RMSUpdate November 4, 2004 Retail Market Subcommittee Update to TAC.

13
RMS RMS Update Update November 4, 2004 Retail Market Subcommittee Update to TAC

Transcript of RMSUpdate November 4, 2004 Retail Market Subcommittee Update to TAC.

Page 1: RMSUpdate November 4, 2004 Retail Market Subcommittee Update to TAC.

RMS RMS UpdateUpdateRMS RMS

UpdateUpdate

November 4, 2004

Retail Market SubcommitteeUpdate to TAC

Page 2: RMSUpdate November 4, 2004 Retail Market Subcommittee Update to TAC.

RMS RMS UpdateUpdateRMS RMS

UpdateUpdateVoting Items

Summary

RMGRR 2004-13 – Disconnect at Premium Locations

RMGRR 2004-14 – Inadvertent Gain Process

RMGRR 2004-15 – Data Extract Variance Process

Annual Validation Report to the ERCOT Board

Household Electric Use Survey

Page 3: RMSUpdate November 4, 2004 Retail Market Subcommittee Update to TAC.

RMS RMS UpdateUpdateRMS RMS

UpdateUpdateVoting Items

Retail Market Guide Revision Requests

RMGRR 2004-13 – Disconnect at Premium Locations

Incorporates the tariff charge variation among TDSP’s into the

Retail Market Guide

RMGRR 2004-14 – Inadvertent Gain Process

Identifies individual TDSP processes required to resolve

inadvertent switch situations

RMGRR 2004-15 – Data Extract Variance Process

Defines the Data Extract Variance Process including the utilization

of FasTrak to resolve agreed differences and seeking ADR

resolution for contested differences

Page 4: RMSUpdate November 4, 2004 Retail Market Subcommittee Update to TAC.

4

RMS RMS UpdateUpdateRMS RMS

UpdateUpdateVoting Items

Annual Validation Report to the ERCOT Board

Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct

28 14 314 151 1

Near Term Action Plan Timeline

September 28 - PWG Near Term Action Plan Approved

October 14 – Near Term Action Plan Submitted to

RMS

November 4 – Near Term Action Plan Submitted to TAC for ERCOT Board

Review

December 31- ERCOT Staff Finalizes Recommendations to

PWG. Market Participants Begin Making Changes

February - RMS Requested February Review

March 1 -TDSPs and ERCOT Complete System

Changes

May 1 - TDSPs and ERCOT Complete Testing

System ChangesJune 15 - Normal Start of 2005 Annual Validation

November - Normal Completion of 2005 Annual

Validation Transactions

200

4

200

5

Page 5: RMSUpdate November 4, 2004 Retail Market Subcommittee Update to TAC.

RMS RMS UpdateUpdateRMS RMS

UpdateUpdateVoting Items

Annual Validation Report to the ERCOT Board

Near Term Action Plan

1. Do not replace a prior year non-default

assignment with a default assignment

A new calculation for each ESI ID is made each year

Currently: Insufficient data requires assignment to default

Residential defaults to Residential Low Winter Ratio (RESLOWR)

Commercial defaults to Business Medium Load Factor (BUSMEDLF)

Proposed: If sufficient data was available in a previous year an

assignment to default would not be made

Page 6: RMSUpdate November 4, 2004 Retail Market Subcommittee Update to TAC.

RMS RMS UpdateUpdateRMS RMS

UpdateUpdateVoting Items

Annual Validation Report to the ERCOT Board

Near Term Action Plan

2. Applying dead-bands around the specified Residential

Segment trigger point

Currently: If WR > 1.5 it is assigned to High Winter Ratio (HiWR)

Proposed: Create a dead-band around the 1.5 trigger point

Example – Assume dead-band (1.0 to 2.0)

if current assignment is RESLOWR and new WR = 1.7, would remain RESLOWR

if current assignment is RESLOWR and new WR = 2.1, would change to RESHIWR

Result - significant reduction in migration

SpringBaseFallBaseAverage

ADUseADUseADUseMaxWR febjandec

,

,,

Page 7: RMSUpdate November 4, 2004 Retail Market Subcommittee Update to TAC.

RMS RMS UpdateUpdateRMS RMS

UpdateUpdateVoting Items

Annual Validation Report to the ERCOT Board

Near Term Action Plan

3. Use more than 1 month for the Residential

Winter Ratio formula

Example – Change numerator to average the ADU for highest 2

months

Result - significant reduction in migration

SpringBaseFallBaseAverage

ADUseADUseADUseMaxWR febjandec

,

,,

Page 8: RMSUpdate November 4, 2004 Retail Market Subcommittee Update to TAC.

RMS RMS UpdateUpdateRMS RMS

UpdateUpdateVoting Items

Annual Validation Report to the ERCOT Board

Near Term Action Plan

4. Apply a kWh minimum for Residential

High Winter Ratio profile assignment

Currently: None

Proposed: Identify a reasonable minimum usage for High

Winter Ratio assignment

Example – RESHIWR minimum = 10 kWh/day (300kWH/month)

If WR = 3.0 and 5 kWh/day then assign RESLOWR

If WR = 3.0 and 15 kWh/day then assign RESHIWR

Page 9: RMSUpdate November 4, 2004 Retail Market Subcommittee Update to TAC.

RMS RMS UpdateUpdateRMS RMS

UpdateUpdateVoting Items

Annual Validation Report to the ERCOT Board

Near Term Action Plan

5. Use an ERCOT administered residential survey

to determine heating system type for a sample

of customers

The survey will empirically support data used to define dead-

bands, minimum thresholds and revised WR calculation

40,000 surveys will be mailed to end use customers

5,000 to each weather zone

2,500 to each existing profile type current assignment

Page 10: RMSUpdate November 4, 2004 Retail Market Subcommittee Update to TAC.

10

RMS RMS UpdateUpdateRMS RMS

UpdateUpdateVoting Items

Annual Validation Report to the ERCOT Board

Near Term Action Plan

Market Participant Concerns Customer Confusion Call Center Impact Statistical Relevance

Solutions Adopted Bilingual Survey Answering service (800 number) Web information ERCOT staff follow-up Call Center Training Materials Statistical Relevance….

Page 11: RMSUpdate November 4, 2004 Retail Market Subcommittee Update to TAC.

11

RMS RMS UpdateUpdateRMS RMS

UpdateUpdateVoting Items

Annual Validation Report to the ERCOT Board

Near Term Action Plan

Statistical Relevance “Even in the worst case scenario, response data will be sufficient to make

significant improvements in profile assignments.”

Survey Accuracy (95% Confidence)

Return Rate ERCOT Total Weather Zone

15% ±1.3% ± 3.7%

10% ± 1.6% ± 4.5%

5% ± 2.2% ± 6.3%

1% ± 5.0% ± 14.1%

Page 12: RMSUpdate November 4, 2004 Retail Market Subcommittee Update to TAC.

12

RMS RMS UpdateUpdateRMS RMS

UpdateUpdateVoting Items

Annual Validation Report to the ERCOT Board

Near Term Action Plan

RMS approved the PWG action plan Concept of the residential survey Implementation time line

Collaborative effort of PWG and RMS produced a simplified residential survey

Market conference call to discuss concerns

RMS email vote affirmed the survey

RMS Recommendation: TAC endorse the Residential Survey and Near Term Action Plan

Page 13: RMSUpdate November 4, 2004 Retail Market Subcommittee Update to TAC.

13

RMS RMS UpdateUpdateRMS RMS

UpdateUpdate

???

Questions

???