Risk analysis workshop
Dec 2009
![Page 2: Risk analysis workshop Dec 2009. 2 Objectives of the workshop: Impact Intervention Discuss the function of hazard and risk analysis in contingency planning.](https://reader036.fdocuments.us/reader036/viewer/2022082818/56649eef5503460f94bff15e/html5/thumbnails/2.jpg)
2
Objectives of the workshop:
Impact
Intervention
Discuss the function of hazard and risk analysis in contingency planning
Describe basic hazard and risk analysis concepts and tools
Identify risk and threats at country level
![Page 3: Risk analysis workshop Dec 2009. 2 Objectives of the workshop: Impact Intervention Discuss the function of hazard and risk analysis in contingency planning.](https://reader036.fdocuments.us/reader036/viewer/2022082818/56649eef5503460f94bff15e/html5/thumbnails/3.jpg)
3
Function of hazard and risk analysis:
Impact
Intervention
To understand the potential emergency situations that a country or region may face in the future – especially those where your organization assistance may be required (according to the impact and the mandate of your organization)
To prioritize hazards for contingency planning
![Page 4: Risk analysis workshop Dec 2009. 2 Objectives of the workshop: Impact Intervention Discuss the function of hazard and risk analysis in contingency planning.](https://reader036.fdocuments.us/reader036/viewer/2022082818/56649eef5503460f94bff15e/html5/thumbnails/4.jpg)
4
Hazard and Risk analysis
Impact
Intervention
Hazard analysis: Analysis of the possible threats or sources of exposure to injury, harm or loss. Each hazard is characterised by its location, intensity, frequency and probability
Risk analysis: Analysis of the probability of occurrence and the magnitude/gravity (intensity, area) of the consequences of hazards
The gravity of the event is mainly determined by the scale of the impact on households, populations or livelihoods, and by how much the event is overwhelming existing structures and mechanisms to deal with it.
![Page 5: Risk analysis workshop Dec 2009. 2 Objectives of the workshop: Impact Intervention Discuss the function of hazard and risk analysis in contingency planning.](https://reader036.fdocuments.us/reader036/viewer/2022082818/56649eef5503460f94bff15e/html5/thumbnails/5.jpg)
5
Risk analysis
Impact
Intervention
A risk is an event which might or might not occur resulting in harm or loss or danger. It is rated by likelihood and impact as shown:
Impact
Catastrophic
Medium
Moderate
Likelihood
Likely
Major
Almost Certain
RISK
------------------------
------------------------------
![Page 6: Risk analysis workshop Dec 2009. 2 Objectives of the workshop: Impact Intervention Discuss the function of hazard and risk analysis in contingency planning.](https://reader036.fdocuments.us/reader036/viewer/2022082818/56649eef5503460f94bff15e/html5/thumbnails/6.jpg)
6
Hazard and risk analysis process:
Impact
Intervention
Collection and analysis of information:
Maps Statistics (past hazards) Reports and studies about past crisis impact Lessons learnt Risk and hazard matrix Risk ranking Risk mapping Etc..
![Page 7: Risk analysis workshop Dec 2009. 2 Objectives of the workshop: Impact Intervention Discuss the function of hazard and risk analysis in contingency planning.](https://reader036.fdocuments.us/reader036/viewer/2022082818/56649eef5503460f94bff15e/html5/thumbnails/7.jpg)
7
The Funnel Analogy for Risk Ranking:
Impact
Intervention
Plan for a small number of key and representative contingencies and scenarios.
Rule of thumb: No more than 5
Contingencies must be filtered:
• Most probable?
• Biggest impact?
![Page 8: Risk analysis workshop Dec 2009. 2 Objectives of the workshop: Impact Intervention Discuss the function of hazard and risk analysis in contingency planning.](https://reader036.fdocuments.us/reader036/viewer/2022082818/56649eef5503460f94bff15e/html5/thumbnails/8.jpg)
8
Risk analysis process:
Impact
Intervention
How likely is the risk event to happen?
Measure the likelihood or probability with which the event will occur. Using the best information available, planners should try to reach a consensus on probability and then assign the scenario a “probability level”.
What would be the impact or consequences of that event occurring?
Using the best information available, planners should try to assess the potential impact or consequences of the scenario, and assign an “impact level”.
![Page 9: Risk analysis workshop Dec 2009. 2 Objectives of the workshop: Impact Intervention Discuss the function of hazard and risk analysis in contingency planning.](https://reader036.fdocuments.us/reader036/viewer/2022082818/56649eef5503460f94bff15e/html5/thumbnails/9.jpg)
9
Risk ranking matrix:
Impact
Intervention
![Page 10: Risk analysis workshop Dec 2009. 2 Objectives of the workshop: Impact Intervention Discuss the function of hazard and risk analysis in contingency planning.](https://reader036.fdocuments.us/reader036/viewer/2022082818/56649eef5503460f94bff15e/html5/thumbnails/10.jpg)
10
Risk ranking matrix
Impact
Intervention
Catastrophic Major MediumA B C
3 Almost Certain AAA BBB CCC
2 Likely AA BB CC
1 Moderate A B C
High RiskModerate Risk
Low Risk
IMPACT
PR
OB
AB
ILIT
Y Risk Point: HIGH
RISK
By combining probability and impact planners reach an agreement on the risk levels and prioritize among the full range of risks considered.
After having agreed on the Risk Point planners Build Scenarios and Develop Planning Assumptions.
Catastrophic Major MediumC
3 Almost Certain
2 Likely
1 Moderate
High RiskModerate Risk
Low Risk
IMPACT
PR
OB
AB
ILIT
Y
![Page 11: Risk analysis workshop Dec 2009. 2 Objectives of the workshop: Impact Intervention Discuss the function of hazard and risk analysis in contingency planning.](https://reader036.fdocuments.us/reader036/viewer/2022082818/56649eef5503460f94bff15e/html5/thumbnails/11.jpg)
11
Practical exercice
Impact
Intervention
Over the next 2 hours, each group will develop concise and clear hazard and risk analysis for the following area:
Mali