![Page 2: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/2.jpg)
Goals of Streambank Restoration
• Work With Nature
• Reduce Sediment
• Protect Cropland
• Protect infra-structure
• Improve Water Quality
• Improve Aquatic Habitat
• Make it Affordable
![Page 3: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/3.jpg)
Lanes Balance
![Page 4: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/4.jpg)
200+ years of Human Activity on the Landscape
• Cleared the Timber
• Plowed the Prairie
• Drained the Wetlands
• Straightened the Streams
• Leveed the Floodplains
• Built Cities with Large Areas of Concrete, Asphalt and Rooftops
![Page 5: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/5.jpg)
Results of Human Activity on Stream dynamics
• Increased Runoff• Increased Stream
Slope• Reduced Floodplain
Width
![Page 6: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/6.jpg)
Design Philosophy
• Work WITH the Natural Processes.• Know Where Nature is Taking the Stream.• Determine the Cause of The Problem• Treat Only the Cause• Let Nature Finish Healing The Banks• Keep the Cost Down
![Page 7: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/7.jpg)
Channel Evolution Model (CEM)
![Page 8: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/8.jpg)
Stream Stabilization Techniques
• 4 Major Practices Used in Illinois ===========================
• Rock Riffle Grade Control Structures (stage II or III)
• Stone Toe Protection (stage III or IV)• Bendway Weirs (stage IV)• Stream Barbs (stage IV)
![Page 9: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/9.jpg)
Rock Riffle Grade Control Structures (stage II/ III streams)
• Stabilize the Bed• Creates Riffle/Pool Sequence• Dissipates Energy• Aerates Water• Permit Fish Passage• Aesthetically Attractive
![Page 10: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/10.jpg)
![Page 11: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/11.jpg)
![Page 12: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/12.jpg)
![Page 13: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/13.jpg)
![Page 14: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/14.jpg)
![Page 15: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/15.jpg)
![Page 16: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/16.jpg)
Determine Stability
• Review I & E Data
• CEM Stage?
• Entrenchment Ratio?
![Page 17: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/17.jpg)
STREAMBANK INVENTORY AND EVALUATION FORM
County ______________________T.________ R________Sec. ___________Stream Name ______________________________________UTM Coord. _______________________, ______________________________Landowner ____________________________
Drainage Area _______________sq. mi. Bankfull dimensions from Regional Curve: Width _______ft. Depth _______ft.
Valley slope from Topographic Map ______________ ft/mi. _______________ft/ft
Estimated 2 yr. Discharge from “Water Resources 87-4207” _______________ cfsEstimated sinuosity ___________ (stream length / valley length)
Field Data
Field determined Bankfull Width _________ft. Maximum Depth_____________ft. Mean Depth ________________ft.Width / Depth Ratio ___________(bankfull width / mean bankfull depth)
Estimated D 90 particle size ___________in.Estimated D 50 particle size ___________in.Manning’s “n” _____________Channel slope ______________Velocity ----- Manning’s equation ______________ v=(1.49/n) (R2/3) (S1/2) V= Q/A _______________________ Required to move D 90 ____________
Entrenchment ratio ___________ (width @ 2 x max. bankfull depth / width @ bankfulldepth)
Channel Evolution Stage (1 thru 5) __________ Stream Type (Rosgen) ____________
Radius of Curvature (Rc) _____________ Rc / Bankfull width ______________
NOTES:_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
![Page 18: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/18.jpg)
![Page 19: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/19.jpg)
West Branch Hurricane
600
610
620
630
640
650
660
670
680
690
0 5000 10000 15000 20000 25000
Distance
Ele
vati
on
XY (Scatter) 1Slope = 0.0035 ft/f t
Slope = 0.0016 ft/f t
Existing Valley Slope
![Page 20: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/20.jpg)
![Page 21: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/21.jpg)
![Page 22: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/22.jpg)
X-Sec. Hurricane Creek (McCray)
88.2
90
94.795.1
87.988.2
89.5
93.4
95
94.5
87
88
89
90
91
92
93
94
95
96
0 10 20 30 40 50 60 70 80
Distance (ft)
Ele
vati
on
(ft
)
XY (Scatter) 1
Bankfull --Elev. 91.4 Q = 392 cfsVelocity - 5.11fps Area = 76.7 sq. ft.Manning's "n" = 0.035 S= 0.004 ft/ftHyd. Rad. = 2.62Max. Depth = 3.5 ft.Mean Depth = 2.7 ft.Width = 28 ft.W/D Ratio =10.3
2 times Max. Depth =7.0 ftElevation = 94.9Flood Width = 36 ft.Entrenchment Ratio = 1.28
![Page 23: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/23.jpg)
![Page 24: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/24.jpg)
STREAMBANK STABILIZATION GUIDELINES FOR PRACTICE SELECTION
YES ROCK RIFFLE GRADE CONTROL
NO
------------------- YES STOP ---TREAT SEEPS AND/OR SPRINGS
NO
YES STONE TOE PROTECTION
NO
YES BENDWAY WEIRS OR STREAM BARBS
NO
YES BENDWAY WEIRS & STONE TOE PROTECTION OR STREAM BARBS
NO
--- CALL FOR ASSISTANCE
AVERAGE SURVEYED GRADIENT > VALLEY SLOPE FROM TOPOG ORBED IN RIFFLE LOCATION IS SILT OR CLAY ORWIDTH/DEPTH RATIO < 10 & ENTRENCHMENT RATIO <1.4
SEEPS OR SPRINGS PRESENT AT PROJECT SITE
BANKFULL WIDTH @ SITE < 130% WIDTH AT RIFFLE
UNVEGETATED POINT BAR < 30% WIDTH AT RIFFLE
RADIUS/WIDTH RATIO > 1.8
RADIUS/WIDTH RATIO > 4.0
UNVEGETATED POINT BAR < 50% BANKFUL DEPTH
UNVEGETATED POINT BAR MATERIAL < 1 INCH DIA.
RADIUS/WIDTH RATIO < 4
UNVEGETATED POINT BAR < 50% BANKFULL DEPTH
UNVEGETATED POINT BAR MATERIAL < 1 INCH DIA.
STREAM BARBS ORTRADITIONAL BANK TREATMENT
![Page 25: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/25.jpg)
McCray Stream Site
• Valley slope = 0.0028
• Surveyed slope ave. 0.0024 (slightly lower)
• Bed in Riffle ---Clay (exposed in riffle bed)
• Width/Depth ratio = 10.3 (just over 10)
• Entrenchment Ratio = 1.28 (just under 1.4)
• 2 elements suggest Grade Control
• 2 elements outside suggested range (barely)
![Page 26: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/26.jpg)
Channel Geometry Considerations
• Sine Wave Flow
• Anticipated Scour Depth
• Radius Curvature/Bankfull Width Ratio (should be more than 1.8)
• Existing Riffle Location
• Existing Riffle Spacing
![Page 27: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/27.jpg)
![Page 28: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/28.jpg)
![Page 29: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/29.jpg)
Scour Depth
• Assume Scour Depth will equal Max. Bankfull Flow Depth
• Assumes bed material allows full Sine Wave Flow to develop over time
![Page 30: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/30.jpg)
West Branch Hurrican Creek
82
83
84
85
86
87
88
89
90
91
92
93
0 500 1000 1500 2000 2500
Distance (ft)
Ele
v. (
ft)
Series1Gradeline --slope =0.0024ft/ft
0
Bankfull Hydraulic Gradeline3.5 ft. above channel gradeline
Lowest Anticipated Scour3.5 ft. below channel gradeline
![Page 31: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/31.jpg)
Radius of Curvature
• Ave radius = 2.3 times bankfull width (Leopold)
• Range generally from 1.6 to 4.5 times bankfull width (natural streams)
• 2.3 is the optimum for hydraulic efficiency
• 1.8 is the suggested minimum under guidelines
![Page 32: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/32.jpg)
![Page 33: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/33.jpg)
Locating Riffles
• 5 to 7 Bankfull widths (28 ft)
• Expect Spacing--140 to 196 ft.
• Located at Cross-over Points
![Page 34: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/34.jpg)
![Page 35: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/35.jpg)
![Page 36: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/36.jpg)
![Page 37: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/37.jpg)
![Page 38: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/38.jpg)
Read The Channel
• Knickzones and Headcuts
• May be hundreds of feet long
• Little or no bedload in crossover pts.
• Will not be bedload material (sand wave)
• Increasing bank height downstream?
•
• Stable Points? (Bedrock, Culvert, etc)
![Page 39: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/39.jpg)
![Page 40: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/40.jpg)
Gather Survey Data
• Bed Profile
• Water Surface Profile
• Typical X-Section @ Riffles (detailed)
• Low Bank Profile
• Stream Cross-over Points (Stations) or surveyed planform
![Page 41: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/41.jpg)
Plot profile
• Channel Grade (riffle to riffle)
• Riffle Spacing
• Compare low bank vs. channel grade
• Pool Depths
• Stable Points
![Page 42: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/42.jpg)
West Branch Hurricane Creek
82
83
84
85
86
87
88
89
90
91
92
93
0 500 1000 1500 2000 2500
Distance (ft)
Ele
v. (
ft)
XY (Scatter) 1Gradeline --slope =0.0024ft/ft
0.6 ft. difference
Bankfull Hydraulic Gradeline3.5 ft. above channel gradeline
Lowest Anticipated Scour
![Page 43: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/43.jpg)
West Branch Hurricane Creek
82
83
84
85
86
87
88
89
90
91
92
93
0 500 1000 1500 2000 2500
Distance (ft)
Ele
v. (
ft)
XY (Scatter) 1Gradeline --slope =0.0024ft/ft
0.6 ft. difference
Bankfull Hydraulic Gradeline3.5 ft. above channel gradeline
Lowest Anticipated Scour
Riffles
![Page 44: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/44.jpg)
Existing Riffles?
• Stations: 0+00, 4+25, 5+90, 8+25, 10+20
• 11+50, 13+20, 13+75, 14+75 15+50,16+40, 20+20
• 12 riffles in 2020 ft. --Ave. Spacing 168 ft.
• Max. Spacing --425 ft.
• Min. Spacing-- 55 ft.
![Page 45: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/45.jpg)
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
0 500 1000 1500 2000 2500
Series1
Low Bank
Profile
Grade Line
![Page 46: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/46.jpg)
X-Sec. Hurricane Creek (McCray)
88.2
90
94.795.1
87.988.2
89.5
93.4
95
94.5
87
88
89
90
91
92
93
94
95
96
0 10 20 30 40 50 60 70 80
Distance (ft)
Ele
vati
on
(ft
)
Series1
Bankfull --Elev. 91.4 Q = 392 cfsVelocity - 5.11fps Area = 76.7 sq. ft.Manning's "n" = 0.035 S= 0.004 ft/ftHyd. Rad. = 2.62Max. Depth = 3.5 ft.Mean Depth = 2.7 ft.Width = 28 ft.
2 times Max. Depth =7.0 ftElevation = 94.9Flood Width = 36 ft.Entrenchment Ratio = 1.28
![Page 47: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/47.jpg)
Bank Heights
HUB # Bank Height10 6.668 8.157 8.594 8.263 9.22 9.9
![Page 48: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/48.jpg)
Plot Cross-Section(s)
• Bankfull depths
• Riffle Crest Elev.
![Page 49: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/49.jpg)
Cross Sec. @ Riffle #1--McCray
86
87
88
89
90
91
92
93
94
95
96
97
0 10 20 30 40 50 60 70
Distance
Ele
vati
on
Riffle #1 Elev. 89.0Height = 1.5 ft.
Bankfull--Pre-Riffle--elev. 91.6
![Page 50: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/50.jpg)
Determine New Gradeline
• Slope (will be greater than existing slope)
• Stable Upstream(flood out headcut/knickzone)
• Stable Downstream(Culvert/Stable Grade, etc)
• Blend into existing channel bed (generally 1.0 ft. height or less @ last riffle)
![Page 51: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/51.jpg)
West Branch Hurrican Creek
82
83
84
85
86
87
88
89
90
91
92
93
0 500 1000 1500 2000 2500
Distance (ft)
Ele
v. (
ft)
Series1
Gradeline --slope =0.0024ft/ft
0
Bankfull Hydraulic Gradeline3.5 ft. above channel gradeline
Lowest Anticipated Scour3.5 ft. below channel gradeline
Proposed Gradeline0..0028
![Page 52: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/52.jpg)
Locate Riffles and Crest Elev.
• Geometrically Correct
• Uniform Gradeline
• 6 Bankfull Width spacing?
• Backwater to Toe of Upstream Riffle
![Page 53: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/53.jpg)
![Page 54: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/54.jpg)
West Branch Hurricane--Chuck McCray
82
83
84
85
86
87
88
89
90
0 500 1000 1500 2000 2500
Distance (ft)
Ele
vati
on
(ft
) assu
med
XY (Scatter) 1
HUB 10
HUB 4
R-1 Elev. 89.0
R-2 Elev. 88.4
R-3 Elev. 87.7
R-4 elev. 86.8
R-5 Elev. 86.2
R-6 Elev. 85.4
R- 7 Elev. 84.5
Slope = 0.0028 ft/ft
![Page 55: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/55.jpg)
Planned Riffles
1 3+70 (ave. 233 ft.)2 5+80 210 ft.3 8+20 240 ft.4 11+30 310 ft.5 13+60 230 ft.6 16+30 270 ft.7 20+00 370 ft.
![Page 56: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/56.jpg)
Riffle Spacing
• Existing Riffles range from 55 ft. to 425 ft.
• (2 to 15 bankfull widths)
• Ave. 168 ft. (6 bankfull widths)
• Planned Riffles range from 210 ft. to 370 ft.
• (7.5 to 13 bankfull widths)
• Ave. 233 ft. (8.3 bankfull widths)
• Too Wide?
![Page 57: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/57.jpg)
Riffle Spacing (cont.)
• Concern is natural flow pattern and siltation problems if spacing is too wide.
• Experience has not shown spacing to be as critical as once thought (especially with silt and sand bed streams)
• Attempt to locate riffles near existing riffles at cross-over points and put backwater on tail of upstream riffle.
![Page 58: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/58.jpg)
Check for increased Flooding(when necessary)
• Bankfull Specific Energy Line
• Critical Flow Depth
• Critical Specific Energy Line
• Allowable Riffle Height = Bankfull Specific Energy - Critical Specific Energy
![Page 59: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/59.jpg)
![Page 60: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/60.jpg)
Max. Riffle Ht. CalculationSpecific Energy Line
• Energy Line = Bkf Depth + Velocity squared divided by 2 times gravity
• Energy Line = 2.7 + (5.1sq./ 2 x 32.2)
• Energy Line = 2.7 + (26.01/64.4)
• Energy Line = 2.7 + .40 = 3.1 ft.
![Page 61: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/61.jpg)
Max. Riffle Ht. CalculationCritical Flow Depth
• Critical Depth = (Q sq. divided by gravity times width sq.) raised to the 1/3 power
• Critical Depth = (350 sq./32.2 x 28 sq.) raised to 1/3 power
• Critical Depth = (122,500/32.2 x 784) 1/3
• Critical Depth = (122,500/28142) 1/3
• Critical Depth = (4.35) 1/3power = 1.63 ft.
![Page 62: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/62.jpg)
Max. Riffle Ht. CalculationCritical Energy Line
• Critical Energy Line = 1.5 times Critical Flow Depth
• Critical Energy Line = 1.5 x 1.63
• Critical energy Line = 2.45 ft.
![Page 63: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/63.jpg)
Max. Riffle Ht. Calculation
• Max. Riffle Ht. Allowable without raising water surface profile or creating backwater effect = Energy Line - Critical Energy Line
• Max. Riffle Ht = 3.1 - 2.45
• Max. Riffle Ht. = 0.65 ft.
![Page 64: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/64.jpg)
Max. Riffle Ht. Calculation Summary
• Specific Energy Line = 3.1 ft.
• Critical Flow Depth = 1.63 ft.
• Critical Specific Energy Line = 2.45
• Max. Allowable Riffle Ht. W/O effecting water surface elev. = Specific Energy Line - Critical Specific Energy Line or
• 3.1 ft. - 2.45 ft. = 0.65 ft. max. ht.
![Page 65: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/65.jpg)
Critical Velocity Estimate
• Velocity at Critical Flow(Vc) = (gravity x critical flow depth) raised to the 0.5 power
• Vc =32.2 x 1.63 (raised to 0.5 power)
• Vc = 52.5 (raised to 0.5 power)
• Vc = 7.24 ft/sec.
![Page 66: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/66.jpg)
X-Sec. Hurricane Creek (McCray)
88.2
90
94.795.1
87.988.2
89.5
93.4
95
94.5
87
88
89
90
91
92
93
94
95
96
0 10 20 30 40 50 60 70 80
Distance (ft)
Ele
vati
on
(ft
)
XY (Scatter) 1
Bankfull --Elev. 91.4 Q = 392 cfsVelocity - 5.11fps Area = 76.7 sq. ft.Manning's "n" = 0.035 S= 0.004 ft/ftHyd. Rad. = 2.62Max. Depth = 3.5 ft.Mean Depth = 2.7 ft.Width = 28 ft.W/D Ratio =10.3
2 times Max. Depth =7.0 ftElevation = 94.9Flood Width = 36 ft.Entrenchment Ratio = 1.28
![Page 67: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/67.jpg)
What if I Raise Flood Surface Profile?
• Will I increase Out of Bank Flooding?
• Will I effect instream pipe outlets, tile, etc.
• Is the increase in flood surface profile acceptable to all effected parties?
![Page 68: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/68.jpg)
Cross Sec. @ Riffle #1--McCray
86
87
88
89
90
91
92
93
94
95
96
97
0 10 20 30 40 50 60 70
Distance
Ele
vati
on
Riffle #1 Elev. 89.0
Bankfull--Pre-Riffle--
Bankfull After Riffle Construction
Elev. Difference = Riffle ht. (1.5 ft)
![Page 69: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/69.jpg)
Cross- Sec.Riffle #5--McCray
84
85
86
87
88
89
90
91
92
93
94
0 20 40 60 80 100 120
Distance
Ele
vati
on
Bankfull Elev.--Pre-Riffle =
Riffle Elev. 86.2
Bankfull Elev. 89.45
Q = 369 CFS
Elev. Difference = ht. Of riffle (1.2) minus
![Page 70: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/70.jpg)
Compute Quantities and Cost
• Determine Stone Size from CriticalVelocity Calculations (double size for safety)
• Quantity Chart
• Average County Cost per Ton of Stone
![Page 71: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/71.jpg)
![Page 72: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/72.jpg)
![Page 73: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/73.jpg)
![Page 74: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/74.jpg)
![Page 75: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/75.jpg)
![Page 76: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/76.jpg)
Cost of RipRap
• Statewide Average is about $25 per ton installed• Check with local quarries/truckers for delivered
price of A-5 or A-6 stone---Add $3 to $5 per ton for installation
• “quarry run” or “shot-rock” CAN be acceptable--Check with designer for O.K. before using and plan on being at site during delivery.
![Page 77: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/77.jpg)
ROCK RIFFLE
CONSTRUCTION
![Page 78: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/78.jpg)
Construction Layout
• Riffles must be located at stream crossover points where flow goes from one side to the other. (riffles)
• Riffles should be located slightly upstream of existing riffle so backslope can “blend” into existing riffle--also places maximum water depth closer to apex of bend and dissipates energy in pool.
![Page 79: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/79.jpg)
Sequencing
• Build from Upstream to Downstream
• Riffles will not “seal” and pond water until voids are filled with sediment.
• Can speed up “pooling” by placing a few inches of fine silt/clay on front face of riffle.
![Page 80: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/80.jpg)
Bed Key
• 4 ft. minimum width
• 3 ft. minimum depth/or to bedrock
• Extends across channel bottom and 3-4 ft. into outer bank.
• Doesn’t need to be larger material
• Do not over excavate! Easy to “lose” stone in bed key
![Page 81: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/81.jpg)
Bank Key
• 4 ft. minimum width• 5 ft. minimum depth• Construct with a 1.5 on 1 slope into bank so
that as “vertical banks”stabilize the ”key” is not exposed
• No need to “fill” key trench out to original bank.
• Top Elev. approx.1 ft. below top bank
![Page 82: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/82.jpg)
Riffle Crest
• Build Crest to elevation before starting on backslope
• Use largest material in gradation
• Place crest stones individually with “thumb” if possible
• Build Crest with slight “V” shape using control elevation as low point in “v”.
![Page 83: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/83.jpg)
Backslope
• Build with 20:1 backslope
• Place next largest stone available from gradation immediately downstream of Crest stones.
• Flare the backslope up the channel sides slightly (1.5 ft?)
• Leave backslope “rough” to aerate flow and provide resting places for fish passage.
![Page 84: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/84.jpg)
Blending into Exit Channel
• H-4 dimension is depth to place material below existing channel bed at exit.
• Most streambeds are “soft” enough that material can be “pressed” into channel bed without excavating
![Page 85: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/85.jpg)
Alignment
• Align Crest so that desired exit is at 90 degrees to Crest.
• If channel has a sharp bend near tail of riffle use Stone Toe Protection downstream to protect against increased velocity near riffle exit. (Riffle backslope has a 5% grade)
![Page 86: Rock Riffle Design Course](https://reader035.fdocuments.us/reader035/viewer/2022062305/56815a03550346895dc75013/html5/thumbnails/86.jpg)
Follow-up and Maintenance
• Check each structure after first major storm (near bankfull flow)
• Some movement and of smaller stone and sorting of material is expected.
• If any crest stone moves it should be repaired immediately