Risk Considerations When Working Globally Frank Wampol, Corporate Safety Director, B. L. Harbert International David Warman, Willis Construction Practice Tanja Maffei, Willis International September, 2012

Transcript of Risk Considerations When Working Globally Frank Wampol, Corporate Safety Director, B. L. Harbert...

Page 1: Risk Considerations When Working Globally Frank Wampol, Corporate Safety Director, B. L. Harbert International David Warman, Willis Construction Practice.

Risk Considerations When Working Globally Frank Wampol, Corporate Safety Director, B. L. Harbert InternationalDavid Warman, Willis Construction PracticeTanja Maffei, Willis International

September, 2012

Page 2: Risk Considerations When Working Globally Frank Wampol, Corporate Safety Director, B. L. Harbert International David Warman, Willis Construction Practice.

2

Today’s Agenda Globalization

Considerations When Expanding Overseas

Some Examples

When to Purchase International Insurance

Typical International Program Structures

Top International Insurers

Emerging Topics and Hot Countries

Best Practices

Willis International Construction Capabilities

Appendix

Page 3: Risk Considerations When Working Globally Frank Wampol, Corporate Safety Director, B. L. Harbert International David Warman, Willis Construction Practice.

3

Globalization—New World Order Economic activity and wealth patterns are shifting dramatically. The World’s Ten

Largest Economies (Gross Domestic Product, GDP) recent past and looking forward:

Rank 2010 Rank 2020 (Forecast)

1. United States 1. China

2. China 2. United States

3. Japan 3. India

4. India 4. Japan

5. Germany 5. Russia

6. Russia 6. Germany

7. United Kingdom 7. Brazil

8. France 8. United Kingdom

9. Brazil 9. France

10. Italy 10. Mexico

Source: © 2010 Euromonitor International

Page 4: Risk Considerations When Working Globally Frank Wampol, Corporate Safety Director, B. L. Harbert International David Warman, Willis Construction Practice.

4

Globalization—Corporate Risk in the Real World

Publication Date 08/27/2012 Source: UPI International Top News 28 punished for building collapse Chinese authorities said 28 people have been punished for a building collapse in November, 2011 that killed six people and injured seven others.

Among those held responsible for the incident were Zheng Xinqin, the deputy governor of Chengqu District of Shanwei city, Guangdong province, and Zhuo Hongzuan, director of the district's Urban and Rural Construction Bureau, Xinhua reported Sunday.

Punishments ranging from disciplinary warning to serious demerits were handed out to the 28 for the Nov. 22 building collapse in Shanwei.

The building that collapsed was being built as a training facility for a bank. Design defects and substandard construction were to blame for the collapse that killed six and injured seven and caused a $1.59 million loss.

Page 5: Risk Considerations When Working Globally Frank Wampol, Corporate Safety Director, B. L. Harbert International David Warman, Willis Construction Practice.

5

Considerations When Expanding OverseasAssets and Possible Solutions Protecting People – D&O, WC, EL, AD&D, DBA, K&R, Benefits,

Faute Inexcusable, UK Manslaughter Act, Strict liability, auto, war, evacuation, political disasters

Insuring Assets – CAR, property, auto, mobile equipment, shipments, surety, trade credit, terrorism, CEN/Political risk, patent/trademark,

Revenue Streams – BI, CBI, Supply chain, Reputation Environment – Strict liability, fines and penalties Country risk

Page 6: Risk Considerations When Working Globally Frank Wampol, Corporate Safety Director, B. L. Harbert International David Warman, Willis Construction Practice.

6

Considerations When Expanding Overseas Regulatory Compliance/Protectionism Global Taxes – income, people, premiums and claims Litigiousness/Legal environment/Claims Handling Service availability and standards- suppliers, vendors, brokers,

adjusters, loss control Liability – contractual risk transfer vs. law, who is responsible, what

is standard limit/deductible in each country, good local standard extensions, fines and penalties

Professional/E&O, Reps and warranties, Decennial, Reputational risk, Patent/Trademark, Cyber

Legal Entity Structure – Partnerships vs. JV vs. Wholly Owned Entities

Global Data – exposures, certificates, contracts, audits, claims- storage, updates, online 24/7 access

Page 7: Risk Considerations When Working Globally Frank Wampol, Corporate Safety Director, B. L. Harbert International David Warman, Willis Construction Practice.

7

People Issues- Protecting Your Employees Worldwide

SCR, a wholly-owned subsidiary of Willis Limited with over 70 international staff with over 30 years experience, SCR are the world’s leading specialist insurance broker for

Kidnap and Ransom and Extortion; High-Risk Personal Accident and Emergency Medical Expenses, Political and Natural Disaster Evacuation and Repatriation and Crisis Management

SCR’s Risk Prevention/Security Consultancy services can include: Audit of client’s security, crisis management and evacuation plans Terrorism surveys of construction facilities – often in conjunction with Willis’ in-house

team of Engineers to add value to EML calculations Hostile environment and security awareness training for expatriate staff and travelers International Travel Advice

SCR’s in-house Risk Prevention and Security Consultants have ex-FBI and former UK Special Forces background and long-standing experience in working with Construction clients globally

when you purchase an insurance product through SCR, Insurers will often make a contribution to the cost of the Prevention Service via Risk Prevention Allowance – available as a percentage of the policy premium

Contact: Philipp A. Seel -   [email protected]

Page 8: Risk Considerations When Working Globally Frank Wampol, Corporate Safety Director, B. L. Harbert International David Warman, Willis Construction Practice.

8

People Issues

Page 9: Risk Considerations When Working Globally Frank Wampol, Corporate Safety Director, B. L. Harbert International David Warman, Willis Construction Practice.

9

People Issues

Know and respect the culture Work force motivation Obtaining safety and quality buy-in Back to the basics!

Page 10: Risk Considerations When Working Globally Frank Wampol, Corporate Safety Director, B. L. Harbert International David Warman, Willis Construction Practice.

10

Asset Issues Availability of Materials Availability of Equipment and Spare Parts Local Transportation Challenges Local Logistical Challenges Lack of Municipal Infrastructure Adapting to Local Laws and Customs Safety and Health Concerns

Page 11: Risk Considerations When Working Globally Frank Wampol, Corporate Safety Director, B. L. Harbert International David Warman, Willis Construction Practice.

11

When to Purchase International Insurance

1. Compulsory covers2. Contract requirements3. Non-admitted illegal4. Exemptions to non-admitted(aviation, marine, no local market)5. Reasons to want local cover(claims service, language, currency, tax, JVs)

Yes

No

Yes

Local admittedpolicy

Can cover from home

country

Is there an ownedoverseas company?

(legal entity, assets, people, sales) No

What is at stake?What do you have to lose?How much control to exercise? At what cost?

Page 12: Risk Considerations When Working Globally Frank Wampol, Corporate Safety Director, B. L. Harbert International David Warman, Willis Construction Practice.

12

Master Policy with DIC/DIL(ACE)

Master Policy with DIC/DIL(ACE)

Typical International Program Structures—Controlled Master Program (CMP)A single insurer issues a Master Policy in the home country (e.g., U.S.) which acts as Excess/Difference In Conditions over the policies issued locally by that same carrier and primary in the absence of local insurances. The local policy will be issued following local laws/regulations known as Good Local Standards. The Master Policy will provide Excess/DIC/DIL coverage bringing the entire program to U.S. standards.

Local Territory (United Kingdom)Local Territory

(United Kingdom)Local Territory

(France)Local Territory

(France)Local Territory

(Mexico)Local Territory

(Mexico)

ACEACEACEACEACEACE

Page 13: Risk Considerations When Working Globally Frank Wampol, Corporate Safety Director, B. L. Harbert International David Warman, Willis Construction Practice.

13

Current PracticeMost global companies today – from the middle market on up—have some version of a controlled master program for both Property and General/Products Liability inclusive of FVWC , Excess EL and AL.

Almost the “default” program structure: Cost Leverage Compliance Coverage

But not ideal in all respects.

Page 14: Risk Considerations When Working Globally Frank Wampol, Corporate Safety Director, B. L. Harbert International David Warman, Willis Construction Practice.

14

Top International InsurersConsiderations: Licenses/admitted network Pricing Policy Form Capacity Service timeliness, accuracy,

flexibility Loss Control Claims Handling Reporting Premium tax payment Technology

U.S. Headquartered: Chartis Chubb CNA FM Global Liberty Mutual Travelers Sentry Torus AWAC Navigators

HeadquarteredOutside U.S.: ACE Allianz AXA Generali Lloyds Mapfre Mitsui Sumitomo Tokio Marine XL Global Zurich

Page 15: Risk Considerations When Working Globally Frank Wampol, Corporate Safety Director, B. L. Harbert International David Warman, Willis Construction Practice.

15

Emerging Topics & Hot Countries Program Structure Options – CMP vs. Project Specific (Brazil, India,

China) vs. Regional Approach (LATAM, APAC, EU) Americanization of liability – products, pollution, D&O, fidelity, class actions Regulatory pressures and changes – international compliance, tax, good

corporate citizen model Economic challenges – issues with LOCs, surety, trade credit, financials, Globalization of information/Social Media – Reputational risks Inconsistency of social programs structures: uncertain borders, changing

workforce, global benefits worldwide Construction Defect, Water Intrusion, Mold, Asbestos, Lead, Chinese

Drywall, Acoustical, Trusted external vendors/contractors Sustainability/Green and environmental insurance Canada, Brazil, India, China, Mexico, Mideast, S. America

Page 16: Risk Considerations When Working Globally Frank Wampol, Corporate Safety Director, B. L. Harbert International David Warman, Willis Construction Practice.

16

Best Practices Respect local culture and languages Disparity in labor forces and talent by country Be creative in finding solutions Flexibility, coordination and over communication can go a long way Plan for the unthinkable – war, evacuation, terrorism are very

common in certain parts of the world A safe worksite has a different meaning in various countries Be prepared for delays Manage the site as a builder not a contractor – be accountable Empower the local project management to be creative and have

great flexibility  Thinking outside the box must be the norm…

Page 17: Risk Considerations When Working Globally Frank Wampol, Corporate Safety Director, B. L. Harbert International David Warman, Willis Construction Practice.

17

Best Practices

Page 18: Risk Considerations When Working Globally Frank Wampol, Corporate Safety Director, B. L. Harbert International David Warman, Willis Construction Practice.

18

Best Practices Non-admitted requirements – U.S. carriers may not be able to adjust

a claim, issue a certificate or provide loss control if you do not purchase a local policy in the country. Tax implications in case a claim is paid to U.S. parent instead.

Cash before cover countries – if premium is not paid before effective date, no policy, no coverage for claims – Japan, Mexico, China and others.

Remember that Europe still has a largely unionized work force. Be aware of OFAC regulations for U.S. firms. Obtain your partner’s loss history to gauge the quality of their work &

staff.

Page 19: Risk Considerations When Working Globally Frank Wampol, Corporate Safety Director, B. L. Harbert International David Warman, Willis Construction Practice.

19

Best Practices Foreign policies in many countries have tacit renewal provisions – need 2-4

months before expiration to cancel or LTA – multiyear agreements (5+ years) where the commission is fully earned at inception and often premium is too

Several countries impose a 10 year period for construction defects – Decennial liability policy is common in Spain, France, other Napoleonic code countries, Abu Dhabi and spreading to other countries

Use of independent contractors or other non employees in the construction industry can lead to claims against the GL (for lack of safe equipment, working premises, etc.) or DBA policy of the GC if the independent contractors do not purchase their own wc/el insurance

Review the JV agreement for who is responsible for risk of loss by line – if this is not clear, insurance policy may not respond – in China leases are often silent on who bears the risk for the property insurance/building

European insurance buyers prefer lower deductibles and higher limits than U.S. buyers, Chinese firms purchase lower limits and less insurance than U.S., when working with your foreign partner, discuss who is in charge of insurance

Page 20: Risk Considerations When Working Globally Frank Wampol, Corporate Safety Director, B. L. Harbert International David Warman, Willis Construction Practice.

20

Willis and Construction Number one business sector for Willis and therefore a commitment

to provide a truly global response Over 750 construction specialists and over in 100 Global

Construction Services (GCS) Over USD 3 billion of premium handled annually 12,000 construction clients Largest PPP Practice of any broker – over 60 specialists globally Broker to 6 of the top 10 world’s largest construction groups Specialised claims consultancy operations located within GCS The only broker with North American and Global (ex-NA)

Construction Practices Over 98 dedicated construction safety personnel (28 in North

America)

Page 21: Risk Considerations When Working Globally Frank Wampol, Corporate Safety Director, B. L. Harbert International David Warman, Willis Construction Practice.

21

Willis International Network

Key Facts• 120 Countries• Ownership 70%- 41 correspondents • Contractual agreement that network will comply with our standard network rules and operating procedures. We can control and manage the services provided by our network brokers. • The network is managed by a global executive committee• Willis OnLine – Policy Summaries & Country Data• Dedicated Network Teams In Each Country• Detailed Client Survey• Exposure collection and certificate requests online

Page 22: Risk Considerations When Working Globally Frank Wampol, Corporate Safety Director, B. L. Harbert International David Warman, Willis Construction Practice.

22

Global Construction Services (GCS) & GCPG– Industry Leaders Over 100 specialists and growing worldwide!

Global marketing and a lead supplier to many of the major worldwide insurers and reinsurers

Specialist practice groups in Power, Utilities, Oil, Gas and Infrastructure

Leaders in Master Construction Programmes (for Contractors and Owners) whether single territory, regional and global

Research and Development operations delivering cutting edge material and superior RFP response capabilities

Pioneers of a state of the art claims protocol – creating new standards to settling claims

PFI / PPP industry leaders – over 500 concessions worked on

Specialist claims consultancy – helping Willis clients negotiate better settlements

Page 23: Risk Considerations When Working Globally Frank Wampol, Corporate Safety Director, B. L. Harbert International David Warman, Willis Construction Practice.

23

International Projects: Key Risks and Issues Driving a risk analysis strategy alongside services and solutions

• Force Majeure: Preferred definitions in the contract• OCIP v CCIP: Contractors resisting more often • Increasing Project Costs: Avoid “value” in the sum insured • Supply Chain Management: Consistent quality controls

throughout the supply• Cost Overruns: Can liquidated damages really mitigate?• Claims Settlement: Still taking far too long. A Claims Protocol

needed! • Reputational Risk: More important than ever • Extremely Low Margins: Making all contractors nervous • Concession Contracts: (PPP etc.) seamless cover and

products are the way forward • Natural Catastrophes: Still testing capacity and cover • Project Finance: No less demanding on contract structure • Global or regional programmes: (for both Owner and Contractor)

straitening the curve • No sign of market hardening despite claims mounting up

Page 24: Risk Considerations When Working Globally Frank Wampol, Corporate Safety Director, B. L. Harbert International David Warman, Willis Construction Practice.

24

Examples of Recent GCPG Successes Lukoil Russia Global Master Programme – USD 16 billion

Qatar Rail Consultancy – USD 30 billion

Caspian Pipeline, Kazakhstan to Russia – USD 4 billion

Abu Dhabi Airport, UAE – USD 5 billion

Asia Pacific LNG, Australia – USD 7 billion

Bicentenario Pipeline, Colombia – USD 3 billion

Antucoya Mine, Chile – USD 1.5 billion

Jurau Hydro Electric Project Consultancy, Brazil – USD 8 billion

Page 25: Risk Considerations When Working Globally Frank Wampol, Corporate Safety Director, B. L. Harbert International David Warman, Willis Construction Practice.

25

Appendix—Glossary Admitted – Issued in the local country by an authorized insurer in

that country AD&D- accidental death and dismemberment BI – Business interruption BI – Bodily injury CMP – “Controlled Master Program” Master policy issued in the U.S.

with corresponding local coverages issued by the same insurer CAR – Contractors All Risks (can sometimes include liability) Compulsory - Insurance required by law on an admitted basis.

Usually third-party risks but can be property in certain instances DBA – Defense Based Act DIC/DIL – Difference in Conditions and Difference in Limits –

Provides broad coverage and higher limits in the event local coverage is not sufficient

Euro Policy – See FOS

Page 26: Risk Considerations When Working Globally Frank Wampol, Corporate Safety Director, B. L. Harbert International David Warman, Willis Construction Practice.

26

Appendix—Glossary Fronting – a primary insurer acts as the insurer of record by issuing

a policy, but then passes the entire risk to a reinsurer in exchange for a commission. Often, the fronting insurer is licensed to do business in a state or country where the risk is located, but the reinsurer is not.

FOS – Freedom of Service contracts issued in Europe to serve EU countries

FVWC – Foreign Voluntary Workers Compensation Global – One policy issued in the U.S. to cover exposures

throughout the world IRB – The government-controlled reinsurance company that has

held a monopoly in Brazil for decades (no showing signs of losing it’s grip on the local insurance market)

Page 27: Risk Considerations When Working Globally Frank Wampol, Corporate Safety Director, B. L. Harbert International David Warman, Willis Construction Practice.

27

Appendix—Glossary IPT – Insurance Premium Tax IVA – Value added tax (in Spanish-speaking countries normally) Local – the country outside the U.S. where the exposures exist Non-admitted – Issued outside the local country by an authorized or

unauthorized insurer of that country RAQ – Risk analysis questionnaire Tacit Renewal – Policy is automatically renewed by the incumbent

carrier unless the required (30/90/180 days) notice is sent by the insured

Tariff – A system of set rate regulations enforced by the local insurance industry. (prevalent in Japan/Korea/Brazil as well as other countries)