    Risk Assessment &

    Management

    Health & Safety Management for Quarries

    Topic Five

  • 8/9/2019 Risk Assessment Work Place

    2/54

     

    Objectives of this Section

    • Introduce the concept of risk assessment andrisk management and its role within UK health

    and safety legislation.

    •To define the principle components of riskmanagement.

    • To outline advanced risk assessment

    methodologies for use in QRAs.

    • To outline a practical risk assessmentprocess.

  • 8/9/2019 Risk Assessment Work Place

    3/54

     

    Principals of Risk Management

    Risk management can !e defined as"

    The eradication or minimisation of the adverseaffects of risks to which an organisation is

    exposed.

  • 8/9/2019 Risk Assessment Work Place

    4/54

     

    Stages in Risk Management

    • Identifying the ha#ards.

    • $valuating the associated risks.

    • %ontrolling the risks.

  • 8/9/2019 Risk Assessment Work Place

    5/54

     

     Activity%haracterisation

    &a#ard Identification

    Risk $stimation

     

    Implementation

    Monitoring

    Audit or Review

    'ption Analysis

    (ecision )aking

     

    RI*K )A+A,$)$+T

    RI*K A**$**)$+T

    RI*K R$(U%TI'+

  • 8/9/2019 Risk Assessment Work Place

    6/54

     

    Regulation -/0 of the 1)anagement of &ealthand *afety at 2ork Regulations /334 states"5

    • ‘very mployer shall make a suita!le and efficientassessment of"#

    a$ The risks to the health and safety of his employees to

    which they are exposed whilst they are at work.!$ The risks to the health and safety of persons not in his

    employment arising out of or in connection with the conduct !yhim or his undertaking%

    • or the purpose of identifying the measures he needs

    to take to comply with the re'uirements and prohi!itions imposed on him !y or under the relevantstatutory provisions.( 

  • 8/9/2019 Risk Assessment Work Place

    7/54

     

    Risk assessment can !e a

     1very straightforward process !ased on

     )udgement re'uiring no specialist skills orcomplicated techni'ues.

    This approach is commonly known as'alitative or s'bjective risk assessment(

  • 8/9/2019 Risk Assessment Work Place

    8/54

     

    Major )a*ar+s

    • )a6or ha#ards associated with comple7chemical or nuclear plants8 may 1warrant the

    need of such techni'ues as Quantitative *isk

     +ssessment .

    • In Quantitative Risk Assessment ,-RA. a

    numerical estimate is made of the pro!a!ility

    that a defined harm will result from the

    occurrence of a particular event.

  • 8/9/2019 Risk Assessment Work Place

    9/54

     

    The Risk Management Process

    )a*ar+ I+entification

    Hazard : 

    The potential to cause harm. Harm including ill

    health and in)ury, damage to property, plant,

     products or the environment, production losses

    or increased lia!ilities.

  • 8/9/2019 Risk Assessment Work Place

    10/54

     

    )a*ar+ I+entification

    • Comparative Methods. e.g. checklists andaudits.

    • Fundamental Methods" e.g. (eviation Analysis8 &a#ard and 'pera!ility *tudies8$nergy Analysis8 9ailure )odes : $ffects

     Analysis.

    • Failure Logic " e.g. 9ault Trees8 $vent Trees :%ause5 %onse;uence diagrams

  • 8/9/2019 Risk Assessment Work Place

    11/54

     

    Assessing the Risks

    Risk: 

    The likelihood that a specified undesired

    event will occur due to the realisation of aha-ard !y, or during work activities or !ythe products and services created !ywork activities.

  • 8/9/2019 Risk Assessment Work Place

    12/54

     

    Assessing the Risks 

    Quantitative risk assessment 

    • %ommonly used in the high technology

    industries

    • QRA tends to deal with the avoidance of

    low pro!a!ility events with serious

    conse;uences to the plant and the

    surrounding environment. 

  • 8/9/2019 Risk Assessment Work Place

    13/54

     

    Assessing the Risks

     Su!)ective risk assessment 

    •Qualitative risk assessment involves making a formal 6udgement on the conse;uence and pro!a!ility using"

    *isk Severity x /ikelihood 

  • 8/9/2019 Risk Assessment Work Place

    14/54

     

    Assessing the Risks

    $7ample"The likely effect of a ha#ard may for e7ample !e rated"

    /( Major 

    (eath or ma6or in6ury or illness causing long term disa!ility

     

    0( Serio's

    In6uries or illness causing short5term disa!ility

     1( Slight

     All other in6uries or illnesses

  • 8/9/2019 Risk Assessment Work Place

    15/54

     

    Assessing the Risks

    The likelihood of harm may !e rated

     

    /( )igh

    2here it is certain that harm will occur 

     

    0( Me+i'm

    2here harm will often occur 

     1( !o2

    2here harm will seldom occur 

  • 8/9/2019 Risk Assessment Work Place

    16/54

     

    Assessing the Risks

    Risk

    <

    *everity of &arm

    7=ikelihood of occurrence

    • This simple computation gives a risk value of !etween / and 3

    ena!ling a rough and ready comparison of risks.• In this case the lower the num!er8 the greater the risk8 and soprioritises the ha#ards so that control action can !e targeted athigher risks.

  • 8/9/2019 Risk Assessment Work Place

    17/54

     

    3ontrolling Risk

    • Risk Avoi+ance > This strategy involves aconscious decision on the part of the organisation to

    avoid completely a particular risk !y discontinuing the

    operation producing the risk e.g. the replacing a

    ha#ardous chemical !y one with less or no risk

    potential.

    • Risk Retention > The risk is retained in theorganisation where any conse;uent loss is financed

    !y the company. There are two aspects to consider

    here8 risk retention with knowledge and risk retention

    without knowledge.

  • 8/9/2019 Risk Assessment Work Place

    18/54

     

    3ontrolling Risk

    • Risk Transfer  > This refers to the legalassignment of the costs of certain potential losses

    from one party to another. The most common way is!y insurance.

    • Risk Re+'ction > &ere the risks aresystematically reduced through control measures8

    according to the hierarchy of risk control descri!ed inearlier sections.

  • 8/9/2019 Risk Assessment Work Place

    19/54

     

    A!ARP

    • =egislation re;uires employers to reducerisks to a level that is as low as is reasona!lypractica!le sometimes a!!reviated as

     A=AR?0.

    • To carry out a duty so far as is reasona!ly practica!le means that the degree of risk in aparticular activity or environment can !e!alanced against the time8 trou!le8 cost andphysical difficulty of taking measures to avoidthe risk.

  • 8/9/2019 Risk Assessment Work Place

    20/54

     

    T4pes of Risk Assessment

    0ithin 1ndustry, three types of riskassessment can !e distinguished"

    •  Assessments of large scale comple7 ha#ard sites8

    such as those found in the process and nuclear

    industries. These re;uire QRAs• ,eneral assessments of the complete range of

    workplace risks > as re;uired under the )anagement

    of &ealth : *afety at 2ork Regulations8 /333. 

    • Risk Assessments re;uired under specific legislation > for e7ample for ha#ardous su!stances %'*&&

    Regulations8 /33@08 )anual &andling )anual

    &andling 'perations Regulations8 /3340.

  • 8/9/2019 Risk Assessment Work Place

    21/54

  • 8/9/2019 Risk Assessment Work Place

    22/54

     

    -'antitative Risk Assessment ,/.

    • In+ivi+'al Risk is defined as 1the fre;uency atwhich an individual may !e e7pected to sustain a

    given level of harm from the realisation of specificha#ards. 

    • Societal Risk

  • 8/9/2019 Risk Assessment Work Place

    23/54

     

    Usually e7pressed as risk contours"

     

    %&='RI+$

    I+*TA==ATI'+ 

    /5BCyear

    risk contour  

    .-D/5BCyearrisk contour  

    *ite for

    proposed

    developmen

     

    EI==A,$ 

    /5FCyear

    risk contour  

    / km 

  • 8/9/2019 Risk Assessment Work Place

    24/54

     

    -'antitative Risk Assessment5 

    Acceptance 3riteria

    • The &*$ state that 1!roadly, a risk of death of 2 in

    2333 42x23#5

     $ per annum is a!out the most that isordinarily accepted under modern conditions for

    workers in the 67 and it seems to !e the dividing line

    !etween what is tolera!le and what is intolera!le( . 

  • 8/9/2019 Risk Assessment Work Place

    25/54

     

    Fail're Mo+es an+ #ffect Anal4sis

    The system is divided into su! systems that

    can !e handled effectively.

    1t involves"• Identification of the component and parent system.

    • 9ailure mode and cause of failure.

    • $ffect of the failure on the su!system or system.

    • )ethod of detection and diagnostic aids availa!le.

  • 8/9/2019 Risk Assessment Work Place

    26/54

     

    Fail're Mo+es an+ #ffect Anal4sis

     A typical format"

    %omponent 9unction 9ailure

    )ode

    9ailure

    Rate

    9ailure

    $ffect

    %riticality (etection

    )ethod

    ?reventative

    )easures

  • 8/9/2019 Risk Assessment Work Place

    27/54

     

    Fail're Mo+es an+ #ffect Anal4sis

    • 9or each components functions8 every conceiva!lemode of failure is identified and recorded.

    • It is also common to rate the failure rate for each

    failure mode identified.• The potential conse;uences for each failure must !e

    identified along with its effects on other e;uipment8components within the rest of the system.

    • It is then necessary to record preventative measuresthat are in place or may !e introduced to correct thefailure8 reduce its failure rate or provide someade;uate form of detection.

  • 8/9/2019 Risk Assessment Work Place

    28/54

     

    )a*ar+ & Operabilit4 St'+ies

    • &a#ard and 'pera!ility *tudies&AG'?0 have !een used for manyyears as a formal means for the reviewof chemical process designs.

    •  A &AG'? study is a systematic searchfor ha#ards which are defined asdeviations within these parameters thatmay have dangerous conse;uences.

    • In the process industry8 these deviations

    concern process parameters such asflow8 temperature8 pressure etc.

  • 8/9/2019 Risk Assessment Work Place

    29/54

  • 8/9/2019 Risk Assessment Work Place

    30/54

     

    The process is as follows"

    The system is divided into suita!le parts or su!5systems8which are then analysed one at a time.

    9or each su!5system each parameter flow8 temperature8pressure8 volume8 viscosity etc.0 that has an influence on it8is noted.

    ,uidewords are applied to each parameter in eachsu!system. The intention is to prompt creative discussion ofdeviations and possi!le conse;uences

    9or each significant deviation8 possi!le causes are

    identified. 

    )a*ar+ & Operabilit4 St'+ies

  • 8/9/2019 Risk Assessment Work Place

    31/54

     

    )a*ar+ & Operabilit4 St'+ies

    +' or +'T +o part of the design intent occurs8 such as no flow in a

    pipeline due to !lockage.

    )'R$ or =$** A ;uantitative increase or decrease of some parameter8 such

    as flow8 temperature etc.

     A* 2$== A* All the design intentions are fulfilled and something happens

    in addition

    ?ART '9 'nly part of the design intention is fulfilled

    R$E$R*$ The logical opposite of the design intention occurs

    ,uideword (efinitions

    'T&$R T&A+ *omething completely different than attended occurs

  • 8/9/2019 Risk Assessment Work Place

    32/54

     

    )a*ar+ & Operabilit4 St'+ies

    #6ample• %onsider the simple process diagram !elow. It

    represents a plant where su!stances A and H react

    with each other to form a new su!stance %. If there is

    more H than A there may !e an e7plosion.

     A

    H

    E/E4

    E-

    E

    EF

    A 7 8 9 #6plosion %

    $7ample from &arms Ringdahl = /33F08 *afety Analysis" ?rincipals and ?ractice in

    'ccupational *afety8 $lsevier Applied *cience. 

  • 8/9/2019 Risk Assessment Work Place

    33/54

     

    The &AG'? sheet for the section of the plant from A to % will !e as

    follows"

    ,uide 2ord (eviation ?ossi!le %auses %onse;uences ?roposed

    )easures

    +'8 +'T +o A Tank containing A is empty.

    E/ or E4 closed.

    ?ump does not work.

    ?ipe !roken

    +ot enough A <

    $7plosion

    Indicator for low

    level.

    )onitoring of flow

    )'R$ Too much A ?ump too high capacity

    'pening of E/ or E4 is too

    large.

    % contaminated !y

     A. Tank overfilled.

    Indicator for high

    level.

    )onitoring of flow

    =$** +ot enough A

    E/8E4 or pipe are partially!locked. ?ump gives low flow or

    runs for too short a time.

    +ot enough A <$7plosion

    *ee a!ove

     A* 2$== A* 'ther

    su!stance

    E- open > air sucked in +ot enough A <

    $7plosion

    9low monitoring

    !ased on weight

    R$E$R*$ =i;uid

    pumped

    !ackwards

    2rong connector to motor +ot enough A <

    $7plosion

     A is contaminated

    9low monitoring

    'T&$R

    T&A+

     A !oils in

    pump

    Temperature too high +ot enough A <

    $7plosion

    Temperature and

    flow0 monitoring.

    $7ample from &arms Ringdahl = /33F08 *afety Analysis" ?rincipals and ?ractice in

    'ccupational *afety8 $lsevier Applied *cience. 

  • 8/9/2019 Risk Assessment Work Place

    34/54

  • 8/9/2019 Risk Assessment Work Place

    35/54

  • 8/9/2019 Risk Assessment Work Place

    36/54

  • 8/9/2019 Risk Assessment Work Place

    37/54

     

    Fa'lt Tree Anal4sis

    #6ample• %onsider the simple circuit diagram shown !elow"

    J

    5

    =A)?

    *2IT%&9U*$

    HATT$R

    ?'2$RU+IT

    $7ample from &arms Ringdahl = /33F08 *afety Analysis" ?rincipals and ?ractice in

    'ccupational *afety8 $lsevier Applied *cience. 

  • 8/9/2019 Risk Assessment Work Place

    38/54

     

    Fa'lt Tree Anal4sis

    • The corresponding fault tree for the a!ove circuit8 with the top

    event or ha#ard0 !eing the lamp not working is as follows"

    =amp does notlight

    +o currentthrough the lamp

    +o power supplyto the lamp

    Hroken circuit+o power feed

    9aulty=amp

    +o ?ower from !attery

    +o ?ower from unit

    Hroken%ircuit

    (efectiveswitch

    (efectivefuse

    $7ample from &arms Ringdahl = /33F08 *afety Analysis" ?rincipals and ?ractice in

    'ccupational *afety8 $lsevier Applied *cience. 

    Practical Risk Assessment

  • 8/9/2019 Risk Assessment Work Place

    39/54

     

    Practical Risk Assessment

    ,from 8S::;;.

    %lassify work activities

    Identify ha#ards

    (etermine risk

    (ecide if risk is tolera!le

    ?repare risk control action plan

    if necessary0

    Review ade;uacy of action plan

  • 8/9/2019 Risk Assessment Work Place

    40/54

  • 8/9/2019 Risk Assessment Work Place

    41/54

     

    I+entif4 )a*ar+s

    Broad categories of hazard To help with the process of identifying

    ha#ards it is useful to categorise ha#ards in

    different ways8 for e7ample !y topic8 e.g."

    • )echanical.

    • $lectrical.

    • Radiation.

    • *u!stances.• 9ire and e7plosion.

    H*@@"/33B

  • 8/9/2019 Risk Assessment Work Place

    42/54

     

    Hazards prompt-list 

    8uring work activities could the followingha-ards exist9

    • Slips:falls on the level.

    • alls of persons form heights.

    • alls of tools, materials, etc., from heights.

    • 1nade'uate headroom.

    • Ha-ards associated with manual lifting:handling oftools, materials, etc..

    • Ha-ards from plant and machinery associated withassem!ly, commissioning, operation, maintenance,modification, repair and dismantling.

    H*@@"/33B

  • 8/9/2019 Risk Assessment Work Place

    43/54

     

    Hazards prompt-list 

    • ;ehicle ha-ards, covering !oth site transport, and travel!y road.

    • ire and explosion.

    • ;iolence to staff.

    • Su!stances that may !e inhaled.• Su!stances or agents that may damage the eye.

    • Su!stances that may cause harm !y coming intocontact with, or !eing a!sor!ed through, the skin.

    • Su!stances that may cause harm !y !eing ingested4i.e., entering the !ody via the mouth$.

    • Harmful energies 4e.g., electricity, radiation, noise,vi!ration$.

    H*@@"/33B

  • 8/9/2019 Risk Assessment Work Place

    44/54

     

    Hazards prompt-list 

    • 0ork#related upper lim! disorders resulting from

    fre'uently repeated tasks.

    • 1nade'uate thermal environment, e.g. too hot.

    • /ighting levels.

    • Slippery, uneven ground:surfaces.

    • 1nade'uate guard rails or hand rails on stairs.

  • 8/9/2019 Risk Assessment Work Place

    45/54

     

    =etermine risk

    The risk from the ha#ard should !e

    determined !y estimating the potential

    severity of harm and the likelihood that harmwill occur.

  • 8/9/2019 Risk Assessment Work Place

    46/54

     

    Severit of harm

    Information o!tained a!out work activities is avital input to risk assessment. 2hen seeking

    to esta!lish potential severity of harm8 the

    following should also !e considered"

    • ?arts0 of the !ody likely to !e affectedM• +ature of the harm8 ranging from slightly to e7tremely

    harmful"

     > /0  *lightly harmful8 e.g." 

    • *uperficial in6uriesM minor cuts and !ruisesM eye irritationfrom dust.

    • +uisance and irritation e.g. headaches0M ill5health leading

    to temporary discomfort.

    H*@@"/33B

  • 8/9/2019 Risk Assessment Work Place

    47/54

  • 8/9/2019 Risk Assessment Work Place

    48/54

     

    Likelihood of harm 

    2hen seeking to esta!lish likelihood of harmthe ade;uacy of control measures already

    implemented and complied with needs to !e

    considered.

    Issues considered"•+um!er of personnel e7posed.

    •9re;uency and duration of e7posure to the ha#ard.

    •9ailure of services e.g. electricity and water.

    •9ailure of plant and machinery components and safety devices.•$7posure to the elements.

    H*@@"/33B

  • 8/9/2019 Risk Assessment Work Place

    49/54

  • 8/9/2019 Risk Assessment Work Place

    50/54

     

    =eci+e if risk is tolerable

    'ne simple method for estimating risk levels and for

    deciding whether risks are tolera!le. Risks are

    classified according to their estimated likelihood and

    potential severity of harm.

    Slightly harmful

     

    Harmful

     

    Extremely

    harmful

     

    Highly unlikely

     

    TRIVIAL RIS 

     

    T!LERA"LE

    RIS 

     

    #!DERATE

    RIS 

     

    $nlikely

     

    T!LERA"LE

    RIS 

     

    #!DERATE

    RIS 

     

    S$"STA%TIAL

    RIS 

     

    Likely

     

    #!DERATE

    RIS 

     

    S$"STA%TIAL

    RIS 

     

    I%T!LERA"LE

    RIS 

    H*@@"/33B

  • 8/9/2019 Risk Assessment Work Place

    51/54

     A simple risk5!ased control plan.

  • 8/9/2019 Risk Assessment Work Place

    52/54

     

    RISK !#$#! A3TIO A= TIM#S3A!#

    TRI$IA! +o action is re;uired and no documentary records need to !e kept.

    TO!#RA8!# +o additional controls are re;uired. %onsideration may !e given to

    a more cost5effective solution or improvement that imposes no

    additional cost !urden. )onitoring is re;uired to ensure that the

    controls are maintained.

    MO=#RAT# $fforts should !e made to reduce the risk8 !ut the costs of

    prevention should ! e carefully measured and limited. Risk

    reduction measures should !e implemented within a defined time

    period.2here the moderate risk is associated with e7tremely harmful

    conse;uences8 further assessment may !e necessary to esta!lish

    more precisely the likelihood of harm as a !asis for determining the

    need for improved control measures.

    S%8STATIA! 2ork should not !e started until the risk has !een reduced.

    %onsidera!le resources may have to !e allocated to reduce the risk.

    2here the risk involves work in progress8 urgent action should !e

    taken.

    ITO!#RA8!# 2ork should not !e started or continued until the risk has !een

    reduced. If it is not possi!le to reduce risk even with unlimited

    resources8 work has to remain prohi!ited.

    H*@@"/33B

  • 8/9/2019 Risk Assessment Work Place

    53/54

     

    Prepare risk control action plan

     The action plan should !e reviewed !efore

    implementation8 typically !y asking"

    • 2ill the revised controls lead to tolera!le risk levelsN

    •  Are new ha#ards createdN• &as the most cost5effective solution !een chosenN

    • 2hat do people affected think a!out the need for8 and

    practicality of8 the revised preventive measuresN

    • 2ill the revised controls !e used in practice8 and notignored in the face of8 for e7ample8 pressures to get

    the 6o! doneN

    H*@@"/33B

  • 8/9/2019 Risk Assessment Work Place

    54/54

    Changing Conditions and Revising 

    Risk assessment should !e seen as a

    continuing process. Thus8 the ade;uacy of

    control measures should !e su!6ect tocontinual review and revised if necessary. 

    H*@@"/33B