~30%
RTB Expected 2nd Q 2011
…we expect to reach the Ready-to-Build stage for the entire Beta Wind P j t d i 2011
MILESTONES
Development Construction Operation
Project during 2011.
ProjectWF Construction
LicenseInterconnection Lines Construction License
Start of Civil Works
Start ofErection
FirstOperation
Beta North 3 2nd Q 2011 (E) 1st Q 2011 (E) 2011 (E) 3rd Q 2011 (E) 1st Q 2012 (E)Beta North 3 2 d Q 2011 (E) 1st Q 2011 (E) 2011 (E) 3 d Q – 2011 (E) 1st Q – 2012 (E)
+4 BETA Wind Project4. BETA Wind ProjectBeta South 1Cluster
Project Basic InfoAll the licensing procedures are advancing at a good pace...
Permitting Procedure
Ongoing
N. of WEC’s 12
Wind Speeds 7 2 @80mWind Speeds ~7,2 @80m
Capacity Factor ~30%
RTB Expected 2nd Q 2011
…we expect to reach the Ready-to-Build stage for the entire Beta Wind P j t d i 2011
MILESTONES
Development Construction Operation
Project during 2011.
ProjectWF Construction
LicenseInterconnection Lines Construction License
Start of Civil Works
Start ofErection
FirstOperation
Beta South 1 2nd Q 2011 (E) 1st Q 2011 (E) 2011 (E) 3rd Q 2011 (E) 1st Q 2012 (E)Beta South 1 2 d Q 2011 (E) 1st Q 2011 (E) 2011 (E) 3 d Q – 2011 (E) 1st Q – 2012 (E)
+4 BETA Wind Project4. BETA Wind ProjectBeta South 2 Cluster
Project Basic InfoAll the licensing procedures are advancing at a good pace...
Permitting Procedure
Ongoing
N. of WEC’s 12
Wind Speeds 7 2 @80mWind Speeds ~7,2 @80m
Capacity Factor ~30%
RTB Expected 2nd Q 2011
…we expect to reach the Ready-to-Build stage for the entire Beta Wind P j t d i 2011
MILESTONES
Development Construction Operation
Project during 2011.
ProjectWF Construction
LicenseInterconnection Lines Construction License
Start of Civil Works
Start ofErection
FirstOperation
Beta South 2 1st Q 2011 (E) 1st Q 2011 (E) 2011 (E) 3rd Q 2011 (E) 1st Q 2012 (E)Beta South 2 1st Q 2011 (E) 1st Q 2011 (E) 2011 (E) 3 d Q – 2011 (E) 1st Q – 2012 (E)
+4 BETA Wind Project4. BETA Wind ProjectBeta South 3 Cluster
Project Basic InfoAll the licensing procedures are advancing at a good pace...
Permitting Procedure
Ongoing
N. of WEC’s 11
Wind Speeds 7 2 @80mWind Speeds ~7,2 @80m
Capacity Factor ~30%
RTB Expected 1st Q 2011…The Beta South 3 Cluster has already
bt i d th B ildi
MILESTONES
Development Construction Operation
obtained the Building Permit.
ProjectWF Construction
LicenseInterconnection Lines Construction License
Start of Civil Works
Start ofErection
FirstOperation
Beta South 3 Done 1st Q 2011 (E) 2011 (E) 3rd Q 2011 (E) 1st Q 2012 (E)Beta South 3 Done 1st Q 2011 (E) 2011 (E) 3 d Q – 2011 (E) 1st Q – 2012 (E)
+5 BETA Wind Project 5. BETA Wind Project Wind Information
WIND STUDIESThe Wind Measurement has been conducted by
In cooperation with its partners, IMA Partners has conducted wind measurements for the Beta Project since 2008:
a highly experienced international company …..
• Wind Studies and data processing, done by a experience Austrian company – Energiewerkstatt;
• The P50 Capacity Factor is expected to raise above 30%;
• The expected equivalent hours will be around the 2750h NETT with the existing turbines
• The measurements were conducted for more than 2 complete years;
The Project location is considered to have the best
WIND MEASUREMENTS
p y ;
• A new 100m Measurement Antenna will be erected in November 2010;
• Cooperation with others Developers for Wind Data acquisition.
have the best wind speeds in Dobrogea Region…
All Equipments used, comes from known Manufactures:
• 40m Tower will NRG Equipments;F ll C lib i f h A d Wi d • Full Calibration of the Anemometers and Wind Vanes;
• New 100m Tower with Thies Clima Equipment ;• Highly experience company for Wind analysis.
+6 BETA Wind Project 6. BETA Wind Project Construction Key Elements
SITE CONSTRUCTIONIMA Partners, has worked in close relation with experienced
Using experienced designers on the Romanian Market, the Beta Project has already all preliminary designs:
consultants and designers for the Beta Project…..
….. the BoP stage
• Roads will be built using the agriculture servitude roads and private lands;
• Big size Turbines used on road design and Building Permit approvals;
• Wind Farm Cabling using private lands and agriculture servitude roads;
• Several large storage areas (100x150m) to simplify the building, assembly and commissioning ghas already attracted several international companies for the electrical and civil
BOP MAIN ELEMENTS
g g ( ) p y g, y gstage;
• 400kV Substation Tender to be finalized in Nov. 2010
electrical and civil works. Several General Contractors have showed their
interest:
• Geotechnical Studies carried out in several areas;;
• Roads design for Cluster Beta South 3 complete;• 30kV Wind Farm Cabling, Intermediary
Substations and 110kV Cable design by ISPE.
+7 BETA Wind Project 7. BETA Wind Project Project Licensing Status
Stage DescriptionBeta North 1 Beta North II Beta North 1II
Beta South1 Beta South I1 Beta South II1 New Clusters
City Planning Certificate Concluded Concluded Concluded Concluded Concluded ConcludedOngoing / Concluded
Environmental Approval for Zoning (PUZ)
4thQ - 2010 4thQ – 2010 1stQ – 2011 1stQ – 2011 Concluded Concluded Ongoing
Zoning Approval (PUZ) 1stQ – 2011 1stQ – 2011 1stQ – 2011 1stQ – 2011 Q4-2010 Concluded4th Q 2010 to 3rdQ – 2011
Environmental Approval for Construction
1stQ – 2011 1stQ – 2011 1stQ - 2011 1stQ – 2011 1stQ - 2011 Concluded4th Q 2010 to 3rdQ – 2011
Building Permit 1stQ - 2011 1stQ – 2011 2ndQ – 2011 2ndQ – 2011 1stQ – 2011 Concluded4th Q 2010 to 3rdQ – 2011
Technical Permit of Connection
Concluded Concluded Concluded Concluded Concluded Concluded Concluded
Connection Contract Concluded Concluded Concluded Concluded Concluded Concluded End 2010
Investor Investor Investor Investor Investor Investor InvestorSet-up Authorization
InvestorResponsibility
InvestorResponsibility
InvestorResponsibility
InvestorResponsibility
InvestorResponsibility
InvestorResponsibility
InvestorResponsibility
NOTE: (1)Several Positions for the new 100MW capacity can be used from buffer positions on other Clusters therefore their licensing status are very advanced. (2) The above deadlines assume the selection of the turbines is final. Any changes of turbines determine up to 2 months delay.turbines determine up to 2 months delay.
+8 IMA Partners Contact List8. IMA Partners Contact List
MARIUS ILIEV
Managing DirectorTel : : +4 031 425 1935
Nuno Costa AlemãoSenior Technical AdviserTel: +4 031 425 1935Tel.: : +4 031 425 1935
Mob.: +4 072 230 7400Email: [email protected]
Tel: +4 031 425 1935Mob.: +4 073 532 2222Email: [email protected]
A d i RAndrei RapeanuProject ManagerTel: +4 031 425 1935Mob.: +4 073 502 2222Email: andrei rapeanu@imapartners roEmail: [email protected]