The Inspectorate aims to provide a high level of confidence in the robust details scheme. It is
effectively an additional layer of consumer protection which does not replace, but is
supplementary to, the responsibilities of building control bodies and warranty providers. It involves
the collection and review of performance data
robustdetails
• Spot check visual inspections and sound tests
• No enforcement powers
• If any serious problems cannot be resolved, notify BCB
• Withdraw any robust detail that consistently fails to meet required standards
Performance Monitoring
Part E Robust Details
robustdetails
Part E Robust Details
Visual Inspections.
robustdetails
Green : These are plots that when inspected comply fully with the Robust Detail.
Amber : These are plots where the inspector has identified slight deviations from the Robust Detail that could be easily put right and the builder agrees to do so within twenty eight days. In these cases the inspector is of the view that the fault or faults identified would
not have any significant reduction on the sound insulation performance.
Red : These are plots where the inspector has identified significant deviation from the Robust Detail which is likely to lead to a
significant reduction in performance.
robustdetails
Part E Robust Details
EW
M1
EW
M2
EW
M3
EW
M4
EW
M5
EW
M6
EW
M7
EW
M8
EW
T1
EW
T2
EW
S1
EW
S2
EW
S3
EF
C1
EF
C2
EF
C3
EF
C4
EF
C5
EF
C6
EF
C7
EF
T1
EF
T2
EF
T3
EF
S1
0
100
200
300
400
500
600
700
Total to date.
robustdetails
Part E Robust Details
Green visual inspections = 72.3%
Amber visual inspections = 17.1%
89.4% of all Robust Details are built correctly
or so nearly perfect as makes no difference.
Red visual inspections = 10.6%
Out of the 10.6% red visual inspections only
2.1% would actually translate to a failed test.
robustdetails
Part E Robust Details
Spot Check Field Tests.
robustdetails
Part E Robust Details
Green CategoryIn this category the test results meet or exceed the requirements of the RD
performance standards. Specifically:-
47 dB DnT,w + Ctr or greater and/or 60 dB L’nT,w or lower.
Amber CategoryResults in the Amber Category fail to meet the requirements of the RD performance
standards but satisfy the requirements of the Building Regulations Part E. Specifically:-
45 or 46 dB DnT,w + Ctr and/or 61 or 62 dB L’nT,w.
Red CategoryResults in the Red Category have failed to meet the requirements of the Building
Regulations Part E. Specifically:-
44 dB DnT,w + Ctr or lower and/or 63 dB L’nT,w or greater.
robustdetails
Part E Robust Details
EW
M1
EW
M2
EW
M3
EW
M4
EW
M5
EW
M6
EW
M7
EW
M8
EW
T1
EW
T2
EW
S1
EW
S2
EW
S3
EF
C1
EF
C2
EF
C3
EF
C4
EF
C5
EF
C6
EF
C7
EF
T1
EF
T2
EF
T3
EF
S1
0
100
200
300
400
500
600
700
Total to date.
robustdetails
Part E Robust Details
robustdetails
Part E Robust Details
66646260585654525048464544424038
120
100
80
60
40
20
0
AIRBORNE dB (DnT,w + Ctr)
Frequency
45dB
Mean 53.04Sample Size 1066
EWM4 AIRBORNE HISTOGRAM - ALL DATA
1.5%<45dB
robustdetails
Part E Robust Details
robustdetails
Part E Robust Details
robustdetails
Part E Robust Details
100
125
160
200
250
315
400
500
630
800
1000
1250
1600
2000
2500
3150
Frequency, Hz.
10
20
30
40
50
60
70
80
Dn
T, d
B.
First floor.
Ground floor.
EWM4_E0419002H
robustdetails
Part E Robust Details
robustdetails
Part E Robust Details
robustdetails
Part E Robust Details
robustdetails
Part E Robust Details
6058565452504846454442
50
40
30
20
10
0
AIRBORNE
Frequency
45dB
Mean 49.65Sample Size 344
EFC1 AIRBORNE HISTOGRAM - ALL DATA
2.0%<45dB
robustdetails
Part E Robust Details
robustdetails
Part E Robust Details
626058565452504846444240383634
40
30
20
10
0
IMPACT dB (Ln'T,w)
Frequency
62dB
Mean 51.09Sample Size 344
EFC1 IMPACT HISTOGRAM - ALL DATA
0%>62dB
robustdetails
Part E Robust Details
robustdetails
Part E Robust Details
EWM8 – a recent addition.
robustdetails
Part E Robust Details
robustdetails
Part E Robust Details
robustdetails
Part E Robust Details
64626058565452504846454442
18
16
14
12
10
8
6
4
2
0
AIRBORNE dB (DnT,w + Ctr)
Frequency
45dB
Mean 52.16Sample Size 133
EWM8 AIRBORNE HISTOGRAM - ALL DATA
0%<45dB
robustdetails
Part E Robust Details
robustdetails
Part E Robust Details
robustdetails
Part E Robust Details
robustdetails
Part E Robust Details
Robust Details Ltd (RDL) monitors the construction of a sample of robust details by carrying out visual inspections of, and acoustic testing on, a percentage of plots registered.
Acoustic testing of E-WM-7 has identified cases of unacceptable levels of acoustic performance where some types of wall tie have been used. RDL has therefore, taken the step of temporarily suspending E-WM-7 for the registration of new plots, or amending existing plot registrations from another RD type to E-WM-7, pending further investigations. It is anticipated that a revised version of the E-WM-7 pattern will be published once these investigations have been completed.
Our investigations to date have shown that an acoustic performance sufficient to satisfy the requirements of Robust Details has been achieved where the two leaves of the cavity separating wall are untied. To date, there have been no reported under performing tests using this form of construction. However the suitability of this approach in any particular case should be based on appropriate advice from a structural engineer.
Should you wish to adopt this form of construction, outside of the robust details scheme, we would strongly advise that you seek the block manufacturers guidance. It would also be necessary to consult with your building control body about their likely requirements for pre-completion testing.
robustdetails
Part E Robust Details
robustdetails
Part E Robust Details
605856545250484645444240
35
30
25
20
15
10
5
0
AIRBORNE dB (DnT,w + Ctr)
Frequency
45dB
Mean 50.13Sample Size 183
EFC3 AIRBORNE HISTOGRAM - ALL DATA
<45dB 2.7%
robustdetails
Part E Robust Details
7270686664626058565452504846444240
25
20
15
10
5
0
IMPACT dB (Ln'T,w)
Frequency
62dB
Mean 56.04Sample Size 183
EFC3 IMPACT HISTOGRAM - ALL DATA
>62dB 10.4%
robustdetails
Part E Robust Details
robustdetails
Part E Robust Details
robustdetails
Part E Robust Details
robustdetails
Part E Robust Details
robustdetails
Part E Robust Details
robustdetails
• Spot check visual inspections and sound tests
• No enforcement powers
• If any serious problems cannot be resolved, notify BCB
• Withdraw any robust detail that consistently fails to meet required standards
Performance Monitoring
Part E Robust Details
robustdetails
The Inspectorate aims to provide a high level of confidence in the robust details scheme. It is
effectively an additional layer of consumer protection which does not replace, but is
supplementary to, the responsibilities of building control bodies and warranty providers. It involves
the collection and review of performance data
robustdetailsrobustdetailsrobustdetails
thankyou
www.robustdetails.com