ROADNET TRANSPORTATION SYSTEM ( IMPLEMENTATION) PRIOR POST 0 10 20 30 40 50 60 70 80 90 100 COST Series 3 7% TRANSPORTATION FLEET COST REDUCTION IN IMPLEMENTATION PROJECT . • ON TIME DELIVERY IMPROVEMENTS FROM 64% TO 92%.

description

Transportation / Roadnet Power Point Efficiency Improvements

Transcript of Roadnet Transportation System Pp Overview 1210

  • 1. ROADNETTRANSPORTATION SYSTEM 100(IMPLEMENTATION) 90 7% TRANSPORTATION 80FLEET COST REDUCTION INIMPLEMENTATION 70PROJECT . 60 COST 50 ON TIME DELIVERY ON TMEIMPROVEMENTS FROM 40 DELIVERIES64% TO 92%. 30 20 10 0 PRIOR POST
  • 2. ROADNET IMPLEMENTATION LETTER
  • 3. ROADNET 100TRANSPORTATION SYSTEM(3 YEAR PROGRAM) 90 LOWERED DRIVER OVERTIME BY 27% 80REDUCED 3RD PARTY DELIVERYEXPENSE BY 17% 70 REDUCED FLEET TRUCK INSURANCE 60BY 31% COST(OT) 50 3PL COST 40 FLEET INS.NEGOTIATED A YEARLY SAVINGS 30OF $78K WITH STARBUCKS 3RDPARTY DELIVERY SERVICE PROVIDER. 20ELIMINATED A REDUNDANT 10TRANSPORTATION POSITION FOR AYEARLY SAVINGS OF $45K. 0 PRIOR POST