presented by Rick Ferrin JAXPORT Executive Director Sept. 29, 2008 Talleyrand Marine Terminal – Berth 3 Project

Transcript of Rick Ferrin JAXPORT Executive Director Sept. 29, 2008 · 2008. 10. 7. · Rick Ferrin JAXPORT...

  • presented by

    Rick FerrinJAXPORT Executive Director

    Sept. 29, 2008

    Talleyrand Marine Terminal – Berth 3 Project

  • Overview

    Sinkhole and asphalt patches along

    Berth 3 at JAXPORT’s 173-acre

    Talleyrand Terminal

  • Existing Berth 3

  • Project Challenges

    Avoid complete demolition of the berth

    Allow Southeast Toyota to continue to import cars across the dock

  • Design of new Berth 3

  • TIME: 0START Phase 1RELOCATE SHIP NORTHWARD

    BERTH 3: 700’ +/-

    END OF MONTH 3FINISH PHASE 1 & START PHASE 2RELOCATE SHIP TO NORMAL POSITION

    EXISTING DOCKSHIP AT NORMAL POSITION

    BERTH 4BERTH 3 (TOYOTA)START

    PHASE 1PHASE 1

    COMPLETESTART

    PHASE 2PHASE 2

    COMPLETESTART

    PHASE 3PHASE 3

    COMPLETESTART

    PHASE 4PHASE 4

    COMPLETE

    END OF MONTH 6FINISH PHASE 2 & START PHASE 3RELOCATE SHIP NORTHWARD

    END OF MONTH 9FINISH PHASE 3 & START PHASE 4RELOCATE SHIP TO NORMAL POSITION

    END OF MONTH 12FINISH PHASE 4 (PROJECT COMPLETE)SHIP STAYS AT NORMAL POSITION