ROADNET TRANSPORTATION SYSTEM PP OVERVIEW 1210
3
ROADNET TRANSPORTATION SYSTEM ( IMPLEMENTATION) PRIOR POST 0 10 20 30 40 50 60 70 80 90 100 COST Series 3 • 7% TRANSPORTATION FLEET COST REDUCTION IN IMPLEMENTATION PROJECT . • ON TIME DELIVERY IMPROVEMENTS FROM 64% TO 92%.
-
Upload
timcalie328 -
Category
Documents
-
view
20 -
download
0
Transcript of ROADNET TRANSPORTATION SYSTEM PP OVERVIEW 1210
ROADNET TRANSPORTATION SYSTEM(IMPLEMENTATION)
PRIOR POST0
10
20
30
40
50
60
70
80
90
100
COSTON TME DE-LIVERIES
• 7% TRANSPORTATION FLEET COST REDUCTION IN IMPLEMENTATION PROJECT .
• ON TIME DELIVERY IMPROVEMENTS FROM 64% TO 92%.
ROADNET IMPLEMENTATION LETTER
ROADNET TRANSPORTATION SYSTEM (3 YEAR PROGRAM)
PRIOR POST0
10
20
30
40
50
60
70
80
90
100
COST(OT)3PL COSTFLEET INS.
• LOWERED DRIVER OVERTIME BY 27%
•REDUCED 3RD PARTY DELIVERY EXPENSE BY 17%
• REDUCED FLEET TRUCK INSURANCE BY 31%
NEGOTIATED A YEARLY SAVINGS OF $78K WITH STARBUCKS 3RD PARTY DELIVERY SERVICE PROVIDER.
ELIMINATED A REDUNDANT TRANSPORTATION POSITION FOR A YEARLY SAVINGS OF $45K.