Risk management. Group task Think back to a particular visit and remember the visit leader, the...

71
Risk management

Transcript of Risk management. Group task Think back to a particular visit and remember the visit leader, the...

Page 1: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.

Risk management

Page 2: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.

Group task• Think back to a particular visit and remember the

visit leader, the group, the visit/activity they did, transport used etc.

• In order to decide whether to contest the claim, they have asked you to provide evidence that can be used to demonstrate that this leader, and therefore the LA/employer, did not act negligently.

• What evidence could you provide?

• The LA/employer has been notified of a claim over an accident that is alleged to have occurred on this visit 2 years ago.

Page 3: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.

What records do we need to keep?Individual visits or series of repeated visits

• Who went? - register of staff and young people• What did they do and when? - programme of visit

• Was planning reasonable? - risk assessment/forms

• Evaluation of visit? • Visit/activity objectives met? • Accident/incident on the visit and resulting action?

• Provider check prior to booking? (if relevant)

General record keeping• Policy for off site visits current at the time of the incident• Personnel records – training, qualifications etc.

How long do we need to keep them for?

Page 4: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.

Apathy Paranoia

Managing risk sensibly

Reasonable and practicable

Suitable and sufficient

Focus on significant hazards

Not ‘normal life’ risks

Foreseeable risks

Follow good practice

Use common sense

Efficient

Cost effective

No consideration Overkill

‘I’ve been doing this for twenty years without a hitch’

‘Someone else should do the risk assessment’

‘It’s not worth the risk’

‘You have to risk assess everything’

‘My risk assessment is 5 pages long’

‘We’ve done the best we can’

‘We can always review and improve this’

Model by

Paul Airey

Page 5: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.

Conventional Model of Risk

Hazards Controls

Page 6: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.

Risk / Benefit model

Hazards Controls

Benefits

Page 7: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.

http://www.dcsf.gov.uk/play/

December 2008http://www.englishoutdoorcouncil.org/wp-content/uploads/Nothing-Ventured.pdf

Page 8: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.

Written risk assessment

• But….risk assessment is an essential part of the planning process for visits.

On it’s own, paperwork never saved anyone. It is a means to an end – not an end in itself. Action is what protects people.

HSE, 2007

• Risk assessment is a legal requirement that provides evidence of the process.

• In this session we will look at a minimal paperwork approach that you can use.

Page 9: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.

2 levels of written risk assessment

Adapted from model by Adge Last

Employer’s or organisation’s existing written standard risk

assessment or operating procedures for educational visits

Visit Leader’s written risk

assessment for a visit – issues not already covered

by employer’s generic risk

assessment/S.O.P.

SpecificGeneric

Page 10: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.

Specific risk assessmentThe visit leader’s specific risk assessment needs to address issues not already covered by the employer / organisation generic risk assessment/standard operating procedures relating to:

• the Activity

• the Group

• the Environment

• the Distance away from base (and transport)

• the Staff (all adults on the visit)

Page 11: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.

Adapted from model by Adge Last

written risk assessment/standard operating procedures

written risk assessment

SpecificGeneric

Risk management

Active risk management that takes place as the visit unfolds. Not written but may trigger a review/update of generic risk assessment/s.o.p. on return to base.

Page 12: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.

Ongoing risk management

The gut-feeling - acceptable or unacceptable ‘my child’ test?

Page 13: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.
Page 14: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.
Page 15: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.
Page 16: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.
Page 17: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.

OK or not OK?

Page 18: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.
Page 19: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.
Page 20: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.
Page 21: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.
Page 22: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.
Page 23: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.
Page 24: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.
Page 25: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.
Page 26: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.
Page 27: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.
Page 28: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.
Page 29: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.

Ongoing risk management

= spotting issues/picking up on clues… and responding appropriately to manage the risk.

How do visit leader’s develop this ability … and how can you help this to happen?

Page 30: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.

OEAP Leader TrainingCourse details:

• Ongoing risk management• Group management on Educational Visits• A practical, Nationally recognised course• Courses for individual staff (whole staff available

on request)• Contact the Outdoor Education Adviser for

further details

Page 31: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.

Why are we doing this? Identify benefits and desired outcomes.

Identify significant hazards and risks associated with the visit/activity and the safety measures needed to reduce risk to a tolerable level.

Risk Benefit Assessment – the process

Can/should it be done? Do the benefits justify the level of risk?

No? Move to Plan B Yes? Start detailed planning.

Page 32: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.

Does the employer have a generic risk assessment/standard operating procedures for this type of visit/activity?

Does this cover all of the hazards/safety measures for this visit and group?

Yes

Ensure there is a copy of the risk assessment for the visit on file. Ensure safety measures are implemented and make sure those involved in the visit understand their role in managing safety.

Yes

Identify significant hazards and risks associated with the visit / activity and the safety measures needed to reduce risk to a tolerable level.

Page 33: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.

Does the employer have a generic risk assessment/standard operating procedures for this type of visit/activity?

Does this cover all of the hazards/safety measures for this visit and group?

Yes

Specific risk assessment for additional hazards used in conjunction with Generic risk assessment/standard operating procedures.

Ensure there is a copy of the risk assessment for the visit on file. Ensure safety measures are implemented and make sure those involved in the visit understand their role in managing safety.

No

Identify significant hazards and risks associated with the visit / activity and the safety measures needed to reduce risk to a tolerable level.

Yes

Page 34: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.

Does the employer have a generic risk assessment/standard operating procedures for this type of visit/activity?

Start from scratch! Risk assess the significant hazards and identify the safety measures

Ensure there is a copy of the risk assessment for the visit on file. Ensure safety measures are implemented and make sure those involved in the visit understand their role in managing safety.

No

Identify significant hazards and risks associated with the visit / activity and the safety measures needed to reduce risk to a tolerable level.

Yes

Yes

Does this cover all of the hazards/safety measures for this visit and group?

No

Specific risk assessment for additional hazards used in conjunction with Generic risk assessment/S.O.P.

Page 35: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.

Does the employer have a generic risk assessment/standard operating procedures for this type of visit/activity?

Does this cover all of the hazards/safety measures for this visit and group?

Yes

Start from scratch! Risk assess the significant hazards and identify the safety measures

Specific risk assessment for additional hazards used in conjunction with Generic risk assessment/S.O.P.

Ensure there is a copy of the risk assessment for the visit on file. Ensure safety measures are implemented and make sure those involved in the visit understand their role in managing safety.

Ongoing risk management during visit. Change plans if needed but re-assess risk and safety measures before doing so.

Yes No

No

After the visit – do we need to update the generic RA?

Identify significant hazards and risks associated with the visit / activity and the safety measures needed to reduce risk to a tolerable level.

Page 36: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.
Page 37: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.

Checklist of Possible Injuries /Outcomes

• Falls: objects / people• Collisions• Drowning• Cold related: frost bite /

hypothermia• Smoke inhalation• Fractures• Concussion / head injuries• Amputations• Asphyxiation / gassing• Cuts / open wounds• Internal injuries• Asthma

• Sight / hearing loss• Sprains / strains• Electrical injury• Burns: heat / chemical• Scalds• Poisoning• Psychological• Disease• Diabetes / Epilepsy• Dehydration• Stings / Bites / Allergies• Abuse • Getting Lost

Page 38: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.
Page 39: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.

Task1) Generic risk assessment/standard operating procedures for off site visits

As a group, draw up a generic risk assessment/S.O.P. to cover the typical significant risks involved in any off-site visit/activity (5 minutes).

[N.B Significant = likely to cause serious harm unless something is done to reduce the risk.]

2) Specific risk assessment for a visit

Using the scenario given to your group, identify any significant risks and safety measures that are not already covered in the generic risk assessment /S.O.P. (5 minutes).

Page 40: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.

Day visit (river study) with 15 young people (15/16 year olds). One young person has ADHD (controlled by medication). There are no toilet/café facilities at the venue. You have walked 15 minutes from your minibus in the car park on a rough riverside path to get to the waterfall area. You are 45 minutes drive from your base.

Page 41: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.

Walk up popular local hill (550m above sea level and 8 miles from your base) with 32 young people aged between 8 and 12 in May. Weather forecast is dry with sunny spells but cold, moderately Easterly wind. You have been dropped by coach at a car park where the photo has been taken and are following a major path from the road bend to the top – a 2 km walk.

Page 42: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.

Day visit to Gordale Scar in November to look at gorge and limestone pavement with 30 young people (13/14 year olds). One young person is deaf and another has a peanut allergy (requiring epipen to control). You have travelled by Coach for 2 hours to get to the venue and have then walked for 20 minutes on an increasingly rocky but mainly flat path to get to this point. Your plan is to look for fossils in the rocks at this point before returning the way you came to go to the visitor centre.

Page 43: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.

Day visit to a castle with a group of 30 young people (10/11 year olds). One young person has asthma (controlled by ventolin inhaler) and another is confined to a wheelchair. There is a small gift shop and toilets on site but no café. Parking is in the car park shown in the picture and you have travelled an hour to the venue by coach.

Page 44: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.

Overnight camp with a group of 27 young people (8/9 year olds). You are staying on a public camp site with toilet facilities and a village shop nearby. You have walked 1 mile on a footpath from your base to get to the campsite.

Page 45: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.
Page 46: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.

Benefits of this approach- shared knowledge / good practice – involve visit leaders writing generic RA/standard operating procedures

- reduces duplication of effort

- focuses visit leaders on specific issues (SAGED)

- EVC can use the risk assessment as a monitoring tool

- creates a useful induction tool for new visit leaders

Page 47: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.
Page 48: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.
Page 49: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.
Page 50: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.

Risk assessment responsibilities – who does what?Our staff risk assess the areas that they are responsible for.

Independent providers risk assess what they are responsible for.

If there are any grey areas these should be resolved through discussion with the independent provider.

Where provision is collaborative (ie shared between more than one establishment), who is responsible for what, including risk assessment? This can only be confirmed if all parties share the risk assessment process.

This should be confirmed through standard checks before booking with a provider.

Our staff still retain duty of care relating to pastoral care of young people.

Page 51: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.

Managing risk

Page 52: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.

Key ingredients for effective risk management

• Experienced and competent leaders• Activity and visit appropriate for the group• Participants appropriately trained / prepared• Suitable clothing and equipment (Personal

Protective Equipment (PPE) required?)• Appropriate level of supervision• Suitable conditions for the activity• If uncomfortable: alternative method/activity?• If not resolved: discontinue the activity?• Knowing when to turn back or move to Plan B

Page 53: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.
Page 54: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.
Page 55: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.

Young person involvement in risk management

• an important life skill

• more likely to understand and follow safety measures

• understand leader’s decisions

• Curriculum requirement in all subject areas

Page 56: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.
Page 57: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.

BENSON AND LEDGESNINE boys risked their lives scaling a 45ft block of flats – before having a cigarette on the roof.

The lads – aged 11 to 14 – clambered up the four storey building balcony by balcony . . .

Police released this picture to deter others from doing it.

Hampshire Police spokesman Lucy Dibden: “This climb could easily have been fatal for the children involved”

Last night the mother of one of the kids who did not want to be named, said: “My lad’s a good boy. All they are trying to do is to have a bit of fun because they are bored to tears”

The SUN Nov 2002

Page 58: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.

Who said this?

‘Health and safety law is often used as an excuse to stop children taking part in exciting activities, but well-managed risk is good for them.

They won’t understand about risk if they’re wrapped in cotton wool. Risk itself won’t damage children, but ill-managed and overprotective actions could!’

November 2008

Page 59: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.
Page 60: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.
Page 61: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.
Page 62: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.
Page 63: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.
Page 64: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.
Page 65: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.

"We do not believe in extremist health and safety ideas which would keep children wrapped in cotton wool.

Our argument is that a skinned knee or a twisted ankle in a challenging and exciting play environment is not just acceptable, it is a positive necessity.

We need to prepare children for a complex, dangerous world in which healthy, robust activity is more a national need than ever before.

We think people should climb mountains, and sail boats..." Tom Mullarkey, Chief Executive RoSPA

November 2007

Page 66: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.

Play time, 1930s style!

Page 67: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.

Top TipsTop Tips1. Think of risk assessments as the minutes of a meeting

where issues regarding safety were raised and discussed

2. It is the discussion and sharing of ideas, experience and knowledge which will enhance safety and reduce risk – not the piece of paper

3. Try to keep the form simple

4. Include yourself in ‘who might be harmed’

Page 68: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.

Top TipsTop Tips5. Use existing risk assessments carefully- not as a

substitute for thinking

6. Don’t let your risk assessments become static – review them regularly (eg annually) and after any incidents

7. Use other peoples’ accidents as a ‘near miss’ for your groups and revisit your risk assessments – anything to change or add?

Page 69: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.

Top TipsTop Tips8. There is no ‘right way’ to do risk assessments. A dozen

different R/As could be done for one activity and they all could be equally valid

9. Most accidents occur on the activities that were considered to be the lowest risk

10.It’s not what you write which drives safety, it’s what you do. Merely writing a risk assessment will not protect people from harm

Thanks to Marcus Bailie of AALA for these last 3

Page 70: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.

If you don’t risk much, then you

don’t lose much, but winning isn’t

very exciting either

Sipri Cuthbert

Page 71: Risk management. Group task Think back to a particular visit and remember the visit leader, the group, the visit/activity they did, transport used etc.