ROADNET TRANSPORTATION SYSTEM PP OVERVIEW 1210

3
ROADNET TRANSPORTATION SYSTEM ( IMPLEMENTATION) PRIOR POST 0 10 20 30 40 50 60 70 80 90 100 COST Series 3 7% TRANSPORTATION FLEET COST REDUCTION IN IMPLEMENTATION PROJECT . • ON TIME DELIVERY IMPROVEMENTS FROM 64% TO 92%.

Transcript of ROADNET TRANSPORTATION SYSTEM PP OVERVIEW 1210

Page 1: ROADNET TRANSPORTATION SYSTEM PP OVERVIEW 1210

ROADNET TRANSPORTATION SYSTEM(IMPLEMENTATION)

PRIOR POST0

10

20

30

40

50

60

70

80

90

100

COSTON TME DE-LIVERIES

• 7% TRANSPORTATION FLEET COST REDUCTION IN IMPLEMENTATION PROJECT .

• ON TIME DELIVERY IMPROVEMENTS FROM 64% TO 92%.

Page 2: ROADNET TRANSPORTATION SYSTEM PP OVERVIEW 1210

ROADNET IMPLEMENTATION LETTER

Page 3: ROADNET TRANSPORTATION SYSTEM PP OVERVIEW 1210

ROADNET TRANSPORTATION SYSTEM (3 YEAR PROGRAM)

PRIOR POST0

10

20

30

40

50

60

70

80

90

100

COST(OT)3PL COSTFLEET INS.

• LOWERED DRIVER OVERTIME BY 27%

•REDUCED 3RD PARTY DELIVERY EXPENSE BY 17%

• REDUCED FLEET TRUCK INSURANCE BY 31%

NEGOTIATED A YEARLY SAVINGS OF $78K WITH STARBUCKS 3RD PARTY DELIVERY SERVICE PROVIDER.

ELIMINATED A REDUNDANT TRANSPORTATION POSITION FOR A YEARLY SAVINGS OF $45K.