Rgppl Marine Process Flow

download Rgppl Marine Process Flow

of 5

Transcript of Rgppl Marine Process Flow

  • 7/31/2019 Rgppl Marine Process Flow

    1/5

    RATNAGIRI GAS AND POWER PVT. LTD. (A Joint Venture of GAIL & NTPC), A/P-Anjanwel, Tal - Guhagar, Dist Ratnagiri, Maharashtra - 415 703

    LNG UNLOADING AT RGPPL TERMINAL:

    PROCESS FLOW

  • 7/31/2019 Rgppl Marine Process Flow

    2/5

    ARRIVAL LNG TRANSFER DEPARTURE

  • 7/31/2019 Rgppl Marine Process Flow

    3/5

    ARRIVAL LNG TRANSFER DEPARTURE

  • 7/31/2019 Rgppl Marine Process Flow

    4/5

    0000 0100 0200 0800 1615 1630 1700 1715 1730 1800 .. 06.00 07.00 08.00 09.00 10.00

    ARRIVAL OFSHIP

    NOTICE OF READINESS(NOR)

    BY SHIP TO RGPPL

    ACCEPTENCE OF NOR BYRGPPL

    BERTHING OFLNGC / All Fast

    SHIPS LEFTRGPPL LIMIT,

    pilot Disembark

    FINISH WITH ENGINE / STEAMCUT TO M/E

    START OF DISCHARGE

    PRE-DISCHARGEMEETINGS

    ARMS CONNECTED

    1ST RAMP UP

    LAST RAMP DOWN

    ARMS

    DISCOUNNECTING

    PILOT ON BOAD / TryManeuver Open sea

    STAND BY NOTICE BYRGPPL TO SHIP

    PILOT ON BOAD

    CARGO MEASUREMENT

    CSTM

    GANGWAYLOWARED /

    CUSTOM

    OFFICIALS BOARDLNGC

    CUSTOMCLERENCE

    PILOT ONBOAD/ESCORT OF

    LNGC

    ARRIVAL LNG TRANSFER DEPARTURE

  • 7/31/2019 Rgppl Marine Process Flow

    5/5

    RATNAGIRI GAS AND POWER PVT. LTD. (A Joint Venture of GAIL & NTPC), A/P-Anjanwel, Tal - Guhagar, Dist Ratnagiri, Maharashtra - 415 703

    WISHING A SAFE AND SECURE

    COMMISSIONING OF INDIAS FIRST

    INTEGRATED LNG CUM POWER PROJECT !

    THANK YOU