Road Infringement Forms (ENGLISH + FRENCH)
-
Upload
tambe-john-bita -
Category
Documents
-
view
55 -
download
0
Transcript of Road Infringement Forms (ENGLISH + FRENCH)
1
MINUTES OF ROAD INFRINGEMENT REPORT Ref. N° /SW /MINTP/DRTP
� Mindful of Articles 80, 82 – 91, 116 – 117 of the Penal Code Procedure, � Mindful of Articles 17 – 19 of the Law N° 96/07 of 8th April 1996 bearing on the Protection of the National Road Heritage.
DATE
& TIM
E DATE OF ACCIDENT: DAY OF WEEK: TIME OF ACCIDENT:
LOCATION
(EAR
TH R
OAD
) EARTH ROAD ON WHICH INCIDENT OCCURRED:
DISTANCE COVERED (Km):
LOCATION
(PAV
ED R
OAD
) PAVED ROAD ON WHICH ACCIDENT OCCURRED:
PLACE WHERE ACCIDENT OCCURRED:
VEHIC
LE(S
) INVO
LVED
VEHICLE 1 VEHICLE 2 COMING FROM: COMING FROM:
GOING TO: GOING TO:
TYPE OF VEHICLE: TYPE OF VEHICLE:
NUMBER PLATE: NUMBER PLATE:
DRIVER’S FULL NAMES: DRIVER’S FULL NAMES:
MALE: DRIVER’S LICENCE : MALE: DRIVER’S LICENCE :
FEMALE: FEMALE:
NB: IF MORE THAN TWO VEHICLES ARE INVOLVED IN THIS ACCIDENT, USE AN ADDITIONAL REPORT FORM
SUPP
LEMEN
TARY
INFO
RMATION
WERE THE GENDARMES PRESENT AT THE SCENE OF THE ACCIDENT/INCIDENT AT TIME OF THIS REPORT?
WERE THE POLICE PRESENT AT THE SCENE OF THE ACCIDENT/INCIDENT AT TIME OF THIS REPORT?
YES: NO: YES: NO:
WAS THIS REPORT DRAWN UP ON THE VERY DAY OF THE ACCIDENT/INCIDENT?
IF NOT, THEN HOW MANY DAYS AFTERWARDS?
YES: NO: _______________ DAYS LATER
REPUBLIQUE DU CAMEROUN Paix – Travail – Patrie
------------- MINISTERE DES TRAVAUX PUBLICS
------------- DELEGATION REGIONALE DU SUD – OUEST
-------------
DEPARTEMENT: _________________________
REPUBLIC OF CAMEROON Peace – Work – Fatherland
------------- MINISTRY OF PUBLIC WORKS
------------- SOUTH – WEST REGIONAL DELEGATION
-------------
DIVISION: __________________________
2
DAMAGE CAUSE
D TO R
OAD H
ERITAGE
EARTH ROADS PAVED ROADS DAMAGED STRUCTURE MARK A CROSS DAMAGED STRUCTURE MARK A CROSS
EARTH ROAD SURFACE PAVED ROAD SURFACE RAIN-GATES KERBS ROAD SIGNS SHOULDER (PAVEMENT) WOODEN BEACONS ROAD SIGNS CONCRETE BEACONS WOODEN BEACONS METALLIC CULVERTS CONCRETE BEACONS CONCRETE CULVERTS CULVERT HEADS CULVERT HEADS COLLECTING CHAMBER COLLECTING CHAMBER MASONRY DITCHES MASONRY DITCHES CONCRETE DITCHES WOODEN DECKING REINFORCED CONCRETE SLAB HAND RAILS HAND RAILS OTHERS: METALLIC CRASH BARRIER CONCRETE CRASH BARRIER DWARF CONCRETE WALL OTHERS:
PUBLIC W
ORKS OPJ
ID
ENTIFICATION
NAMES SERVICE OATH NUMBER SIGNATURE
DRIVER
(S) &
WITNES
SES
IDEN
TIFICATION
NAMES RESIDENCE TELEPHONE SIGNATURE
UNIFORM O
FFIC
ERS
IDEN
TIFICATION
(Gen
darm
e or
Police)
NAMES SERVICE RANK SIGNATURE
ANNEX
DESCRIPTION ITEMS NUMBER
DRIVER’S DOCUMENTS
VEHICLE DOCUMENTS
PHOTOGRAPHS AND/OR SKETCHES
COST ESTIMATE FOR THE REPAIRS OF DAMAGES
DONE AT ___________________ ON THE __________________ PREPARED BY ________________________
3
PV D’INFRACTION SUR LE PATRIMOINE ROUTIER Ref. N° /SW /MINTP/DRTP
� Vu les articles 80, 82 à 91, 116 à 117 du Code de Procédure Pénal, � Vu les articles17 à 19 de la Loi N° 96/07 du 8 Avril 1996 portant sur la Protection du Patrimoine Routier.
DATE
&
L’HEU
RE DATE DE L’ACCIDENT: JOUR DE LA SEMAINE: L’HEURE DE L'ACCIDENT:
LIEU
(R
OUTE
EN TERRE) ROUTE EN TERRE SUR LAQUELLE L'INCIDENT S'EST PRODUIT:
DISTANCE PARCOURUE (Km):
LIEU
(R
OUTE
REV
ETUE) ROUTE REVETUE SUR LA QUELLE L'ACCIDENT S'EST PRODUIT:
LIEU OÙ L'ACCIDENT S'EST PRODUIT:
VÉHIC
ULE
(S) IMPL
IQUÉ(
S)
VÉHICULE 1 VÉHICULE 2 VENANT DE: VENANT DE:
ALLANT À: ALLANT À:
TYPE DE VÉHICULE:
TYPE DE VÉHICULE:
PLAQUE D’IMMATRICULATION: PLAQUE D’IMMATRICULATION:
NOMS ET PRÉNOMS DU CONDUCTEUR: NOMS ET PRÉNOMS DU CONDUCTEUR:
HOMME: N° PERMIS DE CONDUIRE: HOMME: N° PERMIS DE CONDUIRE:
FEMME: FEMME:
NB: SI PLUS DE DEUX VÉHICULES SONT IMPLIQUÉS DANS CET ACCIDENT, UTILISEZ UN FORMULAIRE SUPPLEMENTAIRE
L'IN
FORMATION
SUPP
LÉMEN
TAIR
E
DES GENDARMES ÉTAIENT T’ILS PRÉSENT AU LIEU DE L'ACCIDENT/INCIDENT À L’INSTANT DE CE CONSTAT?
DES POLICIERS ÉTAIENT T’ILS PRÉSENT AU LIEU DE L'ACCIDENT/INCIDENT À L’INSTANT DE CE CONSTAT?
OUI: NON: OUI: NON:
CE RAPPORT ÉTAIT IL ÉLABORÉ LE JOUR MÊME DE L'ACCIDENT/INCIDENT?
SI NON, COMBIEN DE JOURS APRÈS?
OUI: NON: _______________ JOURS PLUS TARD
REPUBLIQUE DU CAMEROUN Paix – Travail – Patrie
------------- MINISTERE DES TRAVAUX PUBLICS
------------- DELEGATION REGIONALE DU SUD – OUEST
-------------
DEPARTEMENT: _________________________
REPUBLIC OF CAMEROON Peace – Work – Fatherland
------------- MINISTRY OF PUBLIC WORKS
------------- SOUTH – WEST REGIONAL DELEGATION
-------------
DIVISION: __________________________
4
DOMMAGES
SUR LE PA
TRIM
OIN
E ROUTIER
ROUTES EN TERRE ROUTES REVETUES PARTIE ENDOMMAGÉE METTEZ LA CROIX PARTIE ENDOMMAGÉE METTEZ LA CROIX
SURFACE ROUTE EN TERRE SURFACE ROUTE REVÊTUE BARRIERE DE PLUIES BORDURES DE TROTTOIR PANNEAU DE SIGNALISATION ACCOTEMENT BALISES EN BOIS PANNEAU DE SIGNALISATION BALISES EN BETON BALISES EN BOIS BUSE MÉTALLIQUES BALISES EN BETON BUSE EN BÉTON TÊTES DE BUSE TÊTES DE BUSE FOSSÉS MAÇONNÉS PUISARD FOSSÉS BÉTONNÉS FOSSÉS MAÇONNÉS PUISARD PLATELAGE EN BOIS DALLETTE EN BETON ARMÉ GARDE CORPS GARDE CORPS AUTRES: GLISSIERE DE SECURITE METALLIQUE GLISSIERE EN BETON ARMÉ MURET EN BETON ARMÉ AUTRES:
IDEN
TIFICATION D
E L’OPJ
DU M
INTP
NOM ET PRENOMS SERVICE N° ASSERMENTATION SIGNATURE
IDEN
TIFICATION D
ES
TEMOIN
S DU
CHAUFF
EUR
NOM ET PRENOMS RÉSIDENCE TELEPHONE SIGNATURE
IDEN
TIFICATION D
ES
AGEN
TS D
E FM
O
(Gen
darm
es ou Po
liciers) NOM ET PRENOMS SERVICE RANG SIGNATURE
ANNEX
E
DÉSIGNATION PIECE NOMBRE
DOSSIER DU CONDUCTEUR
DOSSIER DU VÉHICULE
PHOTOS ET/OU CROQUIS
DEVIS ESTIMATIF DE REPARATION DES DOMMAGES
FAIT À ___________________ LE __________________ PRÉPARÉ PAR ________________________