Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.

43
Risk Severity Matrix 7-7

Transcript of Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.

Page 1: Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.

Risk Severity Matrix 7-7

Page 2: Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.

Risk Event Response

Contingency Plan Trigger

Who is

Responsible

Page 3: Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.

CH

AP

TE

R E

IGH

T

Scheduling Resources

Page 4: Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.

• Project human resource management:– Includes the processes required to make the

most effective use of the people invovled with the project.

• Individual contributors• Etc.

PMBOK – Resource Management

Page 5: Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.

• Major Processes– Organizational Planning– Staff acquisition

PMBOK – Resource Management

Page 6: Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.

PMBOK – Resource Management

• Organizational Planning– Involves identifying, documenting and assigning

project roles, responsibilities, and reporting relationships to either individuals or groups.

– Reviewed/revised regularly throughout project

– Tightly linked to communications planning

Page 7: Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.

PMBOK – Resource Management

Inputs Process Output

Project Interfaces

Staffing Requirements

constraints

Role and responsibility assignments

Staffing management plan

Organization chart

Supporting detail

Organizational Planning

Page 8: Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.

PMBOK – Resource Management

• Staff Acquisition

– Involves getting the human resources needed (individuals or groups) assigned to and working on the project.

Page 9: Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.

PMBOK – Resource Management

Inputs Process Output

Staffing management plan

Staffing pool description

Recruitment practices

Project Staff Assigned

Project team directory

Staff Acquisition

Page 10: Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.

PMBOK – Resource Management

• Team development

– Includes both enhancing the ability of stakeholders to contribute as individuals as well as enhancing the ability of the team to function as a team.

– Complicated by two bosses.

Page 11: Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.

PMBOK – Resource Management

Inputs Process Output

Project staff

Project plan

Staffing management plan

Performance resports

External feedback

Team Building activities

General management skills

Reward recognition systems

Collocation

Training

Team Development

Page 12: Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.

Types of Project Constraints

• Technical Constraints

• Physical Constraints

• Resource Constraints

Page 13: Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.

Constraint Examples

8-1

Page 14: Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.

Technical Constraints

• Also called logic constraints

• Sequence of events for project activities

• CPM addresses these– X-Planes

Page 15: Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.

Physical Constraints

• Contractual

• Environmental

• Handled similar to resource constraints– X-Planes

Page 16: Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.

Resource Constraints

• Parallel activities hold conflict for resources

• Wedding example– One person, many tasks

• X-Planes

Page 17: Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.

Types of Resource Constraints

• People– Most Important

• Materials– Exotic

• Equipment– Type Size Quantity

• Working Capital– My Driveway

Page 18: Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.

Classification of Scheduling

• Time Constrained

• Resource constrained

Time

Project Manager

Resources

Customer

Page 19: Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.

Project Priority Matrix

Constrain: The original parameter is fixed. The project must meet the completion date, specs. And scope of the project, or budget

Enhance: Given the scope of the project, which criterion should be optimized?

Accept: For which criterion is it tolerable not to meet the original parameters?

Constrain

Enhance

Accept

Time Performance Cost

Page 20: Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.

Time Constrained

• Resource Utilization focus

• Level within Slack

Page 21: Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.

Botanical Garden 8-4

Page 22: Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.

Botanical Garden 8-4

Results:Reduced resourcesRequired by 25%(from 4 to 3)

Did not affect Schedule

Why:Some Equipment Not Easily moved.

Negatives:Loss of Slack

Page 23: Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.

Resource Constrained Projects

• Difficult to manage

• No good math models for:

• Rules (Heuristics)– Allocation of resources to

activities to minimize project delays

Page 24: Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.

Heuristics Rules that Seem to Work

• Follow in order: Assign resources according to activities with:

1. Minimum slack

Then if tie:

2. Smallest Duration

Then if still a tie:

3. Lowest Activity Identification Number

Page 25: Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.

Resource-Constrained Schedule Through Period 0-1

8-7

Page 26: Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.

Resource-Constrained Schedule Through Period 1-2

8-7

Page 27: Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.

Resource-Constrained Schedule Through Period 2-3

8-7

Page 28: Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.

Resource-Constrained Schedule Through Period 2-3 Continued

Next least slack

Least Slack

Most Slack

AssignLeast SlackFirst

Page 29: Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.

Resource-Constrained Schedule Through Period 3-4

xNothing to do hereCan’t assign activityB, its too large (2+2=4>3So, must leave C and D alone

0

Page 30: Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.

Resource-Constrained Schedule Through Period 4-5

xNothing to do hereCan’t assign activityB, its too large (2+2=4>3So, must leave C and D alone

x-1

Page 31: Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.

Resource-Constrained Schedule Through Period 5-6

x x xNothing to do hereCan’t assign activityB, its too large (2+2=4>3So, must leave C and D alone

-2

Page 32: Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.

Resource-Constrained Schedule Through Period 6-7

x x xNow, we assign activity with least Slack, that is activity B with –2 periods ofSlack. Next activity F has least slack soassign

-22

1

3

1

x

x

Page 33: Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.

Resource-Constrained Schedule Through Period 7-8

x x xNow, we assign activity with least Slack, that is activity B with –2 periods ofSlack. Next activity F has least slack soassign

-22

1

3

2

1

3

x x

xx

0

Page 34: Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.

Resource-Constrained Schedule Through Period 8-9

x x xNow, we assign activity with least Slack, that is activity B with –2 periods ofSlack. Next activity F has least slack soassign

-22

1

3

2

1

3

2xx

-11

xx x

Page 35: Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.

Resource-Constrained Schedule Through Period 9-10

x x xNow, we assign activity with least Slack, that is activity B with –2 periods ofSlack. Next activity F has least slack soassign

-22

1

3

2

1

3

2

x

x

-21

xx x

1

3

2

Page 36: Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.

Resource-Constrained Schedule Through Period 10-11

x x x

Now, we assign activity with least Slack, that is activity B with –2 periods ofSlack. Next activity E has least slack soassign

-22

1

3

2

1

3

2

x

x

-21

xx x

1

3

2

1

2

x3

-1

Page 37: Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.

Resource-Constrained Schedule Through Period 11-12

x x x

Now, we assign activity with least Slack, that is activity B with –2 periods ofSlack. Next activity E has least slack soassign

-22

1

3

2

1

3

2

x

2-2

1

xx x

1

3

2

1

2

x3

-2

1

2

x3

2 s s

Page 38: Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.

Resource-Constrained Schedule Through Period 1-14

8-9

Page 39: Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.

EMR Project Network View—Schedule Before Resources

Leveled

8-11

Page 40: Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.

EMR Project Before Resources Added

8-12

Page 41: Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.

EMR Project—Time Constrained Resource Usage Viewand Resource Loading Chart

8-13

Page 42: Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.

EMR Project Network ViewSchedule After Resource Leveled

8-14

Page 43: Risk Severity Matrix 7-7. Risk EventResponse Contingency Plan Trigger Who is Responsibl e.

EMR Project Resources Leveled8-15