RIO TINTO FUEL INFRASTRUCTUREWEST ANGELAS & BROOKMAN FUEL HUBSPrimero Group is a West Australian based company focused on engineering, management and construction solutions for the mining, infrastructure, energy and oil & gas industries.• Project Management• Engineering Design• Fabrication and Construction• Turnkey Solutions
image courtesy of Primero Group
australia
PROJECT DETAILSClient
Rio Tinto
LocationPilbara, Australia
Commodity
Diesel
Project Value$70m+
Timeframe
Nov 2012 – Apr 2013
Solution ProvidedFuel Infrastructure
PROJECT RELATED SERVICES
Process DesignFuel Plant Detailed Design
Pipe Stress and Surge Analysis
Finite Element AnalysisSafety and Design
HAZOP StudiesProject Management
CONTACT [email protected]
08 6424 92703F, 661 Newcastle Street
Leederville WA 6007
THE PROJECTThe West Angelas and Brookman Fuel Hubs are located in the Pilbara region of Western Australia and are two important nodes in Rio Tinto Iron Ore’s fuel storage and distribution infrastructure.
With a strong background in Hydrocarbon facilities and Safety in Design, Primero Group was engaged to undertake the process and detailed design of the fuel infrastructure for both sites.
The solution consisted of rail tank car unloading, three 25m diameter fuel storage tanks, road tanker loading and all associatedpipework, structures and amenities.
Primero Group delivered the detailed design of civil, structural, mechanical and piping elements to meet the process design criteria and exceed Client and Statutory compliance requirements.
SOLUTIONWe used the Autodesk Plant Design Suite to develop the Process Schematics, model the vessels, model the Structure, model the Mechanical Equipment and model the Piping.
P&ID’s were used for the HAZOP Analysis, Plant models were feed directly into our FEA and Pipe Stress tools, Procurement data was extracted from the project database and the required Fabrication Documentation was produced directly within Plant Design Suite.
After reviewing several packages
Primero Group chose Plant 3D as our design
package. Not only was it quick, easy to learn and implement, it also allowed us to
customise the package to suit ours,
and our client’s needs.
The support and training provided by
Cadgroup also allowed us to address quickly and efficiently
any issues arising during the
implementation and life of the project.
Daniel Scudder Piping / Mechanical
DesignerPrimero Group
NEWS
image courtesy of Primero Group
image courtesy of Primero Group
Primero Group was announced as one of 10 finalists in the recent Business News Rising Star awards 2013. Being considered as a finalist and among WA’s top private businesses based on growth over the past 2 years was a great privilege for the Primero team.
Primero Group was awarded 3rd place in this years Startup Smart Awards, in Australia’s Top 50 Fastest Growing Business category.StartupSmart.com.au is Australia’s leading news and advice resource for start-ups, recognising the most innovative and fastest-growing new busi-nesses in Australia.