Right of Way Project Information Sheet - Permit · Right of Way Project Information Sheet - Permit...

1
@SanAntonioTCI UPDATED October 2016 Right of Way Project Information Sheet - Permit # To be submitted when applying for permits for projects with over 50’ of excavation Project Limits Project Title Project Duration Impact to ROW (lane/sidewalk closure(s), street excavation, etc.) Utility Owner Title Phone # E-mail Contractor and Point of Contact Contractor Title E-mail Phone # Contact Name Utility Owner (SAWS, CPS Energy, AT&T, Google, etc.) and Point of Contact Project Scope Council District

Transcript of Right of Way Project Information Sheet - Permit · Right of Way Project Information Sheet - Permit...

Page 1: Right of Way Project Information Sheet - Permit · Right of Way Project Information Sheet - Permit # To be submitted when applying for permits for projects with over 50’ of excavation.

@SanAntonioTCI UPDATED October 2016

Right of Way Project Information Sheet - Permit #

To be submitted when applying for permits for projects with over 50’ of excavation

Project Limits

Project Title

Project Duration

Impact to ROW (lane/sidewalk closure(s), street excavation, etc.)

Utility Owner

Title

Phone # E-mail

Contractor and Point of Contact

Contractor

Title

E-mailPhone #

Contact Name

Utility Owner (SAWS, CPS Energy, AT&T, Google, etc.) and Point of Contact

Project Scope

Council District

framartinez
Text Box
[email protected] / Frances Martinez@ saws.org