Risk assessment 2016 (1) i mm ab (2)
-
Upload
archiebakermedia -
Category
Art & Photos
-
view
87 -
download
0
Transcript of Risk assessment 2016 (1) i mm ab (2)
Group No 36 Film Title Working Title
Teacher Liz Davies Filming Date 23/ 11/ 16
Team membersList those involved
Izzy, Molly Meese, Archie Baker
LocationsWhere are you planning to film
Castlefield, Lab
Hazard Who is at risk Risk Level Control measures
Outline of risk assessmentSummary of what is proposed in terms of sequences and set ups.
List who might be harmed from this activitye.g. staff, student, public, etc.
For each hazard, decide level of riski.e. if you were to do the activity without your controls
List the measures you will be taking to minimise the risk identifiede.g. moving trip obstacles, allocate responsibility for equipment, film away from traffic, have bottled water etc.
Syringe sharp end Student Medium Allocate responsibility for it, keep it safe.
Lighting bright/ hot Student Low Have bottled water
Fake wounds alarming Public Low Film away from busy areas
Lighting obstruction Student Low Ensure correct setup to prevent falling.
Road cars student Low look before crossing road
Hazard Student Low We will be filming in a lab so there are strict rules on what your allowed to do. We will be careful and follow rules in the lab
Filming Risk Assessment