RH5a RH6a RH1a RH2a RH7a Rogers House The building is a two-story structure typical of many houses...
-
Upload
christina-marian-neal -
Category
Documents
-
view
214 -
download
0
Transcript of RH5a RH6a RH1a RH2a RH7a Rogers House The building is a two-story structure typical of many houses...
RH5a
RH6a
RH1a
RH2a
RH7a
Rogers House
The building is a two-story structure typical of many houses throughout Campus. It was built in the early 1920’s and moved to the current site in 2006. The building houses Campus office space and is operated during normal office hours.
Rogers House
QUD-3
QUD-7
QUD-1
QUD-5
QUD-4 QUD-6
QUD-8
Outer Quad Building
The building is an older masonry faced structure outside the main Quad. It is a stand alone structure that sits on a small hill above the main Quad. The building houses offices and classrooms as well as mechanical engineering laboratories. There may be hazardous chemicals within. It is occupied by students and faculty nearly full time throughout the year.
Outer Quad Building
FOR-5
FOR-7
FOR-3
FOR-1 FOR-4
FOR-6
Forsythe Parking Structure
The building is a multi-level structure. It was built in the 1980’s and serves as a parking structure.
Forsythe Parking Structure
MOB-3
MOB-4
MOB-2MOB-1
MOB-5
Medical School Office Building
This building houses Medical School administrative offices. It is a three story structure that appears to be new, built within the past fifteen years. The exterior siding appears to be cementitious. The walls are punctuated by large windows.
Medical School Office Building
OU - 1
Old Union
The building is a multi-story concrete structure built in the late 1920’s. It has a full arcade in the front surrounding a large courtyard. There are two tall towers flanking the main entrance. The building houses Campus student administrative services and is occupied during office hours year-around.
OU - 3OU - 2
OU - 4
OU - 5
Old Union
EV5 - 1
Escondido Village EV 5
The building is a four-story building, built in early 2000's It is a student residence occupied 24/7
EV5 - 2 EV5 - 3
EV5 - 4 EV5 - 5
EV5
DUR-1
Durand
The building is a four-story concrete frame structure built in the late 1960’s. The building houses classroom, laboratory and office space and is operated during normal office hours.
DUR-5
DUR-4
DUR-3
DUR-2
Durand
AOERC-1
AOERC
The building is a two-story building with a basement, built in 2014. It is a student sports complex consisting of large gymnasium spaces in the basement and first floors and office space in the second floor. The basement is exposed on one side. It is occupied until late in the evening most days.
AOERC-2 AOERC-3
AOERC-4
AOERC-5 AOERC-6
AOERC