RIU Explorers Conference Update – Fremantle 14 February 2013 Discovery Pit East Pit

Transcript of RIU Explorers Conference Update – Fremantle 14 …€¦ · as well as political and operational...

RIU Explorers Conference Update – Fremantle 14 February 2013

Discovery  Pit  

East  Pit  

RIU Explorers Conference Update – Fremantle – February 2013

Cautionary Advice on Forward Looking Statements Ø  The information contained in this presentation has been prepared by MacPhersons Resources Ltd (MRP). This

presentation is not an offer, invitation, solicitation or other recommendation with respect to the subscription for, purchase or sale of any securities in MRP. This presentation has been made available for information purposes only and does not constitute a prospectus, short form prospectus, profile statement or offer information statement. This presentation is not subject to the disclosure requirements affecting disclosure documents under Chapter 6D of the Corporations Act.

Ø  While the information contained in this presentation has been prepared in good faith, neither MRP nor any of its directors, officers, employees, agents or advisors give any representation or warranty, express or implied, as to the fairness, accuracy, completeness or correctness of the information, opinions and conclusions contained in this presentation. Accordingly, to the maximum extent permitted by law, none of MRP, its directors, officers, employees, agents, advisers, nor any other person accepts any liability whether direct or indirect, express or limited, contractual, tortuous, statutory or otherwise, in respect of the accuracy or completeness of the information or for any of the opinions contained in this presentation or for any errors, omissions or misstatements or for any loss, howsoever arising, from the use of this presentation.

Ø  This presentation may contain statements that may be deemed ‘forward looking statements’. Forward risks, uncertainties and other factors, many of which are outside the control of MRP, can cause actual results to differ materially from such statements. Such risks and uncertainties include, but are not limited to, commodity price volatility, increased production costs and variances in ore grade recovery rates from those assumed in mining plans, as well as political and operational risks and governmental regulation and judicial outcomes. MRP makes no undertaking to update or revise such statements, but has made every endeavour to ensure that they are fair and reasonable at the time of making the presentation.

Ø  Investors are cautioned that any forward looking statements are not guarantees of future performance and that actual results or developments may differ materially from those projected in any forward looking statements made.

Ø  Exploration targets are conceptual in nature and drilling may not convert these to resources.

2  

RIU Explorers Conference Update – Fremantle – February 2013 3  

RIU Explorers Conference Update – Fremantle – February 2013

Strategic Achievements

4  

Achievements in the last 15 months Ø Silver, Gold & Zinc mine acquisition Ø Silver/Gold mill acquisition/expansion Ø  73,400m drilled; 352,880m in review

Ø  Ø Exploration – Copper/Nickel upside Ø Operations management team Ø Road to production

Silver Eq 0 → 18.3Moz Gold 100 → 330Koz Zinc 0 → 49Kt

RIU Explorers Conference Update – Fremantle – February 2013

Corporate

ASX Code: MRP ASX Listed: 24 December 2010

Ordinary Shares: 249 million Unlisted Options: 22 million Market Cap: A$80M (at 32 cents)

Cash: A$12M (January 2013)

Debt: Nil

Projects 100% Nimbus Silver-Gold-Zinc VHMS 100% Boorara/Coolgardie Gold Assets

Substantial Shareholders

Directors/Management: 37% RK Mine Finance: 8.5%

5  

Directors Ashok Parekh, Chairman Morrie Goodz, Managing Director Jeff Williams, Non-Exec Director Stephen Hewitt-Dutton, Co. Secretary Ray Wright, Mining Advisor

RIU Explorers Conference Update – Fremantle – February 2013

2013 Project Schedule

Ø  Completion of Mining Tender process Ø  Completion of Optimisation Studies Ø  Completion of Mill Process Flowsheet Ø  Completion of Mill Equipment Specs and Tender Documents Ø  Completion of Plant Build Tender Process +15% Ø  Completion of Financial Modelling Ø  Finance Options Review Ø  Completion of First Pass Drilling on Nimbus Deeps and Copper

Targets & Commence Boorara Drilling Ø  Metallurgical testwork on Copper Lenses Ø  Review of Additional Concentrate Flowsheets – Copper Circuit Ø  Design of Concentrator Plant Ø  Delivery of Merrill-Crowe Plant Ø  Delivery of Gravity Circuit Ø  Commissioning of Gravity and M-C Plant

6  

March            April    August            October      

Q1  2014  

RIU Explorers Conference Update – Fremantle – February 2013

Video Flyover – CLICK HERE TO VIEW

7  

RIU Explorers Conference Update – Fremantle – February 2013 8  

Grade is King – Massive Sulphides DSO – 3200g/t Ag, 41% Zn, 14% Pb

Corporate Update – AGM – Kalgoorlie – 23 November 2012 9  

What Does Silver Highgrade Mean?

9  

           TODAY                    LEVERAGE  Sale  price/oz                $32      $50  Current  MRP  pit  opGmisaGon  cost  price/oz        $10      $12  Net  margin  70%              $22      $38    Target  producGon  (2014-­‐2015)    2Mozpa                  2Mozpa  Target  cash  margin  on  model/spot  price      $44M                          $76M  

Plus:    Ø  Ongoing  Gold  credits  Ø  New  Gold  producGon  Ø  Zinc  producGon  –  

18mth  Ø  Hg  -­‐  Cu  -­‐  Pb  credits  

Corporate Update – AGM – Kalgoorlie – 23 November 2012 10  

Zinc Prices predicted to be Climb by 20-40%

10  

RIU Explorers Conference Update – Fremantle – February 2013

Resource & Production Targets

11  

RIU Explorers Conference Update – Fremantle – February 2013 12  

Project Growth – 18.3 Moz & open

RIU Explorers Conference Update – Fremantle – February 2013 13  

Project Growth – Pit Expansion

Silver  Superpit  1:    1.5million  tonnes  @  179g/t  Ag-­‐Eq*  (137g/t  silver  plus  gold-­‐zinc  credits  Equates  to  6.6Moz  silver  plus  2.0Moz  Ag-­‐Eq  from  gold-­‐zinc  credits)  

RIU Explorers Conference Update – Fremantle – February 2013

Exploration Upside – Pit Expansion Planned Nimbus Deeps Drilling

14  

RIU Explorers Conference Update – Fremantle – February 2013

Boorara Gold Deposits & Copper Targets

15  

Nimbus  Mill  

Brindabella  Cu-­‐Zn-­‐Ag  

Nimbus  NW  Cu-­‐Zn-­‐Ag  

Nimbus  Deeps  Cu-­‐Zn-­‐Ag  

RIU Explorers Conference Update – Fremantle – February 2013

Exploration Upside – Project Pipeline Diversification into Copper-Nickel

16  

Copper  PotenYal  -­‐  analogies  with  the  geology  of  nearby  Golden  Grove  and  Jaguar-­‐Bentley  mines  support  the  high  likelihood  of  copper-­‐zinc-­‐silver-­‐gold  feeder  lenses  being  idenYfied  nearby.  Nickel  PotenYal  –  both  the  Coolgardie  and  Golden  Ridge  tenements  are  at  the  northern    extension  of  the  Kambalda  Nickel  Dome  and  have  known  nickel  occurrences  –  drilling  of  one  of  these  outcropping  zones  will  be  undertaken  in  2013.  

RIU Explorers Conference Update – Fremantle – February 2013

Leach Tank Circuit Go-Ahead

17  

56.6%  Zn  Con  9.5%  Ag  Rec  

74.8%  Ag  Con  15.7%  Ag  tail  in  testwork  

RIU Explorers Conference Update – Fremantle – February 2013

Points of Difference

Ø  Grade is King (179g/t Ag-Eq)

Ø  Move to Producer

Ø  Polymetallic

Ø  Silver - Gold – Zinc

Ø Copper – Nickel

Ø ASX Code: MRP

p$�

www.mrpresources.com.au

� iv � pt � � iol � P� � r P� � � � Pt �

Grade is King (179g/t Ag-Eq)

Silver - Gold – Zinc

� iv � pt � � iol � P� � r P� � � � Pt �

RIU Explorers Conference Update – Fremantle – February 2013

Additional Background Information

19  

RIU Explorers Conference Update – Fremantle – February 2013 r e�

Experienced Management Team

Chairman (Executive) Ashok Parekh BBus, FCA, AIMM, FTIA Chartered Accountant 33 years experience Coordinates assets for IPOs

Managing Director (Executive) Morrie Goodz MSc (Mining Geo), MBA, FAIMM Cert Mine Manager Geologist – 34 years experience Discovered/designed 4 decline mines

Non-Executive Director Jeffrey Williams BSc (Mining Eng), MBA, FAIMM Mining Engineer – 39 yrs experience Founder – Mineral Deposits (MDL)

Company Secretary Stephen Hewitt-Dutton BBus, CA, SA Fin Chartered Acct – 18 years experience Specialist – Mergers & Acquisitions

Processing Manager Warwick Mckenzie BSc (Extractive Metallurgy) 14 years experience Manager of Operating Mills & Heap Leach Facility

Mining Advisor Ray Wright Cert Mine Manager 45 years experience Owner/Operator of 4 producing mines

RIU Explorers Conference Update – Fremantle – February 2013

Competent Person Statement

The information in this presentation that relates to mineral resources and exploration results is based on information compiled by Mr Morrie Goodz, who is a Fellow of the Australasian Institute of Mining and Metallurgy. Mr Morrie Goodz is a full time officer of MacPhersons Resources Ltd and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration, and to the activity which he is undertaking, to qualify as a Competent Person as defined in the 2004 edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Goodz has given his consent to the inclusion in this presentation of the matters based on the information in the form and context in which it appears.

21  

RIU Explorers Conference Update – Fremantle – February 2013 r r �r r �

� iv � pt � itEr Pi� � o� � Pr � p� ar e �� r ee� t0� � � � � � � � � � � � � � � � � � � � � � � � -­‐ 9z266/ � Er ee� t �� l � P� � � � P� � � 0� � � � � � � � � � -­‐ */ � NE� tiol � P�� Pr � p� ar e0� � � � � � � � � � � � � � � � � -­‐ 4( � � r b� tiol � P� �� y � P� ae � � r tE0� � � � � � � � � � S( 4*q� N� r b� �� l � P� � � � � oo� � Pi� � 0� � � � � S64@d� N� r b�� r tE� � � EPi� t0� � � � p� � � � � r pPN� e� P O� � O� *@md@B�/@9/ � � Pi� � 0� � � � S/dmS-­‐ d� N� r b� � C� � py � -­‐ @@� m� q@@B�9/4*� � r b� � iol � P� �   $� 3 � -­‐ q2-­‐ @@� Er ee� t � � ie� �6� � � � iar e� o� � � � e� � yr oOv � E� ooi� � � � yr tiEt �

Corporate Update – AGM – Kalgoorlie – 23 November 2012 23  

Silver Superpit Potential

23  

Q2  2013  

Cu  

Cu  

Cu  

Cu  

1 2

34

5

6

7

Corporate Update – AGM – Kalgoorlie – 23 November 2012 r c �

First 6 lenses >18.3Moz Silver-Eq* Opportunities - 9 deposits - 50 lenses

r c �

� � � � � � r v yoi� eE� � ie� P� ot� � � tr pP� � � 9z4-­‐ � r b� � m�   �

RIU Explorers Conference Update – Fremantle – February 2013

Existing Nimbus Process Plant

� 5� � 2�2 7� � � �� � � � 4T   5�

� 5T6� � 2� � � � �2 7�

� � � � 7   � � 3� � � �

� 7   � � 3� � � �� � �5 � � � �8   2�

� � � 75�8   2�

� � � 82� �

� � �5 � � � �8   2�

� �� TT � �� � �� 5�8   2�

�   � � � � Y� � 4T� � �� � 3�5 �8   2��   � � � � Y� � 4T� � �� �� � � � � � � �� �� � � � � � � �

� �� � � 2� �

� iv � pt � itEr Pi� � o� � Pr � p� ar e Tonnes: 318,992 tonnes

Average Grade: 352 g/t silver Production: 3.6 Moz silver

Operating Cost: $6.40/oz Average Sell Price: $9.07/oz

2012 Price: $27-$37/oz

18.3Moz Silver Eq* & 49KT Zn & 33KozAu 9 additional Ag & Polymetallic deposits

� � O� � Pr s� � Et �Met test work (oxide, transition, sulphides) Process water TSF 3 Mill construction � � Pv ih e � � � � � -­‐ � �Works approval – DEC Mining proposal – DMP Native vegetation clearing permit - DMP

� Pr � � tt � � or u tD� � E�

Corporate Update – AGM – Kalgoorlie – 23 November 2012 r o�

Pit Optimisation Studies (August 2012)

r o�

*

� it� r l � PO�

� � tE�9/

-­‐

(

RIU Explorers Conference Update – Fremantle – February 2013

Gold Drillhole Intersections

27  

May  2012  Proposed    Pit  Cutback  

Nimbus  Mill  NEW  Western  GOLD  Zones  Future  Proposed  Pit    Cutback  –  December  Review  

RIU Explorers Conference Update – Fremantle – February 2013

Gold Intercepts Extend Pit Outline

28  

May  2012  Proposed    Pit  Cutback  

NEW  Western  GOLD  Zones  20  –  40m  under  cutback  Future  Proposed  Pit    Cutback  –  December  Review  

NEW  GOLD  Zone  In  Between  Pits    

RIU Explorers Conference Update – Fremantle – February 2013

Exploration Upside

Ø  Maiden silver resource – Nimbus main zone – 6 lenses being drilled

Ø  4 VHMS lenses at Nimbus (not yet classified)

Ø  9 other silver-zinc prospects

Ø  2013 – drillout of Nimbus Ø  2013 – JORC resource updates

Nimbus and Coolgardie

Ø  2013 – commence drillout of Boorara gold and adjacent lenses

Ø  2013 – commence drillout of other silver deposits

29  

RIU Explorers Conference Update – Fremantle – February 2013 30  

Project Pipeline Boorara Gold Project – 2km from Mill

RIU Explorers Conference Update – Fremantle – February 2013

Boorara Gold Deposits & Copper Targets

31  

Nimbus  Mill  

Brindabella  Cu-­‐Zn-­‐Ag  

Nimbus  NW  Cu-­‐Zn-­‐Ag  

Nimbus  Deeps  Cu-­‐Zn-­‐Ag  

RIU Explorers Conference Update – Fremantle – February 2013

Coolgardie Gold Project

Coolgardie Gold Projects Ø 50% upgrade in gold

resources (>1.7g/t) Ø MacPhersons Pit 1

optimisation – 76,000oz Ø Tycho Pit 1 optimisation

– 43,000oz Ø A-Cap Deeps Discovery Ø 100% increase in

tenement holding Ø Nickel Projects

32  

RIU Explorers Conference Update – Fremantle – February 2013

MacPhersons Reward Gold Mine Optimised Pit 1 – 1.5Mt @ 1.8g/t Gold

33  

RIU Explorers Conference Update – Fremantle – February 2013

Target Plan to Production

Nimbus Silver-Gold-Zinc Mines Ø  New Merrill Crowe Expansion – 2013-14 Ø  Pit cutbacks and tailings processing Ø  10 Massive Sulphide lenses at Nimbus Ø  9 other Silver-Zinc deposits on tenements

Boorara – Coolgardie Gold Projects Ø  Multiple deposits on Boorara – Kanowna shear zones Ø  MacPhersons Optimised Pits and A-Cap Deeps Ø  Tycho pit optimisation and mine plan in progress