Transcript of RISK ASSES-106-Erection of Steel Structure Buildin
Location: Terga Date of Assessment:
Assessor(s): FRIDI.ALI System/Activity:
Pro
bab
ili
ty&
Fre
qu
enc
y
Definite 5 5 10 15 20High 4 4 8 12 16
Moderate 3 3 6 9 12Low 2 2 4 6 8
Negligible 1 1 2 3 41 2 3 4
Minor Serious Major Catastrophic
Severity
Key to PrioritiesMedium Priority (5
days)High Priority (2-3 days) Immediate
INTRODUCTION
The table below provides a simplified representation of the methodology used and the processesManagement) to be undertaken by OCIA and all Subcontractors in order to initi
IDENTIFICATION - Pre planning, Methodstatement , Job safety analysis.
ASSESSMENTMitigation measure, Residual risk
Identify activities , Identify hazards Assess Impacts, Analyze Risk ,Establish Mitigation Measures.
RISK ASSESSMENT FORM
Date of Assessment: 21-07-2010 Assessment No:
System/Activity: Erection of Steel Structure Building (B12)1.2.3
The table below provides a simplified representation of the methodology used and the processes involved in this Hazard Identification & Risk Analysis Procedure (RiskManagement) to be undertaken by OCIA and all Subcontractors in order to initiate, act on, review and effectively manage project-related risks
ASSESSMENT – Impact, Risk factor,Mitigation measure, Residual risk
IMPLEMENTATION &COMMUNICATION
REVIEW & UP DATE
Assess Impacts, Analyze Risk ,Establish Mitigation Measures.
Communication & Training Audit, Inspection & Up dating of Log.
Page 2 sur 5
106
1.2.3
involved in this Hazard Identification & Risk Analysis Procedure (Riskrelated risks throughout the Construction Phase.
REVIEW & UP DATE
Audit, Inspection & Up dating of Log.
Tasks Hazards Identified (includethe exposed groups)
Probability
1 - 5
Transferequipment
Transfer device collidewith other things;
Oil leakage
4
Locate the crane Hitting injury 4
Transport Traffic risk Collision with person Collision device
3
Movement oftraffic Slip/trip/all
3
RISK ASSESSMENT FORM
Severity
1 - 4
Risk
1 - 20
Control Measures to be Implemented Probability
1 - 5
3 12 Chose a qualified driver before
work
Check the calibration of all tools
Make sure the transport device in
good condition
1
3 12 Solid the ground
Reinforce the pads beneath the
outriggers
Check the around circumstance
before working
1
3 9 The trucks must respect:
The limited speed in the site
The circulation signs
The circulation plan (updated)
2
3 9 All hose/ropes/cables in use shall
be secured to the side of walkways
and handrails
All unnecessary materials and
equipment to be immediately
removed from site
All exits and walkways to be kept
clear for use of personnel
High standard of housekeeping to
be maintained at all times
2
Page 3 sur 5
Probability Severity
1 - 4
Risk
1 - 20
ResidualRisk
DateAction
Completed
2 2
2 2
3 6
2 4
Tasks Hazards Identified (include
the exposed groups)
Probability
1 - 5
Lifting Fall from height andhurt workers
Component fall down
Component collidewith other thingssurrounded
collision with person
collision betweenframe and scaffolding
collision between thecrane and equipments
falling materials
Poor visibility for thedriver
4
RISK ASSESSMENT FORM
Severity
1 - 4
Risk
1 - 20
Control Measures to be Implemented Probability
1 - 5
4 16 Lifting crane, forklift wires shouldbe regularly calibrated, safeworking loads are announced maxspeed at site is respected for allvehicle
It is not allowed to work underloads
Handling by qualified riggers wornthe related PPE and undersupervision
Qualified crane operator andqualified rigger to operate liftingwork
Crane in calibrated period Barricade the lifting area Proper lifting tools Make sure lifting wok operated in
good weather mark the area of operations of the
crane officer commanding the ship
maneuver through regulatoryactions to avoid accidents
Control of the safety catch hookthe slings
Ensure the crane on his dashboardthat the load weight does notexceed the maximum allowed
Ban the person be under asuspended load
defining the radius of the rotarycrane
prohibit the movement of people
around the handling
stop the lifting operation in strong
winds exceed the 50km /h
2
Page 4 sur 5
Probability Severity
1 - 4
Risk
1 - 20
ResidualRisk
Date ActionCompleted
3 6
Tasks Hazards Identified (include
the exposed groups)
Probability
1 - 5
Work at height
(Scaffolding and
Man basket)
falls from height
falling objects
4
Use tools Hand injuries crushed fingers smooth head against the
frame
3
Environmental Pollution the air:
Exhaust gas, The dust
Leaking oil or diesel
machines on soil
3
Assessor Print :
RISK ASSESSMENT FORM
Severity
1 - 4
Risk
1 - 20
Control Measures to be Implemented Probability
1 - 5
3 12 the scaffolding should be based ongraded soil with good foundation
protect a guard with a height of1.15 m
Protection of Persons with safetyharnesses
protect with an end-board 10 to 15cm high
prohibit work at height if the
weather affected the safety of
persons
2
3 9 ensure protection adequate PPE(gloves, helmet, goggles, harness
2
3 9 Checking the condition of
equipments before beginning the
work
ventilation Workstation
2
Sign: Date:
Page 5 sur 5
Probability Severity
1 - 4
Risk
1 - 20
ResidualRisk
DateAction
Completed
2 4
2 4
2 4