Ril - Idc - Case Study

2
Reference project - Reliance Datacenter Project Project background Location Industry Customer End user Total power available Year of installation At Vashi, Navi Mumbai, India Integrated Data Center(IDC) Reliance Industries Limited Reliance Industries - RCP 3.0 MVA (No Break) 2009 Reliance Industries demanded the highest possible level of security to achieve the maximum reliability and uptime for the mission critical servers and other crucial IT equipment to be hosted at its new Navi Mumbai facility . Reliance also required a Green solution that could deliver the desired level of power efficiency . The five story 2000 sqm datacenter built to accommodate the data halls is situated remotely , approximately 0.7 km from the critical power and cooling plant. The Navi Mumbai facility is also situated in an environmentally challenging location that experiences high temperatures, high humidity and heavy rainfall. The Diesel Rotary UPS (DRUPS) solution from Hitec Power Protection fully met the requirements of Reliance Industries as it provides a flexible and future-proof solution to accommodate the ever growing and expanding needs of India’ s largest company . It is important to mention that during the evaluation process Hitec demonstrated to Reliance that its equipment had been specifically developed to meet the needs of the Indian market and that it would operate reliably and efficiently to deliver secure power to the critical IT and cooling loads. By combining Hitec’ s efficient, economic and environmentally conscious principles with the excellent after-sales support from Hitec’ s Indian partner Hi-Rel, Reliance has chosen the most suitable and ef fective power solutions for this facility . Project requirements The main objective was to design a datacenter facility to be Tier IV compliant. A Tier IV solution is the most resilient approach possible from the uptime institute and it demands the incorporation of duplicate and physically separate operating systems to ensure complete fault tolerance and concurrent maintainability (99.995% data hall uptime). T o realize this Hitec installed two completely independent Medium Voltage Hitec diesel rotary UPS systems to a total resilience level of N+N. There is total system isolation up to the point of power delivery for 3 MVA of secure power . The stand alone fuel capacity of the system was required to be at least 72 hours. The project counted for many challenges one being the 30 meter high (chimney) exhaust system that would be needed for the individual DRUPS and connecting the vertical radiators to provide sufficient cooling air . UPS room after installation MV Switch panels and controls

description

CASE STUDY

Transcript of Ril - Idc - Case Study

Page 1: Ril - Idc - Case Study

Reference project - Reliance Datacenter

Project

Project background

Location

Industry

Customer

End user

Total power available

Year of installation

At Vashi, Navi Mumbai, India

Integrated Data Center(IDC)

Reliance Industries Limited

Reliance Industries - RCP

3.0 MVA (No Break)

2009

Reliance Industries demanded the highest possible level of security to achieve the maximum reliability and uptime forthe mission critical servers and other crucial IT equipment to be hosted at its new Navi Mumbai facility. Reliance alsorequired a Green solution that could deliver the desired level of power efficiency. The five story 2000 sqm datacenterbuilt to accommodate the data halls is situated remotely, approximately 0.7 km from the critical power and coolingplant. The Navi Mumbai facility is also situated in an environmentally challenging location that experiences hightemperatures, high humidity and heavy rainfall. The Diesel Rotary UPS (DRUPS) solution from Hitec PowerProtection fully met the requirements of Reliance Industries as it provides a flexible and future-proof solution toaccommodate the ever growing and expanding needs of India’s largest company. It is important to mention thatduring the evaluation process Hitec demonstrated to Reliance that its equipment had been specifically developed tomeet the needs of the Indian market and that it would operate reliably and efficiently to deliver secure power to thecritical IT and cooling loads. By combining Hitec’s efficient, economic and environmentally conscious principles withthe excellent after-sales support from Hitec’s Indian partner Hi-Rel, Reliance has chosen the most suitable andeffective power solutions for this facility.

Project requirementsThe main objective was to design a datacenter facility to be Tier IV compliant. A Tier IV solution is the most resilientapproach possible from the uptime institute and it demands the incorporation of duplicate and physically separateoperating systems to ensure complete fault tolerance and concurrent maintainability (99.995% data hall uptime). Torealize this Hitec installed two completely independent Medium Voltage Hitec diesel rotary UPS systems to a totalresilience level of N+N. There is total system isolation up to the point of power delivery for 3 MVA of secure power. Thestand alone fuel capacity of the system was required to be at least 72 hours. The project counted for many challengesone being the 30 meter high (chimney) exhaust system that would be needed for the individual DRUPS and connectingthe vertical radiators to provide sufficient cooling air.

UPS room after installation MV Switch panels and controls

Page 2: Ril - Idc - Case Study

Hitec solution• Tier IV system• N+N system• Mitsubishi diesel engines, type S16R-PTA (16 cylinders)• Hitec Power Protection Induction Couplings• AVK alternators• 4 units x 1500 kVA• Cross Link System• 26 kV Medium Voltage switchgear• Medium Voltage (MV) application, 11kV at 50 Hz• Turnkey project with Hi-Rel – Hitec partner in India

- Project management & engineering- MV power & control cabling- Exhaust system (30m high)- Water cooling diesel engines with vertical radiators- Connection of vertical radiators- Fuel systems with daily 990l fuel day tank- UPS room ventilation

Off loading Chimney installation(30 meters)

Completed piping, flues and power cabling

Key partners involved

www.ril.com www.hirel.net

Equipment Design Engineers (Project Consultants) Discover the power of oursystems!To stay informed about latestdevelopments, Hitec solutions,services and events please visitour website and subscribe toour news letter.