This feasibility study has been prepared by Tonkin Zulaikha Greer Architects for the Bundanon Trust to guide future development of the Riversdale site.
contents ................................................................................................................................2introduction ........................................................................................................................3site planning option a ....................................................................................................4site planning car parking................................................................................................5area schedule creative learning centre.................................................................6area schedule catering building.................................................................................7area schedule accommodation building..............................................................8Tonkin zulaikha greer......................................................................................................9
CONTENTS
RIV
ERSD
ALE
FEA
SIBI
LIT
Y S
TU
DY
PAGE 3
satellite photograph showing current site
The Masterplan Concept Study prepared in October 2010 assumed further development might take place at Eearie Park and Bundanon, however developing the site at Riversdale further, which already has significant built infrastructure, would have considerable economic and environmental benefits.
The brief for this study was to investigate the physical impact and viability of placing two new buildings on the Riversdale site. The aim for these two new buildings is to increase visitation to the site in order to generate greater revenue for the Bundanon Trust.
The first building outlined in the brief was a creative learning centre, which required the following:
INTRODUCTION
- Boyd art collection storage- Collection display / gallery space- Teaching spaces- Small auditorium (black/white box)- Office space for 20 staff- Meeting rooms- Small cafe- Commercial kitchen to service the entire site- Laundry to service the entire site- Staff / Caretaker’s accommodation
The preferred location for this building is on the site of the current car park adjacent to the existing buildings.
The second building is a new accommodation building, which required the following:
- Flexible accommodation for 60 people - Dining area for 60 people- Self catering kitchen
The preferred location for the new accommodation building is on the hill to the North-west of to the existing carpark.
0 10 20 30 40
RL 22400
RL 22400
RL 18400ENTRY TO UNDER GROUND CARPARK (73 CAR SPACES)
SHORT TERM + STAFF PARKING+ LOADING BAY
NEW LANDSCAPED TERRACE
NEW LANDSCAPED TERRACE
RIVERSDALE KITCHEN +LIBRARY CONVERTED TOFUNCTION SPACE
RL 18400
S H
O A
L H A
V E
N R
I V E
R
NEW ACCOMMODATIONBUILDING (30 DOUBLE ROOMSWITH ENSUITES OVER 3LEVELS)
NEW ROAD WITH BRIDGE OVEREXISTING WATERCOURSE
NEW AREA OF PLANTING
EXISTING SHED TO BEREMOVED, STORAGERELOCATED TO NEW FACILITES
NEW CREATIVE LEARNINGCENTRE
NEW CATERING + STORAGEBUILDING WITH GREEN ROOF
ABOVE GROUND CAR PARK(50 CAR SPACES)
EXISTING BOYD EDUCATIONCENTRE
RIVERSDALE HOMESTEADCONVERTED TO CARE-TAKERACCOMODATION
EXISTING FORECOURT
BOYD STUDIO CONVERTED TOVISITOR SERVICES +INTERPRETATION SPACE
NEW LANDSCAPED SWALE
EXISTING CAR PARK SHOWNDASHED
water course
water course
water course
boun
dary
boundary
INTERPRETATION SPACE -INCORPORATINGRECONFIGURED LANDFORMSAND NEW PLANTING
SMALL PEDESTRIAN BRIDGEOVER CREEK
EXISTING ROAD
INTERPRETATION SPACE -INCORPORATINGRECONFIGURED LANDFORMSAND NEW PLANTING
BUS TURNING ZONE
RIV
ERSD
ALE
FEA
SIBI
LIT
Y S
TU
DY
PAGE 4
The new 30-room accommodation building will be located on the hill to the North-west of the existing buildings on the site.
Advantages- Separation from existing accommodation building.- Minimal new roads required for accessing the building.
Disadvantages - The new building will be visually dominant in the landscape.
SECONDARYCIRCULATION
PRIMARYCIRCULATION
VEHICLE CIRCULATION DIAGRAM
RL 28000SECONDARYCIRCULATION
PRIMARYCIRCULATION
VEHICLE CIRCULATION DIAGRAM
SECONDARYCIRCULATION
PRIMARYCIRCULATION
VEHICLE CIRCULATION DIAGRAM
A B C
NEW ACCOMMODATION
NORTH
0 10 20 30 40
OPTION 2: UNDERGROUND CARPARK (61 CAR SPACES)
VEHICLE RAMP TO UPPERPLATFORM
LIFT AND STAIR ACCESS TOPLATFORM ABOVE
PEDESTRIAN DROP OFF ZONE
OPTION 1: ABOVE GROUND CARPARK (50 CAR SPACES)
RL 18400
RL 18000
RL 12500
PLATFORM ABOVE SHOWNDASHED
NEW AREA OF PLANTING
LARGE BUS TURNING ZONE
S H
O A
L H A
V E
N R
I V E
R
COLLECTION STORAGE
VERTICAL CIRCULATION
INTERPRETATION SPACE -INCORPORATINGRECONFIGURED LANDFORMSAND NEW PLANTING
SMALL PEDESTRIAN BRIDGEOVER CREEK
EXISTING ROAD
water course
water course
water course
NORTH
RIV
ERSD
ALE
FEA
SIBI
LIT
Y S
TU
DY
PAGE 5
An effort has been made to keep traffic and parking separate frompedestrian movement, so as to create a precinct that is free of cars.
Two new car-parking options have been explored;- The first option is an above ground car park (50 car spaces)located on the hill below the Riversdale homestead. This car parkis will be screened from the main site through existing and newplanting. Visitors will approach the main site via a walking track afterleaving their cars.
- The second option is an underground car park (48 car spaces +secure collection storage area) where visitors will access the mainsite via a lift and staircase located in the new catering building. Thecapacity of the car park could be increased to 60 car spaces if thecollection storage is located within the main building above.
Both car-parking options compliment each other, one catering primarily for residential visitors and the other for day visitors.
All delivery and service vehicles will conduct loading/un-loadingoperations at the loading bay, to be located within the small staff carpark at the rear of the new creative learning centre and cateringbuildings. Disabled parking will also be provided in this area
SITE PLANNING: CAR PARKING
CREATIVE LEARNING CENTRE
CREATIVE LEARNINGCENTRE
PUBLIC TERRACE
SHORT TERM / STAFFPARKING
GROUND LEVELBASEMENT (UNDERGROUND CAR PARK OPTION)
VERTICALCIRCULATION
VERTICALCIRCULATION
UNDERGROUNDCARPARK (48 SPACES,OR 60 SPACES IFCOLLECTION ISSTORAGE LOCATED ONGROUND LEVEL
POTENTIALCOLLECTION STORAGE
RIV
ERSD
ALE
FEA
SIBI
LIT
Y S
TU
DY
PAGE 6
NEW CREATIVE LEARNING CENTRE
SPATIAL REQUIREMENTSWith a projected area of 642m2, this facility is needed to house the main administration group with workspaces for around 20 people. The facility will also accommodate functions relating to a substantial collection of Boyd family paintings.
FUNCTIONAL REQUIREMENTSReception Area • Primary entry to the facility
Gallery Space• Minimum floor to ceiling height of 4m• Potential for views (as well as black out)• High quality gallery services• Floor plan to maximise wall hanging space• May include movable internal walls
Office• Office accommodation for staff of the Bundanon Trust administration.• Storage for records requiring immediate access.
Meeting/Staff Room• Meeting facilities for approximately fifteen to twenty staff and/or visitors fully equipped for audio visual presentations.
Copy / Print Area• Central services area for printer, copier, etc. to be provided.• Storage for office supplies, files and records requiring immediate access.
Collection Storage• The area will need to accommodate floor to ceiling art rack storage and shelving storage.• Floor storage for large or free- standing items, and moving equipment such as dollies and art trolleys.• This area should meet best practice standards for environmental conditions and controls for art storage.• Finishes should be non-dust producing, durable and low maintenance (no off gassing materials). Floor is to be smooth
General Storage• Secure and controlled access• Volume to be optimised for storage, provided retrieval of items can be undertaken safely.
CREATIVE LEARNING CENTRE
DESCRIPTION OF SPACE AREA (M2)
reception area 10
gallery space 100
office space (20 people) 150
single offices (1 person) 10
copy/print room 7
meeting room 18
collection storage 150
small lecture theatre 70
teaching space 20
general storage 50
NET USABLE AREA 535
circulation, amenities, plant + structure (30%) 107
TOTAL FUNCTIONAL AREA 642
AREA SCHEDULE
CATERING BUILDING
GROUND ROOF
CAFE SEATING
LOADING ZONE
CATERING BUILDING
AMPHITHEATRE AMPHITHEATRE
GREEN ROOF
RIV
ERSD
ALE
FEA
SIBI
LIT
Y S
TU
DY
PAGE 7
CATERING BUILDING
DESCRIPTION OF SPACE AREA (M2)
cafe seating 30
commercial kitchen (service entire site 50
storage (dry/cool store, secure store) 30
back of house / waste 15
site laundry 15
entry from underground car park 10
general storage 80
NET USABLE AREA 230
circulation, amenities, plant + structure (30%) 46
TOTAL FUNCTIONAL AREA 276
NEW CATERING BUILDING
SPATIAL REQUIREMENTSWith a projected area of 276m2, this facility will have indoor and outdoor seating located to optimise patronage from visitors.
FUNCTIONAL REQUIREMENTSCafé / Seating Area• Outdoor seating should make provision for weather protection to maximise use of this space throughout the year.• Furniture should be of a high quality, durable and easy to move, stack and store.
Kitchen• The kitchen must be generous in size to cater for the food and beverage requirements of the whole site. • Temporary mobile service carts for special events and peak peri-ods will also need to be serviced from the kitchen.
AmenitiesThere should be male, female and accessible amenities.
Laundry•Shared washers, dryers and folding tables
General Storage• Secure and controlled access.• Volume to be optimised for storage, provided retrieval of items can be undertaken safely.
AREA SCHEDULE
DESCRIPTION OF SPACE
PROPOSEDNO.
NET AREA (M2)
TOTAL AREA (M2)
reception area 1 30 30
bedrooms(1 double or 2 singles, ensuite bathroom)
30 30 900
terrace / break out space
1 40 40
dining hall 1 80 80
self catering kitchen 1 30 30
storage 1 20 20
NET USABLE AREA 1100
circulation, amenities, plant + structure (20%)
220
TOTAL FUNCTIONAL AREA
1320
ACCOMMODATION OPTION ABUILDING (30 DOUBLE ROOMS)
GREEN ROOF
PUBLIC TERRACE
PUBLIC AREAINCLUDING DINNINGHALL + KITCHEN
ENTRY TERRACE
VERTICALCIRCULATION
GREEN ROOF
VERTICALCIRCULATION
DOUBLE ROOMS WITHENSUITE
GENERAL STORAGE
DOUBLE ROOMS WITHENSUITE
VERTICALCIRCULATION
LEVEL 3 (ARRIVAL)
LEVEL 2
LEVEL 1
RIV
ERSD
ALE
FEA
SIBI
LIT
Y S
TU
DY
PAGE 8
NEW ACCOMMODATION BUILDING
SPATIAL REQUIREMENTS
With a projected area of 1320m2, this facility would be designed to accommodate 60 people.
FUNCTIONAL REQUIREMENTS
Both buildings have the following functional requirements.
Reception / Lounge Area• Primary entry to the facility for staff, guests and visitors• Office for Residence Manger• Workstation and space for small group meetings
Bedrooms – 2 people per room• Flexible bedrooms (one double bed or two single beds) • Each room will contain its own en-suite bathroom
Kitchen/Dining Facility• Shared kitchen outfitted to prepare full meals and/or packed lunches for 60 people• Dining area with tables and chairs for 60 people
Storage• General storage facilities. Provide one or more spaces depending on the layout of the facility
Outdoor Recreation Area(s)Ideally there should be a number of outdoor spaces to cater for a broad variety of spontaneous and planned outdoor activities.
Barbeques under cover and room for tables encourage interaction. These spaces should be provided with night lighting.
AREA SCHEDULE: OPTION A
RIV
ERSD
ALE
FEA
SIBI
LIT
Y S
TU
DY
PAGE 9
TONKIN ZULAIKHA GREER
“Tonkin Zulaikha Greer have been acknowledged as one of Australia’s most inventive and acclaimed architectural practices since their inception in 1987. Their work ranges across the entire spectrum of architecture in a large city context: from iconic public buildings to the detailed restoration and adaptive re-use of historic structures; and from pragmatic community-minded inner-city housing to expressive and unusual private houses.” Geoffrey London, Tonkin Zulaikha Greer, Pesaro Press, 2005.
TZG’s architecture covers a broad spectrum including commercial, residential, heritage, urban and cultural projects.
Recent award-winning works include: CarriageWorks Performing Arts Centre, the $33m adaptive re-use of the carriageworks building at the Eveleigh Rail-yards. Paddington Reservoir Gardens, a sunken garden in urban Sydney.‘Portico’ apartment complex, the $68m conversion of the historic Scots Church in Sydney’s CBD.Craigieburn Bypass, an infrastructure project including sound walls and road furniture for the Hume Freeway, Melbourne Casula Powerhouse, the creation of an arts centre out of a disused power station.
No two TZG buildings look the same. Each is tailor-made, a strong representation to the client’s aspirations. The variety is made possible by an inventive spirit common to all. Their contemporary forms, rooted in strong consideration for building usage, are underpinned by sound environmentally sustainable building principles, finished with an informed use of materials with elegant and robust detailing.
TZG’s energetic team of architects has worked together since the late 80’s on a wide range of public and private projects. They have developed efficient procedures for navigating the design though the construction period, all the time maximising the potential in the process. TZG embraces the future with confidence in technology, fascination for history and enthusiasm for the sense of place to be found within the site for any new project.
The directors of Tonkin Zulaikha Greer Architects are Peter Tonkin, Brian Zulaikha, Tim Greer and Roger O’Sullivan.