RIVERSIDE - SITE NEWSLETTER 1 (2)

2
Project Manager, Tony Black will be your first point of contact on site. 07592 113790 [email protected] Kier Construction London Road Purfleet Essex RM191QY You can contact him in office hours on: Meet our Project Manager You can contact the Kier London team on: 020 8508 5622 [email protected] Dear Neighbour, Riverside News Kier Construction Issue 1 - Jan 2018 What is Harris Academy Riverside ? The works at Riverside include Construction of a 4 storey secondary school and a two storey Sports Hall together with three hard courts, a grass sports field, soft and hard land scaping and parking for the school staff. The construction is to be : Steel frame to both buildings Brickwork and insulated render to the main building Brickwork and insulated cladding to the sports hall Disabled lifts to both buildings Sports hall for school and external hire uses. Solar rooftop panels . Hall and dining facilities for school and external use. Building is designed to meet BREEAM ’Very Good’ accreditation. Planned Works Early works (Jan 2018 - March 2018) Removal of existing foundations and ground bearing slabs, crushing and placing as a stability matt for the piling rigs. Remediation of the existing site foot print. Reduction of site to formation level . Main construction works due to start Early March 2018. We would like to take this opportunity to introduce ourselves as the point of contact for Kier Construction who have been appointed to undertake the construction of Harris Academy Riverside. Monthly News leer : Keeping you informed.

Transcript of RIVERSIDE - SITE NEWSLETTER 1 (2)

Page 1: RIVERSIDE - SITE NEWSLETTER 1 (2)

Project Manager, Tony Black will be your first point of contact on site.

� 07592 113790

[email protected]

� Kier Construction

London Road

Purfleet Essex

RM191QY

You can contact him in office hours on:

Meet our Project Manager

You can contact the Kier London team on:

� 020 8508 5622

[email protected]

Dear Neighbour,

Riverside News

Kier Construction

Issue 1 - Jan 2018

What is Harris Academy Riverside ?

The works at Riverside include Construction of a 4

storey secondary school and a two storey Sports Hall

together with three hard courts, a grass sports field,

soft and hard land scaping and parking for the school

staff.

The construction is to be :

• Steel frame to both buildings

• Brickwork and insulated render to the main building

• Brickwork and insulated cladding to the sports hall

• Disabled lifts to both buildings

• Sports hall for school and external hire uses.

• Solar rooftop panels .

• Hall and dining facilities for school and external

use.

• Building is designed to meet BREEAM ’Very Good’

accreditation.

Planned Works Early works (Jan 2018 - March 2018)

• Removal of existing foundations and ground bearing slabs,

crushing and placing as a stability matt for the piling rigs.

• Remediation of the existing site foot print.

• Reduction of site to formation level .

Main construction works

due to start Early March

2018.

We would like to take this opportunity to

introduce ourselves as the point of

contact for Kier Construction who have

been appointed to undertake the

construction

of Harris Academy Riverside.

Monthly News le er : Keeping you informed.

Page 2: RIVERSIDE - SITE NEWSLETTER 1 (2)

Kier are Considerate Constructors The Code of Considerate Practice forms the basis of Kier’s commitment to working in

your community.

Considerate

Our work will be carried out with consideration to your needs and the needs of those people who are vulnerable.

Safe

We will ensure that the work on our site is carried out in a safe manner and that local residents including children are aware of the dangers of construction sites.

Environment

We will work to minimise the effects of noise, light and air pollution. We will reduce waste, reuse and recycle materials where this has been identified as being possible.

Cleanliness

Our site will be kept clean and in good working order. We will control dust and dirt from our construction operations so that we minimise the impact on the local

surrounding homes.

Accountable

To demonstrate our commitment to the Considerate Constructors Scheme we will display their poster in a public place.

Security

All our personnel will be readily

identifiable. The site will be secured at the

close of each working day.

Good Neighbour

We will provide you with regular updates on our progress but if

you have any concerns you can contact our Site Manager on 07800

509452.

Responsible

Everyone working on our sites receives an induction to help them

understand what is expected while they are working on our site and

how they can help maintain the standards set out in this code.

Respectful

We will treat all people with respect and our team will behave in a

professional way.

We want you to be involved! Kier Construction London are working to bring a valuable and

much needed new Teaching facility to Purfleet and we want to

keep you informed and involved every step of the way!

If you are aware of anybody who has not received this newsletter, but is interested in receiving further updates, please make let us

know.

Also, of you experience any nuisance or noise please let us know!

Riverside News

Kier Construction

Issue 1 - Jan 2018