Safe harbor Neither the information nor any opinion expressed in this presentation constitutes an offer, or invitation to make an offer, or to buy any security issued by the company. This presentation contains predictions, estimates or other information regarding the Company's operations which are forward looking in nature. While these forward looking statements represent our best current judgment on what the future holds, they are subject to risks and uncertainties that could cause actual results to differ materially and may involve risk and uncertainty. This presentation is prepared for general purposes only and does not have any regard to the specific investment objectives, financial situation and particular needs of any specific person. No liability for any loss will arise with the company as a result of the action taken on the basis of information contained herein. For a discussion of the risks and uncertainties that may cause results to differ, you should review GTL’s filings with stock exchanges, including the annual report and quarterly disclosures. RF RF Optimisation Optimisation

Transcript of RF Optimisation - Welcome to GTL ltd. :: · PDF fileRF optimisation remains one of the key...

  • Safe harbor

    Neither the information nor any opinion expressed in this presentation constitutes an offer, or invitation to make an offer, or to buy any security issued by the company. This presentation contains predictions, estimates or other information regarding the Company's operations which are forward looking in nature. While these forward looking statements represent our best current judgment on what the future holds, they are subject to risks and uncertainties that could cause actual results to differ materially and may involve risk and uncertainty. This presentation is prepared for general purposes only and does not have any regard to the specific investment objectives, financial situation and particular needs of any specific person. No liability for any loss will arise with the company as a result of the action taken on the basis of information contained herein.

    For a discussion of the risks and uncertainties that may cause results to differ, you should review GTLs filings with stock exchanges, including the annual report and quarterly disclosures.

    RF RF OptimisationOptimisation

  • Network Planning, Design & OptimisationCore Offerings

    2

  • Imperatives for Optimisation

    3

    RF optimisation remains one of the key challenges in any network.

    Identifying potential faults in the network and resolving them before they affect network performance.

    Rectifying causes of faults affecting network performance.

    Leads to efficient use of the spectrum.

  • Optimisation Overview

    4

  • Need for optimisation

    Perceived reduction in network quality.

    Maximising the use of existing infrastructure.

    Introduction of new services.

    Indications from network performance monitoring.

    Subscriber's experience of using the network.

    Operators wants to ensure the best returns on investment.

    Maximise existing resources to accommodate new services such as GPRS.

    Flawed original design in format.

    Original design information has changed.

    Change in original design parameters.

    Network issues that may generate a requirement

    5

  • Network Lifecycle

    Network

    Rollout

    Network

    Planning

    Licence

    Award

    Continuous Optimisation

    Pre Launch

    Optimisation

    Network Lifecycle

    Swap Management

    (If required)

    6

  • RF Optimisation

    7

    SwapManagement

    - BTS upgrade

    - BTS re-homing

    - BSC re-parenting

    - Transmission Re-engineering

    (If required)

    Pre Launch Optimisation

    Continuous Optimisation

    Virtual Optimisation Centre

    Virtual Optimisation Centre

  • Pre Launch Optimisation

    8

    Objectives

    High rate of integrations

    Low traffic (Pre-launch or launch)

    Predominantly drive data dependant

    Pre Launch

    Optimisation

    Continuous Optimisation

    Swap Management

  • Optimisation Process Single site verification

    9

    RF Site Audit

    Coverage Verification

    Parameter verification

    Reconfiguration

    Problem Analysis

    Fail

    PassSite

    Acceptance

    Site IdentificationPre Launch

    Optimisation

    Continuous Optimisation

    Swap Management

  • Optimisation Process Drive Test Based

    10

    ClusterStimulation

    Site Identification

    ClusterPreparation

    Drive Test

    Data Analysis Reconfiguration

    Problem Analysis

    Site Acceptance

    Fail

    PassCluster Analysis

    Cluster IdentificationPre Launch

    Optimisation

    Continuous Optimisation

    Swap Management

  • Cluster Analysis

    OMC Data

    Drive Test Results

    SimulationData

    Determine clusters for acceptance

    Characterise performance

    Ensure correct site configuration

    Drive tests

    Process data

    Analysis

    Remodelling

    Reconfiguration

    Parameter Setting Neighbors Powered Stable

    Call statistics Key measurement events Neighbor analysisKey measurement data

    Parameters Neighbors Report Hardware Requirements

    11

  • Cluster Reconfiguration

    12

    HardwareHardware

    OptimisationOptimisation

    Antenna Reorientation

    Antenna Down tilt

    Antenna Relocation

    Antenna Height adjustment

    Masthead Amplifiers

    Cell parameter Cell parameter

    optimisationoptimisation

    Handover parameters

    Power planning

    Neighbour list reconfiguration

    Frequency planning

    Performance Monitoring

    Pre Launch

    Optimisation

    Swap Management

    Continuous Optimisation

  • Pre Launch Optimization

    13

    Parameter Analysis

    Process Creation

    KPI Definition

    KPI Reporting

    Training

    Functionality

    Asses

    Config Management

    Cluster

    Preparation

    Drive Testing

    Drive Analysis

    Modelling

    Cluster Monitoring

    Model Calibration

    Cluster

    Identification

    Network Reconfigure

    On SiteOff Site

    What GTL can do for you

    Pre Launch

    Optimisation

    Continuous Optimisation

    Swap Management

  • KPIs to be MonitoredBased on performance of a Network & Cell

    Network KPI Target TypeKPI Deciding

    Factor

    Network / Town Level

    CSR (%)

    CSSR (%)

    DCR (%)

    TCH Blocking

    SDCCH

    Blocking

    93%

    95%

    5%

    2%

    3%

    Performance

    Performance

    Performance

    Performance

    Performance

    TBD upon checking trend to maintain the performance of the network

    and to improve

    CSR (%)

    CSSR (%)

    DCR (%)

    TCH Blocking

    SDCCH Blocking

    90%

    92%

    10%

    4%

    6%

    Performance

    Performance

    Performance

    Performance

    Performance

    TBD upon checking trend to maintain the performance of the network

    and to improve

    Cell Level

    (TBD : To Be Decided)

    14

  • KPIs to be MonitoredBased on performance of a Network & Cell

    Network KPI Target TypeKPI Deciding

    Factor

    Network / Town Level

    Downlink Rx Qual

    Uplink Rx Qual

    FER

    Data Through

    output

    Data

    Accessibility

    TBA

    TBA

    TBA

    TBA

    TBA

    Performance

    Performance

    Performance

    Performance

    Performance

    TBD upon checking trend to maintain the performance of the network

    and to improve

    Downlink Rx Qual

    Uplink Rx Qual

    FER

    Data Through

    output

    Data Accessibility

    Performance

    Performance

    Performance

    Performance

    Performance

    TBD upon checking trend to maintain the performance of the network

    and to improve

    Cell Level

    (TBA : To Be Accepted)

    15

    TBA

    TBA

    TBA

    TBA

    TBA

  • Reports

    Pre Launch Optimization

    Cell / Cluster Drive Test and Analysis Report.

    Quality issues identification and RX lev, RX Qual, TCH Blocking,SDCCH Drop,HO Issues, Call drop problems, and call set up issues analysis.

    RF parameters audit and tuning : neighbour site list, power

    parameters, HO parameters, etc.

    Cell / Cluster Optimisation Report.

    Antenna engineering tuning.

    Deliverables

    Cell / cluster Optimisation and tuning to reach acceptance criteria.

    Pre Launch

    Optimisation

    Continuous Optimisation

    Swap Management

    16

  • Reports

    Network Analysis and Optimisation Report.

    Cell, cluster, Network drive test reports from post processing tool.

    RF coverage and quality assessment report.

    Radio and system Parameters audit and tuning report.

    Optimisation Report.

    Acceptance Report.

    Interference Measurement.

    Updated network site database.

    Traffic Statistics Analysis Report.

    Pre Launch

    Optimisation

    Continuous Optimisation

    Swap Management

    17

  • Continuous Optimisation

    18

    Objectives

    Minimisation of integration Issues

    Maintaining the traffic rate within medium to low

    To achieve more stability in neighbour/ pilot

    Reducing operational cost

    Predominantly OMC R Stats and Counters

    Pre Launch

    Optimisation

    Continuous Optimisation

    Swap Management

  • Continuous Optimisation

    19

    Network Performance

    Targets

    Performance

    Customer Faults Trouble Tickets

    CM Data Call Trace

    Drive Test Results Alarms

    Service Level OMC

    Status

    Fault Resolution

    Cell

    Prioritisation

    ReportsFault

    Pre Launch

    Optimisation

    Continuous Optimisation

    Swap Management

  • Optimisation Process Drive Test Based

    20

    Pre Launch

    Optimisation

    Continuous Optimisation

    Swap Management

    Characterise performance

    Ensure correct site configuration

    Drive tests

    Process data

    Analysis

    Remodelling

    Reconfiguration

    Parameter Setting Neighbors Powered Stable

    Call statistics Key measurement events Neighbor analysisKey measurement data

    Determine clusters for acceptance

    Parameters Neighbors Report Hardware Requirements

  • Cluster Reconfiguration

    21

    HardwareHardware

    OptimisationOptimisation

    Antenna Reorientation

    Antenna Down tilt

    Antenna Relocation

    Antenna Height adjustment

    Masthead Amplifiers

    Cell parameter Cell parameter

    optimisationoptimisation

    Handover parameters

    Power planning

    Neighbour list reconfiguration